Atch_Rev_Specs_Table_of_Contents.pdf
PDF 20 KB Posted
- Attached to
- New Bearings Multiple Locations Walla Walla District Federal contract opportunity
- Solicitation number
- W912EF18R0024
About this file
Amend 2 Revices Specs Table of Contents
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_R_W912EF18R00240003.pdf | ||
| A.07.24_W912EF18R00240002_.pdf | ||
| Atch_4_Rev_Section_01_45_01.00_28.pdf | ||
| Atch_1_Rev_BIDSCH.pdf | ||
| Atch_3_Rev_Section_01_22_00.10_28.pdf | ||
| Atch_5_Rev_Section_48_13_13.09_26.pdf | ||
| A.07.24_W912EF18R00240002.pdf | ||
| Atch_2_Rev_Section_01_11_01.00_28.pdf | ||
| Atch_6__Rev_FIO-003.pdf | ||
| 18R00240001_Amendment_1.pdf | ||
| W912EF18R0024NewBearings.pdf | ||
| 18R0024VOL_5_MNA_PLANS.pdf | ||
| 18R0024PastPerformanceInfo.pdf | ||
| 18R0024VOL_4_HLD_PLANS.pdf | ||
| 18R0024VOL_1_LLA_PLANS.pdf | ||
| 18R0024VOL_2_LGA_PLANS.pdf | ||
| W912EF18R0024Specs.pdf | ||
| 18R0024VOL_3_LMA_PLANS.pdf | ||
| 18R0024PastPerformanceQuestionnaires.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Main Unit Bearings W912EF18R0024 Amend-0002
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 22 00.10 28 MEASUREMENT AND PAYMENT
01 33 00 SUBMITTAL PROCEDURES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
DIVISION 05 - METALS
05 05 23.20 26 WELDING
05 05 33.20 26 NON-DESTRUCTIVE TESTING
05 50 03.20 26 METALWORK FABRICATION, MACHINE WORK AND MISCELLANEOUS
PROVISIONS
DIVISION 48 - ELECTRICAL POWER GENERATION
48 13 13.06 26 FURNISH GENERATOR THRUST BEARING SHOES (MCNARY UNITS 1-12)
48 13 13.07 26 FURNISH GENERATOR GUIDE BEARING SHOES (ICE HARBOR UNITS
4-6)
48 13 13.08 26 FURNISH GENERATOR GUIDE BEARING SHOES (LITTLE GOOSE UNITS
1-3 AND LOWER MONUMENTAL UNITS 1-3)
48 13 13.09 26 FURNISH GENERATOR GUIDE BEARING SHOES (LOWER GRANITE
UNITS 4-6, LITTLE GOOSE UNITS 4-6, AND LOWER MONUMENTAL
UNITS 4-6)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1 g4edddca Line
File details come from the government source that posted it.