This document is a Submittal Register for Solicitation W912EF24Q0028, "HLD Main Unit 6 Scroll Case Cooling Water Lamprey Exclusion Cover". It lists the various submittal items required from the contractor, including preconstruction submittals, test reports, certificates, and closeout submittals. Key required submittals include an Equipment List, Pre-Construction On-Site Inspection Report, Air Purity Control Program, Project Schedule, Accident Prevention Plan, Confined Space Entry Plan, Contractor Quality Control Plan, Environmental Protection Plan, Working As-Built Drawings, and Installer Qualifications. The submittal register also includes details on items such as Wedge Wire Screen, Stainless Steel Fasteners, Welding Procedures, and Nondestructive Examination. Approval authority and submittal/approval timelines are specified for each submittal item. This is a detailed document outlining the administrative and technical information required to be provided by the contractor for this federal construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES

W912EF24Q0028

HLD PH Unit 6 Scroll Case Cooling Water Lamprey Excl Cover

01 11 01.00 28 SD-01 Preconstruction Submittals

1.9 I CEquipment List

1.5 I CPre-Construction On-Site

Inspection Report

1.14 I CAir Purity Control Program

1.15 I CProject Superintendent

1.8 G CProperty Management Plan

SD-07 Certificates

1.16 G CKey Personnel Substitution

01 14 00.10 28 SD-01 Preconstruction Submittals

1.4.4 G SLEForeign Visit Request (FVR)

Form

1.3.2 G CQualifications

01 14 00.90 28 SD-01 Preconstruction Submittals

1.6 G CSuspicious Activity Reporting

1.8 I CPre-Screen Candidates Using

E-Verify Program

01 32 16.00 28 SD-01 Preconstruction Submittals

1.2 G CProject Schedule

SD-07 Certificates

1.4 G CMonthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.5.1.1 G GSBentley DGN Sample Sheets

01 35 29.10 28 SD-01 Preconstruction Submittals

1.7 G CAccident Prevention Plan (APP)

1.8 G CActivity Hazard Analysis (AHA)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G4EDHCMP

Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES

HLD PH Unit 6 Scroll Case Cooling Water Lamprey Excl Cover

01 35 29.10 28 1.9 I CSafe Clearance

1.9 I CAuthorized Individuals

1.7.1.2 G CStandard Lift Plan

1.7.1.3 G CCritical Lift Plan

1.13.5 G STCrane Wheel And Outrigger

Loading Diagram And Deck

Protection For Outriggers

1.6.1.2 G CCompetent Person Qualifications

1.7.1.1 G CConfined Space Entry Plan

1.6.1.1 G CSite Safety And Health Officer

(SSHO) Designation Letter

SD-06 Test Reports

1.4 I CMonthly Exposure Reports

1.13 I CNotifications and Reports

1.13.2 I CAccident Reports

1.13.3 I CLHE Inspection Reports

SD-07 Certificates

1.6.1.3 I CCrane Operators/Riggers

1.10.1 I CConfined Space Entry Permit

1.10.1 I CHot Work Permit

1.13.4 I CCertificate of Compliance

1.15 I CRadiation Materials and

Equipment Records

01 45 00.01 28 SD-01 Preconstruction Submittals

3.1 G CContractor Quality Control Plan

01 55 10.00 28 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

G4EDHCMP

Line

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

HLD PH Unit 6 Scroll Case Cooling Water Lamprey Excl Cover

01 55 10.00 28 1.5 G STTransport Loading Diagrams

01 57 20.00 28 SD-01 Preconstruction Submittals

1.6 G ECCEnvironmental Protection Plan

01 78 00.00 28 SD-11 Closeout Submittals

3.1 G GSFinal Shop Drawings

3.2.1 I CWorking As-Built Drawings

3.3 G CFinal As-Built Drawings

3.4 G GSRecord Drawings

3.5 G CGovernment Issued Items

05 05 20.01 28 SD-01 Preconstruction Submittals

1.5.1.1 G STInstaller Qualifications

1.5.1.2 G STPost-Installed Anchor Special

Inspector Qualifications

SD-03 Product Data

2.1.1.3 G STFlush Mount Undercut Anchor

System in Concrete

3.1.2 G STNon-Shrink, Non-Metallic Grout

SD-06 Test Reports

3.3.3 G STPost-Installed Anchor Special

Inspections Report

3.1.3 G STRepair Of Mislocated Or

Misdrilled Holes

SD-07 Certificates

2.1.1.1 G STPost-Installed Anchor

Certification

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES

HLD PH Unit 6 Scroll Case Cooling Water Lamprey Excl Cover

05 05 20.01 28 2.1.1.2 G STManufacturer's Printed

Installation Instructions

1.5 I STManufacturer's Material Safety

Data Sheets

05 50 14.00 28 SD-01 Preconstruction Submittals

3.6.1 I STWelding Procedure

1.4Witness Points

SD-02 Shop Drawings

3.2 I M/STFabrication Drawings

3.3 I M/STAssembly Drawings

3.4 I M/STInstallation Drawings

SD-03 Product Data

2.8 G MWedge Wire Screen

2.4 G MStainless Steel Hex Cap Screws

2.5 G MNylon Insert Hex Nuts

2.6 G MThread Locking

2.7 G MWeld Nuts

2.2 G MStainless Steel Flat-Head Cap

Screws

2.3 G MStainless Steel Button-Head Cap

Screws

SD-04 Samples

2.8 G MWedge Wire Screen Sample

SD-06 Test Reports

3.6.2 I STWelding Repairs - Non-Fracture

Critical Members

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES

HLD PH Unit 6 Scroll Case Cooling Water Lamprey Excl Cover

05 50 14.00 28 3.8.1 I M/STNondestructive Examination

2.8 G MWedge Wire Load Test

3.5.5 G STRepair Of Mislocated Or

Misdrilled Holes

1.5 G STManufacturer Certified Test

Reports

SD-07 Certificates

1.3 I STQualification of Welders and

Welding Operators

3.8.1 I STCertified Welding Inspector

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

Amend-0001
Amend-0001