Atch_3_Rev_Section_01_22_00.10_28.pdf

PDF 46 KB Posted

Attached to
New Bearings Multiple Locations Walla Walla District Federal contract opportunity
Solicitation number
W912EF18R0024
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amend 2 Revised Section 01 22 00.10 28

View the file

Other files for this federal contract opportunity

Other files attached to New Bearings Multiple Locations Walla Walla District, newest first.
File Type Posted
A.07.24_R_W912EF18R00240003.pdf PDF
A.07.24_W912EF18R00240002_.pdf PDF
Atch_1_Rev_BIDSCH.pdf PDF
Atch_2_Rev_Section_01_11_01.00_28.pdf PDF
Atch_6__Rev_FIO-003.pdf PDF
Atch_5_Rev_Section_48_13_13.09_26.pdf PDF
A.07.24_W912EF18R00240002.pdf PDF
Atch_4_Rev_Section_01_45_01.00_28.pdf PDF
Atch_Rev_Specs_Table_of_Contents.pdf PDF
18R00240001_Amendment_1.pdf PDF
18R0024VOL_5_MNA_PLANS.pdf PDF
18R0024PastPerformanceInfo.pdf PDF
18R0024VOL_4_HLD_PLANS.pdf PDF
18R0024PastPerformanceQuestionnaires.pdf PDF
18R0024VOL_1_LLA_PLANS.pdf PDF
18R0024VOL_2_LGA_PLANS.pdf PDF
W912EF18R0024Specs.pdf PDF
18R0024VOL_3_LMA_PLANS.pdf PDF
W912EF18R0024NewBearings.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Main Unit Bearings W912EF18R0024 Amend-0002

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 RETAINAGE OF PAYMENT

1.2 ITEM 0001 ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4

- 6 (UPPER & LOWER)

1.3 ITEM 0002 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS

1 - 3 (UPPER & LOWER)

1.4 ITEM 0003 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS

4 - 6 (UPPER & LOWER)

1.5 ITEM 0004 LOWER GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6 (UPPER & LOWER)

1.6 ITEM 0005 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 1 - 3 (UPPER & LOWER)

1.7 ITEM 0006 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6 (UPPER & LOWER)

1.8 ITEM 0007 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

SECTION 01 22 00.10 28 - Page 1 g4edddca Line

SECTION 01 22 00.00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.

1.1 RETAINAGE OF PAYMENT

Retainage in the amount of 10 percent of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. The 10 percent retainage for final submittals will not be held until such time as the Contractor has earned 90 percent of the original contract value. See SECTION 01 33 00 "SUBMITTAL PROCEEDURES" for additional information.

a. Final Operation and Maintenance Manuals and Parts Catalogs.

b. Final Approved Versions of Contractor Prepared Drawings.

c. As-built contract drawings and FIO drawings.

d. Return of Government Issued Items.

1.2 ITEM 0001 ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6

(UPPER & LOWER)

Ice Harbor generator guide bearing shoes for main units 4 - 6 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Ice Harbor generator guide bearing shoes for main units 4 - 6 (Upper & Lower).

Payment will be made at the unit price for CLIN No. 0001, "ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER & LOWER)," which price and payment shall be full compensation for all work required for the Ice Harbor generator guide bearing shoes for main units 4 - 6, (Upper & Lower)complete, as specified and approved.

1.3 ITEM 0001 ICE HARBOR UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS

4 - 6

Ice Harbor upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0001, "ICE HARBOR UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Ice Harbor upper generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.

1.4 ITEM 0002 ICE HARBOR LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS

4 - 6

Ice Harbor lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0002, "ICE HARBOR LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Ice Harbor lower

SECTION 01 22 00.10 28 - Page 2 generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.

1.3 ITEM 0002 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 -

3 (UPPER & LOWER)

Little Goose generator guide bearing shoes for main units 1 - 3 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Little Goose generator guide bearing shoes for main units 1 - 3 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0002, "LITTLE

GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3 (UPPPER & LOWER),"

which price and payment shall be full compensation for all work required for the Little Goose generator guide bearing shoes for main units 1 - 3 (Upper & Lower), complete, as specified and approved.

1.4 ITEM 0003 LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 1 - 3

Little Goose upper generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0003, "LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish the Little Goose upper generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.

1.5 ITEM 0004 LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 1 - 3

Little Goose lower generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0004, "LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish Little Goose lower generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.

1.4 ITEM 0003 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 -

6 (UPPER & LOWER)

Little Goose generator guide bearing shoes for main units 4 - 6 (Upper & lower) will be measured for payment as the number of sets (SET) for the Little Goose generator guide bearing shoes for main units 4 - 6 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0003, "LITTLE

GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER & LOWER),"

which price and payment shall be full compensation for all work required for the Little Goose generator guide bearing shoes for main units 4 - 6 (Upper & Lower), complete, as specified and approved.

1.5 ITEM 0005 LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6

Little Goose upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0005, "LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 ," which price and payment shall be full compensation for all work required to furnigh the Little Goose upper generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.

SECTION 01 22 00.10 28 - Page 3

1.6 ITEM 0006 LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6

Little Goose lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0006, "LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Little Goose lower generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.

1.5 ITEM 0004 LOWER GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4

- 6 (UPPER & LOWER)

Lower Granite generator guide bearing shoes for main units 4 - 6 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Lower Granite generator guide bearing shoes for main units 4 - 6 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0004, "LOWER

GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER & LOWER) ,"

which price and payment shall be full compensation for all work required for the Lower Granite generator guide bearing shoes for main units 4 - 6 (Upper & Lower), complete, as specified and approved.

1.6 ITEM 0007 LOWER GRANITE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6

Lower Granite upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0007, "LOWER GRANITE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 ," which price and payment shall be full compensation for all work required to furnish the Lower Granite upper generator guide bearing shoes for main units 4 - 6 , complete, as specified and approved.

1.7 ITEM 0008 LOWER GRANITE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6

Lower Granite lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0008, "LOWER GRANITE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Lower Granite lower generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.

1.8 ITEM 0001AA LOWER GRANITE GENERATOR THRUST BEARING SHOES FOR MAIN UNITS

4 - 6

Lower Granite generator thrust bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0001AA, "LOWER GRANITE GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required for construction of Lower Granite generator thrust bearing shoes for main units 4 - 6, complete, as specified and approved.

SECTION 01 22 00.10 28 - Page 4

1.6 ITEM 0005 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS

1 - 3 (UPPER & LOWER)

Lower Monumental generator guide bearing shoes for main units 1 - 3 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Lower Monumental generator guide bearing shoes for main units 1 - 3 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0005, "LOWER

MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3 (UPPER &

LOWER)," which price and payment shall be full compensation for all work required for the Lower Monumental generator guide bearing shoes for main units 1 - 3(Upper & Lower), complete, as specified and approved.

1.7 ITEM 0009 LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 1 - 3

Lower Monumental upper generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0009, "LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish the Lower Monumental upper generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.

1.8 ITEM 0010 LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 1 - 3

Lower Monumental lower generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0010, "LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish the Lower Monumental lower generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.

1.7 ITEM 0006 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS

4 - 6 (UPPER & LOWER)

Lower Monumental generator guide bearing shoes for main units 4 - 6 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Lower Monumental generator guide bearing shoes for main units 4 - 6 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0006, "LOWER

MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER &

LOWER)," which price and payment shall be full compensation for all work required for the Lower Monumental generator guide bearing shoes for main units 4 - 6 (Upper & Lower), complete, as specified and approved.

1.8 ITEM 0011 LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6

Lower Monumental upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0011, "LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Lower Monumental upper generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.

SECTION 01 22 00.10 28 - Page 5

1.9 ITEM 0012 LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN

UNITS 4 - 6

Lower Monumental lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0012, "LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Lower Monumental lower generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.

1.8 ITEM 0007 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12

McNary generator thrust bearing shoes for main units 1-12 will be measured for payment as the number of times (EA) for the McNary generator thrust bearing shoes for main units 1-12. Payment will be made at the unit price for CLIN No. 0007, "MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12," which price and payment shall be full compensation for all work required for the McNary generator thrust bearing shoes for main units 1-12, complete, as specified and approved.

1.9 ITEM 0013 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12

McNary generator thrust bearing shoes for main units 1-12 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0013, "MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12," which price and payment shall be full compensation for all work required to furnish the McNary generator thrust bearing shoes for main units 1 - 12, complete, as specified and approved. Payment shall include labor, material, and equipment required to furnish the thrust bearing shoe set in accordance with Section 48 13 13.06 26

1.10 CLIN 000X UNIT PRICE

Xxxxx will be measured for payment as the number of times (EA) the xxxx.

Payment will be made at the unit price for CLIN No. 00x, "Xxxxxx," which price and payment shall be full compensation for all work required for xxxxxx, complete, as specified and approved.

1.11 CLIN 000X UNIT PRICE

Xxxxx will be measured for payment as the number of times (EA) the xxxx.

Payment will be made at the unit price for CLIN No. 00x, "Xxxxxx," which price and payment shall be full compensation for all work required for xxxxxx, complete, as specified and approved.

1.12 ITEM 0014 GENERATOR GUIDE BEARING SHIPMENT TO ICE HARBOR DAM

Generator guide bearing shipment to Ice Harbor Dam will be measured for payment as the number of times (EA) one turbine guide bearing shipment is performed to Lower Monmental Dam. Payment will be made at the unit price for Item No. 0014, "GENERATOR GUIDE BEARING SHIPMENT TO ICE HARBOR DAM," which price and payment shall be full compensation for all work required for the Generator guide bearing shipment to Ice Harbor Dam, complete, as specified and approved.

1.13 ITEM 0015 GENERATOR GUIDE BEARING SHIPMENT TO LITTLE GOOSE DAM

Generator guide bearing shipment to Little Goose Dam will be measured for

SECTION 01 22 00.10 28 - Page 6 payment as the number of times (EA) one generator guide bearing shipment is performed to Little Goose Dam. Payment will be made at the unit price for Item No. 0015, "GENERATOR GUIDE BEARING SHIPMENT TO LITTLE GOOSE DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to Little Goose Dam, complete, as specified and approved.

1.14 ITEM 0007B GENERATOR THRUST BEARING SHIPMENT TO LOWER GRANITE DAM

Generator thrust bearing shipment to Lower Granite Dam will be measured for payment as the number of times (EA) the generator thrust bearing shipment is performed to Little Goose Dam. Payment will be made at the unit price for Item No. 0007B, "GENERATOR THRUST BEARING SHIPMENT TO LOWER GRANITE DAM," which price and payment shall be full compensation for all work required for the generator thrust bearing shipment to Lower Granite Dam, complete, as specified and approved.

1.15 ITEM 0016 GENERATOR GUIDE BEARING SHIPMENT TO LOWER GRANITE DAM

Generator guide bearing shipment to Lower Granite Dam will be measured for payment as the number of times (EA) the generator guide bearing shipment is performed to Lower Granite Dam. Payment will be made at the unit price for Item No. 0016, "GENERATOR GUIDE BEARING SHIPMENT TO LOWER GRANITE DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to Lower Granite Dam, complete, as specified and approved.

1.16 ITEM 0017 GENERATOR GUIDE BEARING SHIPMENT TO LOWER MONUMENTAL DAM

Generator guide bearing shipment to Lower Monumental Dam will be measured for payment as the number of times (EA) the generator guide bearing shipment is performed to Lower Monumental Dam. Payment will be made at the unit price for Item No. 0017, "GENERATOR GUIDE BEARING SHIPMENT TO LOWER MONUMENTAL DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to Lower Monumental Dam, complete, as specified and approved.

1.17 ITEM 0018 GENERATOR THURST BEARING SHOES SHIPMENT TO MCNARY DAM

Generator thrust bearing shoes shipment to McNary Dam will be measured for payment as the number of times (EA) the generator thurst bearing shoes shipment is performed to McNary Dam. Payment will be made at the unit price for Item No. 0018, "GENERATOR THURST BEARING SHOES SHIPMENT TO MCNARY DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to McNary Dam, complete, as specified and approved.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

SECTION 01 22 00.10 28 - Page 7

PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 01.00 28 - SUPPLEMENTARY REQUIREMENTS
SUPPLEMENTARY REQUIREMENTS
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Contract Drawings
1.1.2 Contractor Prepared Shop Drawings
1.1.3 As-Built Drawings
1.2 SUBMITTALS
1.3 PROJECT SCHEDULE
1.4 CONTRACTOR RESPONSIBILITY FOR CONTRACT WORK
1.5 PROJECT SECURITY
1.5.1 Vehicle Access
1.6 WORK SCHEDULES
1.6.1 Government's Work Schedule
1.7 DELIVERY OF NEW ITEMS
1.8 FINAL AS-BUILT DRAWINGS
1.9 SUPERSEDED AND/OR OBSOLETE FIO DRAWINGS
1.10 FINAL CONTRACTOR PREPARED SHOP DRAWINGS HC AND ELECTRONIC COPY
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
01 22 00.10 28 - MEASUREMENT AND PAYMENT
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 ITEM 0001 ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6
1.3 ITEM 0002 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 -
1.4 ITEM 0003 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 -
1.5 ITEM 0004 LOWER GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4
1.6 ITEM 0005 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
1.7 ITEM 0006 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
1.8 ITEM 0007 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12
PART 2 PRODUCTS Not Applicable
PART 3 EXECUTION Not Applicable
01 33 00 - SUBMITTAL PROCEDURES
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal Descriptions SD
1.1.2 Approving Authority
1.1.2.1 Action Elements for Submittal Review

1.1.3 Work

1.2 SUBMITTALS
1.3 SUBMITTAL CLASSIFICATION
1.3.1 Government Approved G
1.3.2 Information Only
1.4 PREPARATION
1.4.1 Transmittal Form
1.4.2 Identifying Submittals
1.4.3 Format for SD-02 Shop Drawings
1.4.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions
1.4.5 Format of SD-04 Samples
1.4.6 Format of SD-05 Design Data and SD-07 Certificates
1.4.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports
1.4.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout
1.5 QUANTITY OF SUBMITTALS
1.5.1 Electronic Copies
1.5.2 Hard Copies HC
1.5.3 Official Receipt of Transmittals
1.5.4 Number of Hard Copies of SD-02 Shop Drawings
1.5.4.1 Additional Hard Copies
1.5.5 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's
1.5.6 Number of Samples SD-04 Samples
1.5.7 Number of Copies SD-05 Design Data and SD-07 Certificates
1.5.8 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field
1.5.9 Number of Copies of SD-10 Operation and Maintenance Data
1.5.10 Number of Copies of SD-01 Preconstruction Submittals and SD-11
1.6 INFORMATION ONLY SUBMITTALS
1.7 VARIATIONS REQUESTS
1.7.1 Considering Variations
1.7.2 Proposing Variations
1.7.3 Warranting That Variations Are Compatible
1.7.4 Review Schedule Is Modified
1.8 SUBMITTAL REGISTER
1.8.1 Use Of Submittal Register
1.8.2 Contractor Use of Submittal Register
1.8.3 Approving Authority Use of Submittal Register
1.8.4 Contractor Action Code and Action Code
1.8.5 Copies Delivered to the Government
1.9 SCHEDULING
1.10 GOVERNMENT APPROVING AUTHORITY
1.10.1 Review Notations
1.11 DISAPPROVED OR REJECTED SUBMITTALS
1.12 APPROVED/ACCEPTED SUBMITTALS
1.13 APPROVED SAMPLES
1.14 WITHHOLDING OF PAYMENT
1.15 General
1.16 MAINTAIN WORKING AS-BUILT CONTRACT DRAWINGS AND FIO DRAWINGS
1.17 FINAL APPROVED VERSIONS OF CONTRACTOR PREPARED DRAWINGSELECTRONIC
1.18 STAMPS
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
PART 2 PRODUCTS
PART 3 EXECUTION
01 45 01.00 28 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM
PART 1 GENERAL
1.1 REFERENCES
1.2 CONTRACT ADMINISTRATION
1.2.1 Correspondence and Electronic Communications
1.2.2 Other Factors
1.3 RMS SOFTWARE
1.4 SYSTEM REQUIREMENTS
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
1.6 CONTRACT DATABASE - GOVERNMENT
1.7 CONTRACT DATABASE - CONTRACTOR
1.7.1 Administration
1.7.1.1 Contractor Information
1.7.1.1.1 New Contractors to RMS-CM
1.7.1.2 Subcontractor Information
1.7.1.3 Correspondence
1.7.1.4 Equipment
1.7.1.5 Management Reporting
1.7.1.6 Request For Information RFI
1.7.2 Finances
1.7.2.1 Pay Activity Data
1.7.2.2 Payment Requests
1.7.3 Quality Control QC
1.7.3.1 Daily Contractor Quality Control CQC Reports.
1.7.3.2 Deficiency Tracking.
1.7.3.3 QC Requirements
1.7.3.4 Three-Phase Control Meetings
1.7.3.5 Labor and Equipment Hours
1.7.3.6 Accident/Safety Reporting
1.7.3.7 Features of Work
1.7.3.8 Hazard Analysis
1.7.4 Submittal Management
1.7.5 Schedule
1.7.6 Import/Export of Data
1.8 IMPLEMENTATION
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
PART 2 PRODUCTS
PART 3 EXECUTION
DIVISION 05 - METALS
05 05 23.20 26 - WELDING
WELDING
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALIFICATION OF WELDERS
1.5 SYMBOLS
PART 2 PRODUCTS
2.1 WELDING MATERIALS
PART 3 EXECUTION
3.1 WELDING OPERATIONS
3.1.1 Preparation for Welding
3.1.2 Welding Procedure
3.1.3 Preheat and Interpass Temperature
3.1.4 Welding/Weld Repair
3.1.5 Stress Relieving
3.1.6 Temporary Welds
3.1.7 Tack Welds
3.2 INSPECTION
3.2.1 General
3.2.2 Contractor's Quality Control CQC Welding Program
3.2.2.1 General
3.2.2.2 Inspection
3.2.2.3 Inspection Agency
3.2.2.4 Inspection Procedure
3.2.2.5 Acceptability of Welds
3.2.2.6 Repairs
3.2.3 Government Quality Assurance
3.2.3.1 General
3.2.3.2 Non-Destructive Inspection
3.2.3.3 Test Coupons
05 05 33.20 26 - NON-DESTRUCTIVE TESTING
NON-DESTRUCTIVE TESTING
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 REFERENCES
1.3 SUBMITTALS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.1 NONDESTRUCTIVE TESTING NDT
3.1.1 General
3.1.2 Visual Examination VT
3.1.3 Magnetic Particle Inspection MT
3.1.4 Ultrasonic Inspection UT
3.1.4.1 Equipment
3.1.4.2 Procedure

3.1.5 Liquid Penetrant Inspection PT

05 50 03.20 26 - METALWORK FABRICATION, MACHINE WORK AND MISCELLANEOUS PROVISIONS
METALWORK FABRICATION, MACHINE WORK AND MISCELLANEOUS PROVISIONS
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 METAL WORK AND MACHINE WORK DETAIL DRAWINGS
1.5 QUALITY CONTROL
PART 2 PRODUCTS
2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES
2.1.1 General

2.2 FABRICATED METAL ITEMS

PART 3 EXECUTION
3.1 METALWORK FABRICATION
3.1.1 General
3.1.2 Dimensional Tolerances for Structural Work
3.1.3 Structural-Steel Fabrication
3.2 MACHINE WORK
3.2.1 General
3.2.2 Finished Surfaces
3.2.3 Unfinished Surfaces
3.2.4 Shafting
3.2.5 Bolt Holes
3.3 INSPECTION
3.4 MISCELLANEOUS PROVISIONS
3.4.1 Protection of Machined Surfaces

3.5 WELDING

DIVISION 48 - ELECTRICAL POWER GENERATION
48 13 13.06 26 - FURNISH GENERATOR THRUST BEARING SHOES MCNARY UNITS 1-12
FURNISH GENERATOR THRUST BEARING SHOES MCNARY UNITS 1-12
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.1.1 Scope
1.1.2 Equipment Description
1.2 REFERENCES
1.3 SUBMITTALS
1.4 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
2.1.2 Steel Plates
2.1.3 Bronze for Plugs

2.2 BABBITTING MATERIALS

PART 3 EXECUTION
3.1 GENERAL
3.1.1 General Information
3.1.2 Drawings
3.2 FINAL INSPECTION AND ACCEPTANCE
3.3 PACKAGING, MARKING, AND SHIPPING
3.3.1 Packaging
3.3.2 Marking
3.4 BEARING COMPONENT FABRICATION
3.4.1 General
3.4.2 General Fabrication Requirements
3.4.3 Fabrication Process
3.5 BABBITTING
3.5.1 General Requirements
3.5.2 Babbitting Process
3.5.3 Babbitt Repair
3.6 FINISHING
3.6.1 General
3.7 INSPECTION
3.7.1 General
3.7.2 Notification
3.7.3 Instrument Calibrations
3.7.4 Preliminary Inspections
3.7.5 Final Inspections
3.8 NONDESTRUCTIVE TESTING NDT
3.8.1 General
3.8.2 Independent Party NDT Report
3.9 NONDESTRUCTIVE TESTING OF BASE METAL
3.10 NONDESTRUCTIVE TESTING OF BABBITT
3.10.1 General
3.10.2 Babbitt Liquid Penetrant PT Testing
3.10.3 Acceptance Standards
3.10.4 Babbitt Bond Acceptance

3.11 TOLERANCES FOR STATIONARY THRUST BEARING SHOE SEGMENTS

48 13 13.07 26 - FURNISH GENERATOR GUIDE BEARING SHOES ICE HARBOR UNITS 4-6
FURNISH GENERATOR GUIDE BEARING SHOES ICE HARBOR UNITS 4-6
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.1.1 Description of Work
1.1.2 Description of Generator Guide Bearings
1.2 REFERENCES
1.3 SUBMITTALS
1.4 FINAL INSPECTION AND ACCEPTANCE
1.5 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
2.1.2 Steel Plates
2.1.3 Tool Steel
2.1.4 Bolts/Capscrews

2.2 BABBITTING MATERIALS

PART 3 EXECUTION
3.1 GENERAL INFORMATION
3.1.1 Duplication of Bearings from Reference Drawings
3.1.2 RESERVED
3.1.3 Drawings
3.2 FINAL INSPECTION AND ACCEPTANCE
3.3 PACKAGING, MARKING, AND SHIPMENT
3.3.1 Packaging
3.3.2 Marking
3.3.3 RESERVED
3.4 BEARING COMPONENT FABRICATION
3.4.1 Fabrication Process
3.4.2 Weld Repair
3.5 BABBITTING
3.5.1 General Requirements
3.5.2 Babbitting Process
3.5.3 Babbitt Repair
3.6 FINISHING
3.6.1 General
3.6.2 Finishing Segments
3.7 INSPECTION
3.7.1 General
3.7.2 Notification
3.7.3 Instrument Calibrations
3.7.4 Preliminary Inspections
3.7.5 Final Inspections
3.8 NONDESTRUCTIVE TESTING NDT
3.8.1 General
3.8.2 Independent Party NDT Report
3.9 NONDESTRUCTIVE TESTING OF BASE METAL
3.10 NONDESTRUCTIVE TESTING OF BABBITT
3.10.1 General
3.10.2 Babbitt Liquid Penetrant PT Testing
3.10.3 Acceptance Standards
3.10.4 Babbitt Bond Acceptance
48 13 13.08 26 - FURNISH GENERATOR GUIDE BEARING SHOES LITTLE GOOSE UNITS 1-3 AND LOWER
FURNISH GENERATOR GUIDE BEARING SHOES LITTLE GOOSE UNITS 1-3 AND LOWER
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.1.1 Description of Work
1.1.2 Description of Generator Guide Bearings
1.2 REFERENCES
1.3 SUBMITTALS
1.4 FINAL INSPECTION AND ACCEPTANCE
1.5 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
2.1.2 Steel Plates
2.1.3 Tool Steel
2.1.4 Bolts/Capscrews

2.2 BABBITTING MATERIALS

PART 3 EXECUTION
3.1 GENERAL INFORMATION
3.1.1 Drawings
3.2 FINAL INSPECTION AND ACCEPTANCE
3.3 PACKAGING, MARKING, AND SHIPMENT
3.3.1 Packaging
3.3.2 Marking
3.4 BEARING COMPONENT FABRICATION
3.4.1 Fabrication Process
3.4.2 Weld Repair
3.5 BABBITTING
3.5.1 General Requirements
3.5.2 Babbitting Process
3.5.3 Babbitt Repair
3.6 FINISHING
3.6.1 General
3.6.2 Finishing Segments
3.7 INSPECTION
3.7.1 General
3.7.2 Notification
3.7.3 Instrument Calibrations
3.7.4 Preliminary Inspections
3.7.5 Final Inspections
3.8 NONDESTRUCTIVE TESTING NDT
3.8.1 General
3.8.2 Independent Party NDT Report
3.9 NONDESTRUCTIVE TESTING OF BASE METAL
3.10 NONDESTRUCTIVE TESTING OF BABBITT
3.10.1 General
3.10.2 Babbitt Liquid Penetrant PT Testing
3.10.3 Acceptance Standards
3.10.4 Babbitt Bond Acceptance
48 13 13.09 26 - FURNISH GENERATOR GUIDE BEARING SHOES LOWER GRANITE UNITS 4-6, LITTLE GOOSE
FURNISH GENERATOR GUIDE BEARING SHOES LOWER GRANITE UNITS 4-6, LITTLE GOOSE
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.1.1 Description of Work
1.1.2 Description of Generator Guide Bearings
1.2 REFERENCES
1.3 SUBMITTALS
1.4 FINAL INSPECTION AND ACCEPTANCE
1.5 WARRANTY
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 General
2.1.2 Steel Plates
2.1.3 Tool Steel
2.1.4 Bolts/Capscrews

2.2 BABBITTING MATERIALS

PART 3 EXECUTION
3.1 GENERAL INFORMATION
3.1.1 RESERVED
3.1.2 Duplication of Bearings from Government-furnished Samples
3.1.3 Drawings
3.2 FINAL INSPECTION AND ACCEPTANCE
3.3 PACKAGING, MARKING, AND SHIPMENT
3.3.1 Packaging
3.3.2 Marking
3.3.3 Shipment of Existing Governement Sample
3.4 BEARING COMPONENT FABRICATION
3.4.1 Fabrication Process
3.4.2 Weld Repair
3.5 BABBITTING
3.5.1 General Requirements
3.5.2 Babbitting Process
3.5.3 Babbitt Repair
3.6 FINISHING
3.6.1 General
3.6.2 Finishing Segments
3.7 INSPECTION
3.7.1 General
3.7.2 Notification
3.7.3 Instrument Calibrations
3.7.4 Preliminary Inspections
3.7.5 Final Inspections
3.8 NONDESTRUCTIVE TESTING NDT
3.8.1 General
3.8.2 Independent Party NDT Report
3.9 NONDESTRUCTIVE TESTING OF BASE METAL
3.10 NONDESTRUCTIVE TESTING OF BABBITT
3.10.1 General
3.10.2 Babbitt Liquid Penetrant PT Testing
3.10.3 Acceptance Standards
3.10.4 Babbitt Bond Acceptance

File details come from the government source that posted it.