SOLICITATION NO. W912ES-15-B-0008
OPERATION AND MAINTENANCE
MISSISSIPPI RIVER, POOL 4
RIVER MILE 762
WABASHA COUNTY, MN
CONSTRUCTION
DOCUMENTS FOR
WABASHA GRAVEL PIT DREDGE SITE
UNLOADING
June 18, 2014
US Army Corps of Engineers St. Paul District
WABASHA GRAVEL PIT DREDGE SITE UNLOADING
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 00 SOLICITATION CONTRACT FORM
00 10 00 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
00 60 00 REPRESENTATIONS & CERTIFICATIONS
00 70 00 CONTRACT CLAUSES
00 80 00 SPECIAL CONTRACT REQUIREMENTS
WAGE RATES
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 13 GENERAL
01 14 00.00 13 WORK RESTRICTIONS
01 22 00.00 10 MEASUREMENT AND PAYMENT
01 32 01.00 13 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 02.00 10 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 13 CONTRACTOR QUALITY CONTROL
01 50 02.00 13 TEMPORARY CONSTRUCTION FACILITIES
01 57 20.00 13 ENVIRONMENTAL PROTECTION
01 71 23.05 13 CONTRACTOR SURVEYS
01 78 02.00 10 CLOSEOUT SUBMITTALS
DIVISION 31 – EARTHWORK
31 00 00.00 13 EARTHWORK
-- End of Project Table of Contents --
W81G6750904300
Wabasha Gravel Pit Dredge Site Unloading, Wabasha County, MN.
Work involves transferring stockpiled dredge material from the Wabasha Gravel Pit to the Wabasha Sand and Gravel Pit # 2. This procurement is a total small business set-aside and w ill result in a f irm-fixed-price contract consisting of a Base and one (1) Option. The estimated price for the Base is betw een $500,000 and $1,000,000. The appropriate NAICS code for this procurement is 238910 w ith a small business size standard of $15,000,000.
X
JUSTIN H ROSE 651-290-5422
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Jul-2015
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10ALT1
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________04 Aug 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 5TH STREET EAST
SUITE 700
ST. PAUL MN 55101-1678
W912ES
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912ES-15-B-0008 168
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Table of Contents
SECTION 00 01 00 SOLICITATION CONTRACT FORM
NOTES TO BIDDERS
PRICING SCHEDULE
SECTION 00 10 00 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
52.204 16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (NOV 2014)
52.204 19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
52.209 4001 BIDDER'S QUALIFICATIONS (APR 1984) FAR 9.105 1
52.214 3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
52.214 4 FALSE STATEMENTS IN BIDS (APR 1984)
52.214 5 SUBMISSIONOF BIDS (MAR 1997)
52.214 6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
52.214 7 LATE SUBMISSIONS,MODIFICATIONS, ANDWITHDRAWALS OF BIDS (NOV 1999)
52.214 18 PREPARATIONOF BIDS CONSTRUCTION (APR 1984)
52.214 19 CONTRACT AWARD SEALED BIDDING CONSTRUCTION (AUG 1996)
52.214 34 SUBMISSIONOF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
52.214 35 SUBMISSIONOF OFFERS IN U.S. CURRENCY (APR 1991)
52.214 4001 INQUIRIES BID INFORMATION
52.214 4002 ALL OR NONEQUALIFICATIONS (FEB 2011) FAR 14.404 5
52.216 1 TYPE OF CONTRACT (APR 1984)
52.217 5 EVALUATIONOF OPTIONS (JUL 1990)
52.222 5 CONSTRUCTION WAGE RATE REQUIREMENTS SECONDARY SITE OF THEWORK (MAY 2014)
52.222 23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
52.225 10 NOTICE OF BUY AMERICAN REQUIREMENT CONSTRUCTIONMATERIALS (MAY 2014) ALTERNATE I
(MAY 2014)
52.233 2 SERVICE OF PROTEST (SEP 2006)
52.236 27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
52.252 1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
52.252 5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
SECTION 00 60 00 REPRESENTATIONS & CERTIFICATIONS
52.204 8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
52.209 7 INFORMATION REGARDING RESPONSIBILITYMATTERS (JULY 2013)
252.203 7005 REPRESENTATION RELATING TO COMPENSATIONOF FORMER DODOFFICIALS (NOV 2011)
252.203 7998 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS—REPRESENTATION (DEVIATION 2015 O0010) (FEB 2015)
252.209 7992 REPRESENTATION BY CORPORATIONS REGARDING ANUNPAID DELINQUENT TAX LIABILITY OR A FELONY CONVICTIONUNDER ANY FEDERAL LAW—FISCAL YEAR 2015 APPROPRIATIONS (DEVIATION 2015
OO0005) (DEC 2014)
SECTION 00 70 00 CONTRACT CLAUSES
52.203 3 GRATUITIES (APR 1984)
52.203 5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203 6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
52.203 7 ANTI KICKBACK PROCEDURES. (MAY 2014)
52.203 8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203 10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203 12 LIMITATIONON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
52.203 17 CONTRACTOR EMPLOYEEWHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
52.204 4 PRINTED OR COPIED DOUBLE SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)
52.204 7 SYSTEM FOR AWARDMANAGEMENT (JULY 2013)
52.204 10 REPORTING EXECUTIVE COMPENSATION AND FIRST TIER SUBCONTRACT AWARDS (JULY 2013)
52.204 13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)
52.204 18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (NOV 2014)
52.209 6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)
52.209 9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITYMATTERS (JULY 2013) 47
52.209 10 PROHIBITION ON CONTRACTINGWITH INVERTED DOMESTIC CORPORATIONS. (DEC 2014)
52.211 10 COMMENCEMENT, PROSECUTION, AND COMPLETIONOFWORK (APR 1984) ALTERNATE I (APR 1984)
52.211 12 LIQUIDATED DAMAGES CONSTRUCTION (SEP 2000)
52.211 18 VARIATION IN ESTIMATEDQUANTITY (APR 1984)
52.214 26 AUDIT AND RECORDS SEALED BIDDING (OCT 2010)
52.214 27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA MODIFICATIONS SEALED
BIDDING. (AUG 2011)
52.214 28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA MODIFICATIONS SEALED BIDDING. (OCT 2010)
52.219 6 NOTICE OF TOTAL SMALL BUSINESS SET ASIDE (NOV 2011)
52.219 8 UTILIZATIONOF SMALL BUSINESS CONCERNS (OCT 2014)
52.219 14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
52.219 28 POST AWARD SMALL BUSINESS PROGRAMREREPRESENTATION (JULY 2013)
52.222 3 CONVICT LABOR (JUN 2003)
52.222 4 CONTRACT WORK HOURS AND SAFETY STANDARDS OVERTIME COMPENSATION. (MAY 2014)
52.222 6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)
52.222 7 WITHHOLDINGOF FUNDS (MAY 2014)
52.222 8 PAYROLLS AND BASIC RECORDS (MAY 2014)
52.222 9 APPRENTICES AND TRAINEES (JUL 2005)
52.222 10 COMPLIANCEWITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222 11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222 12 CONTRACT TERMINATION DEBARMENT (MAY 2014)
52.222 13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY 2014)
52.222 14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222 15 CERTIFICATIONOF ELIGIBILITY (MAY 2014)
52.222 21 PROHIBITIONOF SEGREGATED FACILITIES (APR 2015)
52.222 26 EQUAL OPPORTUNITY (APR 2015)
52.222 27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015)
52.222 30 CONSTRUCTION WAGE RATE REQUIREMENTS PRICE ADJUSTMENT (NONEOR SEPARATELY
SPECIFIEDMETHOD) (MAY 2014)
52.222 35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014)
52.222 36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
52.222 37 EMPLOYMENT REPORTS ON VETERANS (JULY 2014)
52.222 40 NOTIFICATIONOF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
52.222 50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
52.222 54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)
52.222 55 MINIMUMWAGES UNDER EXECUTIVE ORDER 13658 (DEC 2014)
52.223 6 DRUG FREEWORKPLACE (MAY 2001)
52.223 9 ESTIMATE OF PERCENTAGE OF RECOVEREDMATERIAL CONTENT FOR EPA DESIGNATED ITEMS (MAY 2008)
52.223 17 AFFIRMATIVE PROCUREMENTOF EPA DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION
CONTRACTS (MAY 2008)
52.223 18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXTMESSAGINGWHILE DRIVING (AUG 2011)
52.225 9 BUY AMERICAN—CONSTRUCTIONMATERIALS (MAY 2014)
52.225 13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
52.227 1 AUTHORIZATION AND CONSENT (DEC 2007)
52.227 2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)
52.227 4 PATENT INDEMNITY CONSTRUCTION CONTRACTS (DEC 2007)
52.228 1 BID GUARANTEE (SEP 1996)
52.228 2 ADDITIONAL BOND SECURITY (OCT 1997)
52.228 5 INSURANCE WORKONAGOVERNMENT INSTALLATION (JAN 1997)
52.228 11 PLEDGES OF ASSETS (JAN 2012)
52.228 12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)
52.228 14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
52.228 15 PERFORMANCE AND PAYMENT BONDS CONSTRUCTION (OCT 2010)
52.229 3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.232 5 PAYMENTS UNDER FIXED PRICE CONSTRUCTION CONTRACTS (MAY 2014)
52.232 17 INTEREST (MAY 2014)
52.232 23 ASSIGNMENTOF CLAIMS (MAY 2 14) ALTERNATE I (APR 1984)
52.232 27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)
52.232 33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (JULY 2013) 114
52.232 39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232 40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
52.233 1 DISPUTES. (MAY 2014)
52.233 3 PROTEST AFTER AWARD (AUG. 1996)
52.233 4 APPLICABLE LAW FOR BREACHOF CONTRACT CLAIM (OCT 2004)
52.236 2 DIFFERING SITE CONDITIONS (APR 1984)
52.236 3 SITE INVESTIGATION AND CONDITIONS AFFECTING THEWORK (APR 1984)
52.236 4 PHYSICAL DATA (APR 1984)
52.236 5 MATERIAL ANDWORKMANSHIP (APR 1984)
52.236 6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236 7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236 8 OTHER CONTRACTS (APR 1984)
52.236 9 PROTECTIONOF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
(APR 1984)
52.236 10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236 11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236 12 CLEANINGUP (APR 1984)
52.236 13 ACCIDENT PREVENTION (NOV 1991)
52.236 15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236 16 QUANTITY SURVEYS (APR 1984) ALTERNATE I (APR 1984)
52.236 17 LAYOUTOFWORK (APR 1984)
52.236 21 SPECIFICATIONS ANDDRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE I (APR 1984
52.236 26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.242 13 BANKRUPTCY (JUL 1995)
52.242 14 SUSPENSIONOFWORK (APR 1984)
52.243 4 CHANGES (JUN 2007)
52.244 6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015)
52.246 12 INSPECTIONOF CONSTRUCTION (AUG 1996)
52.248 3 VALUE ENGINEERING CONSTRUCTION (OCT 2010)
52.249 2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (APR 2012) ALTERNATE I
(SEP 1996)
52.249 10 DEFAULT (FIXED PRICE CONSTRUCTION) (APR 1984)
52.252 2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.252 6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
52.253 1 COMPUTER GENERATED FORMS (JAN 1991)
252.201 7000 CONTRACTINGOFFICER'S REPRESENTATIVE (DEC 1991)
252.203 7000 REQUIREMENTS RELATING TO COMPENSATIONOF FORMER DODOFFICIALS (SEP 2011)
252.203 7001 PROHIBITIONON PERSONS CONVICTED OF FRAUDOROTHER DEFENSE CONTRACT RELATED
FELONIES (DEC 2008)
252.203 7002 REQUIREMENT TO INFORM EMPLOYEES OFWHISTLEBLOWER RIGHTS (SEP 2013)
252.203 7999 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS (DEVIATION 2015 O0010)(FEB 2015)
252.204 7000 DISCLOSURE OF INFORMATION (AUG 2013)
252.204 7003 CONTROL OF GOVERNMENT PERSONNELWORK PRODUCT (APR 1992)
252.204 7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
252.204 7012 SAFEGUARDINGOF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION (NOV 2013)
252.209 7004 SUBCONTRACTINGWITH FIRMS THAT ARE OWNEDOR CONTROLLED BY THE GOVERNMENTOF A
COUNTRY THAT IS A STATE SPONSOROF TERRORISM (DEC 2014)
252.223 7004 DRUG FREEWORK FORCE (SEP 1988)
252.223 7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
252.225 7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)
252.225 7048 EXPORT CONTROLLED ITEMS (JUNE 2013)
252.227 7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
252.232 7003 ELECTRONIC SUBMISSIONOF PAYMENT REQUESTS AND RECEIVING REPORTS (JUNE 2012)
252.232 7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
252.236 7000 MODIFICATION PROPOSALS PRICE BREAKDOWN. (DEC 1991)
252.236 7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
252.236 7002 OBSTRUCTIONOF NAVIGABLEWATERWAYS. (DEC 1991)
252.236 7008 CONTRACT PRICES BIDDING SCHEDULES. (DEC 1991)
252.242 7006 ACCOUNTING SYSTEMADMINISTRATION (FEB 2012)
252.243 7001 PRICINGOF CONTRACTMODIFICATIONS (DEC 1991)
252.243 7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
252.244 7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)
252.247 7023 TRANSPORTATIONOF SUPPLIES BY SEA (APR 2014)
252.247 7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR 2000)
SECTION 00 80 0 SPECIAL CONTRACT REQUIREMENTS
52.000 4004 PARTNERING
52.212 4003 TIME EXTENSIONS FOR UNUSUALLY SEVEREWEATHER (OCT 1989) ER 415 1 15
52.217 4000 OPTION FOR ADDITIONALWORK (CONSTRUCTION) (AUG 2000)
52.228 4002 INSURANCE
52.228 4022 REQUIREMENT FOR BID GUARANTEE (FAR 28.101 2)
52.232 4004 INVOICE PROCEDURES
52.236 4005 UNAVAILABILITY OF UTILITY SERVICES
52.236 4006 SAFETY ANDHEALTH REQUIREMENTSMANUAL INTERIM CHANGES, EM 385 1 1 (MAR 2015) 169
52.236 4014 PURCHASE ORDERS
52.249 5000 BASIS FOR SETTLEMENTOF PROPOSALS
AT/OPSEC 15: PRE SCREEN CANDIDATES USING E VERIFY PROGRAM
MVP 0002 APPARENT CLERICALMISTAKES
MVP 0003 EQUIPMENTOWNERSHIP ANDOPERATING EXPENSE SCHEDULE
WAGE RATEMN101
Section 00 01 00 Solicitation Contract Form
NOTES TO BIDDERS
Base Bid Item Description Quantity Unit Unit Price Amount
Option 1 Item Description Quantity Unit Unit Price Amount
TOTAL BID (BASE AND OPTION)
BIDDING SCHEDULE
W912ES-15-B-0008
Wabasha Gravel Pit Dredge Site Unloading
Section 00 10 00 Bidding Schedule/Instructions to Bidders
52.204 16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
(NOV 2014)
52.204 19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
52.209 4001 BIDDER'S QUALIFICATIONS (APR 1984) FAR 9.105 1
52.214 3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
52.214 4 FALSE STATEMENTS IN BIDS (APR 1984)
52.214 5 SUBMISSION OF BIDS (MAR 1997)
52.214 6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
52.214 7 LATE SUBMISSIONS, MODIFICATIONS, ANDWITHDRAWALS OF
BIDS (NOV 1999)
52.214 18 PREPARATION OF BIDS CONSTRUCTION (APR 1984)
52.214 19 CONTRACT AWARD SEALED BIDDING CONSTRUCTION (AUG
1996)
52.214 34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR
1991)
52.214 35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
52.214 4001 INQUIRIES BID INFORMATION
Managing Agency: USACE Solicitation Number: W912ES-15-B-0008 Bidder Inquiry Key: VJIJ42-K666M5
52.214 4002 ALL OR NONE QUALIFICATIONS (FEB 2011) FAR 14.404 5
52.216 1 TYPE OF CONTRACT (APR 1984)
52.217 5 EVALUATION OF OPTIONS (JUL 1990)
52.222 5 CONSTRUCTIONWAGE RATE REQUIREMENTS SECONDARY SITE
OF THEWORK (MAY 2014)
s,
52.222 23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB
1999)
52.225 10 NOTICE OF BUY AMERICAN REQUIREMENT CONSTRUCTION
MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)
52.233 2 SERVICE OF PROTEST (SEP 2006)
52.236 27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB
1995)
52.252 1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
(FEB 1998)
52.252 5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
Section 00 60 00 Representations & Certifications
52.204 8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
[Contracting Officer check as appropriate.]
[offeror to insert changes, identifying change by provision number, title, date]
52.209 7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY
2013)
252.203 7005 REPRESENTATION RELATING TO COMPENSATION OF
FORMER DOD OFFICIALS (NOV 2011)
252.203 7998 PROHIBITION ON CONTRACTINGWITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—
REPRESENTATION (DEVIATION 2015 O0010) (FEB 2015)
252.209 7992 REPRESENTATION BY CORPORATIONS REGARDING AN
UNPAID DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER
ANY FEDERAL LAW—FISCAL YEAR 2015 APPROPRIATIONS (DEVIATION
2015 OO0005) (DEC 2014)
Section 00 70 00 Contract Clauses
52.202-1 DEFINITIONS (NOV 2013)
52.203 3 GRATUITIES (APR 1984)
52.203 5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203 6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (SEP 2006)
52.203 7 ANTI KICKBACK PROCEDURES. (MAY 2014)
52.203 8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203 10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014)
52.203 12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2010)
52.203 17 CONTRACTOR EMPLOYEEWHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM
52.204 4 PRINTED OR COPIED DOUBLE SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
52.204 7 SYSTEM FOR AWARDMANAGEMENT (JULY 2013)
52.204 10 REPORTING EXECUTIVE COMPENSATION AND FIRST TIER
SUBCONTRACT AWARDS (JULY 2013)
52.204 13 SYSTEM FOR AWARDMANAGEMENTMAINTENANCE (JULY
52.204 18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(NOV 2014)
52.209 6 PROTECTING THE GOVERNMENT'S INTERESTWHEN
SUBCONTRACTINGWITH CONTRACTORS DEBARRED, SUSPENDED, OR
PROPOSED FOR DEBARMENT (AUG 2013)
52.209 9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (JULY 2013)
52.209 10 Prohibition on Contracting With Inverted Domestic Corporations. (DEC 2014)
52.211 10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
52.211 12 LIQUIDATED DAMAGES CONSTRUCTION (SEP 2000)
52.211 18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
52.214 26 AUDIT AND RECORDS SEALED BIDDING (OCT 2010)
52.214 27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR
PRICING DATA MODIFICATIONS SEALED BIDDING. (AUG 2011)
52.214 28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA
MODIFICATIONS SEALED BIDDING. (OCT 2010)
52.219 6 NOTICE OF TOTAL SMALL BUSINESS SET ASIDE (NOV 2011)
acquisition
52.219 8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)
52.219 14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
52.219 28 POST AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JULY 2013)
52.222 3 CONVICT LABOR (JUN 2003)
regulations
52.222 4 CONTRACTWORK HOURS AND SAFETY STANDARDS
OVERTIME COMPENSATION. (MAY 2014)
52.222 6 CONSTRUCTIONWAGE RATE REQUIREMENTS (MAY 2014)
The primary site of the work
The secondary site of the work, if any
52.222 7 WITHHOLDING OF FUNDS (MAY 2014)
52.222 8 PAYROLLS AND BASIC RECORDS (MAY 2014)
52.222 9 APPRENTICES AND TRAINEES (JUL 2005)
52.222 10 COMPLIANCEWITH COPELAND ACT REQUIREMENTS (FEB
1988)
52.222 11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222 12 CONTRACT TERMINATION DEBARMENT (MAY 2014)
52.222 13 COMPLIANCEWITH CONSTRUCTIONWAGE RATE
REQUIREMENTS AND RELATED REGULATIONS (MAY 2014)
52.222 14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222 15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
52.222 21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
52.222 26 EQUAL OPPORTUNITY (APR 2015)
52.222 27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION (APR 2015)
52.222 30 CONSTRUCTIONWAGE RATE REQUIREMENTS PRICE
ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD) (MAY 2014)
52.222 35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014)
52.222 36 EQUAL OPPORTUNITY FORWORKERSWITH DISABILITIES
(JUL 2014)
52.222 37 EMPLOYMENT REPORTS ON VETERANS (JULY 2014)
52.222 40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (DEC 2010)
52.222 50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
52.222 54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)
52.222 55 MINIMUMWAGES UNDER EXECUTIVE ORDER 13658 (DEC 2014)
52.223 6 DRUG FREEWORKPLACE (MAY 2001)
52.223 9 ESTIMATE OF PERCENTAGE OF RECOVEREDMATERIAL
CONTENT FOR EPA DESIGNATED ITEMS (MAY 2008)
52.223 17 AFFIRMATIVE PROCUREMENT OF EPA DESIGNATED ITEMS IN
SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)
52.223 18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGINGWHILE DRIVING (AUG 2011)
52.225 9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
52.225 13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
52.227 1 AUTHORIZATION AND CONSENT (DEC 2007)
52.227 2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (DEC 2007)
52.227 4 PATENT INDEMNITY CONSTRUCTION CONTRACTS (DEC 2007)
52.228 1 BID GUARANTEE (SEP 1996)
52.228 2 ADDITIONAL BOND SECURITY (OCT 1997)
52.228 5 INSURANCE WORK ON A GOVERNMENT INSTALLATION (JAN
1997)
52.228 11 PLEDGES OF ASSETS (JAN 2012)
52.228 12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS.
(MAY 2014)
52.228 14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
52.228 15 PERFORMANCE AND PAYMENT BONDS CONSTRUCTION (OCT
2010)
52.229 3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.232 5 PAYMENTS UNDER FIXED PRICE CONSTRUCTION CONTRACTS
(MAY 2014)
52.232 17 INTEREST (MAY 2014)
52.232 23 ASSIGNMENT OF CLAIMS (MAY 2 14) ALTERNATE I (APR
1984)
52.232 27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY
2014)
52.232 33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR
AWARDMANAGEMENT (JULY 2013)
52.232 39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN
52.232 40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
52.233 1 DISPUTES. (MAY 2014)
52.233 3 PROTEST AFTER AWARD (AUG. 1996)
52.233 4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT
2004)
52.236 2 DIFFERING SITE CONDITIONS (APR 1984)
52.236 3 SITE INVESTIGATION AND CONDITIONS AFFECTING THEWORK
(APR 1984)
52.236 4 PHYSICAL DATA (APR 1984)
52.236 5 MATERIAL ANDWORKMANSHIP (APR 1984)
52.236 6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236 7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236 8 OTHER CONTRACTS (APR 1984)
52.236 9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
52.236 10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236 11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236 12 CLEANING UP (APR 1984)
52.236 13 ACCIDENT PREVENTION (NOV 1991)
52.236 15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236 16 QUANTITY SURVEYS (APR 1984) ALTERNATE I (APR 1984)
52.236 17 LAYOUT OFWORK (APR 1984)
52.236 21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB
1997) ALTERNATE I (APR 1984
52.236 26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.242 13 BANKRUPTCY (JUL 1995)
52.242 14 SUSPENSION OFWORK (APR 1984)
52.243 4 CHANGES (JUN 2007)
52.244 6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015)
52.246 12 INSPECTION OF CONSTRUCTION (AUG 1996)
52.248 3 VALUE ENGINEERING CONSTRUCTION (OCT 2010)
52.249 2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED PRICE) (APR 2012) ALTERNATE I (SEP 1996)
52.249 10 DEFAULT (FIXED PRICE CONSTRUCTION) (APR 1984)
52.252 2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.252 6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
52.253 1 COMPUTER GENERATED FORMS (JAN 1991)
252.201 7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
252.203 7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER
DOD OFFICIALS (SEP 2011)
252.203 7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR
OTHER DEFENSE CONTRACT RELATED FELONIES (DEC 2008)
252.203 7002 REQUIREMENT TO INFORM EMPLOYEES OF
WHISTLEBLOWER RIGHTS (SEP 2013)
252.203 7999 PROHIBITION ON CONTRACTINGWITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS
(DEVIATION 2015 O0010)(FEB 2015)
252.204 7000 DISCLOSURE OF INFORMATION (AUG 2013)
252.204 7003 CONTROL OF GOVERNMENT PERSONNELWORK PRODUCT
(APR 1992)
252.204 7004 ALTERNATE A, SYSTEM FOR AWARDMANAGEMENT (FEB
2014)
(a) Definitions. As used in this provision—
“System for Award Management (SAM) database” means the primary Government repository for contractor information required for the conduct of business with the Government.
“Commercial and Government Entity (CAGE) code” means—
(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or
(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an “NCAGE code.”
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR 32.11) for the same parent concern.
“Registered in the System for Award Management (SAM) database” means that—
(1) The contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and Contractor and Government Entity (CAGE) code into the SAM database; and
(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as part of the SAM registration process; and
(4) The Government has marked the record “Active.”
252.204 7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED
TECHNICAL INFORMATION (NOV 2013)
252.209 7004 SUBCONTRACTINGWITH FIRMS THAT ARE OWNED OR
CONTROLLED BY THE GOVERNMENT OF A COUNTRY THAT IS A STATE
SPONSOR OF TERRORISM (DEC 2014)
252.223 7004 DRUG FREEWORK FORCE (SEP 1988)
252.223 7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
252.225 7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES
(FEB 2013)
252.225 7048 EXPORT CONTROLLED ITEMS (JUNE 2013)
252.227 7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
252.232 7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND
RECEIVING REPORTS (JUNE 2012)
252.232 7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
252.236 7000 MODIFICATION PROPOSALS PRICE BREAKDOWN. (DEC
1991)
252.236 7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
252.236 7002 OBSTRUCTION OF NAVIGABLEWATERWAYS. (DEC 1991)
252.236 7008 CONTRACT PRICES BIDDING SCHEDULES. (DEC 1991)
252.242 7006 ACCOUNTING SYSTEM ADMINISTRATION (FEB 2012)
252.243 7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
252.243 7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
252.244 7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)
252.247 7023 TRANSPORTATION OF SUPPLIES BY SEA (APR 2014)
252.247 7024 Notification of Transportation of Supplies by Sea (MAR 2000)
Section 00 80 0 Special Contract Requirements
52.000 4004 PARTNERING
52.212 4003 TIME EXTENSIONS FOR UNUSUALLY SEVEREWEATHER
(OCT 1989) ER 415 1 15
52.217 4000 OPTION FOR ADDITIONALWORK (Construction) (AUG 2000)
52.228 4002 INSURANCE
52.228 4022 REQUIREMENT FOR BID GUARANTEE (FAR 28.101 2)
52.232 4004 INVOICE PROCEDURES
52.236 4005 UNAVAILABILITY OF UTILITY SERVICES
52.236 4006 SAFETY AND HEALTH REQUIREMENTS MANUAL INTERIM
CHANGES, EM 385 1 1 (MAR 2015)
52.236 4014 PURCHASE ORDERS
52.249 5000 BASIS FOR SETTLEMENT OF PROPOSALS
AT/OPSEC 15: Pre screen candidates using E Verify Program.
MVP 0002 APPARENT CLERICAL MISTAKES
MVP 0003 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
WAGE RATE MN101
General Decision Number: MN150101 0 / 2/2015 MN101
Superseded General Decision Number: MN20140101
State: Minnesota
Construction Type: Heavy
Heavy including Water and Sewer Lines
Counties: Dodge, Olmsted and Wabasha Counties in Minnesota.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number
Publication Date
01/02/2015
BRMN0017-007 05/01/2014
WABASHA Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 35.38 16.62
CARP0930-002 05/01/2012
Rates Fringes
CARPENTER........................$ 32.19 15.18
* ELEC0343-008 07/01/2014
Rates Fringes
ELECTRICIAN......................$ 33.47 12%+12.59
ENGI0049-067 05/05/2014
Rates Fringes
OPERATOR: Power Equipment Group 2.....................$ 3 . 17. 0 Group 3.....................$ 17. 0 Group 4.....................$ 17. 0 Group 5.....................$ 17. 0 Group 6.....................$ 26. 17. 0
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 2: Crane with over 135' Boom, excluding jib; Hydraulic Backhoe with shovel-type controls, 3 cubic yards and over;
Grader/Blade finishing earthwork and bituminous.
GROUP 3: Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over; Mechanic; Tandem Scraper; Truck Crane; Crawler Crane
GROUP 4: Bituminous Roller 8 tons & over; Crusher/Crushing Plant; Drill Rig; Elevating Grader; Loader over 1 cu yd;
Grader; Pump; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Bulldozer over 50 hp.
GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Loader up to 1 cu yd; Bulldozer 50 hp or less.
ROUP 6: Oiler; Self-Propelled Vibrating Packer 35 hp and over.
CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;
CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM
UNDERGROUND WORK:
UNNELS, SHAFTS, ETC. - $ .25 PREMIUM
UNDER AIR PRESSURE - $ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
IRON0512-041 06/09/2013
Rates Fringes
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 3 2
LABO0405-003 05/01/2014
Rates Fringes
LABORERS
(1) Common or General.......$ 24.08 15.55
(2) Mason Tender Cement/Concrete.............$ 24.28 15.55
(6) Pipe Layer..............$ 26.58 15.55
PLAS0633-029 05/09/2012
DODGE
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.80 17.00
PLAS0633-052 05/01/2012
OLMSTED
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 34.86 7.90
TEAM0160-019 05/01/2014
Rates Fringes
TRUCK DRIVER (DUMP)
1 . 0(1) Articulated Dump Truck..$ 2 .90
(2) 3 Axles/4 Axles; 5 Axles receive $0.30 additional per hour.........$ 2 .35 1 . 0
(3) Tandem Axles; & Single Axles.......................$ 2 .25 1 . 0
SUMN2009-077 09/28/2009
Rates Fringes
LABORER: Landscape..............$ 12.88 4.61
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Wabasha Gravel Pit Dredge Site Unloading.
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 13
GENERAL
PART 1 GENERAL
1.1 ORGANIZATION OF SPECIFICATIONS
1.2 USE OF REFERENCES
1.3 MEASUREMENT AND PAYMENT
PART 2 PRODUCTS
2.1 RECYCLED/RECOVERED MATERIALS
PART 3 EXECUTION
3.1 DISPOSAL OF DEBRIS AND WASTE
3.1.1 Disposal of Solid Construction Debris and Waste
3.2 SCHEDULING
3.2.1 General
3.2.2 Notification
3.3 CONTROL OF DUST
3.4 OTHER CONTRACTS
3.4.1 List other contracts
3.4.2 Other Work
-- End of Section Table of Contents --
SECTION 01 00 00.00 13 Page 1 Jun 18, 2015 W912ES-15-B-0008
SECTION 01 00 00.00 13
GENERAL
PART 1 GENERAL
This project is the removal of dredge sand from Wabasha Gravel Pit and placement into the Wabasha Sand and Gravel Pit #2.
1.1 ORGANIZATION OF SPECIFICATIONS
The specifications which govern the materials and equipment to be furnished and the work to be performed under this contract are listed in the Table of Contents. No attempt has been made in the specifications to segregate work to be performed by any trade, craft, or subcontractor. Any segregation between the trades or crafts shall be solely a matter for agreement between the Contractor, Contractor's employees, and subcontractors.
1.2 USE OF REFERENCES
Reference to the standards, specifications, or codes of any technical society, organization, or association, or local, State, or Federal authority shall mean the specific edition or revision listed.
Various publications are referenced in other sections of the specifications to establish requirements for the work. Any referenced publication is to be used solely for technical requirements. Measurement and payment and any other matters respecting the administration of this contract shall be governed by the terms of this contract without considering any referenced publication. These references are identified in each section by document number, date and title. The addresses, phone numbers, and Internet addresses (if available) for references cited in these specifications are listed in the Unified Facilities Guide Specification: UFGS 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS. The UFGS 01 42 00 is available on the TECHINFO page of the Corps of Engineers Huntsville District Internet site:
http://www.hnc.usace.army.mil/.
1.3 MEASUREMENT AND PAYMENT
The Contractor shall be responsible for the work in this section without any direct compensation being made other than the payment received for contract line items on the bidding schedule.
PART 2 PRODUCTS
2.1 RECYCLED/RECOVERED MATERIALS
Government procurement policy is to acquire, in a cost effective manner, items containing the highest percentage of recycled and recovered materials practicable consistent with maintaining a satisfactory level of competition without adversely affecting performance requirements or exposing suppliers' employees to undue hazards from the recovered materials. The Environmental Protection Agency (EPA) has designated certain items which must contain a specified percent range of recovered or recycled materials. EPA designated products specified in this contract comply with the stated policy and with the EPA guidelines. The Contractor shall make all reasonable efforts to use recycled and recovered materials in providing the EPA designated
SECTION 01 00 00.00 13 Page 2 products and in otherwise utilizing recycled and recovered materials in the execution of the work.
PART 3 EXECUTION
3.1 DISPOSAL OF DEBRIS AND WASTE
The Contractor's attention is directed to Section 01 57 20.00 13 ENVIRONMENTAL PROTECTION and to the following CONTRACT CLAUSES: 52.236-7
PERMITS AND RESPONSIBILITIES; 52.236-9 PROTECTION OF EXISTING VEGETATION,
STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS; 52.236-10 OPERATIONS
AND STORAGE AREAS; and 52.236-12 CLEANING UP. Burning will not be permitted at the project site. Debris and/or waste shall not be left on the site.
3.1.1 Disposal of Solid Construction Debris and Waste
Disposal of Solid Construction Debris and Waste shall consist of removal from the construction site and disposal in compliance with Federal, State, and local requirements for solid waste disposal. Contractor shall select the disposal site with the approval of the Contracting Officer.
3.2 SCHEDULING
3.2.1 General
It shall be the responsibility of the Contractor to schedule and execute the work, incorporating the necessary requirements set forth in these specifications. The Contractor shall develop and submit a schedule in accordance with Section 01 32 01.00 13 PROJECT SCHEDULE and CONTRACT
CLAUSE: 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS.
3.2.2 Notification
The Contractor shall inform the Government in writing within 5 days after receipt of notice to proceed and before work begins as to which hours of the day and days of the week for which work under this contract will be performed. The Contractor shall notify the Government at least 24 hours before work is to be conducted on overtime, in multiple shifts, on weekends, or on Federal government holidays.
3.3 CONTROL OF DUST
The contractor shall control dust and blowing sand during construction operations. Control methods can include but are not limited to: spraying water, applying soil fixatives, seeding, snow fencing or other methods known to reduce windblown sand and dust.
3.4 OTHER CONTRACTS
There are other on-going Government contracts and work in the area of this project. The Contractor shall coordinate their work with the other contractors to prevent delays and interferences with those contracts and with channel dredging. The Contractor shall expect minor delays and rescheduling due to these other contracts and work. The other contracts and work in the area of this project are listed below. These contracts will be considered in accordance to CONTRACT CLAUSE: 52.236-8 OTHER CONTRACTS.
SECTION 01 00 00.00 13 Page 3
3.4.1 List other contracts
(1) Groundwater Monitoring. Contract TBD. Work to begin in Spring of 2016.
(2) Crats Island Dredge Site Unloading W912ES-15-B-0005 to be awarded in the Fall of 2015. Dredge material from Crats Island will be hydraulically placed in the Wabasha Gravel Pit after June 30, 2016.
Preparatory work and installation of the pipeline may occur prior to that date.
3.4.2 Other Work
The Contractor shall contact the other local units of government for work they may have going on in the area and coordinate work and schedules to prevent any delays in this contract.
-- End of Section --
SECTION 01 00 00.00 13 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00.00 13
WORK RESTRICTIONS
05/2012
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
1.2 GROUNDS AND ROADWAYS
1.2.1 Staging Area
1.2.2 Parking
1.2.3 Snow Removal
1.3 BLASTING
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 MAJOR TRAFFIC GENERATOR ORDINANCE
3.2 BENEFICIAL USE
3.3 SCREENING AND PROCESSING
3.4 EXISTING UTILITIES
3.4.1 General
3.4.2 Buried Utilities
3.4.3 Minnesota One Call Excavation Notice System
3.5 COORDINATION WITH XCEL ENERGY
3.6 BANK SWALLOW NESTING DISCOURAGEMENT
3.7 PROTECTION OF TREES
3.7.1 Tree Protection Fence
3.7.2 Restoration of Damaged Trees
-- End of Section Table of Contents --
SECTION 01 14 00.00 13 Page 1
SECTION 01 14 00.00 13
WORK RESTRICTIONS
05/2012
PART 1 GENERAL
1.1 MEASUREMENT AND PAYMENT
The Contractor shall be responsible for the work in this section, without any direct compensation being made other than the payment received for contract items.
1.2 GROUNDS AND ROADWAYS
1.2.1 Staging Area
All staging area locations, access, and operations shall be indicated on the Contractor's Site Plan as required elsewhere in these specifications.
The plan shall include the staging for equipment, supplies, field offices, and parking.
1.2.2 Parking
Contractor parking will be permitted only in the area(s) shown on the Contractor's Site Plan and as approved by the Contracting Officer.
1.2.3 Snow Removal
The Contractor shall be responsible for snow removal in the Contractor's access, work, and parking areas.
1.3 BLASTING
Blasting will not be permitted.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 MAJOR TRAFFIC GENERATOR ORDINANCE
The City of Wabasha may have an ordinance regarding projects that generate major traffic. The bidder shall contact the City of the status of the ordinance and to the applicability of this project. The contractor shall comply with the 52.236-7 Permits and Responsibilities Clause.
3.2 BENEFICIAL USE
The Wabasha Gravel pit is a Beneficial Use Site. The Contractor shall not prohibit the general public from entering the pit and taking sand.
3.3 SCREENING AND PROCESSING
The Contractor shall not screen or process the sand in any manner within the work limits of the Wabasha Gravel Pit.
SECTION 01 14 00.00 13 Page 2
3.4 EXISTING UTILITIES
3.4.1 General
The Contractor shall coordinate all utility relocation requirements and make payment to the utility companies for all services, fees, and permits required to relocate and reestablish service. The Contractor shall be responsible for all costs related to protecting existing utilities.
3.4.2 Buried Utilities
The approximate locations of known existing buried utilities are shown on the drawings to the extent of available information at the time the drawings were prepared. Prior to commencing excavation, the Contractor shall accurately locate all such installations. In the event the Contractor damages any existing utility lines, report thereof shall be made immediately to the Contracting Officer. Repair of damaged utilities shall be in accordance with CLAUSE 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS.
3.4.3 Minnesota One Call Excavation Notice System
For contract work performed within the State of Minnesota, the Contractor shall meet the requirements of Minnesota Statutes, Chapter 216D "One Call Excavation Notice System." The Gopher State One Call notification center telephone numbers are:
Twin Cities Metro Area (651) 454-0002 Outstate (800) 252-1166
3.5 COORDINATION WITH XCEL ENERGY
The contractor shall conform to the GENERAL TRANSMISSION LINE ENCROACHMENT GUIDELINES attached at the end of this section.