MR169_AMD_0001_PLANS_2016-04-14.pdf
PDF 4 MB Posted
- Attached to
- LD 15, 16, 18, 22 Bulkhead Recesses
- Solicitation number
- W912EK-16-R-0006
About this file
Plans Amend 0001
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
L31
EC
1- 2" CONDUIT
1- 2" CONDUIT
A N
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -B
X X
X .d g n
:2
:2
P
M
B E
D D
D E
D
/1
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
J
W
B G
R
A S S
H O
W N
D D
J W
B
E L E
C T
R
IC
A L P
L A
N
L O
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
EB001
M R
E -B
X X
X .d g n
ENDS OF EMPTY CONDUITS.
CONCRETE). INSTALL 2 INCH RGS COUPLING AND PLUG TO SEAL
MITER GATE ANCHOR RECESS (I.E. 2 INCH EXPOSED OUT OF
RGS CONDUIT TERMINATED ENDS NOT LESS THAN 2 INCH INTO NEW
DEMOLITION. REPAIR EACH CONDUIT AND EXTEND THREADED 2 INCH
SHALL BE CUT OFF AS REQUIRED TO FACILITATE CONCRETE
1. "EC" MEANS "EMPTY CONDUIT". THESE 2 INCH RGS EMPTY CONDUITS
GENERAL NOTES:
MANHOLE C3
EXISTING
L3A L31
PINTLE STA. 0+00.0
EXISTING ANCHOR AFTER CONSTRUCTION
REINSTALL POLE EQUIPMENT ON
PROTECT EXISTING POLE ANCHOR.
REINSTALLATION. MAINTAIN AND
MENT DURING CONSTRUCTION FOR
AND PROTECT LIGHT POLE EQUIP-
AND ITS BASE SHROUD. STORE
REMOVE EXISTING LIGHT POLE (F2)
L3A
L3A1- 2" CONDUIT
LIGHT POLE
NAVIGATION
EXISTING
AND GATE ANCHORAGES
NEW BULKHEAD RECESS
CONCRETE WORK FOR
APPROX. AREA OF
MANHOLE 11
TO EXISTING
MANHOLE C1
EXISTING
L15 L19
GND L1F P19
L11 L1B L1G CW1
MACHINERY
MITER GATE
(SEE DETAIL A3 ON SHEET EB501)
AND PROVIDE NEW ANCHOR BOLTS.
DEMOLISH EXISTING POLE ANCHOR
ON NEW CONCRETE LIGHT BASE
POLE AND BASE SHROUD (F1)
REMOVE AND REINSTALL LIGHT
EXISTING FENCE
EXISTING SIDEWALK
GENERAL WORK NOTE 1.
UNIT RECEPTACLE. SEE
EXISTING TOW HAUL
1- 2" CONDUIT
1- 2" CONDUIT
1- 2" CONDUIT
EC
L15
L19
EC
CW1L11L1GL1B
4 - 2" CONDUITS
MACHINERY
MITER GATE
EXISTING
P18
RECESS AND GATE ANCHORAGES
WORK FOR NEW BULKHEAD
APPROX. AREA OF CONCRETE
GAUGE WELL STATION
C U
R R
E N
T
LAND WALLINTERMEDIATE WALL (I-WALL)
4 - 2" CONDUITS
L11L1GL1B
EXISTING COUPLING LIGHT
2 - 3" CONDUITSP18 P19 L1F
A1
L/D 16 BULKHEAD RECESS ELECTRICAL PLAN
0 4' 16'8'SCALE : 1/8"=1'-0"
LC
OF LOCKLC
IS COMPLETE.
AND BASE IN NEW LOCATION AFTER BULKHEAD RECESS WORK
2. REMOVE EXISTING COUPLING LIGHT. INSTALL NEW LIGHT, POLE
AFTER BULKHEAD RECESS WORK IS COMPLETE.
LOCATION AT ELEVATION OF 5 FEET ABOVE TOP OF LOCK WALL
EXISTING WEATHERPROOF HOUSING ON NEW PEDESTAL AT NEW
INSTALL EXISTING 480V RECEPTACLE, NEW 120V RECEPTACLE IN
1. REMOVE TOW HAULAGE UNIT 480V RECEPTACLE, AND PEDESTAL.
GENERAL WORK NOTES:
DB-Q1
RECONNECTED.
SHALL BE REINSTALLED IN THE DUCT BANKS AND CONDUITS AND
TEMPORARY CABLES SHALL BE REMOVED AND THE STORED LOCK CABLES
BULKHEAD RECESSES. AFTER COMPLETION OF CONSTRUCTION, ALL
AS REQUIRED TO FACILITATE CONSTRUCTION AND INSTALLATION OF THE
AND LOADS. DUCT BANK AND CONDUITS SHALL BE REPAIRED AND RELOCATED
CONSTRUCTION AREA TO MAINTAIN POWER TO NECESSARY LOCK CONTROLS
POSSIBLE. TEMPORARY CABLES SHALL BE INSTALLED AND ROUTED CLEAR OF
ALL TIMES AND TEMPORARILY STORED IN ADJACENT MANHOLES AS MUCH AS
CONCRETE WILL BE REMOVED. PERMANENT CABLES SHALL BE PROTECTED AT
ELECTRICAL CABLES FROM DUCT BANK AND CONDUITS IN THE AREAS WHERE
CONDUITS PRIOR TO BEGINNING WORK. CONTRACTOR SHALL REMOVE ALL
CONTRACTOR SHALL LOCATE AND MARK EXISTING DUCT BANK AND EMBEDDED
ELECTRICAL SCOPE OF WORK:
L O
C K
D
O W
N S
T R
E A
M
EB006.
5. SEE DETAILED SEQUENCE OF WORK AND GENERAL NOTES ON SHEET
UN-TERMINATED DURING CONSTRUCTION.
4. INSULATE AND WATERTIGHT CAP ALL CABLE CONDUCTORS WHICH WILL REMAIN
AREA OF CONSTRUCTION.
3. REMOVE LAND WALL F1 LIGHT POLE AND I-WALL 'F2' LIGHT POLE IN
OR MANHOLE 'NO. 11' ON LAND WALL AND MANHOLE 'NO. C3'ON I-WALL.
2. REMOVE ALL INDICATED CABLES FROM DUCT BANKS BACK TO MANHOLE 'NO. C1'
1. LOCATE AND MARK DUCT BANK LOCATION IN THE AREAS OF CONSTRUCTION.
PRE-CONSTRUCTION NOTES:
EB006.
4. SEE DETAILED SEQUENCE OF WORK AND GENERAL NOTES ON SHEET
3. REINSTALL LIGHT POLES REMOVED DURING PRE-CONSTRUCTION.
ALL EXISTING CABLES REMOVED PRIOR TO CONSTRUCTION.
2. REMOVE ALL TEMPORARY CABLES. RE-INSTALL AND RE-TERMINATE
1. CLEAN DUCT BANK DUCTS WHERE CABLES WERE REMOVED.
POST-CONSTRUCTION NOTES:
LOCATION NOTES ON SHEET EB006
CABLES. SEE DUCT BANK
DUCT BANK PRIOR TO PULLING
CONTRACTOR SHALL LOCATE
B U
L K
H E
A D R
E C
E S
S
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S E
FINAL
/0
/2
R J
W A
M D N
O P
L O
T T
IN
G E
R R
O R
/1
/2
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -B
X X
X .d g n
:2
:4
P
M
B E
D D
D E
D
/1
/2
O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
E -B
X X
X .d g n
B G
R
R J
W
A S S
H O
W N
D D
J W
B
C E
S S E
L E
C T
R
IC
A L P
L
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
EB002
GND L1F P18
L11
P19
CW1L1B L1G
EC
EC
L19
EXISTING FENCE
UNIT CONTROLLER
EXISTING TOW HAULAGE
(SEE SHEET SB102 & SB103)
RECESS AND NEW LADDER
WORK FOR NEW BULKHEAD
APPROX. AREA OF CONCRETE
1 2
LIBL11 L1G
4 - 2" CONDUITS
GAUGE WELL STATION
L19L15
1 - 2" CONDUIT
L O
C K
D
O W
N S
T R
E A
M L
A N
D W
A L L
0 4' 8'SCALE : 3/16"=1'-0" 12'
15 16
MANHOLE C1
TO EXISTING
MANHOLE 11
TO EXISTING
POWER CABLE
EXISTING
L15 1 - 2" CONDUIT
LIGHT
EXISTING COUPLING
L1F 1 - 2" CONDUIT
LIB L11L1G CW1
RECEPTACLE PEDESTAL
EXISTING TOW HAULAGE
5 10
3 4
DOUBLE GATE
EXISTING
PULL BOX 1" DRAIN
NEW COUPLING LIGHT
DB-Q1
A1
L/D 16 - DOWNSTREAM MAIN LAND WALL LOCK BULKHEAD RECESSES PLAN
MAINTAIN, AND PROTECT EXISTING 480V, 100A PLUG FOR FUTURE USE ON NEW POWER CORD.
REMOVE TOW HAULAGE UNIT EXISTING 480V POWER CABLE FROM TOW HAULAGE UNIT CONTROLLER. 8.
EXISTING CONDUIT WITH NEW CONDUIT FOR NEW COUPLING LIGHT.
REMOVE CONCRETE TO DEPTH OF HORIZONTAL CONDUIT RUN FOR INSTALLATION AND EXTENSION OF 7.
11, CABLE L1A. TEMPORARILY SPLICE CAP CONDUCTOR ENDS OF CABLE L1F AND COIL UP IN MH11.
RECONNECTION OF POWER. PULL EXISTING POWER CABLE TO COUPLING LIGHT (L1F) BACK TO MANHOLE
JUNCTION BOX ON TOW HAULAGE UNIT CANOPY. MAINTAIN AND PROTECT CANOPY JUNCTION BOX FOR
REMOVE EXISTING COUPLING LIGHT POLE AND LIGHT. REMOVE FLEX CABLE FROM LIGHT POLE TO 6.
CONDUIT RUNS.
REMOVE EXISTING TOW HAULAGE UNIT RECEPTACLE PEDESTAL AND CONDUITS TO POINT OF HORIZONTAL 5.
NEW PVC PULL BOX 1 INCH DRAIN.
REMOVE CONCRETE TO DEPTH OF HORIZONTAL CONDUIT RUNS FOR INSTALLATION OF NEW CONDUITS AND 4.
NEW PULL BOX OF DIMENSIONS 10”L X 18”W X 18”D.
REMOVE CONCRETE TO EXPOSE HORIZONTAL CONDUIT RUNS. REMOVE ENOUGH CONCRETE TO INSTALL A 3.
RECEPTACLE WEATHERPROOF ENCLOSURE AND COVER FOR FUTURE REINSTALLATION.
FUTURE REINSTALLATION. REMOVE, MAINTAIN, AND PROTECT EXISTING 120V, TOW HAULAGE UTILITY
REMOVE, MAINTAIN, AND PROTECT EXISTING 480V, 100A TOW HAULAGE RECEPTACLE AND ENCLOSURE FOR 2.
DEMOLISH BOTH CABLES AND GROUND.
RECEPTACLE, AND GROUND FROM TOW HAULAGE UNIT BACK TO LOCK GROUND IN MH11. REMOVE AND
P19 FROM LOWER LEFT CONTROL STAND PANELBOARD P1 AND TOW HAULAGE UNIT PEDESTAL 120V
REMOVE EXISTING CABLES P18 FROM SB-1 AND TOW HAULAGE UNIT PEDESTAL 480V 100A RECEPTACLE, 1.
DEMOLITION KEYNOTES
PLATE TO PREVENT DISSIMILAR METALS CORROSION.
USING 316 STAINLESS STEEL BOLTS. USE ISOLATIVE SPACERS BETWEEN JUNCTION BOX AND PEDESTAL
OF DESIGN OF JUNCTION BOX IS HOFFMAN A-1008NFSS6. SECURE JUNCTION BOX TO PEDESTAL PLATE
THROUGH MYERS HUBS. INSTALL ¾INCH NPT THREADED 316 STAINLESS STEEL BOTTOM BREATHER. BASIS
NEMA 4X WITH INTERIOR TERMINAL BLOCKS FOR CONDUCTOR CONNECTIONS. CONDUITS SHALL ENTER
THE NEW WEATHERPROOF JUNCTION BOX SHALL BE 14 GAUGE 316L STAINLESS STEEL CLAMP COVER 3.
COORDINATE WITH COR FOR EXACT LOCATION OF NEW TOW HAULAGE UNIT PEDESTAL. 2.
AND L1F. SEE REFERENCE DRAWINGS L&D 16, EL70 AND EL71, AND SPECIFICATION FOR CABLE DETAILS.
USE XHHW METAL CLAD OR BONDED SHIELDED CABLE FOR CABLE P18. USE XHHW TRAY CABLE FOR P19 1.
GENERAL NOTES
480V PLUG ON NEW CORD.
MADE IN ACCORDANCE WITH ICEA S-75-381, MSHA ACCEPTED, P-136-135, LR65300. INSTALL THE EXISTING
90 DEGREE C. 2000V, OIL, WATER AND SUNLIGHT RESISTANT TYPE RHH/RHW-2. CABLE MEETS UL 1650, CONDUCTORS. THE EXISTING POWER CABLE IS SOUTHWIRE INDUSTRIAL TYPE W PORTABLE POWER CABLE
BE THE SAME OR EQUAL TO THE EXISTING CABLE AND BE 3 NO. 2 AWG AND 1 NO. 6 AWG GROUND COPPER
BETWEEN THE PEDESTAL JUNCTION BOX AND TOW HAULAGE UNIT CONTROLLER. THE NEW CABLE SHALL
480V RECEPTACLE LOCATION. CABLE SHALL BE LONG ENOUGH TO COMFORTABLY LIE ON GROUND
INSTALL TOW HAULAGE UNIT NEW POWER CABLE FROM TOW HAULAGE UNIT CONTROLLER TO REACH NEW 13.
DUCT BANK DUCTS AS THE EXISTING CABLES WERE IN. SEE GENERAL NOTE 1 FOR CABLE DETAILS.
CONDUCTOR TO GROUND BUSHING. SEAL STUB UP WITH EXPANDING FOAM. INSTALL NEW CABLES IN SAME
TERMINATE ON TOW HAULAGE UNIT. INSTALL GROUNDING BUSHING ON STUB UP AND BOND GROUND
RECEPTACLE. GROUND CONDUCTOR SHALL RUN FROM CONDUIT STUB UP AT BASE OF PEDESTAL TO
COPPER GROUND CONDUCTOR FROM GROUND GRID IN MH11 TO BASE OF NEW TOW HAULAGE UNIT
PEDESTAL JUNCTION BOX. FOR 120V TOW HAULAGE UTILITY RECEPTACLE, INSTALL NEW NO.2 AWG BARE
RECEPTACLE. INSTALL NEW CABLE P19 FROM LOWER LEFT CONTROL STAND PANELBOARD P1 TO NEW
INSTALL NEW CABLE P18 FROM SB-1 TO TOW HAULAGE UNIT NEW RECEPTACLE PEDESTAL 480V, 100A 12.
WITH INSIDE WALL OF BOX. SLOPE DRAIN PIPE TO DRAIN TOWARD GRASSY AREA.
BEYOND NEW PEDESTAL LOCATION. INSTALL DRAIN TOWARD BOTTOM OF PULL BOX WITH END CUT FLUSH
FROM PULL BOX IN THE DIRECTION OF THE NEW PEDESTAL TO EXIT LOCK WALL INTO GRASSY AREA
80 PVC TO PVC-COATED RGS CONDUIT FOR STUB UP. INSTALL NEW SCHEDULE 40 PVC 1 INCH DRAIN PIPE
INCH PVC CONDUIT. MAINTAIN NEW CONDUIT DEPTH AT DEPTH OF EXISTING CONDUIT. CONVERT SCHEDULE
FROM PULLBOX TO NEW TOW HAULAGE UNIT RECEPTACLE PEDESTAL. INSTALL PVC END BELLS ON ONE
WHERE THEY ENTER PULL BOX. INSTALL ONE NEW ONE INCH SCHEDULE 80 PVC CONDUIT (FOR GROUND)
AND 120V UTILITY RECEPTACLE. INSTALL RGS CONDUIT END BELLS ON EACH OF THE TWO CONDUITS
FROM NEW PULL BOX TO NEW TOW HAULAGE UNIT RECEPTACLE PEDESTAL FOR TOW HAULAGE POWER
INSTALL ONE NEW TWO INCH (FOR 480V) AND ONE NEW TWO INCH (FOR 120V) PVC COATED RGS CONDUIT 11.
EB501, DETAIL A1.
CONDUIT END BELLS COMPATIBLE WITH THE 3 INCH CONDUITS WHERE THEY ENTER PULL BOX. SEE SHEET
LOCK WALL TO INTERCEPT THE EXISTING TWO 3 INCH CONDUITS. ANSI TIER RATING SHALL BE 22. INSTALL
INSTALL NEW PULL BOX OF MINIMUM DIMENSIONS OF 23”L X 15”W X 18”D WITH COVER FLUSH WITH TOP OF 10.
NOTES 2 AND 3. COORDINATE WITH COR FOR EXACT LOCATION AND POSITION OF PEDESTAL.
NEW CONCRETE SO IT DOES NOT OBSTRUCT GATE SWING. SEE SHEET EB504, DETAIL A1. SEE GENERAL
120V RECEPTACLE AND CANOPY LIGHTING/RECEPTACLE. LOCATE SO NEW PEDESTAL TOWARD EDGE OF
A NEW WEATHERPROOF JUNCTION BOX OF MINIMUM DIMENSIONS OF 13”H X 6”W X 6”D FOR THE PEDESTAL LOCK WALL ELEVATION. INSTALL NEW 120V, 20A SPECIFICATION GRADE GFI UTILITY RECEPTACLE. INSTALL
RECEPTACLE WEATHERPROOF ENCLOSURE AND COVER, EACH AT A HEIGHT OF 5 FEET MINIMUM ABOVE
100A TOW HAULAGE RECEPTACLE AND ENCLOSURE, AND EXISTING 120V, TOW HAULAGE UTILITY
INSTALL NEW TOW HAULAGE UNIT RECEPTACLE PEDESTAL IN NEW LOCATION. REINSTALL EXISTING 480V, 9.
NEW WORK KEYNOTES 2
/0
/2
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S
17 18
HAULAGE UNIT GROUND IN PULL BOX.
EXOTHERMIC WELD OR USE COMPRESSION FITTING TO ATTACH COUPLING LIGHT GROUND TO TOW
NEW PULL BOX TO LIGHT POLE AND GROUND TO POLE GROUNDING TERMINAL ON LIGHT POLE. EITHER
CONDUCTOR TO RGS PORTION OF CONDUIT. RUN NEW # 1/0 BARE COPPER GROUND CONDUCTOR FROM
SWEEP TO VERTICAL STUB UP. INSTALL GROUNDING BUSHING ON STUB UP TO GROUND GROUNDING
LIGHT POLE BASE APPROXIMATELY 2 INCHES. TRANSITION TO PVC COATED RGS CONDUIT FOR 90 DEGREE
INCHES MINIMUM. INSTALL PVC END BELL WHERE CONDUIT ENTERS PULL BOX. STUB UP CONDUIT AT
NEW COUPLING LIGHT BASE LOCATION FOR LIGHT POLE GROUND. INSTALL CONDUIT AT A DEPTH OF 24
20. SAW CUT TRENCH IN CONCRETE AND INSTALL NEW SCHEDULE 80 PVC CONDUIT FROM NEW PULL BOX TO
COMPLETE. CONSTRUCT NEW LIGHT POLE BASE PRIOR TO REINSTALLATION. SEE SHEET EB501, DETAIL A3.
REMOVE FD LIGHT POLE AND PROTECT AND STORE FOR REINSTALLATION AFTER CONCRETE WORK IS 19.
RECEPTACLE. SEE SHEET EB503, DETAIL A1.
IN NEW PEDESTAL JUNCTION BOX, ONE SET TO CANOPY DEVICE BOX AND THE OTHER SET TO THE 120V
RECEPTACLE. INSTALL 2 SETS OF 2 NO. 12 AWG AND 1 NO. 12 AWG GROUND FROM 120V TERMINAL BOARD
INSTALL NEW 1 INCH RGS CONDUIT FROM NEW PEDESTAL JUNCTION BOX TO FEED 120V UTILITY 18.
18 INCHES MINIMUM. SEE SHEET EB503, DETAIL A1.
UNDER CANOPY ROOF TO AN EXISTING WEATHERPROOF DEVICE BOX. MAINTAIN NEW CONDUIT DEPTH AT
TO 1 INCH UNF UNION. INSTALL 1 INCH RGS CONDUIT VERTICALLY UP CANOPY POLE, THEN HORIZONTALLY
GRADE TO DOWNSTREAM LANDSIDE POST OF EXISTING TOW HAULAGE CANOPY AND STUB UP VERTICALLY
UP TO 1 INCH PVC COATED RGS CONDUIT. RUN 1 INCH PVC COATER RGS CONDUIT HORIZONTALLY BELOW
INSTALL ONE NEW 1 INCH RGS CONDUIT FROM NEW JUNCTION BOX VERTICALLY DOWN PEDESTAL TO STUB 17.
SHALL BE INSTALLED INTERNALLY IN POLE.
NEW COUPLING LIGHT. SEE GENERAL NOTE 1 FOR CABLE DETAILS. ALL COUPLING LIGHT CONDUCTORS
USING CABLE SPLICE SHOWN ON SHEET EB003, DETAIL C3. INSTALL NEW CABLE L1F FROM L1A SPLICE TO
REMOVE EXISTING CABLE L1F FROM SPLICE TO CABLE L1A AND DEMOLISH. SPLICE NEW CABLE L1F TO L1A 16.
EXACT LOCATION OF COUPLING LIGHT.
PRIOR TO GALVANIZING. SEE SHEET EB502, DETAILS A2, C1, C2, AND C4. COORDINATE WITH COR FOR
MANUFACTURER WITH SWITCH OPENING CUT AND SWITCH/COVER PLATE SECURING HOLES PREDRILLED
SO AS NOT TO INTERFERE WITH TIPPING FUNCTION OF POLE. POLE SHALL COME FROM THE
WEATHERPROOF LIGHT SWITCH ON POLE AT ELEVATION OF 5 FEET ABOVE TOP OF LOCK WALL POSITIONED
INSTALL NEW COUPLING LIGHT 5 FEET FROM EDGE OF LOCK WALL. INSTALL NEW FLUSH MOUNTED 15.
NEW COUPLING LIGHT LOCATION.
14. INSTALL ONE NEW 2 INCH PVC COATED RGS CONDUIT TO EXTEND EXISTING COUPLING LIGHT CONDUIT TO
NEW WORK KEYNOTES CONTINUED
(SEE STRUCTURAL DRAWINGS)
NEW FENCE LOCATION
20 2" SCHEDULE 80 PVC
7 14
L1F 2" CONDUIT
M
D N
O A
D D
E D C
O N
D U
IT
N O
T E
A N
D O
T H
E R M
IN
O
R C
H A
N G
E S
R J
W
/1
/2
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -B
X .d g n
:2
:3
P
M
B E
D D
D E
D
/1
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
G
R
R J
W
A S S
H O
W N
D D
J
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
EB004
EXISTING ASPHALT ROADWAY
FLOW
CHAMBER
LOCK
MAIN
STAND
CONTROL
UPPER
S T
A . 7
.0 A
M O
N O
L
IT
H J
O
IN
T
0 2' 4' 8'SCALE : 1/4"=1'-0"
BUBBLER SUPPLY
S T
A . 7
.0 A
C H
E C
K P
O S
T
S T
A . 7
.5 A
L A
D D
E R
S T
A . 7
.5 A
B U
L K
H E
A D R
E C
E S
S
S T
A . 7
.5 A
M O
N O
L
IT
H J
O
IN
T
M R
E -B
X .d g n
NEW PULLBOX
P28 P29
CW2L2DL2CL23
P28 P29 L2F
L2C L2D L2G CW2
L23
DB-Q2
L248
7 EXISTING COUPLING LIGHT
GRASSY AREA
DRAIN IN
DEMOLITION KEY NOTES
GENERAL NOTES
FUTURE USE ON NEW POWER CORD.
MAINTAIN, AND PROTECT EXISTING 480V, 100A PLUG FOR
CABLE FROM TOW HAULAGE UNIT CONTROLLER.
REMOVE TOW HAULAGE UNIT EXISTING 480V POWER 9.
BASE TO DB-Q2. SEAL END WITH NON-SHRINK GROUT.
REMOVE COUPLING LIGHT 2 INCH CONDUIT FROM LIGHT 8.
CABLE L2A IN MH-13.
REMOVE EXISTING COUPLING LIGHT CABLE L2F FROM
REMOVE EXISTING COUPLING LIGHT POLE AND LIGHT. 7.
CONDUIT RUNS.
PEDESTAL AND CONDUITS TO POINT OF HORIZONTAL
REMOVE EXISTING TOW HAULAGE UNIT RECEPTACLE 6.
OF POWER.
PROTECT CANOPY JUNCTION BOX FOR RECONNECTION
BOX ON TOW HAULAGE UNIT CANOPY. MAINTAIN AND
RECEPTACLE PEDESTAL 120V RECEPTACLE TO JUNCTION
REMOVE CONDUIT FROM EXISTING TOW HAULAGE UNIT 5.
PULL BOX PVC 1 INCH DRAIN.
RUNS FOR INSTALLATION OF NEW CONDUITS AND NEW
REMOVE CONCRETE TO DEPTH OF HORIZONTAL CONDUIT 4.
PULL BOX OF DIMENSIONS 10”L X 18”W X 30”D.
RUNS. REMOVE ENOUGH CONCRETE TO INSTALL A NEW
REMOVE CONCRETE TO EXPOSE HORIZONTAL CONDUIT 3.
FOR FUTURE REINSTALLATION.
RECEPTACLE WEATHERPROOF ENCLOSURE AND COVER
PROTECT EXISTING 120V, TOW HAULAGE UTILITY
FUTURE REINSTALLATION. REMOVE, MAINTAIN, AND
TOW HAULAGE RECEPTACLE AND ENCLOSURE FOR
REMOVE, MAINTAIN, AND PROTECT EXISTING 480V, 100A 2.
BOTH CABLES AND GROUND CONDUCTOR.
MH-13 AND TOW HAULAGE UNIT. REMOVE AND DEMOLISH
AND GROUND CONDUCTOR FROM THE GROUND BUS IN
AND TOW HAULAGE UNIT PEDESTAL 120V RECEPTACLE,
P29 FROM LOWER LEFT CONTROL STAND PANELBOARD P2
HAULAGE UNIT PEDESTAL 480V 100A RECEPTACLE, AND
REMOVE EXISTING CABLES P28 FROM SB-1 AND TOW 1.
CONDUCTOR TRAY RATED CABLE.
MULTI CONDUCTOR METAL CLAD CABLE OR MULTI
SPECIFICATION FOR CABLE DETAILS. CABLES SHALL BE
SEE REFERENCE DRAWINGS L&D 16, EL70, EL 71, AND 1.
SCALE : NO SCALE
MONOLITH JOINT
SEE NOTE 3
EXPANSION JOINT
THE CONTRACTING OFFICER PRIOR TO INSTALLATION.
TO BE U.L. LISTED BUT SHALL BE CONCRETE TIGHT AND APPROVED BY
WITH 2" MIN. EMBEDMENT ON EACH SIDE. COUPLING IS NOT REQUIRED
COUPLING SHALL BE OF SUFFICIENT LENGTH TO SPAN EACH JOINT
FLEXIBLE COUPLING WITH STAINLESS STEEL BAND CLAMPS. FLEXIBLE 3.
PROVIDE SEISMIC FITTINGS AT EACH JOINT.2.
JOINTS.
SHALL HAVE ANGLED ENDS WITH JOINT PARALLEL TO MONOLITH
CONDUIT CROSSING EXPANSION/MONOLITH JOINTS AT AN ANGLE 1.
NOTES:
BANK (TYPICAL)
OR CONDUIT IN DUCT
SINGLE EMBEDDED CONDUIT
A4
FLEXIBLE COUPLING DETAIL
A1
UPSTREAM LANDWALL ANCILLARY DEMOLITION PLAN
D E
M O
L
IT
IO
N W
O R
K
L O
C K
U
P S
T R
E A
M L
A N
D W
A L L
A N
C
IL
L A
R Y E
L E
C T
R
IC
A L
/0
/2
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S
MH-13
R J
W
A M
D N
O M
IN
O
R C
H A
N G
E S
/1
/2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
A N
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -B
X .d g n
:3
:0
P
M
B E
D D
D E
D
/1
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
R J
W
A S S
H O
W N
D D
J
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
EB005
EXISTING ASPHALT ROADWAY
FLOW
CHAMBER
LOCK
MAIN
STAND
CONTROL
UPPER
S T
A . 7
.0 A
M O
N O
L
IT
H J
O
IN
T
0 2' 4' 8'SCALE : 1/4"=1'-0"
BUBBLER SUPPLY
S T
A . 7
.0 A
C H
E C
K P
O S
T
S T
A . 7
.5 A
L A
D D
E R
S T
A . 7
.5 A
B U
L K
H E
A D R
E C
E S
S
S T
A . 7
.5 A
M O
N O
L
IT
H J
O
IN
T
M R
E -B
X .d g n
NEW PULLBOX
P28 P29
CW2L2DL2CL23
P28 P29 L2F
L2C L2D L2G CW2
L23
DB-Q2
GRASSY AREA
DRAIN IN
NEW WORK KEY NOTES
A1
UPSTREAM LANDWALL ANCILLARY NEW WORK PLAN
E L E
C T
R
IC
A L N
E W W
O R
K
U P
S T
R E
A M L
A N
D W
A L L A
N C
IL
L A
R Y
L O
C K
E
L E
C T
R
IC
A L N
E W W
O R
K
/0
/2
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S
MH-13
GENERAL NOTES
CLAD CABLE OR MULTI CONDUCTOR TRAY RATED CABLE.
FOR CABLE DETAILS. CABLES SHALL BE MULTI CONDUCTOR METAL
SEE REFERENCE DRAWINGS L&D 16, EL70, EL 71, AND SPECIFICATION 1.
MH-13 SPLICE DETAIL.
INSTALLED INTERNALLY IN POLE. SEE SHEET EB501, DETAIL C3 FOR
CABLE DETAILS. ALL COUPLING LIGHT CONDUCTORS SHALL BE
LIGHT AND L2FB TO TOW HAULAGE CANOPY. SEE GENERAL NOTE 1 FOR
10.INSTALL NEW CABLE L2FA FROM CABLE L2A IN MH-13 TO NEW COUPLING
DETAIL C1.
NEW COUPLING LIGHT. SEE SHEETS EB004, DETAIL A4; AND EB502,
ATTACH COUPLING LIGHT GROUND LOCK GROUND IN MH-13. INSTALL
POLE. EITHER EXOTHERMIC WELD OR USE COMPRESSION FITTING TO
TO LIGHT POLE AND GROUND TO POLE GROUNDING TERMINAL ON LIGHT
GROUND CONDUCTOR FROM LOCK GROUNDING CONDUCTOR IN MH-13
BELLS WHERE CONDUITS ENTER MH-13. RUN NEW # 1/0 BARE COPPER
GROUNDING CONDUCTOR TO RGS PORTION OF CONDUIT. INSTALL END
UP. INSTALL GROUNDING BUSHING ON STUB UP TO GROUND
PVC COATED RGS CONDUIT FOR 90 DEGREE SWEEP TO VERTICAL STUB
BASE APPROXIMATELY 2 INCHES. FOR PVC CONDUIT, TRANSITION TO
CROSSES MONOLITH JOINT. STUB UP BOTH CONDUITS IN LIGHT POLE
BASE. INSTALL CONDUIT EXPANSION COUPLING WHERE CONDUIT
INCH SCHEDULE 80 PVC CONDUIT FROM MH-13 TO NEW COUPLING LIGHT
9. INSTALL ONE NEW 2 INCH PVC COATED RGS CONDUIT AND ONE NEW 1
GALVANIZING. SEE SHEET EB502, DETAILS A1, A2, C1, C2, AND C4.
AND SWITCH/COVER PLATE SECURING HOLES PREDRILLED PRIOR TO
SHALL COME FROM THE MANUFACTURER WITH SWITCH OPENING CUT
SO AS NOT TO INTERFERE WITH TIPPING FUNCTION OF POLE. POLE
POLE AT ELEVATION OF 5 FEET ABOVE TOP OF LOCK WALL POSITIONED
INSTALL NEW FLUSH MOUNTED WEATHERPROOF LIGHT SWITCH ON
WALL. COORDINATE WITH COR FOR EXACT COUPLING LIGHT LOCATION.
LIGHT AT NEW LOCATION APPROXIMATELY 5 FEET FROM EDGE OF LOCK
CONSTRUCT NEW COUPLING LIGHT BASE AND INSTALL NEW COUPLING 8.
DAM 16 SITE PLAN, G-9; AND L&D 16, EL11.
PIPING IN VICINITY OF MH-13. SEE REFERENCE DRAWINGS LOCK AND
EB502 FOR COUPLING LIGHT BASE DETAIL. AVOID EXISTING BUBBLER
CONDUIT END BELL ON CONDUIT WHERE IT ENTERS MH-13. SEE SHEET
CONDUITS FROM NEW COUPLING LIGHT BASE TO MH-13. INSTALL RGS
REQUIRED TO ENTER MH-13. CORE DRILL INTO MH-13. INSTALL
LISTED BELOW TO A MINIMUM DEPTH OF 24 INCHES. VERIFY THE DEPTH
CUT TRENCH TO WIDTH AND DEPTH TO ACCOMMODATE CONDUITS
SAW CUT CONCRETE FROM NEW COUPLING LIGHT LOCATION TO MH-13. 7.
ACCORDANCE WITHICEA S-75-381, MSHA ACCEPTED, P-136-135, LR65300.
RESISTANT TYPE RHH/RHW-2. CABLE MEETS UL 1650, MADE IN
POWER CABLE 90 DEGREE C, 2000V, OIL, WATER AND SUNLIGHT
EXISTING POWER CABLE IS SOUTHWIRE INDUSTRIAL TYPE W PORTABLE
UNIT CONTROLLER TO REACH NEW 480V RECEPTACLE LOCATION. THE
INSTALL TOW HAULAGE UNIT NEW POWER CABLE FROM TOW HAULAGE 6.
CABLES WERE IN. SEE GENERAL NOTE 1 FOR CABLE DETAILS.
INSTALL NEW CABLES IN SAME DUCT BANK DUCTS AS THE EXISTING
CONDUCTOR TO THE GROUNDING BUSHING ON THE RGS STUB UP.
FROM THE CONDUIT STUB UP, INSTALL A GROUND STRAP FROM THE
IN ITS NEW LOCATION. AT THE GROUND CONDUCTORS POINT OF EXIT
BOLTED TO THE TOW HAULAGE UNIT FRAME OF THE TOW HAULAGE UNIT
THE NEW TOW HAULAGE PEDESTAL, AND ACROSS THE GROUND AND
THROUGH SCHEDULE 80 PVC GROUND CONDUIT, OUT THE STUB UP AT
COPPER GROUND CONDUCTOR FROM EXISTING GROUND BUS IN MH-13
HAULAGE UTILITY RECEPTACLE. INSTALL NEW NO. 2 AWG STRANDED
P29 FROM LOWER LEFT CONTROL STAND PANELBOARD P1 TO 120V, TOW
RECEPTACLE PEDESTAL 480V, 100A RECEPTACLE. INSTALL NEW CABLE
INSTALL NEW CABLE P28 FROM SB-1 TO TOW HAULAGE UNIT NEW 5.
STUB UP. SEE SHEET EB503, DETAIL A1.
THE PEDESTAL. INSTALL A GROUNDING BUSHING ON THE END OF THE
CONDUIT 90 DEGREE SWEEP STUBBING UP VERTICALLY ADJACENT TO
CONVERT THE SCHEDULE 80 PVC CONDUIT TO PVC COATED RGS 4.
DRAIN TOWARD GRASSY AREA.
WITH END CUT FLUSH WITH INSIDE WALL OF BOX. SLOPE DRAIN PIPE TO
PEDESTAL LOCATION. INSTALL DRAIN TOWARD BOTTOM OF PULL BOX
PEDESTAL TO EXIT LOCK WALL INTO GRASSY AREA UPSTREAM OF NEW
PVC 1 INCH DRAIN PIPE FROM PULL BOX IN THE DIRECTION OF THE NEW
DEPTH AT DEPTH OF EXISTING CONDUIT. INSTALL NEW SCHEDULE 40
CONDUITS WHERE THEY ENTER PULL BOX. MAINTAIN NEW CONDUIT
ENTER PULL BOX. INSTALL PVC CONDUIT END BELLS ON THE PVC
INSTALL RGS CONDUIT END BELLS ON THE RGS CONDUITS WHERE THEY
RUN 1 INCH CONDUIT VERTICALLY UP LEG TO CANOPY JUNCTION BOX.
INCHES INTO 2 INCH UNF UNION AND REDUCER TO 1 INCH RGS CONDUIT.
CONDUIT FROM NEW PULL BOX TO CLOSEST CANOPY LEG. STUB UP 3
EQUIPMENT GROUND. INSTALL ONE NEW 2 INCH PVC COATED RGS
HAULAGE UNIT RECEPTACLE PEDESTAL LOCATION FOR TOW HAULAGE
FOR BARE GROUND CONDUCTOR FROM NEW PULL BOX TO NEW TOW
RECEPTACLE. INSTALL ONE NEW 2 INCH SCHEDULE 80 PVC CONDUIT
RECEPTACLE PEDESTAL FOR TOW HAULAGE POWER AND 120V UTILITY
AND ONE FOR 120V) FROM NEW PULL BOX TO NEW TOW HAULAGE UNIT
INSTALL TWO NEW 2 INCH PVC COATED RGS CONDUITS (ONE FOR 480V 3.
PULL BOX. SEE SHEET EB502, DETAIL A1.
BELLS COMPATIBLE WITH THE 3 INCH CONDUITS WHERE THEY ENTER
AND GROUND). ANSI TIER RATING SHALL BE 22. INSTALL CONDUIT END
EXISTING THREE 2 INCH CONDUITS FROM DB-Q2. (FOR CABLES P28, P29,
18”D WITH COVER FLUSH WITH TOP OF LOCK WALL TO INTERCEPT THE
INSTALL NEW PULL BOX OF APPROXIMATE DIMENSIONS OF 10”L X 18”W X 2.
SHEET EB503, DETAILS A1, A4, AND C4.
NEW 120V, 20A SPECIFICATION GRADE GFI UTILITY RECEPTACLE. SEE
HEIGHT OF 5 FEET MINIMUM ABOVE LOCK WALL ELEVATION. INSTALL
RECEPTACLE WEATHERPROOF ENCLOSURE AND COVER, EACH AT A
AND ENCLOSURE, AND EXISTING 120V, TOW HAULAGE UTILITY
LOCATION. REINSTALL EXISTING 480V, 100A TOW HAULAGE RECEPTACLE
INSTALL NEW TOW HAULAGE UNIT RECEPTACLE PEDESTAL IN NEW 1.
R J
W A
M D N
O M
IN
O
R C
H A
N G
E S
/1
/2
NO SCALE
FEATURES
NO SCALEC2
LIGHT FIXTURE DETAIL & SCHEDULE
0 6" 1' 2'SCALE : 1 1/2"=1'-0"
1'-6"Ø
EACH LIGHT POLE
ARE REQUIRED FOR
FOUR ANCHOR BOLTS
NOTE:
TOP OF WALL
TO INSTALL POLE
LENGTH AS REQUIRED
(4)#6 @ 90°
#4 SPIRAL
15FT. MOUNTING HEIGHT
APPROXIMATE
NOT SHOWN
REQUIRED, BUT
POLE HINGE IS
JUNCTION BOX
NEW PEDESTAL
CONTINUOUS FROM
CONDUCTORS
INSTALL NEW
FASTENING BOLT
HINGED-POLE
HAND HOLE
COVER
ANCHOR BOLT
EXISTING HANDRAIL
TOP OF LOCK WALL
SIDEWALK
LOCK WALL
FACE OF
RIVER SIDE
BACKFILL
SOIL
GENERAL AREA.
SHOWN HERE TO IDENTIFY
ARRANGEMENT IS NOT KNOWN.
THE LOCK WALL. CONDUIT
EXISTING CONDUITS BEHIND
MAINTAIN AND PROTECT THE
THIS SHEET.
SEE DETAIL B4 ON
COUPLING LIGHT.
FOUNDATION FOR NEW
PROVIDE NEW CONCRETE
(VIEW LOOKING UPSTREAM)
C1
COUPLING LIGHT DETAIL
MANUFACTURER
RECOMMENDED BY LIGHT POLE
QUANTITY, AND BOLT PATTERN AS
ROD SET IN EPOXY GROUT, SIZE,
ASTM F1554 GRADE 55 THREADED
C4
COUPLING LIGHT POLE FOUNDATION DETAIL
SEE LIGHT FIXTURE DETAIL C2
DOWNSTREAM MITER GATES.
DOWNSTREAM OF
ACROSS CHAMBER ENTRANCE
BEST AVERAGE ILLUMINATION
AIM THE LIGHT FIXTURE FOR
FIXTURE. CONTRACTOR SHALL
PROVIDE NEW LED LIGHT
RAB LIGHTING MODEL FXLED300SFBASIS OF DESIGN:
MANUFACTURER'S STANDARD BRONZE COLOR POWDER COAT FINISHFINISH:
SLIPFITTER, ABLE TO BE AIMEDMOUNTING:
WATEROROOF LIGHT SWITCH INSTALLED ON FENCEPOST, SEE SHEET E-101.CONTROL:
NEMA 7H x 6VDISTRIBUTION:
-40 DEGREES F TO 104 DEGREES FOPERATING TEMP:
FIVE (5) YEAR MINIMUM WARRANTYWARRANTY:
120V ACELECTRICAL:
HINGES. UL LISTED FOR WET LOCATIONS.
HARDWARE. HINGED LENSE FRAME WITH GASKETED FLANGE INTEGRAL TO
ONE PIECE DIE-CAST COPPER-ALUMINUM ALLOY WITH STAINLESS STEELHOUSING:
5000K COLOR TEMPERATURELAMP CCT:
300 WATT 72CRI LIGHT EMITTING DIODE (L.E.D.) FLOODLIGHT. ONE FIXTURE REQUIRED.TYPE:
A N
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -B
.d g n
:3
:2
P
M
B E
D D
D E
D
/1
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
R J
W
A S S
H O
W N
D D
J
C K
M
A
IN
R
E C
E
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
IN UPSTREAM DIRECTION.
PARALLEL TO THE LOCK CHAMBER
COLOR). POLE SHALL TILT
STEEL POLE (NATURAL GALVANIZED
HINGED, HOT-DIPPED GALVANIZED
NEW 6" SQUARE, TIP-DOWN,
"ELECTRIC"
EMBOSSED LABEL
TOOL FOR OPENING AT EACH SITE
ANTI-SIEZE COMPOUND. PROVIDE
WITH WASHERS, INSTALLED USING
STAINLESS STEEL HEX HEAD BOLTS
PG STYLE (STACKABLE) ASSEMBLY
COMPOSITE. DESIGN BASIS IS QUAZITE
CONCRETE OR POLYMER CONCRETE
COVER, OR COVERS AND ASSEMBLY
SKID RESISTANT, GASKETED, CAST
ANSI/SCTE 77 TIER 22 LOAD RATING,
NOT TO SCALEA1
IN GROUND PULL BOX - DETAIL
IN DRAINING WATER AWAY FROM THE BOX.
AROUND THE EDGE OF THE PULLBOX TO ASSIST
TROWLED TO CREATE A GRADUAL TAPER
CONCRETE AROUND THE TOP SHALL BE HAND-
WHERE ADJACENT SURFACE IS CONCRETE, NEW 2.
COVERS SHALL FIT SQUARE AND TRUE AND FLAT.1.
DETAIL NOTES:
SCALE : NO SCALE
NEW LIGHT POLE
NEW LIGHT SWITCH
SWITCH HOLE
PRECUT / PREDRILLED
NEW WEATHERPROOF COVER
A2
LIGHT POLE SWITCH
A2 THIS SHEET)
TOP OF LOCK WALL (SEE DETAIL
SECTION OFF POLE AT 5' ABOVE
MOUNTED ON UPSTREAM BOTTOM
COUPLING LIGHT "ON/OFF" SWITCH
GASKET
WEATHERPROOF
NEW TYPICAL
MOUNTING SCREW,
STAINLESS STEEL
SWITCH RATED FOR 120 VAC, 20A, SPECIFICATION GRADE.3.
BASIS OF DESIGN IS APPLETON FSK-IVTS.2.
COVERS SHALL BE MALLEABLE IRON ZINC, ELECTROPLATED.1.
SWITCH NOTES:
EB502
M R
E -B
.d g n
E L E
C T
R
IC
A L D
E T
A
IL
S
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S
/0
/2
EXPANDING FOAM
CONCRETE & SEAL WITH
BASE. EXTEND 2" ABOVE
ENTERING LIGHT POLE
ONE 2" & ONE 1" CONDUIT
R J
W A
M D N
O M
IN
O
R C
H A
N G
E /1
/2
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
STA. 0+00
PINTLELC
UNIT RECEPTACLE
BOX AND TOW HAULAGE
EXISTING POWER JUNCTION
EXISTING FENCE
EXISTING TOW HAULAGE UNIT
CHAMBER
MAIN LOCK
F L
O W
GENERAL NOTES
COR.
BASE LOCATION AND REPAIR OF EXISTING CONCRETE WITH
CLOSE PROXIMITY TO EXISTING BASE. COORDINATE NEW
PREPARATION FOR INSTALLING NEW LIGHT POLE BASE IN
2. REMOVE EXISTING COUPLING LIGHT POLE BASE IN
REMAIN PROPERTY OF THE GOVERNMENT.
FIXTURE, SWITCH, CONDUIT, AND POWER CORD TO COR TO
BOX. TURN OVER EXISTING COUPLING LIGHT POLE, LIGHT
COUPLING LIGHT POWER DISCONNECTION AND PLUG HOLE IN
CONDUCTORS AS REQUIRED IN CANOPY JUNCTION BOX AFTER
JUNCTION BOX ON CANOPY UNDERSIDE. RE-SPLICE
COUPLING LIGHT POWER CORD TO CANOPY BACK TO FIRST
FIXTURE, SWITCH, CONDUIT, AND POWER CORD. REMOVE
CAREFULLY REMOVE EXISTING COUPLING LIGHT POLE, LIGHT 1.
DS DEMOLITION KEY NOTES
DS NEW WORK KEY NOTES
0 2' 4' 8'SCALE : 1/4"=1'-0"
PLAN
NORTH
CORD TO CANOPY JUNCTION BOX
EXISTING COUPLING LIGHT POWER
COUPLING LIGHT POLE LOCATION)
EXISTING COUPLING LIGHT POLE (& NEW
A1
LD 22 DS LANDWALL DEMOLITION / NEW WORK PLAN
A N
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -H
X X
X .d g n
:3
:2
P
M
B E
D D
D E
D
/1
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
E -H
X X
X .d g n
B G
R
R J
W
A S S
H O
W N
D D
J
C
U P
L
IN
G L
IG
H T R
E P
L A
C E
M E
N T P
L A
EH001
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
C K
L
A N
D W
A L L
/0
/2
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S
GROUNDING CONDUCTOR TO RGS PORTION OF CONDUIT.
EACH END ON GROUNDING CONDUIT AND TERMINATE
LIGHT POLE. INSTALL GROUNDING BUSHING ON STUB UP OF
GROUND CONDUCTOR TO POLE GROUNDING TERMINAL ON
FOR 90 DEGREE SWEEP TO VERTICAL STUB UP. TERMINATE
COUPLING LIGHT, TRANSITION TO PVC COATED RGS CONDUIT
CONDUIT AND RUN UP TO BOTTOM OF DEVICE BOX. AT
CONDUIT FROM COUPLING LIGHT TO PVC COATED RGS
EXISTING TOW HAULAGE UNIT GROUND. CONVERT PVC
COUPLING TO BOND NEW COUPLING LIGHT GROUND TO
HAULAGE UNIT GROUND THROUGH BOX. USE COMPRESSION
GROUND STUB UP AT PEDESTAL AND RUN EXISTING TOW
8. INSTALL WEATHERPROOF DEVICE BOX ON TOP OF EXISTING
REPAIR TRENCH FOR COUPLING LIGHT CONDUIT.
7. COORDINATE WITH PRIME CONTRACTOR TO FILL IN AND
INTERNALLY IN POLE.
COUPLING LIGHT CONDUCTORS SHALL BE INSTALLED
COUPLING LIGHT BASE IN THE SCHEDULE 80 PVC CONDUIT. ALL
BARE COPPER GROUND FROM GROUND STUB UP TO 0
1#
COUPLING LIGHT IN THE PVC COATED RGS CONDUIT. INSTALL
TOW HAULAGE UNIT RECEPTACLE PEDESTAL TO NEW
TERMINAL BOARD IN THE EXISTING POWER JUNCTION BOX /
GROUND XHHW COPPER CONDUCTORS FROM THE 120V
6. INSTALL SINGLE CONDUCTOR 2 NO. 12 AWG AND 1 NO. 12 AWG
PEDESTAL TO NEW COUPLING LIGHT LOCATION.
AND ONE NEW 1 INCH SCHEDULE 80 PVC CONDUIT FROM
5. INSTALL ONE NEW 1 INCH INCH PVC COATED RGS CONDUIT
INSTALLATION OF NEW CONDUIT AND CONDUCTORS.
RECEPTACLE PEDESTAL TO NEW COUPLING LIGHT BASE FOR
FROM EXISTING POWER JUNCTION BOX / TOW HAULAGE UNIT
CONDUITS LISTED BELOW TO A DEPTH OF 24 INCHES MINIMUM
4. SAW CUT CONCRETE TRENCH TO A DEPTH TO ACCOMMODATE
C2, AND C4.
PRIOR TO GALVANIZING. SEE SHEET EH501, DETAILS A2, C1,
AND SWITCH/COVER PLATE SECURING HOLES PREDRILLED
COME FROM THE MANUFACTURER WITH SWITCH OPENING CUT
INTERFERE WITH TIPPING FUNCTION OF POLE. POLE SHALL
FEET ABOVE TOP OF LOCK WALL POSITIONED SO AS NOT TO
WEATHERPROOF LIGHT SWITCH ON POLE AT ELEVATION OF 5
COUPLING LIGHT LOCATION. INSTALL NEW FLUSH MOUNTED
LIGHT LOCATION. COORDINATE WITH COR FOR EXACT
COUPLING LIGHT AT NEW LOCATION CLOSE TO THE EXISTING
CONSTRUCT NEW COUPLING LIGHT BASE AND INSTALL NEW 3.
R J
W A
M D N
O M
IN
O
R R
E V
IS
IO
N S
/1
/2
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
CHAMBER
MAIN LOCK
F L
O W
STAND
CONTROL
RIGHT
UPPER
PLAN
NORTH
19121110
16151410
10 161513
TO CAMERA
NEW COUPLING LIGHT
NEW RECEPTACLE PEDESTAL
UNIT AND CANOPY
UPPER TOW HAULAGE
GENERAL NOTES US NEW WORK KEY NOTES
US NEW WORK KEY NOTES
0 2' 4' 8'SCALE : 1/4"=1'-0"
A1
LD 22 US LANDWALL NEW WORK PLAN
DISSIMILAR METALS CORROSION.
BETWEEN JUNCTION BOX AND PEDESTAL PLATE TO PREVENT
USING 316 STAINLESS STEEL BOLTS. USE ISOLATIVE SPACERS
A-1008NFSS6. SECURE JUNCTION BOX TO PEDESTAL PLATE
BREATHER. BASIS OF DESIGN OF JUNCTION BOX IS HOFFMAN
INCH NPT THREADED 316 STAINLESS STEEL BOTTOM
CONDUITS SHALL ENTER THROUGH MYERS HUBS. INSTALL ¾
TERMINAL BLOCKS FOR CONDUCTOR CONNECTIONS.
316L STAINLESS STEEL CLAMP COVER NEMA 4X WITH INTERIOR
3. THE NEW WEATHERPROOF JUNCTION BOX SHALL BE 14 GAUGE
DRAWINGS.
2. CONTRACTOR SHALL COORDINATE WORK WITH STRUCTURAL
CONDUCTOR TRAY RATED CABLE.
CONDUCTOR BONDED SHIELDED, METAL CLAD, OR MULTI
SPECIFICATION FOR CABLE DETAILS. CABLES SHALL BE MULTI
1. SEE REFERENCE DRAWINGS L&D 22, EL60, EL 61, AND
A N
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -H
X X
X .d g n
:4
:0
P
M
B E
D D
D E
D
/1
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
E -H
X X
X .d g n
B G
R
R J
W
A S S
H O
W N
D D
J W
B
N E
W W
O R
K
C O
U P
L
IN
G L
IG
H T R
E P
L A
C E
M E
N T P
L A
EH003
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
C K
U
P S
T R
E A
M L
A N
D W
A L L
/0
/2
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S
J
W A
M D N
O M
IN
O
R R
E V
IS
IO
N S
RGS STUB UP.
FROM THE CONDUCTOR TO THE GROUNDING BUSHING ON THE
EXIT FROM THE CONDUIT STUB UP, INSTALL A GROUND STRAP
NEW LOCATION. AT THE GROUND CONDUCTORS POINT OF
TOW HAULAGE UNIT FRAME OF THE TOW HAULAGE UNIT IN ITS
PEDESTAL, AND ACROSS THE GROUND AND BOLTED TO THE
CONDUIT, OUT THE STUB UP AT THE NEW TOW HAULAGE
STAND MANHOLE THROUGH SCHEDULE 80 PVC GROUND
CONDUCTOR FROM EXISTING GROUND BUS IN CONTROL
BOARD. INSTALL NEW NO. 2 AWG STRANDED COPPER GROUND
PEDESTAL JUNCTION BOX AND TERMINATE ON TERMINAL
STAND MANHOLE AND PULL INTO CONDUIT TO FEED 120V TO
RECEPTACLE. RETRIEVE EXISTING CABLE L2B FROM CONTROL
MANHOLE AND PULL INTO CONDUIT TO FEED 480V PEDESTAL
12. RETRIEVE EXISTING CABLE P28 FROM CONTROL STAND
NON-SHRINK GROUT.
AROUND CONDUITS WHERE THEY EACH ENTER MANHOLE WITH
VERTICALLY 3 INCHES ADJACENT TO THE PEDESTAL. SEAL
COATED RGS CONDUIT 90 DEGREE SWEEP STUBBING UP
PEDESTAL. CONVERT THE SCHEDULE 80 PVC CONDUIT TO PVC
GROUND CONDUIT FROM CONTROL STAND MANHOLE TO
JUNCTION BOX. INSTALL ONE NEW 1 INCH SCHEDULE 80 PVC
VERTICAL RGS CONDUIT FROM REDUCER VERTICALLY UP TO
PEDESTAL TO 480V RECEPTACLE AND ONE NEW 1 INCH
REDUCER VERTICALLY UP TOW HAULAGE UNIT RECEPTACLE
BOX. RUN ONE NEW 2 INCH VERTICAL RGS CONDUIT FROM
UNDER 480V RECEPTACLE, AND THE OTHER UNDER JUNCTION
VERTICALLY 3 INCHES TO UNF UNION AND REDUCER, ONE
TOW HAULAGE UNIT RECEPTACLE PEDESTAL TO STUB UP
EXISTING UPPER RIGHT CONTROL STAND MANHOLE TO NEW
11. INSTALL 2 NEW 3 INCH PVC COATED RGS CONDUITS FROM
STAND MANHOLE.
CONDUIT AND CONDUCTORS. CORE DRILL INTO CONTROL
PEDESTAL TO EXISTING CAMERA FOR POWER. INSTALL NEW
LIGHT AND FROM NEW TOW HAULAGE UNIT RECEPTACLE
HAULAGE UNIT RECEPTACLE PEDESTAL TO NEW COUPLING
HAULAGE UNIT RECEPTACLE PEDESTAL, FROM NEW TOW
FROM UPPER RIGHT CONTROL STAND MANHOLE TO NEW TOW
CONDUITS LISTED BELOW AT A DEPTH OF 24 INCHES MINIMUM
10. SAW CUT CONCRETE TRENCH TO A DEPTH TO ACCOMMODATE
SHEET EH502, DETAILS A1, A4, AND C4. SEE GENERAL NOTE 3.
AND CANOPY LIGHTING/TOW HAULAGE UNIT LIGHTING. SEE
DIMENSIONS OF 10”L X 9”W X 9”D FOR THE COUPLING LIGHT
WEATHERPROOF JUNCTION BOX OF APPROXIMATE
FEET MINIMUM ABOVE LOCK WALL ELEVATION. INSTALL A NEW
HAULAGE RECEPTACLE AND ENCLOSURE AT A HEIGHT OF 5
PEDESTAL LOCATION. REINSTALL EXISTING 480V, 100A TOW
NEW LOCATION. COORDINATE WITH COR FOR EXACT
9. INSTALL NEW TOW HAULAGE UNIT RECEPTACLE PEDESTAL IN
& C4.
PRIOR TO GALVANIZING. SEE SHEET EH501, DETAILS A2, C1, C2
AND SWITCH/COVER PLATE SECURING HOLES PREDRILLED
COME FROM THE MANUFACTURER WITH SWITCH OPENING CUT
INTERFERE WITH TIPPING FUNCTION OF POLE. POLE SHALL
FEET ABOVE TOP OF LOCK WALL POSITIONED SO AS NOT TO
WEATHERPROOF LIGHT SWITCH ON POLE AT ELEVATION OF 5
COUPLING LIGHT LOCATION. INSTALL NEW FLUSH MOUNTED
LIGHT LOCATION. COORDINATE WITH COR FOR EXACT
COUPLING LIGHT AT NEW LOCATION CLOSE TO THE EXISTING
CONSTRUCT NEW COUPLING LIGHT BASE AND INSTALL NEW 8.
DETAIL C1.
MANHOLE. INSTALL NEW COUPLING LIGHT. SEE SHEET EH501,
ATTACH COUPLING LIGHT GROUND LOCK GROUND IN
EITHER EXOTHERMIC WELD OR USE COMPRESSION FITTING TO
GROUND TO POLE GROUNDING TERMINAL ON LIGHT POLE.
GROUNDING CONDUCTOR IN MANHOLE TO LIGHT POLE AND
NEW # 1/0 BARE COPPER GROUND CONDUCTOR FROM LOCK
INSTALL END BELL WHERE CONDUITS ENTER MANHOLE. RUN
GROUNDING CONDUCTOR TO RGS PORTION OF CONDUIT.
INSTALL GROUNDING BUSHING ON STUB UP TO GROUND
CONDUIT FOR 90 DEGREE SWEEP TO VERTICAL STUB UP.
APPROXIMATELY 2 INCHES. TRANSITION TO PVC COATED RGS
LIGHT BASE. STUB UP CONDUIT IN LIGHT POLE BASE
UPPER RIGHT CONTROL STAND MANHOLE TO NEW COUPLING
19. INSTALL ONE NEW 1 INCH SCHEDULE 80 PVC CONDUIT FROM
RECEPTACLE ON NEW CORD.
FLAME TEST P07-KA070018-MSHA. INSTALL THE EXISTING 120V
MEETS UL 62, CSA STANDARD 22.2 NO.49, MSHA LISTED PASSES
WATER, AND SUNLIGHT RESISTANT, OUTDOOR USE. CABLE
ROYAL TYPE SOOW POWER CABLE 90 DEGREE C, 600V, OIL,
CONDUCTORS AND BE THE SAME OR EQUAL TO SOUTHWIRE
SHALL BE 2 NO. 12 AWG AND 1 NO. 12 AWG GROUND COPPER
CONNECTION FOR CANOPY LIGHTING. THE NEW POWER CABLE
PEDESTAL JUNCTION BOX AND TOW HAULAGE UNIT
ENOUGH TO COMFORTABLY LIE ON GROUND BETWEEN THE
JUNCTION BOX FOR CABLE EXIT. CABLE SHALL BE LONG
CABLE FITTING INSTALLED (AS CABLE SUPPORT) IN BOTTOM OF
LOCK NUT CONDUIT HUBS (MYERS HUBS) WITH CGB CORD AND
CANOPY POWER PLUG. INSTALL 1 INCH SEALED LIQUID TIGHT
HAULAGE UNIT PEDESTAL JUNCTION BOX TO REACH THE
18. INSTALL NEW 120V CANOPY POWER CABLE FROM TOW
INSTALL THE EXISTING 480V PLUG ON NEW CORD.
WITHICEA S-75-381, MSHA ACCEPTED, P-136-135, LR65300.
RHH/RHW-2. CABLE MEETS UL 1650, MADE IN ACCORDANCE
2000V, OIL, WATER AND SUNLIGHT RESISTANT TYPE
INDUSTRIAL TYPE W PORTABLE POWER CABLE 90 DEGREE C,
CONDUCTORS. THE EXISTING POWER CABLE IS SOUTHWIRE
CABLE AND BE 3 NO. 2 AWG AND 1 NO. 6 AWG GROUND COPPER
NEW CABLE SHALL BE THE SAME OR EQUAL TO THE EXISTING
JUNCTION BOX AND TOW HAULAGE UNIT CONTROLLER. THE
COMFORTABLY LIE ON GROUND BETWEEN THE PEDESTAL
RECEPTACLE LOCATION. CABLE SHALL BE LONG ENOUGH TO
HAULAGE UNIT CONTROLLER TO REACH NEW 480V
17. INSTALL TOW HAULAGE UNIT NEW POWER CABLE FROM TOW
REPAIR ALL OPEN TRENCHES.
16. COORDINATE WITH PRIME CONTRACTOR TO FILL IN AND
CONDUCTORS SHALL BE INSTALLED INTERNALLY IN POLE.
BASE AND TO CAMERA JUNCTION BOX. ALL COUPLING LIGHT
UNIT PEDESTAL JUNCTION BOX TO NEW COUPLING LIGHT
TERMINAL BOARD (CABLE L2B TERMINALS) IN TOW HAULAGE
GROUND XHHW COPPER CONDUCTORS FROM THE 120V
15. INSTALL SINGLE CONDUCTOR 2 NO. 12 AWG AND 1 NO. 12 AWG
JUNCTION BOX.
¾ INCH RGS CONDUIT VERTICALLY INTO BOTTOM OF EACH
INCHES TO UNF UNION UNDER EACH JUNCTION BOX. EXTEND
BOX. AT PEDESTAL AND CAMERA, STUB UP VERTICALLY 3
TRENCH FROM PEDESTAL TO EXISTING CAMERA JUNCTION
14. INSTALL ONE NEW ¾ INCH PVC COATED RGS CONDUIT IN
EH502, DETAILS A1, A4, AND C4.
VERTICALLY INTO BOTTOM OF JUNCTION BOX. SEE SHEET
UNDER JUNCTION BOX. EXTEND ¾ INCH RGS CONDUIT
AT PEDESTAL, STUB UP VERTICALLY 3 INCHES TO UNF UNION
TRENCH FROM PEDESTAL TO BASE OF NEW COUPLING LIGHT.
13. INSTALL ONE NEW ¾ INCH PVC COATED RGS CONDUIT IN
/1
/2
NO SCALE
FEATURES
NO SCALEC2
LIGHT FIXTURE DETAIL & SCHEDULE
0 6" 1' 2'SCALE : 1 1/2"=1'-0"
1'-6"Ø
EACH LIGHT POLE
ARE REQUIRED FOR
FOUR ANCHOR BOLTS
NOTE:
TOP OF WALL
TO INSTALL POLE
LENGTH AS REQUIRED
(4)#6 @ 90°
#4 SPIRAL
15FT. MOUNTING HEIGHT
APPROXIMATE
NOT SHOWN
REQUIRED, BUT
POLE HINGE IS
JUNCTION BOX
NEW PEDESTAL
CONTINUOUS FROM
CONDUCTORS
INSTALL NEW
FASTENING BOLT
HINGED-POLE
HAND HOLE
COVER
ANCHOR BOLT
EXISTING HANDRAIL
TOP OF LOCK WALL
SIDEWALK
LOCK WALL
FACE OF
RIVER SIDE
BACKFILL
SOIL
GENERAL AREA.
SHOWN HERE TO IDENTIFY
ARRANGEMENT IS NOT KNOWN.
THE LOCK WALL. CONDUIT
EXISTING CONDUITS BEHIND
MAINTAIN AND PROTECT THE
THIS SHEET.
SEE DETAIL B4 ON
COUPLING LIGHT.
FOUNDATION FOR NEW
PROVIDE NEW CONCRETE
(VIEW LOOKING UPSTREAM)
C1
COUPLING LIGHT DETAIL
MANUFACTURER
RECOMMENDED BY LIGHT POLE
QUANTITY, AND BOLT PATTERN AS
ROD SET IN EPOXY GROUT, SIZE,
ASTM F1554 GRADE 55 THREADED
C4
COUPLING LIGHT POLE FOUNDATION DETAIL
SEE LIGHT FIXTURE DETAIL C2
DOWNSTREAM MITER GATES.
DOWNSTREAM OF
ACROSS CHAMBER ENTRANCE
BEST AVERAGE ILLUMINATION
AIM THE LIGHT FIXTURE FOR
FIXTURE. CONTRACTOR SHALL
PROVIDE NEW LED LIGHT
RAB LIGHTING MODEL FXLED300SFBASIS OF DESIGN:
MANUFACTURER'S STANDARD BRONZE COLOR POWDER COAT FINISHFINISH:
SLIPFITTER, ABLE TO BE AIMEDMOUNTING:
WATEROROOF LIGHT SWITCH INSTALLED ON FENCEPOST, SEE SHEET E-101.CONTROL:
NEMA 7H x 6VDISTRIBUTION:
-40 DEGREES F TO 104 DEGREES FOPERATING TEMP:
FIVE (5) YEAR MINIMUM WARRANTYWARRANTY:
120V ACELECTRICAL:
HINGES. UL LISTED FOR WET LOCATIONS.
HARDWARE. HINGED LENSE FRAME WITH GASKETED FLANGE INTEGRAL TO
ONE PIECE DIE-CAST COPPER-ALUMINUM ALLOY WITH STAINLESS STEELHOUSING:
5000K COLOR TEMPERATURELAMP CCT:
300 WATT 72CRI LIGHT EMITTING DIODE (L.E.D.) FLOODLIGHT. ONE FIXTURE REQUIRED.TYPE:
A N
S I
D p w \M
V R -A
P P
W
IN
T .m v r.
d s .u s a c e .a rm y .m il :C
E M
V R R o c k I s la n d D is tr ic t\
D o c u m e n ts \C iv il W o rk s \M is s is s ip p i R iv e r
B a s in \9
M u lt ip le M
R L o c k a n d D a m P ro je c ts \4
L
D s
L o c k C h a m b e r
B u lk h e a d R e c e s s \C
A D \S h e e ts \M
R E -H
X X
X .d g n
:5
:3
P
M
B E
D D
D E
D
/1
/2
R O
C K I S
L A
N D
IL
L
IN
O
IS
R O
C K I S
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
E -H
X X
X .d g n
B G
R
R J
W
A S S
H O
W N
D D
J
C K
S
A N
D
M
IS
S
IS
S
IP
P I
R
IV
E R B
A S
IN
M R
IN UPSTREAM DIRECTION.
PARALLEL TO THE LOCK CHAMBER
COLOR). POLE SHALL TILT
STEEL POLE (NATURAL GALVANIZED
HINGED, HOT-DIPPED GALVANIZED
NEW 6" SQUARE, TIP-DOWN,
SCALE : NO SCALE
NEW LIGHT POLE
NEW LIGHT SWITCH
SWITCH HOLE
PRECUT / PREDRILLED
NEW WEATHERPROOF COVER
A2
LIGHT POLE SWITCH
A2 THIS SHEET)
TOP OF LOCK WALL (SEE DETAIL
SECTION OFF POLE AT 5' ABOVE
MOUNTED ON UPSTREAM BOTTOM
COUPLING LIGHT "ON/OFF" SWITCH
GASKET
WEATHERPROOF
NEW TYPICAL
MOUNTING SCREW,
STAINLESS STEEL
SWITCH RATED FOR 120 VAC, 20A, SPECIFICATION GRADE.3.
BASIS OF DESIGN IS APPLETON FSK-IVTS.2.
COVERS SHALL BE MALLEABLE IRON ZINC, ELECTROPLATED.1.
SWITCH NOTES:
EH501
E L E
C T
R
IC
A L D
E T
A
IL
S
L O
C K
/0
/2
W E
K -1
-R -0
IL
L
IN
O
IS
IO
W A
A N
D M
IS
S
O U
R I
L O
C K C
H A
M B
E R B
U L
K H
E A
D R
E C
E S
S
R J
W A
M D N
O M
IN
O
R R
E V
IS
IO
N
WITH EXPANDING FOAM
CONCRETE & SEAL
BASE. EXTEND 2" ABOVE
ENTERING LIGHT POLE
TWO 1" CONDUITS
/1
/2
ID
Sheet
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
| MR169_E-B001XXX |
| MR169_E-B002XXX |
| MR169_E-B004X |
| MR169_E-B005X |
| MR169_E-B502 |
| MR169_E-H001XXX |
| MR169_E-H003XXX |
| MR169_E-H501XXX |
File details come from the government source that posted it. Updated .