This document is a specification section for Governmental Safety Requirements for a federal contract opportunity. The key details are:
The solicitation number is W912EF24Q0028 for the HLD Main Unit 6 Scroll Case Cooling Water Lamprey Exclusion Cover project. The specification outlines safety requirements for the contractor, including an Accident Prevention Plan, Activity Hazard Analyses, Fall Protection Program, Confined Space Entry requirements, Lockout/Tagout procedures, and regulations for equipment and material handling. It details personnel qualifications, required submittals, safety meetings, accident reporting, and general safety practices. The contractor must comply with USACE EM 385-1-1 Safety and Occupational Health Requirements Manual as well as applicable OSHA and NFPA standards. The specification is part of the overall solicitation for this federal contract opportunity.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HLD PH Unit 6 Scroll Case Cooling Water Lamprey Excl Cover W912EF24Q0028 HLD488347 Amend-0001
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 29.10 28
GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.3.1 Competent Person (CP)
1.3.2 High Hazard Work Group Activities
1.3.3 High Visibility Accident
1.3.4 Load Handling Equipment (LHE)
1.3.5 Medical Treatment
1.3.6 Near Miss
1.3.7 Operating Envelope
1.3.8 Qualified Person (QP)
1.3.9 Recordable Injuries or Illnesses
1.3.10 USACE Property and Equipment
1.3.11 Load Handling Equipment (LHE) Accident or Load Handling
Equipment Mishap
1.4 MONTHLY EXPOSURE REPORTS
1.5 REGULATORY REQUIREMENTS
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer (SSHO)
1.6.1.2 Competent Person Qualifications
1.6.1.3 Crane Operators/Riggers
1.6.2 Meetings
1.6.2.1 Preconstruction Meeting
1.6.2.2 Safety Meetings
1.7 ACCIDENT PREVENTION PLAN (APP)
1.7.1 Plans
1.7.1.1 Confined Space Entry Plan
1.7.1.2 Standard Lift Plan (SLP)
1.7.1.3 Critical Lift Plan- Crane or Load Handling Equipment
1.7.1.4 Fall Protection and Prevention (FP&P) Plan
1.7.1.5 Rescue and Evacuation Plan
1.7.1.6 Hazardous Energy Control Program (HECP)
1.8 ACTIVITY HAZARD ANALYSIS (AHA)
1.8.1 AHA Signature Log
1.9 LOCKOUT/TAGOUT (LOTO)-SAFE CLEARANCE OR HAZARDOUS ENERGY CONTROL
PROGRAM (HECP) PROCEDURES
1.9.1 Safe Clearance Training
1.10 DISPLAY OF SAFETY INFORMATION
1.10.1 Safety Bulletin Board
1.10.2 Safety and Occupational Health (SOH) Deficiency Tracking
System
1.11 SITE SAFETY REFERENCE MATERIALS
1.12 EMERGENCY MEDICAL TREATMENT
SECTION 01 35 29.10 28
1.13 NOTIFICATIONS and REPORTS
1.13.1 Mishap Notification
1.13.2 Accident Reports
1.13.3 LHE Inspection Reports
1.13.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and Rigging
1.13.5 Contractor's Cranes
1.14 HOT WORK
1.15 RADIATION SAFETY REQUIREMENTS
1.16 CONFINED SPACE ENTRY REQUIREMENTS
1.16.1 Entry Procedures
1.16.2 Forced Air Ventilation
1.16.3 Sewer Wet Wells
1.16.4 Rescue Procedures and Coordination with Local Emergency
Responders
1.17 SEVERE STORM PLAN
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
3.1.1 Worksite Communication
3.1.2 Hazardous Material Exclusions
3.1.3 Unforeseen Hazardous Material
3.2 FALL PROTECTION PROGRAM
3.2.1 Training
3.2.2 Fall Protection Equipment and Systems
3.2.2.1 Additional Personal Fall Protection
3.2.2.2 Personal Fall Protection Harnesses
3.2.3 Flexible Horizontal Lifelines (HLL)
3.2.4 Guardrails and Safety Nets
3.2.5 Rescue and Evacuation Plan and Procedures
3.3 WORK PLATFORMS
3.3.1 Scaffolding
3.3.2 Elevated Aerial Work Platforms (AWP's)
3.4 EQUIPMENT
3.4.1 Material Handling Equipment (MHE)
3.4.2 Load Handling Equipment (LHE)
3.4.3 Machinery and Mechanized Equipment
3.4.4 Explosives
-- End of Section Table of Contents --
SECTION 01 35 29.10 28
GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.34 (2021) Protection of the Public on or Adjacent to Construction Sites
ASSP A10.44 (2020) Control of Energy Sources (Lockout/Tagout) for Construction and Demolition Operations
ASSP Z244.1 (2016) The Control of Hazardous Energy Lockout, Tagout and Alternative Methods
ASSP Z359.0 (2018) Definitions and Nomenclature Used for Fall Protection and Fall Arrest
ASSP Z359.1 (2020) The Fall Protection Code
ASSP Z359.2 (2017) Minimum Requirements for a Comprehensive Managed Fall Protection Program
ASSP Z359.3 (2019) Safety Requirements for Lanyards and Positioning Lanyards
ASSP Z359.4 (2013) Safety Requirements for Assisted-Rescue and Self-Rescue Systems, Subsystems and Components
ASSP Z359.6 (2016) Specifications and Design Requirements for Active Fall Protection Systems
ASSP Z359.7 (2019) Qualification and Verification Testing of Fall Protection Products
ASSP Z359.11 (2021) Safety Requirements for Full Body Harnesses
ASSP Z359.12 (2019) Connecting Components for Personal Fall Arrest Systems
ASSP Z359.13 (2013) Personal Energy Absorbers and Energy Absorbing Lanyards
ASSP Z359.14 (2021) Safety Requirements for Self-Retracting Devices for Personal Fall Arrest and Rescue Systems
ASSP Z359.15 (2014) Safety Requirements for Single Anchor Lifelines and Fall Arresters for Personal Fall Arrest Systems
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B30.20 (2018) Below-the-Hook Lifting Devices
ASME B30.22 (2023) Articulating Boom Cranes
ASME B30.26 (2015; R 2020) Rigging Hardware
ASME B30.3 (2020) Tower Cranes
ASME B30.5 (2021) Mobile and Locomotive Cranes
ASME B30.8 (2020) Floating Cranes and Floating Derricks
ASME B30.9 (2018) Slings
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 10 (2022; ERTA 1 2021) Standard for Portable Fire Extinguishers
NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 51B (2024) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 70 (2023; ERTA 4 2023; ERTA 5 2023; ERTA 6
2023) National Electrical Code
NFPA 70E (2024) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Occupational Health Requirements Manual
The Contractor is responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
10 CFR 20 Standards for Protection Against Radiation
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.29 (Nov 2016) Fall Protection System and
Falling Object Protection - Criteria and Practices
29 CFR 1910.146 Permit-required Confined Spaces
29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag Out)
29 CFR 1910.333 Selection and Use of Work Practices
29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment
29 CFR 1915.89 Control of Hazardous Energy (Lockout/Tags-Plus)
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.1400 Cranes and Derricks in Construction
29 CFR 1926.16 Rules of Construction
29 CFR 1926.450 Scaffolds
29 CFR 1926.500 Fall Protection
CPL 2.100 (1995) Application of the Permit-Required Confined Spaces (PRCS) Standards, 29 CFR 1910.146
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. A designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan (APP) ; G, C
Activity Hazard Analysis (AHA) ; G, C
Safe Clearance ; I, C
Authorized Individuals ; I, C
Standard Lift Plan ; G, C
Critical Lift Plan ; G, C
Crane Wheel And Outrigger Loading Diagram And Deck Protection For Outriggers ; G, ST
Competent Person Qualifications ; G, C
Confined Space Entry Plan ; G, C
Site Safety And Health Officer (SSHO) Designation Letter ; G, C
SD-06 Test Reports
Monthly Exposure Reports ; I, C
Notifications and Reports ; I, C
Accident Reports ; I, C
LHE Inspection Reports ; I, C
SD-07 Certificates
Crane Operators/Riggers ; I, C
Confined Space Entry Permit ; I, C
Hot Work Permit ; I, C
Certificate of Compliance ; I, C
Radiation Materials and Equipment Records ; I, C
1.3 DEFINITIONS
1.3.1 Competent Person (CP)
a. CP is a person meeting the requirements as defined in EM 385-1-1 , and must meet the following requirements:
1. Been designated in writing to be responsible for the immediate supervision, implementation and monitoring of the program.
2. Through training, knowledge and experience be able to correctly identify, evaluate and address existing and potential hazards.
3. Has the authority to take prompt corrective measures with regard to specified hazards.
b. CP's are required by the EM 385-1-1 for the following:
1. Confined Space ( 29 CFR 1910.146 )
2. Cranes and Rigging (ASME B30)
3. Fall Protection ( ASSP Z359.14 , 29 CFR 1910.29 and 140;
29 CFR 1926 Subpart M) and Scaffolding ( 29 CFR 1926.450 Subpart L).
See "Competent Person Qualifications" paragraph for additional information.
1.3.2 High Hazard Work Group Activities
High Hazard Work Group (HHWG) Activities are activities that involve work at heights, crane and rigging, excavations and trenching, scaffolding, electrical work, underwater diving, and confined space entry.
1.3.3 High Visibility Accident
A High Visibility Accident is any mishap which may generate publicity or high visibility.
1.3.4 Load Handling Equipment (LHE)
LHE is a term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used with rigging to raise, lower or horizontally move a load).
1.3.5 Medical Treatment
Medical Treatment is treatment administered by a physician, or registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.
1.3.6 Near Miss
A Near Miss is a mishap resulting in no personal injury and zero property damage, but given a shift in time or position, damage or injury may have occurred (e.g., a worker falls off a scaffold and is not injured; a crane swings around to move the load and narrowly misses a parked vehicle).
1.3.7 Operating Envelope
The Operating Envelope is the area surrounding any crane or load handling equipment. Inside this "envelope" is the crane, the operator, riggers and crane walkers, other personnel involved in the operation, rigging gear between the hook, the load, the crane's supporting structure (i.e. ground or rail), the load's rigging path, the lift and rigging procedure.
1.3.8 Qualified Person (QP)
A QP is a person meeting the requirements of EM 385-1-1 , and ASSP Z359.0 , with a recognized degree or professional certificate and with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, and evaluating and specifying fall protection and rescue systems
1.3.9 Recordable Injuries or Illnesses
Recordable Injuries or Illnesses are any work-related injury or illness that results in:
a. Death, regardless of the time between the injury and death, or the length of the illness;
b. Days away from work (any time lost after day of injury/illness onset);
c. Restricted work;
d. Transfer to another job;
e. Medical treatment beyond first aid;
f. Loss of consciousness; or
g. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (a) through (f) above.
1.3.10 USACE Property and Equipment
Interpret "USACE" property and equipment specified in USACE EM 385-1-1 as Government property and equipment.
1.3.11 Load Handling Equipment (LHE) Accident or Load Handling Equipment Mishap
A LHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load; derailment;
two-blocking; overload; or collision, including unplanned contact between the load, crane, or other objects. A dropped load, derailment, two-blocking, overload and collision are considered accidents, even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, or roll over). Document any mishap that meets the criteria described in the ENG FORM 3394 MISHAP NOTIFICATION AND INVESTIGATION. The form can be viewed, or downloaded at the following link:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf
1.4 MONTHLY EXPOSURE REPORTS
Provide a Monthly Exposure Report and attach to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both Prime and sub-contractor. Failure to submit the report may result in retention of up to 10 percent of the voucher.
1.5 REGULATORY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, comply with the most recent edition of USACE EM 385-1-1 , and all federal, state, and local laws. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern.
1.6 SITE QUALIFICATIONS, DUTIES, AND MEETINGS
1.6.1 Personnel Qualifications
1.6.1.1 Site Safety and Health Officer (SSHO)
Provide an SSHO that meets the requirements of EM 385-1-1 Chapter 2. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one
(1) person at each project site to function as the SSHO. The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times, with the exception of temporary absences less than 24 hours discussed below, to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Chapter 2-3.b, and all associated sub-paragraphs including the following.
The SSHO is required to be employed by the Prime Contractor. The SSHO shal l be assi gned no ot her dut i es on t hi s pr oj ect . The SSHO must also meet the following requirements:
a. A minimum of 5 years safety work on similar projects.
b. 30-hour OSHA construction safety class or equivalent within the last 5 years.
c. Provide documentation that shows the completion of a minimum of 8 hours of formal, on-line, or self-study safety and health related coursework each year during the last five (5) years.
d. See USACE EM 385-1-1 Chapter 2 for additional qualification requirements.
e. ENG Form 6282, Site Safety and Health Officer (SSHO) Designation Letter . The form can be viewed, or downloaded at the following link:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf
If the SSHO is off-site for a period longer than 24 hours, an equally-qualified alternate SSHO must be provided and must fulfill the same roles and responsibilities as the primary SSHO. When the SSHO is temporarily (up to 24 hours) off-site, a Designated Representative (DR), as identified in the AHA may be used in lieu of an Alternate SSHO, and must be on the project site at all times when work is being performed.
Note that the DR is a collateral duty safety position, with safety duties in addition to their full time occupation.
The SSHO must comply with EM 385-1-1 Chapter 2-4.b:
1.6.1.2 Competent Person Qualifications
Provide Competent Persons (CP) in accordance with EM 385-1-1 , See Chapter 2-4.c for CP qualifications and herein. CP for high risk activities include confined space, cranes and rigging, excavation/trenching, fall protection, and electrical work. The CP for these activities must be designated in writing, and meet the requirements for the specific activity (i.e. competent person, fall protection).
The CP identified in the Contractor's Safety and Health Program and accepted Accident Prevention Plan, must be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide CP(s) credentials to the Contracting Officer for information in consultation with the Safety Office.
1.6.1.3 Crane Operators/Riggers
a. Provide Operators meeting the requirements in EM 385-1-1 , Chapter 15-3 for Riggers and Chapter 16-3.c for Crane Operators. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacities of 50,000 pounds or greater, designate crane operators qualified by a source that qualifies crane operators (i.e., union, a government agency, or an organization that tests and qualifies crane operators). Provide proof of current qualification.
b. If the Government authorizes the Contractor to operate any of its cranes, each crane operator needs to be approved. Approval consists of the crane operator spending at least one (1) hour demonstrating their capabilities to operate the Government Crane, under the direct surveillance of a Government operator. The operators may be retested at any time.
1.6.2 Meetings
1.6.2.1 Preconstruction Meeting
Refer to SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENT for additional requirements on the Preconstruction Meeting.
a. Contractor representatives who have a responsibility or significant role in accident prevention on the project must attend the preconstruction meeting. This includes the project superintendent, Site Safety and Occupational Health officer, quality control manager, or any other assigned safety and health professionals who participated in the development of the APP (including the Activity Hazard Analyses (AHA's) and special plans, program and procedures associated with it).
b. Discuss the details of the submitted APP to include incorporated plans, programs, procedures and a listing of anticipated AHA's that will be developed and implemented during the performance of the contract. This list of proposed AHA's will be reviewed at the conference and an agreement will be reached between the Contractor and the Contracting Officer as to which phases will require an analysis.
In addition, establish a schedule for the preparation, submittal, and Government review of AHA's to preclude project delays.
c. Deficiencies in the submitted APP, identified during the Contracting Officer's review, must be corrected, and the APP re-submitted for review prior to the start of construction.
1.6.2.2 Safety Meetings
Conduct safety meetings to review past activities, plan for new or changed operations, review pertinent aspects of appropriate AHA (by trade), establish safe working procedures for anticipated hazards, and provide pertinent Safety and Occupational Health (SOH) training and motivation.
Conduct meetings at least once a month for all supervisors on the project location. The SSHO, supervisors, foremen must conduct meetings at least once a week for the trade workers. Document meeting minutes to include the date, persons in attendance, subjects discussed, and names of individual(s) who conducted the meeting. Maintain documentation on-site and furnish copies to the Contracting Officer on request. Notify the Contracting Officer of all scheduled meetings Seven (7) calendar days in advance.
1.7 ACCIDENT PREVENTION PLAN (APP)
Prepare the APP in accordance with the format and requirements of
EM 385-1-1 . A qualified person must prepare the written, site-specific APP on ENG Form 6293, Accident Prevention Plan (APP) Worksheet. The following conditions apply:
1. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors.
2. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
3. If English is not the foreman's primary language, the Prime Contractor must provide an interpreter .
Submit the APP to the contracting Officer Thi r t y ( 30) cal endar days prior to the date of the preconstruction conference for acceptance. Work cannot precede without an accepted APP. Once reviewed and accepted by the contracting Officer, the APP and attachments will be enforced as part of the contract.
1. Disregarding the provisions of this contract or the accepted APP is cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified.
2. Continuously review and amend the APP, as necessary, throughout the life of the contract. Changes to the accepted APP must be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and Quality Control Manager.
3. Incorporate unusual or high-hazard activities not identified in the original APP as they are discovered. Should any severe hazard exposure ( i.e. imminent danger) become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate and remove the hazard.
4. In the interim, take all necessary action to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ASSP A10.34 ), and the environment.
1.7.1 Plans
Provide plans in the APP as well as required names and qualifications, in accordance with the requirements outlined in EM 385-1-1 , including the following:
1.7.1.1 Confined Space Entry Plan
Develop a confined or enclosed space entry plan that is compatible with NWWP 385-1-20 in accordance with EM 385-1-1 , applicable OSHA standards 29 CFR 1910 , 29 CFR 1915 , and 29 CFR 1926 , OSHA Directive CPL 2.100 , and any other federal, state and local regulatory requirements identified in this contract. Identify the qualified person's name and qualifications, training, and experience. Delineate the qualified person's authority to direct work stoppage in the event of hazardous conditions. Include procedure for rescue by contractor personnel and the coordination with emergency responders. (If there is no confined space work, include a statement that no confined space work exists and none will be created.)
1.7.1.2 Standard Lift Plan (SLP)
Plan lifts to avoid situations where the operator cannot maintain safe control of the lift. Prepare a written SLP in accordance with EM 385-1-1 , Chapter 16-7.b., using Crane Standard Lift Plan, ENG Form 6203. The form can be viewed, or downloaded at the following link:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6203_2023Aug10.pdf
Use ENG Form 6203 for every lift or series of lifts (if duty cycle or routine lifts are being performed). The SLP must be developed, reviewed and accepted by all personnel involved in the lift in conjunction with the associated AHA. Signature on the AHA constitutes acceptance of the plan.
Maintain the SLP on the LHE for the current lift(s) being made. Maintain historical SLP's for a minimum of 3 months.
1.7.1.3 Critical Lift Plan - Crane or Load Handling Equipment
Provide a Critical Lift Plan as required by EM 385-1-1 , Chapter 16-7.a, 16-7.b, 16-7.d, using Load Handling Equipment Crane Operation Critical Lift Plan ENG Form 6213. The form can be viewed, or downloaded at the following link:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6213_2023Aug23.pdf
Critical lifts require detailed planning and additional or unusual safety precautions. Develop and submit a critical lift plan to the Contracting Officer Thirty (30) calendar days prior to critical lift. Comply with load testing requirements in accordance with EM 385-1-1 , In addition to the requirements of EM 385-1-1 , the critical lift plan must include the following:
a. For lifts of personnel, demonstrate compliance with the requirements of 29 CFR 1926.1400 and EM 385-1-1
b. Multi-purpose machines, material handling equipment, and construction equipment used to lift loads that are suspended by rigging gear, require proof of authorization from the machine OEM that the machine is capable of making lifts of loads suspended by rigging equipment.
Demonstrate that the operator is properly trained and that the equipment is properly configured to make such lifts and is equipped with a load chart.
1.7.1.4 Fall Protection and Prevention (FP&P) Plan
The plan must comply with the requirements of EM 385-1-1 , Chapter 21-7 and ASSP Z359.2 . Be site specific, and address all fall hazards in the work place and during different phases of construction. Address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet . A competent person or qualified person for fall protection must prepare and sign the plan documentation. Include fall protection and prevention systems, equipment and methods employed for every phase of work, roles and responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods. Review and revise, as necessary, the Fall Protection and Prevention Plan documentation as conditions change, but at a minimum every six months, for lengthy projects, reflecting any changes during the course of construction due to changes in personnel, equipment, systems or work habits. Keep and maintain the accepted Fall Protection and Prevention Plan documentation at the job site for the duration of the project. Include the Fall Protection and Prevention Plan documentation in the Accident Prevention Plan (APP).
1.7.1.5 Rescue and Evacuation Plan
Provide a Rescue and Evacuation Plan in accordance with EM 385-1-1 Chapter 21-7.a and ASSP Z359.2 , and include in the FP&P Plan and as part of the APP. Include a detailed discussion of the following: methods of rescue;
methods of self-rescue; equipment used; training requirement; specialized training for the rescuers; procedures for requesting rescue and medical assistance; and transportation routes to a medical facility.
1.7.1.6 Hazardous Energy Control Program (HECP)
Develop a HECP in accordance with EM 385-1-1 , 29 CFR 1910.147 , 29 CFR 1910.333 , 29 CFR 1915.89 , ASSP Z244.1 , and ASSP A10.44 . Submit this HECP as part of the Accident Prevention Plan (APP). Conduct a preparatory meeting and inspection with all affected personnel to coordinate all HECP activities. Document this meeting and inspection in accordance with EM 385-1-1 . Ensure that each employee is familiar with and complies with these procedures.
1.8 ACTIVITY HAZARD ANALYSIS (AHA)
AHA requirements are in EM 385-1-1 Chapter 2-6.
Before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. AHA's must be developed by the Prime Contractor, subcontractor, or supplier performing the work, and provided for Prime Contractor review and approval before submitting to the Contracting Officer. AHA's must be signed by the SSHO, Superintendent, QC Manager and the subcontractor Foreman performing the work. Submit the AHA for review at least fifteen (15) working days prior to the start of each activity task. The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
Develop the activity hazard analyses using the Project Schedule as the basis for the activities performed. Any activities listed on the Project Schedule requires an AHA to be completed. Use ENG Form 6206, Activity Hazard Analysis (AHA) to complete an AHA. The form can be viewed, or downloaded at the following link:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf
AHA's must identify competent persons required for phases involving high risk activities, including confined entry, crane and rigging, excavations, trenching, electrical work, fall protection, and scaffolding.
1.8.1 AHA Signature Log
Each employee performing work as part of an activity, task or DFOW must review the AHA for that work and sign a signature log specifically maintained for that AHA prior to starting work on that activity. The SSHO must maintain a signature log on site for every AHA. Provide employees whose primary language is other than English, with an interpreter to ensure a clear understanding of the AHA and its contents.
1.9 LOCKOUT/TAGOUT (LOTO)-SAFE CLEARANCE OR HAZARDOUS ENERGY CONTROL
PROGRAM (HECP) PROCEDURES
All Contractor work on site shall meet the requirements of "Safety and Occupational Health Office; Safe Clearance Program for the Control of Hazardous Energy, NWWP 385-1-20". A digital copy may be obtained at the web address shown below in paragraph, Safe Clearance Training. Safe Clearance procedures are used by Project and Contractor personnel to protect personnel, equipment and the environment as well as ensuring continuity of service. Any work performed by the Contractor that requires taking project operated equipment out of service shall be done only after a formal clearance is obtained through the Government. Violations will be reported to the Issuing Individual and violations may result in disciplinary action ranging from retraining to removal of safe clearance authorization.
For jobs with multiple tasks that require AHA's, prepare and submit an Activity Hazard Analysis (AHA) on the first feature of work that requires a clearance request. A comprehensive AHA is required for smaller jobs.
AHA requirements will be verified at the Pre-Construction Meeting.
The following applies to LOTO and HECP procedures:
a. The Government will provide Safe Clearance Tags and will issue Isolation Locks to Contractor for clearances using the Government Safe Clearance Procedures. Provide personal safety locks, meeting OSHA standards, for use with the Government's safe clearance procedures.
See NWWP 385-1-20, Chapter 6 - Locks and Tags, and Chapter 10 - Contractor Personnel for further guidance.
b. Government HECP procedures shall be used on equipment/systems owned by the Government. It shall also be used on all points interfacing with Government owned equipment/systems. In instances where equipment is owned by the Contractor, not yet turned over to the Government, or equipment which is not tied into Government energy sources, the Contractor may use their own Lockout/Tagout Program.
Contractor Programs must be pre-approved by the Responsible Official.
c. Submit the names of Authorized Individuals to the Contracting
Officer prior to the Pre-Construction Meeting. Project-specific training will be given by the Operations Chief or designee and will be approximately 30 minutes in length. Project-specific training will be provided for every contract and only to the Contractor's Authorized Individuals. The Authorized Individuals shall be required to brief their work crews and subcontractors of any project-specific clearance information. Training is only required once per year and is, with the exception of project-specific training, valid for every facility within the Walla Walla District. If the Responsible Official or
Government designee determines that the Authorized Individual's knowledge of the HECP procedures are inadequate the Responsible Official may administer a retest. See NWWP 385-1-20 Chapter 5 - Training for further guidance.
1.9.1 Safe Clearance Training
Contractor, subcontractor, vendors and visitors shall take the appropriate level of HECP Procedure training commensurate with their job duties. Only HECP certificates generated from Walla Walla District or the project are acceptable.
Based on the scope of work and size of crew, have the appropriate number of Authorized Individuals trained to ensure that there are no delays. All Contractor personnel working in areas under a Safe Clearance shall be trained as Affected Persons. Any non-working personnel, vendors and visitors, that will be entering an area under Safe Clearance shall take Awareness Level training. Training and written tests for the modules below shall be completed on-line prior to commencing on-site work. Time estimates for training follow:
a. Awareness Level Training: Approximately 1 hour (non-working personnel, vendors and visitors).
b. Affected Persons: Approximately 2 hours in addition to Awareness Level training.
c. Authorized Individuals: Approximately 3 hours in addition to Awareness Level training and Affected Personnel Training.
A copy of the Safe Clearance Program for the Control of Hazardous Energy (NWWP 385-1-20) can be viewed, or downloaded on the Walla Walla District Internet site at:
ht t ps: / / usace. dps. mi l / s i t es/ PUBS- NWW/ Ot her / For ms/ PubsDi spl ay. aspx?i d=%2Fsi t es%2FPUBS%2DNWW%2FOt her %2FOf f i ce%20Memor andums%2FOM385%2D1%2D20%2Epdf &par ent =%2Fsi t es%2FPUBS%2DNWW%2FOt her %2FOf f i ce%20Mem orandums
All costs for this training are considered incidental to the work, and therefore, no additional payment will be made. Training is an annual requirement and will expire one year from completion date. Training is provided by HSI Learning Management System and is available on line at https://hsi.com/solutions/learning-management-system . Cost for the training is displayed on the home page. Submit the training completion certification a minimum of seven days prior to the individual's arrival at site. Maintain training documentation on site, including the individual's name and date of training completion, in accordance with NWWP 385-1-20.
1.10 DISPLAY OF SAFETY INFORMATION
1.10.1 Safety Bulletin Board
Within one (1) calendar day(s) after commencement of work, erect a safety bulletin board at the job site. Where size, duration, or logistics of project do not facilitate a bulletin board, an alternative method, acceptable to the Contracting Officer, that is accessible and includes all mandatory information for employee and visitor review, may be deemed as meeting the requirement for a bulletin board. Include and maintain information on safety bulletin board as required by EM 385-1-1 , Chapter 2-8.f.2 SOH Bulletin Board. Additional items required to be posted include:
a. Confined space entry permit .
b. Hot work permit .
1.10.2 Safety and Occupational Health (SOH) Deficiency Tracking System
Establish a SOH deficiency tracking system that lists and monitors the status of SOH deficiencies in chronological order. Use the tracking system to evaluate the effectiveness of the APP. A monthly evaluation of the data must be discussed in the QC or SOH meeting with everyone on the project. The list must be posted on the project bulletin board and updated daily, and provide the following information:
a. Date deficiency identified;
b. Description of deficiency;
c. Name of person responsible for correcting deficiency;
d. Projected resolution date;
e. Date actually resolved.
1.11 SITE SAFETY REFERENCE MATERIALS
Maintain safety-related references applicable to the project, including those listed in paragraph REFERENCES. Maintain applicable equipment manufacturer's manuals.
1.12 EMERGENCY MEDICAL TREATMENT
Contractors must arrange for their own emergency medical treatment.
Government has no responsibility to provide emergency medical treatment.
1.13 NOTIFICATIONS and REPORTS
1.13.1 Mishap Notification
Notify the Contracting Officer after any mishaps, including recordable accidents, incidents, and near misses, as defined in EM 385-1-1 . Report all mishaps as soon as possible, but not more than twenty four (24) hours after mishap occurs, to the KO by submitting ENG Form 3394, U.S. Army Corps of Engineers Mishap Notification and Investigation. The form can be viewed, or downloaded at the following link:
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/
In addition, immediately report any mishap occurring in any of the following high hazard areas to the KO. This includes electrical mishaps, to include Arc Flash; shock; uncontrolled release of hazardous energy (includes electrical and non-electrical); load handling equipment or rigging; fall from height (any level other than same surface); and underwater diving as covered in EM 385-1-1 Chapter 2-8.d. The Contractor is responsible for obtaining appropriate medical and emergency assistance and for notifying fire, law enforcement, and regulatory agencies.
Within notification include Contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (for example, type of construction equipment used and PPE used). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted. Assist and cooperate fully with the Government's investigation(s) of any mishap.
1.13.2 Accident Reports
a. Conduct an accident investigation for recordable injuries and illnesses, property damage, and near misses as defined in EM 385-1-1 , to establish the root cause(s) of the accident. Complete the USACE Accident Report Form 3394, and provide the report to the KO within Five (5) calendar day(s) of the accident. The KO will provide copies of any required or special forms.
b. Near Misses: Report all "Near Misses" to the KO, using local mishap reporting procedures, within 24 hrs. The KO will provide the Contractor the required forms. Near miss reports are considered positive and proactive Contractor safety management actions.
c. Conduct an accident investigation for any load handling equipment accident (including rigging gear accidents) to establish the root cause(s) of the accident. Complete the USACE Accident Report Form 3394, and provide the report to the KO within Thirty (30) calendar days of the accident. Do not proceed with crane operations until cause is determined and corrective actions have been implemented to the satisfaction of the KO. The KO will provide copies of any required or special forms.
1.13.3 LHE Inspection Reports
Submit LHE inspection reports required in accordance with EM 385-1-1 and as specified herein with Daily Reports of Inspections.
1.13.4 Certificate of Compliance and Pre-lift Plan/Checklist for LHE and Rigging
Develop and Submit a Standard Lift Plan (SLP) Certificate of Compliance in accordance with EM 385-1-1 Chapter 16-7.b, using ENG Form 6203 for each lift planned. The form can be viewed, or downloaded at the following link:
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/
Post certifications on the crane. Submit SLP to the Contracting Officer for approval a minimum of Fifteen (15) calendar days in advance of planned lift.
1.13.5 Contractor's Cranes
a. Contractor's cranes and equipment furnished for this work shall conform to all applicable OSHA Requirements and EM 385-1-1 . Submit Crane Wheel and Outrigger Loading Diagram and Deck Protection for Outriggers for approval at least Thirty (30) calendar days prior to using any crane rated 50 tons or more on any of the Project decks.
The submittal shall provide the following information on a plan view sketch or drawing. A marked up Government-provided contract Supplemental drawing can also be used, if available.
1. Crane outrigger locations with dimensions from the center of each outrigger to identifiable project feature(s).
2. Dimensions of each outrigger.
3. Maximum load on each outrigger.
4. Outrigger pad deck protection dimensions and location. All outrigger pad deck protection shall be provided by the Contractor.
5. If cribbing material is used, show the cribbing material dimensions and location.
b. Include, in the submittal, the cribbing material properties, and calculations to verify the cribbing material's adequacy to carry the intended loads. To the greatest extent possible, place the outriggers over existing supports such as walls. Avoid placing the outriggers next to a wall or support. Under no circumstance shall an outrigger or cribbing be placed on metal grating or hatches. See Section 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS, paragraph GOVERNMENT ROADWAYS AND DECK ACCESS RESTRICTIONS for information on deck loading capacities.
1.14 HOT WORK
Activities involving burning, brazing, cutting, grinding, powder-actuated tools, soldering, sparks, thawing activities, welding, working with open flames, or any similar operation that is capable of initiating fires or explosions is considered HOT WORK. See EM 385-1-1 Chapter 9-2.g Hot Work for more information.
Provide at least two (2), twenty (20) pound 4A:20 BC rated extinguishers for normal "Hot Work." All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 60 minutes after completion of the task or as specified on the Hot Work Permit.
When starting work in the facility, require personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency phone number. REPORT ANY FIRE, NO MATTER HOW SMALL, TO THE RESPONSIBLE AUTHORITY IMMEDIATELY.
Obtain services from a NFPA Certified Marine Chemist for "HOT WORK" within or around flammable materials (such as fuel systems, welding/cutting on fuel pipes) or confined spaces (such as sewer wet wells, manholes, vaults, etc.) that have the potential for flammable or explosive atmospheres.
1.15 RADIATION SAFETY REQUIREMENTS
a. Submit Radiation Materials and Equipment Records to include License Certificates, employee training records, and Leak Test Reports for all specialized and licensed radiation materials and equipment proposed for use for this contract. Submit a minimum of 30 calendar days prior to equipment arrival on-site. Maintain on-site records whenever licensed radiological materials or ionizing equipment are on government property.
b. Protect workers from radiation exposure in accordance with 10 CFR 20 , ensuring any personnel exposures are maintained As Low As Reasonably Achievable. Use of radiation materials and equipment shall be in accordance with EM 385-1-1 , Chapter 6-8.i, "Ionizing Radiation", and "Non-Ionizing Radiation, Magnetic and Electric Fields", as applicable.
1.16 CONFINED SPACE ENTRY REQUIREMENTS
Confined space entry must comply with Chapter 34 "Confined Space" of EM 385-1-1 , OSHA 29 CFR 1926 , OSHA 29 CFR 1910 , OSHA 29 CFR 1910.146 , and OSHA Directive CPL 2.100 . Any potential for a hazard in the confined space requires a permit system to be used.
1.16.1 Entry Procedures
Prohibit entry into a confined space by personnel for any purpose, including hot work, until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the work intended and that all potential hazards are controlled or eliminated and documented. Comply with EM 385-1-1 , Chapter 34 "Confined Space" for entry procedures. Hazards pertaining to the space must be reviewed with each employee during review of the AHA.
1.16.2 Forced Air Ventilation
Forced air ventilation is required for all confined space entry operations and the minimum air exchange requirements must be maintained to ensure exposure to any hazardous atmosphere is kept below its action level.
1.16.3 Sewer Wet Wells
Sewer wet wells require continuous atmosphere monitoring with audible alarm for toxic gas detection.
1.16.4 Rescue Procedures and Coordination with Local Emergency Responders
Develop and implement an on-site rescue and recovery plan and procedures.
The rescue plan must not rely on local emergency responders for rescue from a confined space.
1.17 SEVERE STORM PLAN
In the event of a severe storm warning, the Contractor must:
a. Secure outside equipment and materials and place materials that could be damaged in protected areas.
b. Check surrounding area, including roof, for loose material, equipment, debris, and other objects that could be blown away or against existing facilities.
c. Ensure that temporary erosion controls are adequate.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 CONSTRUCTION AND OTHER WORK
Comply with EM 385-1-1 , NFPA 70 , NFPA 70E, NFPA 241 , the APP, the AHA, Federal and State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard prevails.
PPE is governed in all areas by the nature of the work the employee is performing. Use personal hearing protection at all times in designated noise hazardous areas or when performing noise hazardous tasks. Safety glasses must be worn or carried/available on each person. Mandatory PPE includes:
a. Hard Hat
b. Long Pants
c. Appropriate Safety Shoes
d. Appropriate Class Reflective Vests
3.1.1 Worksite Communication
Employees working alone in a remote location or away from other workers must be provided an effective means of emergency communications (i.e., cellular phone, two-way radios, land-line telephones or other acceptable means). The selected communication must be readily available (easily within the immediate reach) of the employee and must be tested prior to the start of work to verify that it effectively operates in the area/environment. An employee check-in/check-out communication procedure must be developed to ensure employee safety.
3.1.2 Hazardous Material Exclusions
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with EM 385-1-1 such as nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury or polychlorinated biphenyls, di-isocyanates, lead-based paint, and hexavalent chromium, are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the Radiation Safety Officer (RSO) prior to excepted items of radioactive material and devices being brought on Project site.
3.1.3 Unforeseen Hazardous Material
Contract documents identify materials such as PCB, lead paint, friable and non-friable asbestos and other OSHA regulated chemicals (i.e. 29 CFR Part 1910.1000). If material(s) that may be hazardous to human health upon disturbance are encountered during construction operations, stop that portion of work and notify the Contracting Officer immediately. Within Fourteen (14) calendar days the Government will determine if the material is hazardous. If material is not hazardous or poses no danger, the Government will direct the Contractor to proceed without change. If material is hazardous and handling of the material is necessary to accomplish the work, the Government will issue a modification pursuant to FAR 52.243-4, "Changes" and FAR 52.236-2, "Differing Site Conditions."
3.2 FALL PROTECTION PROGRAM
Establish a fall protection program, for the protection of all employees exposed to fall hazards. Within the program include company policy, identify roles and responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures in accordance with ASSP Z359.2 and EM 385-1-1 .
3.2.1 Training
Institute a fall protection training program. As part of the Fall Protection Program, provide training for each employee who might be exposed to fall hazards. Provide training by a competent person for fall protection in accordance with EM 385-1-1 , Chapter 21-3. Document training and practical application of the competent person in accordance with EM 385-1-1 , Chapter 21-3 and ASSP Z359.2 in the AHA.
3.2.2 Fall Protection Equipment and Systems
Enforce use of personal fall protection equipment and systems designated (to include fall arrest, restraint, and positioning) for each specific work activity in the Site Specific Fall Protection and Prevention Plan and AHA at all times when an employee is exposed to a fall hazard. Protect employees from fall hazards as specified in EM 385-1-1 , Chapter 21 "Fall Protection".
Provide personal fall protection equipment, systems, subsystems, and components that comply with EM 385-1-1 Chapter 21, 29 CFR 1926.500 Subpart
M, ASSP Z359.0 , ASSP Z359.1 , ASSP Z359.2 , ASSP Z359.3 , ASSP Z359.4 ,
ASSP Z359.6 , ASSP Z359.7 , ASSP Z359.11 , ASSP Z359.12 , ASSP Z359.13 ,
ASSP Z359.14 , and ASSP Z359.15 .
3.2.2.1 Additional Personal Fall Protection
In addition to the required fall protection systems, other protection such as safety skiffs, personal floatation devices, and life rings, are required when working above or next to water in accordance with EM 385-1-1 , Chapter 21-8.t. Personal fall protection systems and equipment are required when working from an articulating or extendible boom, swing stages, or suspended platform. In addition, personal fall protection systems are required when operating other equipment such as scissor lifts. The need for tying-off in such equipment is to prevent ejection of the employee from the equipment during raising, lowering, travel, or while performing work.
3.2.2.2 Personal Fall Protection Harnesses
Only a full-body harness with a shock-absorbing lanyard or self-retracting lanyard is an acceptable personal fall arrest body support device. The use of body belts is not acceptable.
3.2.3 Flexible Horizontal Lifelines (HLL)
Provide HLL in accordance with EM 385-1-1 , Chapter 21-10 "Flexible HLL" Commercially manufactured horizontal lifelines (HLL) must be designed, installed, certified and used, under the supervision of a qualified person, for fall protection as part of a complete fall arrest…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .