SEE ADDENDUM

(No Collect Calls)

W912EQ20Q0012 05-Feb-2020

b. TELEPHONE NUMBER

901-544-3343

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 06 Mar 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EQ9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

CHRISTOPHER P WHITE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W38XGR92767155

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY ENGINEER DISTRICT, MEMPHIS

CHRISTOPHER WHITE

167 N MAIN STREET

MEMPHIS TN 38103-1894

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W38XGR 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

W2R9 ENDIST MEMPHIS

USACE ENSLEY ENGINEER YARD

2915 RIVERPORT ROAD

MEMPHIS TN 38109-3018

TEL: 901-785-6355 FAX:

FAX:

TEL: 901-544-3343 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

336611

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912EQ20Q0012

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

FUEL BARGE 101

FFP

DRY DOCK, CLEAN FUEL TANKS, AND INSPECTION OF FUEL BARGE

101.

FOB: Destination

MILSTRIP: W38XGR92767155

PURCHASE REQUEST NUMBER: W38XGR92767155

NET AMT

PERFORMANCE WORK STATEMENT

Performance Work Statement Fuel Barge

Dry Dock and Clean Tanks

GENERAL: The following paragraphs are the scope of work for the new solicitation.

1. Scope of Work (INFORMATION). Contractor shall furnish all labor, management, equipment supervision, facilities, utilities, equipment, tools, lubricants, fuel, materials and articles (excluding Government furnished property) necessary to dry-dock the Fuel Barge in accordance with these specifications and subject to the terms and conditions of the contract.

1.1 VESSEL DATA (INFORMATION). The Fuel Barge 101 is a 295’ by 54’ fuel oil barge. It has a total of 12 internal tanks, consisting of 5 Starboard and Port Diesel Tanks and 2 waste oil tanks. There are two topside tanks 2000 gallon capacity.

1.2 CONTRACTOR QUALITY CONTROL AND GOVERNMENT QUALITY

ASSURANCE (INFORMATION). The Contractor shall establish and maintain a quality control plan as specified in Section 3, Inspection and Acceptance. The Government will evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan as specified in Section 2, Inspection and Acceptance.

1.3 AS BUILT DRAWINGS (INFORMATION). No Drawings Available.

1.4 DRY-DOCKING. The barge is presently moored at its home port, in Memphis, TN.

The Government will deliver the Fuel Barge to the contractor’s location after written notification of award from the Contracting Officer or the Contracting Officer Representative. Dry dock the Fuel Barge and hold on dry dock until all the tanks have been cleaned and the Fuel Barge Inspected by the US COAST GUARD. Contractor shall notify Jeffrey Farmer (901) 245-9332, Jeffrey.a.farmer@usace.army.mil when the Fuel Barge is ready for transport back to the Ensley Engineering Yard.

1.4.2 CLEAN FUEL TANKS. Contractor shall furnish all labor, management, equipment supervision, facilities, utilities, equipment, tools, lubricants, fuel, materials and articles (excluding Government furnished property) necessary to remove, filter and store up to 30,000 gallons for diesel fuel.

1.4.2.1 FUEL REMOVAL. All possible fuel will be pumped or otherwise removed from the tank by the Contractor. Consider remaining fuel contaminated or waste fuel; Pump into 55 gallon drums or other suitable containers for disposal in accordance with approved procedures meeting local, State, and Federal Regulations. Drums or Tanks used for containerizing waste fuel will be furnished by the Contractor.

1.4.2.2 SLUDGE, SEDIMENT REMOVAL AND DISPOSAL. Squeegee or brush any sludge, sediment, or other loose material into piles, shovel into buckets or other suitable containers, and remove from tank. Dispose of Sludge and Sediment according Local, State and Federal Regulations.

1.4.2.3 TANK WASHING. After water, fuel, and sludge have been removed, thoroughly wash the tank interior. Contractor must limit the water pressure during washing so that it does not cause damage to the existing coating. Perform Quality Control to inspect the cleaning during the process to ensure the coating is not being removed.

Minimize the use of water; substitute brush blasting when practical. Start washing at the top of the walls and columns and work down to the floor. Wash the floor last starting from the sides working towards the sump. Wash to remove oil, sludge, wax, tar, and other fuel residue adhering to the surface.

a. Apply a detergent conforming to FS O-D-1276 by spray or brush and soak approximately 30 minutes

b. Hand-scrub the surfaces vigorously with long-handled stiff-bristle brushes. Wet the brushes intermittently with the fresh cleaning solution during the scrubbing process. For heavily oil-soaked areas which still appear to retain some residue after the first scrubbing, give a second application of cleaning agent and repeat the scrub process a second time.

c. Rinse the surfaces thoroughly with fresh water.

d. Brush-off blast clean.

1.4.2.4 WASH WATER, DETERGENT SOLUTION, AND SEDIMENT REMOVAL.

During the washing process, operate a portable pump continuously with suction hose extended to the tank bottom to remove water, detergent, dirt, oil, or other loose mailto:Jeffrey.a.farmer@usace.army.mil materials washed off. Following the final rinse, pump, squeegee and mop the tank dry.

1.5 GAS-FREE CERTIFICATES

1.5.2 Prior to commencement of any hot work, work involving the use of open flames or other means of igniting flammables, clean and gas free all affected spaces as required by 29 CFR 1915. Only the cost of testing, providing, and displaying gas-free certificates shall be included. The direct cost of actually cleaning and gas-freeing the affected spaces shall be included in, and proportioned among bid prices for each item of work requiring cleaning and gas-freeing such spaces.

1.5.3 Test the affected spaces to assure compliance with paragraph 1.5.1 above. Testing and certification shall be accomplished by a Marine Chemist certified by the National Fire Protection Association, a U.S. Coast Guard authorized person, or a Shipyard Certified Trained “competent person” as defined by 29 CFR 1915.7 as required for the type of work.

1.5.4 Furnished and display “Safe for Men – Safe for Fire” certificates in all certified spaces. Furnished one copy of all certificates to the Contracting Officer prior to start of work. The certificates must be posted and current as outlined in time and period of work as authorized by the Marine Chemist.

1.5.5 All such spaces requiring gas-freeing shall be maintained in “Safe for Men – Safe for Fire” condition until all such work in complete.

1.6 COAST GUARD INSPECTION. Coordinate with the COR, Jeffrey Farmer, Jeffrey.a.farmer@usace.army.mil, 901-245-9332 or Dredge Hurley Chief, Tom Schmidt, Thomas.o.schmidt@usace.army.mil, 901-361-5889, for the Coast Guard Inspection. Notify Jeffrey Farmer and Tom Schmidt 5 days in advance of finishing the tank cleaning so the Coast Guard Inspection can be coordinated.

1.7 BID INFORMATION.

Item

Number Description Stock/Part Number Quantity Unit

1 Dry Dock Fuel Barge N/a 1 JB and clean fuel tanks mailto:Jeffrey.a.farmer@usace.army.mil mailto:Thomas.o.schmidt@usace.army.mil

1.8 SITE VISIT. It is highly recommended that contractors attend the scheduled site visit prior to submitting a quote. Site Visit scheduled for 18 Feb 2020 at 9 am, at the Ensley Engineering Yard, 2915 Riverport Rd, Memphis TN 38109. Interested parties may email their name and company information to Christopher White at Christopher.P.White@usace.army.mil, no later than 3:00 pm CST on 17 Feb 2020. All contractors and government personnel will meet at the EEY Administration Building.

2 INSPECTION AND ACCEPTANCE (INFORMATION)

2.1 The Contractor shall perform or have performed the inspections and tests required to substantiate that the supplies and services provided under this contract conform to the specifications, drawings and contract requirements herein. The Contractor shall also perform or have performed the inspections and tests specified herein.

2. 2 The contractor shall provide and maintain a Quality Control Program covering all work specified in the Job Order. The program shall result in the preparation and maintenance of documentation. The documentation shall define the tests and inspections to be accomplished for each specification item keyed to the appropriate contract line item number and paragraph of the specification.

2.3 The Government Inspector shall witness all tests and inspections. The Contractor shall make certain that all materials, installation and workmanship meet the requirements of the specifications and are ready for test or inspection prior to notifying the Government Inspector.

2.4 The Contractor shall notify the Government Inspector at least 24 hours before all testing and inspection. The Government Inspector will be available to witness testing and inspection of completed work Monday thru Friday, except Federal Holidays. The time of his availability will depend upon the distance between the Contractor’s or Subcontractor’s facility.

2.5 The Contractor shall proceed with work if the Government Inspector is not present to witness the inspection or test after the scheduled time provided, if the advance noticed required in paragraph 2. 4 above have been given. The Contractor shall document his inspection or test as if the Government Inspector was present.

2.6 Witnessing tests and inspections by the Government Inspector does not constitute acceptance of the item and does not relieve the Contractor of the responsibility of assuring that the work conforms to the requirements of the specifications.

2.7 Work subcontracted and performed away from the shipyard is covered by this Quality Control Program. The prime Contractor cannot delegate the authority to witness or perform and sign for tests and inspections conducted away from the facility without approval of the Contracting Officer. If the Subcontractor has an established Quality Control Program with designated organization and personnel, the prime Contractor may designate an appropriate individual in that organization as his authorized representatives. Such designation shall clearly indicate that the individual is an employee of a subcontractor and shall be subject to the approval of the Contracting Officer. The Government Inspector will witness tests and inspections at the Subcontractor’s facility in accordance with paragraph 2. 4 and 2.5 above.

2.8 Quality Assurance Surveillance Plan. This plan will be used to assure the Government that the work specified under this contract is completed satisfactorily.

This plan is included for information purposes only. All work performed will be monitored by the Government Inspector on a daily basis. The performance based deliverables identified in Table 2. 8. 1 will be inspected and tested (if applicable) and either approved or rejected by the Government. The Contractor shall correct all deficiencies in rejected work at no additional cost to the Government unless caused by reasons beyond the control of the Contractor.

Table 2. 8. 1 - PERFORMANCE REQUIREMENTS

REQUIREMENT PERFORMANCE

STANDARD

MONITORING

METHOD

INCENTIVE/

DISINCENTIVE

Work items completed as specified without defects in material and workmanship

All work performed in accordance with the specifications, manufacture’s recommendations and accepted commercial marine practice

Observation of the Contractor’s activities and workmanship during the performance of the work. Monitor the

Contractor furnished parts and materials.

Full payment shall be made for 100% compliance with the specifications.

Deficiencies shall be corrected at no additional cost to the Government.

All work performed in accordance with the USACE Safety Manual.

No safety violations or injuries during the term of the contract.

Observation of the Contractor’s daily activities. Record and safety violations and discuss with Contractor to prevent a reoccurrence

Full payment shall be made for 100% compliance.

Contractor may be subject to FAR clause 52.212.4 Termination for

Cause in addition to any damages or costs incurred if violations occur.

Clean Fuel Tanks All work performed in accordance with the specifications.

100 % inspection after tanks are cleaned.

Fuel Tanks will not have any grime or sludge left in the tank.

3.0 DELIVERIES OR PERFORMANCE (INFORMATION)

3.1 COMMENCEMENT, EXECUTION AND COMPLETION. The Contractor is required to execute the work with diligence and to complete the work within (60) calendar days after award.

3.2 DELIVERY AND RETURN OF THE VESSEL.

3.2.1 The Government will deliver the Fuel Barge to the Contractors location after written notification of award, from the Contracting Officer or the Contracting Officer Representative.

3.2.2 The Government will deliver the Fuel Barge back to Ensley Engineering Yard upon completion and acceptance of all work. The time of completion will be the time of acceptance of all work by the Government Inspector.

3.3 DELIVERY OF CONTRACT DATA. The following documents, specified at various locations throughout the specifications are required submittals.

(1) 1. 5. 3 “Safe for Men - Safe for Fire” Certificates.

Furnish one copy of all certificates to the Contracting Officer Representative prior to the start of work.

(2) “Material Safety Data Sheets. Furnish one copy of all MSDS (SDS) sheets to the Contracting Officer Representative prior to the start of work.

(3) Accident Prevention Program. Four copies of the Accident Prevention Program shall be submitted to the Contracting Officer Representative for review and approval within 5 calendar days after award.

4. SPECIAL CONTRACT REQUIREMENTS (INFORMATION)

4.1 MANDATORY ITEMS. All mandatory items, those not specifically identified as

INFORNATION or OPTIONAL, shall be accomplished and completed within the specified performance period.

4.2 OPTIONAL ITEMS. Certain items indentified as OPTIONAL in the bidding schedule and description/specifications may or may not be required. No work shall be performed on any item indentified as OPTIONAL unless authorized in writing, in whole or in part, by the Contracting Officer. When authorized, the Contractor shall perform the OPTIONAL work required at the unit price quoted in the schedule in the quantities authorized. The total actual quantity authorized may be less or more than the estimated quantity. The Contractor shall allow sufficient time to perform the total estimated quantity of all OPTIONAL items in the bidding schedule.

4.2.1 The quantity and additional timing of optional items to be exercised cannot be determined at the time of award of the contract. It is expected that the contractor shall finish all work outlined in the bid schedule both mandatory and optional, provided the optional items are exercised in a reasonable manner. All increases in the scope of work including exercising optional items shall be done via a modification to the contract. The terms of the modification, which may include additional performance days due to unexpected and/or optional growth work shall be agreeable to both the government and the contractor prior to completion of the modification.

4.3 WHARFAGE DOCKAGE, ETC. The Contractor shall be responsible for and pay all expenses of wharfage, tonnage, dockage, mooring, etc. The Contractor shall provide.

(1) All mooring lines and fenders sufficient in strength, quantity, location and quality to prevent damage to the vessel and the dock.

(2) All necessary labor, material, services and equipment as required to safely move the vessel while it is in his possession.

(3) Adequate protection during adverse weather conditions including, but not limited to, moving the vessel to a safe harbor and provide additional mooring lines and anchors.

(4) The necessary facilities for and shall bear the expense of any movement of the vessel while it is in his possession.

4.4 INTERFERENCE. The Contractor shall remove and reinstall any interference required to accomplish the work specified without additional contract time or cost to the Government. Interference is defined as any part of the vessel, installed or portable, that must be removed or disturbed to accomplish the work specified. All damaged or missing fasteners shall be replaced with fasteners of the same size and type as original. New gaskets, packing and seals shall be installed on all disturbed connections and proved leak free. Damaged lagging and insulation shall be repaired or replaced. All new work or disturbed old work shall be cleaned in accordance with section 1. All interferences shall be returned to their original operational position and condition upon reinstallation. All costs associated with interferences shall be included in the bid price of the respective item of work.

4.5 PROTECTION. The contractor is responsible for providing adequate protection to each component throughout the repair process. This protection included but is not limited to foreign matter contamination from dirt, debris, water, chemicals, etc.

4.6 ACCIDENT PROTECTION. All work performed under this contract shall be in accordance with the requirements of the U. S. Army Corps of Engineers Safety Manual, EM 385-1-1 and other safety requirements specified herein.

4.6.1 Control of Hazardous Energy (Lockout/Tag out). Before personnel perform any servicing or maintenance on a system where the unexpected energizing, start up, or release of kinetic of stored energy could occur and cause injury or damage, the system shall be isolated in accordance with the procedures contained in EM-385-1-1, and Engineer Regulation ER 385-1-31. The Contractor shall submit his hazardous energy control plan to the Contracting Officer Representative for acceptance within 10 calendar days after award. Locks and tags will be placed on circuit breakers, or other appropriate devices, to isolate and identify hazardous energy sources. The Contractor will maintain a SAFE CLEARANCE LOG in the engine room or designated location. The log book will have a lock/tag issue sheet and SAFE CLEARENCE REQUEST FORMS. Corps and Contractor designated authorities shall fully coordinate their control activities for the life of the contract. Each shall inform the other of their energy control procedures, ensure that their own personnel understand and comply with rules and restrictions of the procedures, and ensure that all employees affected by the hazardous energy control activity are notified. During each daily walk-through safety inspection the log will be checked. During this inspection the Contractor shall itemize all existing lockouts, all new lockouts, and all removed tags that morning or the previous day. Prior to a change in the status or location of the vessel (such as undocking), the Corps and the Contractor shall meet to review the status of hazardous energy control measures.

4.6.2 Accident Investigations and Reporting. Refer to EM 385-1-1, Para. 01. D.01.

Accidents shall be investigated by the immediate supervisor of the employee (s) involved and reported to the Government’s Technical Representative within one working day after accident occurred. A report of all mishaps occurring on the project shall be submitted to the Contracting Officer within four calendar days following the incident. All data reported must be complete, timely and accurate. A follow up report shall be submitted when the estimated lost time days differs from actual lost time days.

4.6.3 Daily Inspections. The Contractor shall institute a daily inspection program to assure safety requirements are being fulfilled. Reports of daily inspections shall be maintained at the job site. The reports shall be records of the daily inspections and resulting actions. Each report will include, as a minimum, the following.

(1) Items of work underway during the inspection.

(2) Locations of areas where inspections were made.

(3) Results of inspections, including nature of deficiencies observed and corrective action taken, or to be taken, date, and signature of the person responsible for its contents, and submitted to the Contracting Officer for review.

(4) Status of Lockout/Tag out items.

4.6.4 Ground- Fault Protection. Refer to Para 11. C. 05 of EM 385-1-1. The ground-fault circuit interrupter shall be calibrated to trip within the trip-threshold values of 5 Ma + 1 Ma as specified in UL Standard 943. All ground-fault circuit interrupters shall be UL approved and installed in accordance with the latest edition of the National Electrical Code.

4.6.5 Hatches and Openings. Hatches and openings of all kinds that present a hazard will be provided with safe and suitable guard rails and toe boards.

4.6.6 Lighting. The Contractor shall ensure that all work areas and walkways are adequately lit, particularly during hours of darkness.

4.6.7 The Contracting Officer Representative will notify the Contractor immediately of any noncompliance with the foregoing paragraphs and action to be taken. The Contractor shall, after receipt of such notice, immediately take corrective action. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall make no part of the time lost due to any such “stop work” orders the subject of claim against the Government for extension of time or for excess costs or damages.

4.7 ACCESS TO THE VESSEL.

4.7.1 Notwithstanding any other clause of this contract, the Contractor agrees to allow

Officers, employees, associates of the Government, other prime Contractors with the Government and their Subcontractors, and officer, employees, and associates of Offeror on other contemplated work admission to the Contractor’s facilities and the vessel.

4.7.2 The Contractor shall provide suitable ladders, gangways and scaffolds for access to the job. Such equipment considered unsafe or inadequate by the Government inspector shall be removed and replaced by the Contractor with equipment that is acceptable.

4.8 ACCESS TO THE FACILITIES.

4.8.1 The contractor shall allow USACE officers, employees, and authorized associates of the Government admission to the Contractor’s facilities and the components.

4.8.2 The contractor shall provide suitable ladders, gangways and scaffolds for access to the job. Such equipment considered unsafe or inadequate by the Government Technical Representative shall be removed and replaced by the Contractor.

4.9 FALL PROTECTION. Hatches and opening of all kinds that present a hazard will be provided with safe and suitable guardrails and toe boards.

4.10 FIRE PROTECTION. The Contractor shall assume full responsibility for fire protection while the vessel is in his possession. The Contractor shall provide a dedicated person and a fire extinguisher for fire watch at each location where hot work is being performed.

4.11 MATERIAL SAFETY DATA SHEETS (SDS). The Contractor shall provide and display the MSDS sheets for all hazardous material to include detergent for cleaning the tanks.

4.12 WORKMANSHIP. All labor shall be skilled for each kind of work, through and first class in every respect and performed under competent direction. Where work of one trade joins, passes through, or is integral with other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damaging of previously acceptable work shall be cause for rejection of previously acceptable work. All parts of work intended to join or bear upon others shall have complete and solid surface contact and fit together neatly without excessive cold work during assembly.

4.13 RECORDS OF GOVERNMENT PROPERTY. The Property Book Officer, U. S.

Army Engineer District, New Orleans, LA is designated as the property administrator to maintain the necessary property records in connection with this contract.

4.14 GOVERNMENT FURNISHED PROPERTY. Government furnished property (GFP) is described in Section 5, List of Attachments. The Contractor shall advise the Contracting Officer of any shortages, breakage or other discrepancies within 48 hours of receipt of GFP. All unused GFP shall be loaded on the Government furnished conveyance for return. GFO will be delivered FOB the Contractor’s facility. The Contractor shall store the GFP in a secure weather tight facility until it is permanently installed on the vessel.

4.15 SCRAP AND SALVAGE MATERIAL. All items designated as scrap resulting from the work shall become the property of the Contractor. Due consideration of the value of such scrap shall be reflected in the bid price of the items concerned. This shall not apply to salvageable items ordered to remain the property of the Government.

4.16 CLEANING

4.16.1 Transducer heads and other underwater equipment shall be protected. All areas cleaned under these specifications shall be kept clean for the duration of the contract.

4.16.1. After all cleaning work is completed, remove all protective coverings.

4.17 SUSTAINABILITY. Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recoverable materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels.

Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.

5. LIST OF ATTACHMENTS (INFORMATION)

5.1 GOVERNMENT FURNISHED PROPERTY (GFP)

(1) FUEL BARGE

SECURITY REQUIRMENTS

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.

INSPECTION AND ACCEPTANCE TERMS

http://www.epa.gov/epawaste/conserve/tools/cpg/products http://www.uscis.gov/e-verify)

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 60 dys. ADC 1 W2R9 ENDIST MEMPHIS

USACE ENSLEY ENGINEER YARD

2915 RIVERPORT ROAD

MEMPHIS TN 38109-3018

901-785-6355 FOB: Destination

W38XGR

NOTICE TO OFFERORS

NOTICE TO OFFERORS

A. The following documentation must be submitted with your quote for evaluation.

1. SF 1449, Solicitation, Offer and Award; include your signature, name, title, date, include prompt payment terms, remittance address, Tax Identification Number, DUNS number, and Cage Code.

2. Schedule of prices

3. Representations and Certifications. (FAR Clauses 52.212-3)

4. All amendments must be acknowledged

5. Review and submit the required information from FAR clauses 52.212-2

B. Offerors ADDRESS - Prospective Offerors should indicate in the offer, the address to which payment and/or correspondence should be mailed, if such address is different from that shown for the offeror on Standard Form 1449 Block 17a.

C. System for Award Management - By submission of a quote, the Offeror acknowledges the requirement that prospective awardee must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from this quote. Lack of registration in the SAM database will make an Offeror ineligible for award. Contractors may obtain information on registration and annual confirmation requirements by calling 1-888-227-2423, or at: http://www.sam.gov.

D. Basis of Award - The Government intends to award a purchase order from this solicitation to the responsible Contractor whose offer conforming to the solicitation will be most advantageous to the Government based on technical, price, and past performance factors. See Performance Specifications and FAR Clause 52.212-2 Evaluation Criteria specified in this solicitation.

E. How to submit questions: Questions should be emailed to:

Christopher.P.White@usace.army.mil and a response will be provided.

F. How to submit Proposal: Contractor may submit an electronic offer to the following email addresses no later than the stated due date and time in block 8 of the SF 1449. Submit and electronic offer to Christopher.P.White@usace.army.mil. Email is the preferred method of quote submission. You may also deliver hand carried offers to 167 N. Main Street, Memphis TN 38103 and must be time stamped no later than the stated due date in block 8 of the SF 1449. Submission of offers via fax will not be accepted.

G. Delivery Times - The following delivery times are established for contactors:

0700-4:00pm, M-F (Monday thru Friday) 0700-3:00pm, Friday

CLAUSES INCORPORATED BY REFERENCE

52.203-18 Prohibition on Contracting With Entities That Require Certain

Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment.

DEC 2019

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2019

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law

FEB 2016

52.212-1 Instructions to Offerors--Commercial Items OCT 2018 52.212-3 Offeror Representations and Certifications--Commercial

Items

DEC 2019

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION

2019-O0003).

JAN 2019

52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals -- Representation.

DEC 2016

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

AUG 2018

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.245-1 Government Property JAN 2017 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7006 Billing Instructions OCT 2005 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7008 Only One Offer JUL 2019 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor

Personnel

JUN 2013

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

252.245-7002 Reporting Loss of Government Property DEC 2017 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal DEC 2017

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

(1) Technical (2) Past Performance, and (3) Price.

Submittals;

It is incumbent upon the offeror to submit sufficient information for the Government to evaluate, technical, past performance, and price. Failure to submit sufficient information for the government to determine your technical acceptability, past performance or price may be cause for rejection of your quote.

(1) Technical - offerors shall submit for evaluation, documentation of their capability to provide the specified services in accordance with the project Scope-of-Work, including but not limited to, the capability to provide the services specified, and in accordance with the specified delivery schedule.

The contractor shall provide sufficient documentation of their technical capability such as proposed work/delivery schedules, technical approach, technical literature, brochures, equipment list, Key Personnel List, resumes, or any other information to enable the Government to determine the offeror’s capability to perform the requirement.

(2) Past Performance - to demonstrate past performance the offeror shall provide documentation of satisfactory performance on past or current contracts of a similar type, size, scope and complexity, as well as, provide references, including names and contact information of references who can verify their past performance. Past performance information of key personnel and crew may be provided if the company has limited or no past performance. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror will be evaluated as neutral on Past Performance, providing the offeror supplies a certified statement with their offer that no past performance information is available.

The Government’s approach to evaluating past performance is to check the references provided by the contractor to verify satisfactory past performance as well as data obtained from other sources available; e.g., government database, past contract files, etc. The offeror is cautioned that while the Government will consider data from other sources, the burden of demonstrating satisfactory past performance rests with the offeror.

It is incumbent upon the offeror to submit sufficient documentation and information for the Government to determine technical acceptability, past performance, and proposed price. Failure to submit sufficient information for the government to determine technical acceptability, past performance or price may be cause for rejection of your quote.

(3) Price - Price quotes will be examined to determine the extent to which proposed prices are comparable with the Government estimates, and previous procurement history and a determination made of Price Reasonableness. The Government may reject any quote that is determined to be Not Fair and Reasonable, unrealistically high or low in price when compared to Government estimates, or are unbalanced, such that the quote is deemed to reflect an inherent lack of competence or failure to comprehend the requirements. All quotes will be evaluated and a determination made of lowest price, from prices presented on the Bidding Schedule, based on the Total of all line items.

(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (OCT 2019)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.

C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.

L. 111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved]

____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Aug 2018) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Nov 2016) of 52.219-9.

____ (iii) Alternate II (Nov 2016) of 52.219-9.

____ (iv) Alternate III (Nov 2016) of 52.219-9.

____ (v) Alternate IV (Aug 2018) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2019) (15 U.S.C.

657f).

X (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).

____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).

____ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

____(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Oct 2019) (E.O. 13126).

X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

X (28)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

____ (ii) Alternate I (Feb 1999) of 52.222-26.

____ (29)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212).

____ (ii) Alternate I (July 2014) of 52.222-35.

X (30)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

____ (ii) Alternate I (July 2014) of 52.222-36.

____ (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

X (33)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693).

____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun 2016) (E.O. 13693).

____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (41)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

X (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (43) 52.223-20, Aerosols (Jun 2016) (E.O. 13693).

____ (44) 52.223-21, Foams (Jun 2016) (E.O. 13693).

____ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

____ (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (48) 52.225-5, Trade Agreements (Oct 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (49) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.

5150).

____ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

____ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31 U.S.C.

3332).

____ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).

____ (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

____ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .