Amendment_1.pdf
PDF 44 KB Posted
- Attached to
- Wabasha Gravel Pit Dredge Site Unloading Federal contract opportunity
- Solicitation number
- W912ES-15-B-0008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_W912ES-15-B-0008.pdf | ||
| Attachment_1.pdf | ||
| Best_Management_Practices_Full_Size.pdf | ||
| EM_385-1-1_2014.pdf | ||
| W912ES-15-B-0008_Specs_WGPSU_2015_b.pdf | ||
| Gravel_Pit_PreBid_20150630a.pdf | ||
| WGPDSU_WABASHA_GRAVEL_PIT_DREDGE_SITE_UNLOADING_11x17_ADVERTISEMENT.pdf | ||
| AccidentPreventionPlanChecklist2011Sep08.pdf | ||
| Best_Management_Practices_Half_Size.pdf | ||
| WGPDSU_WABASHA_GRAVEL_PIT_DREDGE_SITE_UNLOADING_22x34_ADVERTISEMENT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6750904300
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update section 3.2 of the specs, update w age rates, and create a question / answ er section.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-15-B-0008
X 9B. DATED (SEE ITEM 11)
01-Jul-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Jul-2015
CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES-15-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 1
ACCESS to GRAVEL PIT #2 A secondary access point for Gravel Pit #2 will be constructed and made available for use no later than 1 September 2015. This access will be constructed to a standard that will allow for a fully loaded twenty (20) cubic yard dump truck to traverse from County Road 30 to Wabasha Sand & Gravel Pit #2. Length of access will be approximately fifty (50) linear feet.
SECTION 01 14 00.00 13
WORK RESTRICTIONS
3.2 BENEFICIAL USE
The Wabasha Gravel pit is a Beneficial Use Site. The Contractor shall construct, erect, and maintain a sign at the entrance of the Wabasha Pit. The sign shall be a 4x8 sheet of plywood and state “SITE IS TEMPORARILY CLOSED.” When the project is completed or suspended and the pit is safe for public use, the sign shall be removed.
The Contractor shall also install a swing gate on the access road to the pit. The location shall be coordinated with the Contracting Officer but shall be near the entrance ramp to the pit. It shall be wide enough to prevent vehicle access. The design shall be as is typical for this type of application and shall be approved by the Contracting Officer. The gate shall be of quality and strength to be left in place as a permanent structure. The members shall be a minimum 2” OD galvanized steel with 6”OD posts. The post shall be filled with concrete and embedded in a concrete footing. The gate shall be closed when the Contractor is not hauling and locked with a padlock and a key given to the Contracting Officer. The swing gate shall remain as a permanent site feature.
Questions & Answers Section:
Q: Will the beneficial use site be open to the public during the contract?
A: No, see specification change above to section 3.2. Contractor shall construct a gate and sign to close the site.
Q: Please provide any borehole logs and grain size distribution tests that you have in or near the disposal area.
A: The field logs and grain size tests for borings 12-8M through 12-12M are attached. The locations of the field logs can be determined from the coordinates provided (UTM, Zone 15, meters).
Q: Solicitation shows a height of 685’, is the contractor expected to fill in areas under 685’?
A: No, contractor shall stay at 685’ and will conduct a pre- and post-survey (both quality checked by the Corps) for measurement and payment purposes.
Q: Does the Corps have any regulations/guidelines on dust control?
A: Contractor shall control dust per specifications.
Q: Does the Corps have any regulations/guidelines on noise ordinance, allowable working hours, and trucks per day?
A: Noise ordinances, working hours, trucks per day/conditional use permits should all be addressed with the City of Wabasha.
Q: Is the contractor responsible for swallow nests in the sand?
A: Currently, there are no swallows in the existing nests. Contractor shall keep sand at non-vertical slopes to avoid swallow nests from being built, especially during the nesting season from April through August.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE RATE MN101
General Decision Number: MN150101 07/17/2015 MN101
Superseded General Decision Number: MN20140101 State: Minnesota Construction Type: Heavy Heavy including Water and Sewer Lines Counties: Dodge, Olmsted and Wabasha Counties in Minnesota.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/02/2015 1 05/22/2015 2 06/12/2015 3 07/17/2015
BRMN0017-007 05/01/2014
WABASHA
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 35.38 16.62
CARP0930-002 05/01/2012
Rates Fringes
CARPENTER........................$ 32.19 15.18
* ELEC0343-008 07/01/2015
Rates Fringes
ELECTRICIAN......................$ 34.61 17.44
ENGI0049-067 05/01/2015
Rates Fringes OPERATOR: Power Equipment Group 2.....................$ 31.12 17.90 Group 3.....................$ 30.67 17.90
Group 4.....................$ 30.37 17.90 Group 5.....................$ 27.80 17.90 Group 6.....................$ 26.93 17.90
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 2: Crane with over 135' Boom, excluding jib; Hydraulic Backhoe with shovel-type controls, 3 cubic yards and over; Grader/Blade finishing earthwork and bituminous.
GROUP 3: Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over; Mechanic;
Tandem Scraper; Truck Crane; Crawler Crane GROUP 4: Bituminous Roller 8 tons & over; Crusher/Crushing Plant; Drill Rig; Elevating Grader; Loader over 1 cu yd; Grader; Pump; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Bulldozer over 50 hp.
GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Loader up to 1 cu yd; Bulldozer 50 hp or less.
ROUP 6: Oiler; Self-Propelled Vibrating Packer 35 hp and over.
CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;
CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM
UNDERGROUND WORK:
UNNELS, SHAFTS, ETC. - $ .25 PREMIUM
UNDER AIR PRESSURE - $ .50 PREMIUM
HAZARDOUS WASTE PROJECTS (PPE Required):
LEVEL A - $1.25 PREMIUM
LEVEL B - $ .90 PREMIUM
LEVEL C - $ .60 PREMIUM
IRON0512-041 05/01/2015
Rates Fringes
IRONWORKER, STRUCTURAL AND
REINFORCING......................$ 35.50 23.45
LABO0405-003 05/01/2014
Rates Fringes
LABORERS
(1) Common or General.......$ 24.08 15.55
(2) Mason Tender Cement/Concrete.............$ 24.28 15.55
(6) Pipe Layer..............$ 26.58 15.55
PLAS0633-029 05/09/2012
DODGE
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.80 17.00
PLAS0633-052 05/01/2012
OLMSTED
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 34.86 7.90
TEAM0160-019 05/01/2015
Rates Fringes
TRUCK DRIVER (DUMP)
(1) Articulated Dump Truck..$ 26.90 15.20
(2) 3 Axles/4 Axles; 5 Axles receive $0.30 additional per hour.........$ 26.35 15.20
(3) Tandem Axles; & Single Axles.......................$ 26.25 15.20
SUMN2009-077 09/28/2009
Rates Fringes LABORER: Landscape..............$ 12.88 4.61 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey.
Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH- 0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)