McNar y Dr ai nage Sump Oi l Ski mmer W912EF19B0003

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 14 00. 10 28 PROJECT SI TE RESTRI CTI ONS

01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY

(OPSEC)

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 32 16. 00 28 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 10. 00 28 DIVING

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 51 00. 00 28 TEMPORARY UTI LI TI ES

01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 24 10. 02 28 DEWATERING

DI VI SI ON 03 - CONCRETE

03 60 00. 01 28 CONCRETE CORE DRI LLI NG

DI VI SI ON 05 - METALS

05 50 03. 00 28 OI L SKI MMER EQUI PMENT AND MI SCELLANEOUS PRODUCTS

05 50 14. 00 28 METALWORK AND METAL FABRI CATI ON

DI VI SI ON 22 - PLUMBI NG

22 00 13. 00 28 DRAI NAGE SUMP PI PI NG

DI VI SI ON 26 - ELECTRI CAL

26 05 00. 00 28 GENERAL ELECTRI CAL WORK

26 05 19. 00 28 I NSULATED WI RE AND CABLE

26 24 16. 00 28 PANELBOARDS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

This page intentionally left blank

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

1. 3 FOR I NFORMATI ON ONLY DRAWI NGS ( FI O)

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15. 00 28 - Page 1

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

GENERAL

MDG-1-0-0/622 G-001 COVER SHEET AND LOCATI ON MAPS

MDG-1-0-0/623 G-002 I NDEX TO DRAWI NGS

MDG-1-0-0/624 G-101 GENERAL - SI TE KEY PLAN

MDG-1-0-0/625 G-102 GENERAL - OI L SKI MMER KEY PLAN

MDG-1-0-0/626 G-103 GENERAL - STATI ON SERVI CE BAY - EL 254 KEY

PLAN

STRUCTURAL

MDP-1-5-0/61 S-101 PLAN - CORE DRI LL EL. 235. 50 - SHEET TI TLE 3

MDP-1-5-0/62 S-102 STRUCTURAL - OWS PI PE ROUTI NG - EL 254. 0

PLAN

MDP-1-5-0/63 S-501 LI FTI NG LUG - DETAI LS

MECHANICAL

MDP-1-3-0/86 MD101 McNARY POWERHOUSE - MECHANI CAL DEMOLI TI ON -

POWERHOUSE PLAN & PHOTO

MDP-1-3-0/87 M-101 McNARY POWERHOUSE - MECHANI CAL - OI L

SKI MMER & SUMP - PLANS

MDP-1-3-0/88 M-301 McNARY POWERHOUSE - MECHANI CAL - SUMP

PI PI NG - I SOMETRI C DETAI LS

MDP-1-3-0/89 M-302 McNARY POWERHOUSE - MECHANI CAL - SUMP PI PE

ROUTI NG - I SOMETRI C DETAI LS

MDP-1-3-0/90 M-303 McNARY POWERHOUSE - MECHANI CAL - SUMP PI PE

ROUTE 1 - PLAN & SECTI ONS

DOCUMENT 00 01 15. 00 28 - Page 2

MDP-1-3-0/91 M-304 McNARY POWERHOUSE - MECHANI CAL - SUMP PI PE

ROUTE 2 - PLAN & SECTI ONS

MDP-1-3-0/92 M-305 McNARY POWERHOUSE - MECHANI CAL - SUMP PI PE

ROUTE 3 - PLAN & SECTI ONS

MDP-1-3-0/93 M-306 MECHANI CAL EQUI PMENT ARRANGEMENT - AND

PI PI NG SCHEMATI C

MDP-1-3-0/94 M-307 OI L SKI MMER COLLECTI ON TANK - MECHANI CAL

EQUI PMENT ARRANGEMENT - AND PI PI NG SCHEMATI C

MDP-1-3-0/95 M-401 DECANTER TANK ASSEMBLY - DETAI LS

MDP-1-3-0/96 M-402 OI L SKI MMER SUPPORT STAND - ASSEMBLY VI EWS

MDP-1-3-0/97 M-403 OI L SKI MMER SUPPORT STAND - DETAI LS 1

MDP-1-3-0/98 M-404 OI L SKI MMER SUPPORT STAND - DETAI LS 2

MDP-1-3-0/99 M-405 OI L SKI MMER SUPPORT STAND - DETAI LS 3

MDP-1-3-0/100 M-501 BAFFLE - STANDARD - DETAI LS 1

MDP-1-3-0/101 M-502 BAFFLE - EXTENDED - DETAI LS 2

MDP-1-3-0/102 M-503 BAFFLE - EXTENDED MODI FI ED - DETAI LS 3

MDP-1-3-0/103 M-504 BAFFLE - 14" COLLECTI ON BAFFLE - DETAI LS 4

MDP-1-3-0/104 M-505 DI FFUSER - BOTTOM - DETAI LS 5

MDP-1-3-0/105 M-506 COVER & DI FFUSER PLATES - DETAI LS 6

MDP-1-3-0/106 M-507 3" AND 6" COLLECTI ON BAFFLES - DETAI LS 7

MDP-1-3-0/107 M-901 MECHANI CAL - PHOTOGRAPHS - SHEET 1

MDP-1-3-0/108 M-902 MECHANI CAL - PHOTOGRAPHS - SHEET 2

ELECTRICAL

MDP-1-6-0/31 E-001 GENERAL - NOTES AND SYMBOLS

MDP-1-6-0/32 ED202 FS5 PANEL - ELEVATI ON

MDP-1-6-0/33 ED605 FS5 PANEL - CONNECTI ON DI AGRAM

MDP-1-6-0/34 E-101 PLAN - MOTOR AND CONTROL ENCLOSURES - EL

235.5

MDP-1-6-0/35 E-102 CQ01 - POWER SOURCE TO SKI MMER EQUI PMENT -

EL 254

MDP-1-6-0/36 E-201 OI L SKI MMER SYSTEM CONTROLS LAYOUT

MDP-1-6-0/37 E-202 FS5 PANEL - ELEVATI ON

MDP-1-6-0/38 E-401 OWS CONTROL CABI NET - OSCC PANEL LAYOUT

DOCUMENT 00 01 15. 00 28 - Page 3

MDP-1-6-0/39 E-601 OWS & OSCT CONTROL SCHEMATI C

MDP-1-6-0/40 E-602 PLC SCHEMATI C - I NPUT AND OUTPUT

MDP-1-6-0/41 E-603 THREE- LI NE AND SI NGLE LI NEDI AGRAM - CQ01

480V PANEL

MDP-1-6-0/42 E-604 OI L SKI MMER CONTROL CABI NET - TERMI NAL PLAN

MDP-1-6-0/43 E-605 FS5 PANEL - CONNECTI ON DI AGRAM

MDP-1-6-0/44 E-606 OI L WATER SEPARATOR - CABLE AND CONDUI T

SCHEDULE

MDP-1-6-0/45 E-901 ELECTRI CAL PHOTOS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

a. No For I nf or mat i on Onl y dr awi ngs ar e avai l abl e on CAD.

b. The Cont r act or assumes al l r i sks associ at ed i n usi ng el ect r oni c CAD drawings.

c. El ect r oni c copi es of CAD dr awi ngs ar e onl y avai l abl e i n Bent l ey Mi cr oSt at i on f or mat .

d. The cont r act dr awi ngs shal l gover n i f t her e ar e any di scr epanci es bet ween t he el ect r oni c copy and t he cont r act dr awi ng. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer of any di scr epanci es.

The Gover nment wi l l not be r esponsi bl e t o cor r ect t he el ect r oni c CAD drawing.

1. 3 FOR I NFORMATI ON ONLY DRAWI NGS ( FI O)

These FI O dr awi ngs, al so known as Resour ce ( R) dr awi ngs, ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on. The Gover nment does not war r ant t he accur acy of t he FI O dr awi ngs. The Gover nment r ecommends t hat t he Cont r act or ver i f y t he accur acy of FI O dr awi ngs.

For I nf or mat i on Onl y ( FI O) dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET

NUMBER

DESCRIPTION Revision Number

Date

MDP-2-4-0/136 FIO-001 POWERHOUSE - REI NFORCEMENT - STA. SERVI CE

BAY - BLDG. I NTERI OR - FLOOR EL. 235. 50

MDP-1-6-1D1/1 FIO-002 POWERHOUSE - POWER & CONTROL - CONDUI T -

ASSEMBLY & STATI ON SERVI CE - BAYS - EL.

235. 0 & 287. 0

DOCUMENT 00 01 15. 00 28 - Page 4

MDP-1-3-8/4 FIO-003 POWERHOUSE - MECHANI CAL - STATI ON SERVI CE

UNI TS - DRAI NAGE PI PI NG & MI SC EMBEDDED I TEMS

MDP-2-3-8/5 FIO-004 POWERHOUSE - MECHANI CAL - EMBEDDED PI PI NG -

ASSEMBLY BAY - EL. 267. 50 - BUI LDI NG I NTERI OR

MDP-2-3-8/7 FIO-005 POWERHOUSE - MECHANI CAL - EMBEDDED PI PI NG -

ASSEMBLY BAY - EL. 246. 50 - OI L STORAGE ROOM

MDP-2-3-8/8 FIO-006 POWERHOUSE - MECHANI CAL - STATI ON SERVI CE

UNI TS - EMBEDDED - UNWATEI RNG AND DRAI NAGE

PIPING

MDP-2-3-8/9 FIO-007 POWERHOUSE - MECHANI CAL - EMBEDDED PI PI NG -

STA. SERVI CE BAY - SUMP PUMP ROOM

MDP-2-3-8/18 FIO-008 POWERHOUSE - MECHANI CAL - EMBEDDED PI PI NG -

MAI N UNI T BAYS - PLAN AND SECTI ONS

MDP-2-3-8/21 FIO-009 POWERHOUSE - MECHANI CAL - EMBEDDED PI PI NG I N

DRAI NAGE - TUNNEL OF MAI N UNI T BAYS

MDP-2-3-8/22 FIO-010 POWERHOUSE - MECHANI CAL - TAI LRACE DECK -

EMBEDDED PI PI NG - PLAN AND SECTI ONS

MDP-3-3-9/1 FIO-011 POWERHOUSE - MECHANI CAL - PI PI NG ARRANGEMENT

- DRAI NAGE PUMPS - PLAN & DETAI LS

MDP-2.1-4-0/315 FIO-012 POWERHOUSE - CONCRETE OUTLI NE - STA. SERVI CE

BAY - PLAN EL. 235. 5

MDP-2.1-4-0/316 FIO-013 POWERHOUSE - CONCRETE OUTLI NE - STATI ON

SERVI CE BAY - PLAN EL. 254. 00

MDP-2.1-4-0/321 FIO-014 POWERHOUSE - CONCRETE OUTLI NE - STA. SERVI CE

BAY - GALLERY FLOOR PLANS

MDP-2.1-4-0/323 FIO-015 POWERHOUSE - CONCRETE OUTLI NE - STA. SERVI CE

BAY - LONGI TUDI NAL SECTI ONS

MDP-2.1-4-0/415 FIO-016 POWERHOUSE - REI NFORCEMENT - STA. SERVI CE

BAY - FLOOR EL. 254. 0

MDP-2-4-0/16 FIO-017 POWERHOUSE - CONCRETE OUTLI NE - ASSEMBLY BAY

- BLDG. I NTERI OR - PLAN - EL. 254. 0

MDP-2-4-0/17 FIO-018 POWERHOUSE - CONCRETE OUTLI NE - ASSEMBLY BAY

- BLDG. I NTERI OR - SECTI ONS

MDP-2.1-4-0/304 FIO-019 POWERHOUSE - CONCRETE OUTLI NE - ASSEMBLY BAY

- PLAN EL. 346. 0

MDP-2.1-4-0/319 FIO-020 POWERHOUSE - CONCRETE OUTLI NE - STA. SERVI CE

BAY - PLAN EL. 287. 0

MDP-2.1-4-0/317 FIO-021 POWERHOUSE - CONCRETE OUTLI NE - STATI ON

SERVI CE BAY - PLAN EL. 267. 50

DOCUMENT 00 01 15. 00 28 - Page 5

MDP-2.1-4-0/322 FIO-022 POWERHOUSE - CONCRETE OUTLI NE - STA. SERVI CE

BAY - TRANSVERSE SECTI ON

MDP-2-5-0/2 FIO-023 POWERHOUSE - MI SCELLANEOUS METALWORK - HATCH

FRAMES - SHEET NO. 2

MDP-3-3-9/13 FIO-024 POWERHOUSE - MECHANI CAL - PI PI NG ARRANGEMENT

- MI SC PI PI NG I N STATI ON SERVI CE BAY

MDP-3-3-9/27 FIO-025 POWERHOUSE MECHANI CAL - PI PI NG DI AGRAM -

UNWATERI NG & DRAI NAGE SYSTEMS

MDP-3-3-9/2 FIO-026 POWERHOUSE - MECHANI CAL - PI PI NG ARRANGEMENT

- UNWATERI NG - & DRAI NAGE PUMPS - SECTI ONS

MDP-2.2-3-9/36A FIO-027 POWERHOUSE - MECHANI CAL - PI PI NG ARRANGEMENT

- MAI N UNI T TOP - PLATE DRAI NAGE HEADER &

MI SC DETAI LS

MDP-2-4-0/35 FIO-028 POWERHOUSE - CONCRETE OUTLI NE - STA SERVI CE

BAY - BLDG I NTERI OR - SECTI ONS

819-1 FIO-029 STATI ON SERVI CE DRAI NAGE SUMP - DRAI NAGE

PUMP & DI SCHARGE LI NE - I NSTALLATI ON DETAI LS

791 FIO-030 STATI ON SERVI CE BAY - STI LLWELL FOR SUMP

SKET486 FIO-031 POWERHOUSE - ELECTRI CAL - DACS ANNUNCI ATI ON

- SA CABI NET - TERMI NAL CONNECTI ON DI AGRAM -

SH1

SKET486B FIO-032 POWERHOUSE - ELECTRI CAL - DACS ANNUNCI ATI ON

- SA CABI NET - TERMI NAL CONNECTI ON DI AGRAM -

SH 2

SKET486C FIO-033 POWERHOUSE - ELECTRI CAL - DACS ANNUNCI ATI ON

- SA CABI NET - TERMI NAL CONNECTI ON DI AGRAM -

SH3

SKET645 FIO-034 POWERHOUSE - ELECTRI CAL - GATE HOI ST UNI T

CONTROLS - SC9

SKET669 FIO-035 DRAI AGE & UNWATERI NG SUMP - OI L DETECTI ON &

LEVEL I NDI CATI ON - ELEV 235

SK-V6-279-E203 FIO-036 4160/ 480V STATI ON SERVI CE REPLACEMENT -

ELEVATI ON & ONE- LI NE - CQ01 480V MCC

SK-V6-280-E203A FIO-037 4160/ 480V STATI ON SERVI CE REPLACEMENT -

THREE- LI NE DI AGRAM - CQ01 480V MCC - SHEET 1

SK-V6-281-E203B FIO-038 4160/ 480V STATI ON SERVI CE REPLACEMENT -

THREE- LI NE DI AGRAM - CQ01 480V MCC - SHEET 2

DOCUMENT 00 01 15. 00 28 - Page 6

SK-V6-288-E203C FIO-039 4160/ 480V STATI ON SERVI CE REPLACEMENT -

THREE- LI NE DI AGRAM - CQ01 480V MCC - SHEET 3

SK-V6-289-E203D FIO-040 4160/ 480V STATI ON SERVI CE REPLACEMENT -

THREE- LI NE DI AGRAM - CQ01 480V MCC - SHEET 4

SK-V6-290-E203E FIO-041 4160/ 480V STATI ON SERVI CE REPLACEMENT -

THREE- LI NE DI AGRAM - CQ01 480V MCC - SHEET 5

MDP-2.1-6-2D1/1 FIO-042 POWERHOUSE - LI GHTI NG CONDUI T - STATI ON

SERVI CE BAY - EL 235. 5 & 254

MDP-2-6-2D1/1 FIO-043 POWERHOUSE - LI GHTI NG CONDUI T - STATI ON

SERVI CE BAY - BLDG. I NTERI OR - EL 176 &

223. 5 & 235. 5 AND ABOVE

MDP-2-6-7D0/2 FIO-044 POWERHOUSE - GROUNDI NG SYSTEM - ASSEMBLY AND

STA. SERV. BAY - EL 235. 5 & 246. 50 & 254. 00

& 267. 50

MDP-1-4-0/8 FIO-045 POWERHOUSE - STRUCTURAL - PLANS - EL 267. 5 &

221. 0 & 239. 5

MDP-1-4-0/9 FIO-046 POWERHOUSE - STRUCTURAL - PLANS - EL 254. 0 &

215. 0 & 207. 0

MDP-1-4-0/10 FIO-047 POWERHOUSE - STRUCTURAL - LONGI TUDI NAL

SECTI ON THRU - CENTERLI NE MAI N UNI TS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Document - -

DOCUMENT 00 01 15. 00 28 - Page 7

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

SECTI ON 01 00 00. 00 28 - Page 1

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS

222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

Feder al Vet er an empl oyment i nf or mat i on at http://www.fedshirevets.gov/index.aspx

Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/

Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/

Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html

U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/

Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al https://obamawhitehouse.archives.gov/sites/default/files/docs/white_house_business_council_-_guide_to_hiring_veterans_0.pdf

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

SECTI ON 01 00 00. 00 28 - Page 2

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

1. 4 DEFI NI TI ONS

1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL

1. 6 EQUI PMENT LI ST

1. 7 TESTI NG OF EQUI PMENT

1. 8 DI SPOSI TI ON OF REMOVED EQUI PMENT

1. 9 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

1. 10 PRE- WORK AND POST WORK SURVEYS

1. 11 CARE OF DRAI NS

1. 12 PROTECTI ON OF POWERHOUSE FLOORS

1. 13 TRAI NI NG

1. 14 PROJECT OPERATORS' TRAI NI NG

1. 15 PROJECT TECHNI CAL SUPPORT

1. 16 PROJECT SUPERI NTENDENT

1. 17 KEY PERSONNEL SUBSTI TUTI ON

1. 18 POST AWARD MEETI NGS

1. 18. 1 Pr e- Wor k Meet i ng

1. 18. 2 Pr e- Const r uct i on Meet i ng

1. 18. 2. 1 Mi nut es

1. 18. 2. 2 Demobi l i z i ng And Remobi l i z i ng

1. 19 WEEKLY PRODUCTI ON MEETI NGS

1. 20 ADDI TI ONAL MEETI NGS

1. 21 PARTNERI NG

1. 21. 1 Gener al

1. 21. 2 Par t ner i ng Meet i ngs

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Weekl y Meet i ng Agenda

SECTI ON 01 11 01. 00 28 - Page 1

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON

01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Equi pment Li st ; I , C

Pr e- Wor k Sur vey Phot os And Repor t ; I , C

Pr oj ect Super i nt endent ; I , C

SD- 07 Cer t i f i cat es

Key Per sonnel Subst i t ut i on; G, C

SD- 11 Cl oseout Submi t t al s

Post - Wor k Sur vey Phot os And Repor t ; I , C

Tr ai ni ng Manual s; G, C

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

Fi el d ver i f y al l el evat i ons, di mensi ons, and coor di nat es of exi st i ng f eat ur es i ndi cat ed on t he cont r act dr awi ngs t hat af f ect new const r uct i on.

Any devi at i ons shal l be updat ed as per SECTI ON 01 78 00. 00 28, CLOSEOUT SUBMI TTALS, par agr aph WORKI NG AS- BUI LT CONTRACT DRAWI NGS AND FI O DRAWI NGS.

SECTI ON 01 11 01. 00 28 - Page 2

1. 4 DEFINITIONS

a. Qual i f i ed Per son.

As def i ned i n EM 385- 1- 1; " DEFI NI TI ONS" , unl ess ot her wi se specified.

1. 5 REGULAR CLEANUP AND DEBRI S DI SPOSAL

Wi t h t he except i on of mat er i al s speci f i cal l y i ndi cat ed or speci f i ed t o be sal vaged f or r euse i n const r uct i on, or t ur ned over t o t he Gover nment , al l wast es and demol i shed mat er i al s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j ob s i t e dai l y i n accor dance wi t h Feder al , St at e, and l ocal r egul at i ons. The Cont r act or shal l f ur ni sh wast e cont ai ner s. Al l smal l wast e cont ai ner s pr ovi ded by t he cont r act or shal l be empt i ed dai l y, l ar ge bi n cont ai ner s shal l be empt i ed when f ul l or once a week.

1. 6 EQUI PMENT LI ST

Fur ni sh a compl et e l i s t of al l equi pment t o be used on t he Pr oj ect 30 days pr i or t o commencement of on- si t e wor k. Submi t a r evi sed l i s t i n t he event of change of equi pment . Li st s shal l i ncl ude r ent ed equi pment as wel l as l ease- pur chase or sal e- l easeback equi pment . The i ni t i al l i s t and t he r evi sed l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he Pr oj ect and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name, model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number .

1. 7 TESTI NG OF EQUI PMENT

Bef or e any machi ner y or mechani zed equi pment i s put t o use on t he j ob, i t shal l be i nspect ed and t est ed by a qual i f i ed per son and det er mi ned t o be i n saf e oper at i ng condi t i on. Cr anes or der r i cks shal l be t est ed by t he Cont r act or or a qual i f i ed t est i ng agency i n accor dance wi t h EM 385- 1- 1.

Equi pment shal l be l ar ge enough t o saf el y handl e pr oposed pi cks or t asks wi t hout exceedi ng t he cr ane r at i ng est abl i shed by t hese t est s.

1. 8 DI SPOSI TI ON OF REMOVED EQUI PMENT

Unl ess ot her wi se speci f i ed i n ot her sect i ons of t he speci f i cat i ons, al l exi st i ng equi pment r emoved and not r ei nst al l ed shal l become t he pr oper t y of t he Cont r act or , r emoved f r om t he Pr oj ect s i t e, and di sposed of i n a l egal manner . Mat er i al s t hat cannot be r emoved dai l y may be t empor ar i l y st or ed on- si t e at an appr oved ar ea. Sal vaged mat er i al s shal l not be sol d on t he pr oj ect s i t e.

1. 9 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

Ref er ence FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s ( Apr 1984) .

1. 10 PRE- WORK AND POST WORK SURVEYS

Conduct a pr e- wor k sur vey pr i or t o st ar t of on- si t e wor k and a post - wor k sur vey dur i ng pr oj ect c l oseout , wi t h t he Cont r act i ng Of f i cer Repr esent at i ve, of t he Gover nment f aci l i t i es at t he wor k ar eas. The r esul t s of t he sur veys shal l be document ed by di gi t al phot ogr aphs and

SECTI ON 01 11 01. 00 28 - Page 3 descr i pt i ve nar r at i ve r epor t s. A col or copy of t he sur vey phot ogr aphs and nar r at i ve r epor t s shal l be submi t t ed t o t he Cont r act i ng Of f i cer wi t hi n f i ve ( 5) days af t er sur vey has been compl et ed.

1. 11 CARE OF DRAI NS

Exi st i ng Power house f l oor dr ai ns shal l not be used f or di sposal of any mat er i al or l i qui ds ot her t han c l ear wat er .

1. 12 PROTECTI ON OF POWERHOUSE FLOORS

Car e shal l be t aken t o pr event damage t o al l f l oor s and cur bs wi t hi n t he Power house. At a mi ni mum, t he Cont r act or shal l ensur e:

a. Pr ot ect i on shal l be suf f i c i ent t o pr event any damage t o t he f l oor s and cur bs when t r anspor t i ng any equi pment or mat er i al s, demol i shi ng exi st i ng equi pment and st r uct ur es, or any ot her act i v i t y by t he Cont r act or . Damage t o f l oor s or cur bs caused by t he Cont r act or ' s oper at i on shal l be r epai r ed at no addi t i onal cost t o t he Gover nment .

Repai r s shal l mat ch t he sur r oundi ng ar ea i n mat er i al t ype, col or , t ext ur e, and sur f ace f i ni sh and r epai r s shal l be subj ect t o appr oval by t he Gover nment .

b. Pi pe t r enches shal l r emai n accessi bl e even i f cover ed. Al l desi gnat i ons r el at i ng t o f i r e pr ot ect i on equi pment t hat get cover ed shal l be mar ked on t he t empor ar y f l oor cover i ng. Pr ovi de addi t i onal bl ocki ng and wood suppor t s when r equi r ed. Al so sui t abl y pr ot ect ot her sur f aces of wor k.

c. Cont r act or shal l ensur e al l mat er i al s and equi pment , pl aced or t r anspor t ed, upon or ar ound t he power house f l oor shal l not exceed t he al l owabl e r at ed f l oor l oadi ng.

1. 13 TRAINING

Pr ovi de t he ser v i ces of aut hor i zed st ar t - up engi neer s ( Manuf act ur er ' s Repr esent at i ves) as necessar y t o pr ovi de t r ai ni ng i n pr ogr ammi ng, oper at i on and mai nt enance on t he Dr ai nage Sump Oi l Ski mmer . Pr ovi de t r ai ni ng f or oper at or s and mai nt enance per sonnel pr i or t o pr oj ect oper at i on. Pr ovi de one, ei ght - hour c l ass sessi on f or oper at or s, mai nt enance per sonnel , and engi neer s. Each cl ass sessi on shal l i ncl ude no l ess t han ei ght ( 8) empl oyees. The Gover nment wi l l pr ovi de f or t he t r ai ni ng l ocat i on. Submi t t r ai ni ng manual s and document at i on f or appr oval 30 days pr i or t o schedul ed c l asses and shal l f ur ni sh suf f i c i ent t r ai ni ng mat er i al s at t he t r ai ni ng c l asses f or al l s t udent s pl us a mi ni mum of t hr ee ( 3) copi es f or pr oj ect f i l es. Wher e audi o/ v i sual mat er i al s ar e used i n t r ai ni ng c l asses, t hr ee ( 3) copi es of such mat er i al s shal l be f ur ni shed t o t he Pr oj ect f or use i n f ut ur e t r ai ni ng. I t shal l be t he Cont r act or ' s r esponsi bi l i t y t o coor di nat e t he t r ai ni ng sessi ons wi t h t he Cont r act i ng Of f i cer ' s Repr esent at i ve t o ensur e mi ni mum conf l i c t s wi t h ongoi ng Pr oj ect wor k.

1. 14 PROJECT OPERATORS' TRAI NI NG

Pr ovi de t he ser v i ces of one or mor e aut hor i zed i ndi v i dual s f or Pr oj ect Oper at or s ' t r ai ni ng. Cont r act or per sonnel shal l be exper i enced i n t he oper at i onal r equi r ement s of al l newl y i nst al l ed equi pment , and cont r ol f eat ur es. Cont r act or per sonnel shal l be pr esent at t he pr oj ect and avai l abl e f or assi st ance f or t hr ee ( 3) t en hour wor k shi f t s i mmedi at el y f ol l owi ng Gover nment accept ance of newl y i nst al l ed f eat ur es. Requi r ed wor k

SECTI ON 01 11 01. 00 28 - Page 4 shi f t s shal l be coor di nat ed wi t h t he Cont r act i ng Of f i cer .

1. 15 PROJECT TECHNI CAL SUPPORT

a. Pr ovi de 20 hour s of pr oj ect t echni cal suppor t af t er Gover nment accept ance of t he compl et ed pr oj ect . One or mor e Cont r act or per sonnel exper i enced i n t he oper at i onal r equi r ement s of al l newl y i nst al l ed equi pment , and cont r ol f eat ur es shal l be avai l abl e f or Techni cal Suppor t dur i ng nor mal Gover nment Wor k Schedul e hour s. See par agr aph " Gover nment ' s Wor k Schedul e" i n SECTI ON 01 14 00. 10 28.

b. Suppor t shal l i ncl ude si t e v i s i t s by Cont r act or per sonnel .

Cont r act or per sonnel shal l be avai l abl e at t he pr oj ect wi t hi n 48 hour s, or t he next nor mal Gover nment Wor k Schedul e day f ol l owi ng not i f i cat i on by t he Gover nment - whi chever i s l at er . Techni cal suppor t shal l be avai l abl e f or 60 days f ol l owi ng Gover nment accept ance of t he newl y i nst al l ed dr ai nage sump oi l sk i mmer , or unt i l f i nal Oper at i on and Mai nt enance Manual s and Par t s Cat al ogs have been appr oved and r ecei ved by t he Gover nment - whi chever i s l at er . See SECTI ON 01 78 00. 00 28 CLOSEOUT SUBMI TTALS f or r equi r ement s of Oper at i on and Mai nt enance Manual s and Par t s Cat al ogs submi t t al s.

1. 16 PROJECT SUPERI NTENDENT

At al l t i mes dur i ng per f or mance of t hi s cont r act and unt i l t he wor k i s compl et ed and accept ed, assi gn and have on t he wor ksi t e, a compet ent super i nt endent as per FAR Cl ause 52. 236- 6 " Super i nt endence by t he Cont r act or " . Submi t Super i nt endent name and cont act i nf or mat i on pr i or t o st ar t of on- si t e const r uct i on.

1. 17 KEY PERSONNEL SUBSTI TUTI ON

I f t he Cont r act or pl ans on r epl aci ng any Key per sonnel ( Pr oj ect Super i nt endent , CQC Syst em Manager , or SSHO) t hey must have t he appr oval of t he Cont r act i ng Of f i cer . Per sonnel shal l possess t he qual i f i cat i ons t hat meet or exceed t hose st at ed i n t he speci f i cat i ons f or t he posi t i on of t he i ndi v i dual t hey ar e r epl aci ng. Submi t qual i f i cat i ons of new per sonnel at l east 15 cal endar days i n advance of dat e of r epl acement .

1. 18 POST AWARD MEETI NGS

1. 18. 1 Pr e- Wor k Meet i ng

Wi t hi n 30 cal endar days af t er r ecei pt of Not i ce t o Pr oceed, at t end a Pr e- Wor k Meet i ng. Seni or Level member s of t he Cont r act or ' s st af f i nvol ved wi t h t hi s cont r act shal l par t i c i pat e i n t hi s meet i ng t o di scuss t he over al l cont r act r equi r ement s. The Gover nment wi l l l ead t hi s meet i ng and t ake t he meet i ng mi nut es.

1. 18. 2 Pr e- Const r uct i on Meet i ng

The Pr oj ect Super i nt endent shal l coor di nat e wi t h t he Cont r act i ng Of f i cer and est abl i sh t he dat e of t he Pr e- Const r uct i on Meet i ng. The meet i ng wi l l be hel d at t he Pr oj ect s i t e at l east one ( 1) week pr i or t o mobi l i z i ng t o t he j ob s i t e. Lead t he Pr e- Const r uct i on Meet i ng di scussi ng t he Cont r act or ' s pl an on execut i ng t he wor k at t he pr oj ect s i t e, schedul e, r equi r ed c l ear ances and t i mef r ame f or t hem, and pl an f or i mpl ement i ng saf et y and qual i t y cont r ol . The Gover nment wi l l have key member s f r om t he Pr oj ect st af f t o di scuss envi r onment al and c l ear ance i ssues. Key member s

SECTI ON 01 11 01. 00 28 - Page 5 of t he cont r act or st af f shal l at t end t hi s meet i ng i ncl udi ng t he Qual i t y Cont r ol ( QC) Syst em Manager , Si t e Saf et y and Heal t h Of f i cer ( SSHO) and any ot her member s det er mi ned by t he Gover nment t o be r equi r ed.

1. 18. 2. 1 Minutes

Cont r act or i s r esponsi bl e f or t ak i ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 48 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 18. 2. 2 Demobi l i z i ng And Remobi l i z i ng

Anyt i me t he Cont r act or demobi l i zes f r om t he s i t e and r emobi l i zes at a l at er dat e, anot her Pr e- Const r uct i on Meet i ng shal l be hel d and shal l f ol l ow t he r equi r ement s l i s t ed above.

1. 19 WEEKLY PRODUCTI ON MEETI NGS

Dur i ng al l f abr i cat i on and onsi t e const r uct i on wor k, t he Pr oj ect Super i nt endent shal l l ead a weekl y pr oduct i on meet i ng t o br i ef t he Gover nment on t he st at us of t he pr oj ect . The pr oduct i on meet i ng shal l i dent i f y al l pl anned const r uct i on act i v i t i es, coor di nat i on r equi r ement s, cont r act submi t t al st at us, and any ot her per t i nent i nf or mat i on. The Cont r act or i s r esponsi bl e f or t ak i ng t he meet i ng mi nut es.

I n addi t i on t o t he r equi r ement s above, t he weekl y pr oduct i on meet i ng shal l :

a. Use t he at t ached " Weekl y Meet i ng Agenda" and di scuss al l el ement s of t hi s agenda.

1. Descr i be al l pl anned const r uct i on act i v i t i es, on- si t e and of f - s i t e over t he upcomi ng f ew weeks.

2. ENSURE t hese act i v i t i es al i gn t o t he over al l const r uct i on SCHEDULE submi t t ed under SECTI ON 01 32 16. 00 28 PROJECT SCHEDULE.

3. RECORD any changes t o t he Pr oj ect Schedul e AND I NCLUDE I N t he next schedul ed updat e.

b. Key member s of t he Cont r act or ' s st af f i ncl udi ng t he Qual i t y Cont r ol Syst em Manager and t he SI TE SAFETY AND HEALTH OFFI CER shal l at t end.

c. The Qual i t y Cont r ol Syst em Manager shal l di scuss al l QC aspect s out l i ned i n SECTI ON 01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL.

d. The Gover nment r eser ves t he r i ght t o r equi r e any per son f r om t he Cont r act or ' s st af f such as t he Pr oj ect Manager , Engi neer , Schedul er or Key Subcont r act or Per sonnel t o at t end t he meet i ng.

e. Submi t each meet i ng agenda t o t he COR 24 hour s pr i or t o t he meet i ng.

f . Send meet i ng mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer . .

1. 20 ADDI TI ONAL MEETI NGS

Addi t i onal meet i ngs may be r equi r ed as deemed necessar y by t he Gover nment or t he Cont r act or . The Cont r act or shal l r ecor d t he mi nut es of al l

SECTI ON 01 11 01. 00 28 - Page 6 meet i ngs, i ncl udi ng al l conf er ence cal l s or di scussi ons, t hat occur bet ween t he Cont r act or and Gover nment . Send mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Cont r act i ng Of f i cer f or concur r ence. E- mai l subj ect l i ne shal l i ncl ude pr oj ect name and meet i ng t opi c.

1. 21 PARTNERING

1. 21. 1 General

The Gover nment i nt ends t o encour age t he f oundat i on of a cohesi ve par t ner shi p wi t h t he Cont r act or and i t s subcont r act or s by i nf or mal l y par t ner i ng t hi s cont r act . Thi s par t ner shi p wi l l be st r uct ur ed t o dr aw on t he st r engt hs of each or gani zat i on t o i dent i f y and achi eve r eci pr ocal goal s. The obj ect i ves ar e ef f ect i ve and ef f i c i ent cont r act per f or mance wi t h t he i nt ent t o achi eve a saf e compl et i on of t he wor k - wi t hi n budget , on schedul e, and i n accor dance wi t h pl ans and speci f i cat i ons. Thi s par t ner shi p woul d be bi l at er al i n makeup and par t i c i pat i on wi l l be t ot al l y vol unt ar y. I f Par t ner i ng i s pur sued, meet i ngs woul d be hel d as i dent i f i ed i n t he f ol l owi ng par agr aph.

1. 21. 2 Par t ner i ng Meet i ngs

Wi t hi n 30 cal endar days of r ecei pt of Not i ce t o Pr oceed, t he i ni t i al par t ner i ng meet i ng wi l l be schedul ed i f t he meet i ng i s r equest ed by t he Cont r act or . The Cont r act or ' s key per sonnel wi l l at t end a f ace- t o- f ace par t ner i ng meet i ng ( t ypi cal l y one day i n dur at i on) t oget her wi t h key Gover nment per sonnel , t o di scuss pr oj ect goal s and communi cat i on.

Fol l ow- up meet i ngs wi l l be hel d per i odi cal l y , as r equi r ed, t hr oughout t he dur at i on of t he cont r act , as agr eed t o by t he Cont r act or and t he Gover nment .

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

SECTI ON 01 11 01. 00 28 - Page 7

Weekly Meeting agenda template

Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review

Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters

Coordination - Clearances required over the next week, include the following:

A description of the work to be performed under the Clearance.

Determine the correct energy isolation points needed to perform the work safely.

Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.

Determine the procedure and method of testing for stored energy if applicable.

The date and time the Clearance shall be required.

The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.

Coordination issues

Safety- Review of AHA’s for ongoing work Pending AHA’s

Required for new work Status of Gov’t approval

Safety issues

QC -

Preparatory meetings Held over last week- status of meeting minutes

Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PROJECT SECURI TY

1. 3. 1 Cont r act or Vehi c l e Access

1. 3. 2 I dent i f i cat i on of Empl oyees

1. 4 ELEVATOR USE

1. 5 DELI VERY OF EQUI PMENT

1. 6 USE OF POWERHOUSE BRI DGE CRANE

1. 6. 1 Cr ane Oper at or s

1. 6. 2 Use of t he Cr anes

1. 6. 3 Ri gger s

1. 6. 4 Li f t i ng Devi ces

1. 7 FACI LI TY OCCUPANCY CLOSURE

1. 8 WORK SCHEDULES

1. 8. 1 Cont r act or ' s Wor k Schedul e

1. 8. 2 Gover nment ' s Wor k Schedul e

1. 9 USE OF WALLA WALLA DI STRI CT PARKS

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Secur i t y Badge For m

SECTI ON 01 14 00. 10 28 - Page 1

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Cont r act or shal l be r esponsi bl e f or compl yi ng wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. A desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

El evat or Pr ot ect i on Pl an; G, C

SD- 07 Cer t i f i cat es

Qual i f i cat i ons; G, C

1. 3 PROJECT SECURI TY

The Pr oj ect s i t e i s a secur ed ar ea and access ont o t he Pr oj ect i s r est r i c t ed. The secur i t y measur es af f ect al l of t he Cont r act or ' s vehi c l es and per sonnel . Ther e wi l l be del ays when ent er i ng Pr oj ect s due t o l ocked gat es, vehi c l e i nspect i ons, and per sonnel checks. I nspect i ons and checks may i ncl ude i nspect i on of t ool boxes, br i ef cases, l unch boxes, and ot her containers.

1. 3. 1 Cont r act or Vehi c l e Access

Pr oj ect access r oads on bot h s i des of t he dams ar e secur ed wi t h l ocked gat es. Al l vehi c l es t hat pass t hr ough t he l ocked gat es wi l l be subj ect t o bei ng sear ched. No pr i vat el y owned vehi c l es ( POV' s) wi l l be al l owed t hr ough l ocked gat es. Onl y Cont r act or ' s wor k vehi c l es and equi pment t hat ar e essent i al t o t he conduct of t he wor k wi l l be al l owed i n t he wor k ar eas. Al l Cont r act or vehi c l es shal l di spl ay sui t abl e per manent or t empor ar y i dent i f i cat i on.

SECTI ON 01 14 00. 10 28 - Page 2

1. 3. 2 I dent i f i cat i on of Empl oyees

Gover nment Pr oj ect per sonnel wi l l pr ovi de t he Cont r act or ' s per sonnel wi t h i dent i f i cat i on badges as t hey ar r i ve on s i t e. Compl et e t he Secur i t y Badge For m( at t ached t o t he end of t hi s SECTI ON) , submi t t he compl et ed f or m t o t he Cont r act i ng Of f i cer at l east f i ve ( 5) busi ness days pr i or t o t he empl oyee ar r i val t o wor k on t he Pr oj ect s i t e and upon i ssuance of of f i c i al badges, shal l be r esponsi bl e f or r equi r i ng each empl oyee engaged on t he wor k t o di spl ay i dent i f i cat i on at al l t i mes. Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Qual i t y Assur ance Repr esent at i ve f or cancel l at i on upon t he r el ease of t he empl oyee or pr oj ect compl et i on. I f r equi r ed by t he Cont r act i ng Of f i cer , empl oyees wi l l be phot ogr aphed by t he Gover nment . Empl oyees who f ai l t o submi t t o phot ogr aphi ng wi l l not be al l owed on t he pr oj ect s i t e.

Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .

1. 4 ELEVATOR USE

a. The power house el evat or i s avai l abl e f or Cont r act or use. Pr ot ect t he i nt er i or of t he el evat or f r om damage t hat may occur dur i ng use.

Submi t an el evat or pr ot ect i on pl an, t hat det ai l s what means and met hods wi l l be used t o pr ot ect t he el evat or f r om damage.

b. El evat or may be used, when avai l abl e, f or Cont r act or per sonnel and smal l t ool s. El evat or capaci t y shal l not be exceeded. El evat or use i s at Cont r act or s ' own r i sk. The Gover nment does not guar ant ee oper at i on, or avai l abi l i t y , of t he el evat or .

1. 5 DELI VERY OF EQUI PMENT

Cont r act or shal l be r esponsi bl e f or del i ver y and r ecei pt of al l mat er i al s and equi pment . Gover nment per sonnel wi l l not be avai l abl e t o assi st t he Cont r act or i n t hese act i v i t i es. To t he maxi mum ext ent possi bl e, del i ver i es shal l ar r i ve on t he same si de of t he r i ver as t he Cont r act or ' s wor k ar ea.

Del i ver y vehi c l es wi l l be al l owed t o cr oss t he r i ver over t he dam onl y wi t h Gover nment appr oval . Del i ver y vehi c l es ar r i v i ng on t he opposi t e s i de of t he r i ver as t he wor k ar ea shal l be unl oaded out s i de t he l ocked gat e, equi pment shal l be l oaded ont o Cont r act or ' s vehi c l es, and Cont r act or ' s vehi c l es wi l l t hen be al l owed t o cr oss t he dam t o t he wor k ar ea.

1. 6 USE OF POWERHOUSE BRI DGE CRANE

The Gover nment ' s br i dge cr ane wi t hi n t he power house wi l l be avai l abl e f or t he wor k wi t hi n t he wor ki ng l oad and movement l i mi t s of t he cr ane. The br i dge cr ane wi l l be avai l abl e f or use by t he Cont r act or at such t i mes as not r equi r ed f or ot her mai nt enance and r epai r wor k per f or med by Gover nment per sonnel . The Gover nment wi l l f ur ni sh el ect r i c power , l ubr i cat i on, and nor mal mai nt enance i ncl udi ng adj ust ment s wi t hout cost t o t he Cont r act or .

1. 6. 1 Cr ane Oper at or s

The Cont r act or shal l f ur ni sh qual i f i ed br i dge cr ane oper at or s f or t hei r oper at i ons. Each oper at or , i n addi t i on t o meet i ng t he r equi r ement s of SECTI ON 01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS, shal l have had at

SECTI ON 01 14 00. 10 28 - Page 3 l east 3- year s exper i ence on a br i dge cr ane of equi val ent capaci t y and char act er i st i cs. Qual i f i cat i ons f or each oper at or i n t he f or m of an af f i davi t s i gned by t he oper at or and t he Cont r act or shal l be submi t t ed.

The af f i davi t shal l i ncl ude a compl et e r ecor d of al l r el at ed wor k wi t h par t i cul ar emphasi s on exper i ence di r ect l y r el at ed t o oper at i on of a br i dge cr ane handl i ng compar abl e l oads. Bef or e any oper at or i s appr oved he shal l spend at l east 1 hour i n t r ai ni ng on t he cr anes under t he di r ect super vi s i on of a Gover nment oper at or . The Cont r act or ' s cr ane oper at or s may be r et est ed at any t i me. The Cont r act or shal l ensur e t hat t he cr ane oper at or s have cur r ent ( wi t hi n t he pr evi ous 12 mont hs) physi cal or medi cal exami nat i ons wi t h emphasi s on hear i ng, eyesi ght , and car di ovascul ar condi t i ons. Dat es of physi cal exams shal l be submi t t ed t o t he Cont r act i ng Of f i cer al ong wi t h qual i f i cat i ons.

1. 6. 2 Use of t he Cr anes

The Cont r act or wi l l be l i abl e f or al l damage, due t o f aul t or negl i gence, i ncur r ed whi l e t he cr anes ar e oper at ed by t he Cont r act or ' s cr ane oper at or s.

1. 6. 3 Riggers

Onl y qual i f i ed r i gger s shal l be used i n pr epar i ng l oads f or l i f t i ng and i n at t achi ng such l oads t o t he cr anes. Al l per sonnel per f or mi ng r i ggi ng shal l meet r equi r ement s of SECTI ON 01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS. A Gover nment oper at or wi l l check t hem f or knowl edge of hand si gnal s. Hand hel d por t abl e r adi os may be used but onl y on non- Gover nment frequencies.

1. 6. 4 Li f t i ng Devi ces

The Cont r act or i s r esponsi bl e f or f ur ni shi ng al l ot her r i ggi ng, l i f t i ng devi ces, and cont ai ner s f or use wi t h t he cr anes. Any speci al l i f t i ng devi ces r equi r ed f or handl i ng new equi pment f ur ni shed by t he Cont r act or shal l be t ur ned over t o t he Gover nment upon compl et i on of t he cont r act .

St andar d s l i ngs and shackl es ar e not consi der ed " speci al " l i f t i ng devi ces.

1. 7 FACI LI TY OCCUPANCY CLOSURE

St r eet s, wal ks, and ot her f aci l i t i es occupi ed and used by t he Gover nment shal l not be c l osed or obst r uct ed wi t hout wr i t t en per mi ssi on f r om t he Cont r act i ng Of f i cer .

1. 8 WORK SCHEDULES

1. 8. 1 Cont r act or ' s Wor k Schedul e

At t he Pr e- Wor k Meet i ng, f ur ni sh a schedul e of number of wor ki ng days per week, shi f t s per day, and hour s per shi f t f or cont r act wor k. Fur ni sh not i f i cat i on of any change of schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e. Thi s not i f i cat i on shal l be pr ovi ded a mi ni mum of 48 hour s pr i or t o any schedul e change t o al l ow sui t abl e schedul i ng of Gover nment per sonnel and i nspect i on. Except i on t o t hi s r equi r ement may be al l owed i n case of schedul e change due t o emer gency condi t i ons.

1. 8. 2 Gover nment ' s Wor k Schedul e

a. The mai nt enance cr ews at t he dam wor k f r om 6: 30 a. m. t o 5: 00 p. m. , Monday t hr ough Thur sday. Cr ews and st af f do not wor k on weekends and

SECTI ON 01 14 00. 10 28 - Page 4

Feder al hol i days. I f a Feder al hol i day f al l s on a Fr i day, t he cr ews and st af f do not wor k on t he pr ecedi ng Thur sday. A power house oper at or i s at t he s i t e 24 hour s a day, 7 days a week, i ncl udi ng Feder al hol i days but i s not avai l abl e t o assi st t he Cont r act or .

b. I f t he Cont r act or r equi r es Gover nment suppor t or assi st ance out s i de of nor mal wor k hour s, t he Cont r act or must make a f or mal wr i t t en r equest t o t he Cont r act i ng Of f i cer at l east one week pr i or t o t he dat e t hat suppor t / assi st ance i s needed. The Gover nment wi l l r evi ew t hi s r equest , but t her e i s no guar ant ee t hat Gover nment suppor t or assi st ance can be provided.

1. 9 USE OF WALLA WALLA DI STRI CT PARKS

Speci al consi der at i on f or t he use of t he Wal l a Wal l a Di st r i c t Campi ng Grounds wi l l not be gi ven t o t he Cont r act or i f campi ng at t hese s i t es.

The Cont r act or ' s cr ew may not use Gover nment par ki ng l ot s near t he McNar y Lock and Dam f or RV par ki ng.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used) - - End of Sect i on - -

SECTI ON 01 14 00. 10 28 - Page 5

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 2. 1 Bi ogr aphi cal I nf or mat i on ( HC) Submi t t al

1. 3 AT LEVEL 1 TRAI NI NG

1. 4 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

1. 5 DOD FACI LI TY REQUI REMENTS ( COMMON ACCESS CARD NOT REQUI RED)

1. 6 FOR CONTRACTS THAT REQUI RE OPSEC TRAI NI NG

1. 7 EMPLOYEE ESCORT

1. 8 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

SECTI ON 01 14 00. 90 28 - Page 1

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS. Thi s cont r act does not r equi r e access t o or handl i ng of c l assi f i ed mat er i al .

Thi s cont r act r equi r es access t o secur ed and r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment . Secur ed ar ea i s consi der ed any l ocat i on wher e on- si t e wor k i s per f or med by Cont r act or empl oyees. The r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment consi st s of ever yt hi ng i nsi de t he secur i t y f ence at t he pr oj ect .

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY ( DA)

AR 190- 13 ( 2011) The Ar my Physi cal Secur i t y Pr ogr am

Ar my Di r ect i ve 2014- 05 ( 2014) Pol i cy and I mpl ement at i on Pr ocedur es f or Common Access Car d Cr edent i al i ng and I nst al l at i on Access f or Uncl ear ed Cont r act or s

Websi t e f or Depar t ment of t he Ar my Regul at i ons:

http://armypubs.army.mil/

Feder al Acqui s i t i on Regul at i ons ( FAR)

FAR 52. 204- 9 ( 2015) Per sonal I dent i t y Ver i f i cat i on of Cont r act or Per sonnel

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. The desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ant i Ter r or i sm ( AT) Level 1; I , SLE

Level 1 OPSEC t r ai ni ng; I , C

Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I , SLE

Bi ogr aphi cal I nf or mat i on ( HC) ; G, C

SECTI ON 01 14 00. 90 28 - Page 2

1. 2. 1 Bi ogr aphi cal I nf or mat i on ( HC) Submi t t al

Bi ogr aphi cal I nf or mat i on shal l onl y be submi t t ed t o t he addr ess bel ow.

Submi t one har d copy. No el ect r oni c copi es shal l be submi t t ed.

Bi ogr aphi cal I nf or mat i on; See par agr aph " ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES" f or addi t i onal i nf or mat i on and det ai l s on i t ems t o submi t .

Di st r i c t Commander

ATTN: CENWW- EC- C

Wal l a Wal l a Di st r i c t Cor ps of Engi neer s 201 Nor t h Thi r d Avenue Wal l a Wal l a, WA 99362- 1876

1. 3 AT LEVEL 1 TRAI NI NG

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, r equi r i ng access t o gover nment f aci l i t i es and cont r ol l ed access ar eas shal l compl et e Ant i Ter r or i sm ( AT) Level 1 awar eness t r ai ni ng wi t hi n 30 days af t er Not i ce t o Pr oceed, and annual l y t her eaf t er unt i l pr oj ect compl et i on. Submi t cer t i f i cat es of compl et i on f or each empl oyee t o t he cont r act i ng of f i cer r epr esent at i ve ( COR) or t o t he cont r act i ng of f i cer ( i f a COR i s not assi gned) , wi t hi n 5 cal endar days af t er i ni t i al compl et i on of t r ai ni ng or annual r ef r esher .

The cont r act or shal l r et ai n empl oyee t r ai ni ng cer t i f i cat es f or t he dur at i on of t he cont r act and mai nt ai n a cur r ent r ost er . The r ost er shal l cont ai n t he names of empl oyees who have compl et ed t he t r ai ni ng al ong wi t h t hei r most r ecent t r ai ni ng compl et i on dat e. The cont r act or shal l updat e t he r ost er and r esubmi t t o t he cont r act i ng of f i cer no l at er t han 5 cal endar days af t er compl et i on of r ef r esher t r ai ni ng or a new empl oyee compl et es cer t i f i cat i on.

AT Level I awar eness t r ai ni ng can be compl et ed i n appr oxi mat el y t wo ( 2) hour s and i s avai l abl e at t he f ol l owi ng websi t e:

http://jko.jten.mil/courses/atl1/launch.html

1. 4 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, shal l compl y wi t h al l appl i cabl e f aci l i t y access and secur i t y pol i c i es and pr ocedur es. Local f aci l i t y pol i c i es and pr ocedur es shal l be pr ovi ded by a gover nment r epr esent at i ve.

The cont r act or shal l pr ovi de al l i nf or mat i on r equi r ed f or backgr ound checks t o meet f aci l i t y access r equi r ement s. Backgr ound checks wi l l be per f or med by Wal l a Wal l a Di st r i c t Secur i t y Of f i ce. Cont r act or wor kf or ce must compl y wi t h al l per sonal i dent i t y ver i f i cat i on r equi r ement s ( FAR 52. 204- 9, Per sonal I dent i t y Ver i f i cat i on of Cont r act or Per sonnel :

http://www.ecfr.gov/cgi-bin/text-idx?rgn=div8&node=48:2.0.1.1.1.2.1.28 ) as di r ect ed by DOD and/ or l ocal pol i cy.

For each i ndi v i dual t hat wi l l be wor ki ng at t hi s s i t e, submi t a copy of t hei r dr i ver ' s l i cense t o sat i s i f y t he i nf or mat i on r equi r ed t o conduct t he backgr…