Atch_3_Rev_Section_01_22_00.10_28.pdf
PDF 46 KB Posted
- Attached to
- New Bearings Multiple Locations Walla Walla District Federal contract opportunity
- Solicitation number
- W912EF18R0024
About this file
Amend 2 Revised Section 01 22 00.10 28
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_R_W912EF18R00240003.pdf | ||
| A.07.24_W912EF18R00240002_.pdf | ||
| Atch_1_Rev_BIDSCH.pdf | ||
| Atch_2_Rev_Section_01_11_01.00_28.pdf | ||
| Atch_6__Rev_FIO-003.pdf | ||
| Atch_5_Rev_Section_48_13_13.09_26.pdf | ||
| A.07.24_W912EF18R00240002.pdf | ||
| Atch_4_Rev_Section_01_45_01.00_28.pdf | ||
| Atch_Rev_Specs_Table_of_Contents.pdf | ||
| 18R00240001_Amendment_1.pdf | ||
| 18R0024VOL_5_MNA_PLANS.pdf | ||
| 18R0024PastPerformanceInfo.pdf | ||
| 18R0024VOL_4_HLD_PLANS.pdf | ||
| 18R0024PastPerformanceQuestionnaires.pdf | ||
| 18R0024VOL_1_LLA_PLANS.pdf | ||
| 18R0024VOL_2_LGA_PLANS.pdf | ||
| W912EF18R0024Specs.pdf | ||
| 18R0024VOL_3_LMA_PLANS.pdf | ||
| W912EF18R0024NewBearings.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Main Unit Bearings W912EF18R0024 Amend-0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 ITEM 0001 ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4
- 6 (UPPER & LOWER)
1.3 ITEM 0002 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
1 - 3 (UPPER & LOWER)
1.4 ITEM 0003 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
4 - 6 (UPPER & LOWER)
1.5 ITEM 0004 LOWER GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6 (UPPER & LOWER)
1.6 ITEM 0005 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 1 - 3 (UPPER & LOWER)
1.7 ITEM 0006 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6 (UPPER & LOWER)
1.8 ITEM 0007 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.10 28 - Page 1 g4edddca Line
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 RETAINAGE OF PAYMENT
Retainage in the amount of 10 percent of original contract award amount will be withheld until the final submittals, listed below, have been approved by the Government. The 10 percent retainage for final submittals will not be held until such time as the Contractor has earned 90 percent of the original contract value. See SECTION 01 33 00 "SUBMITTAL PROCEEDURES" for additional information.
a. Final Operation and Maintenance Manuals and Parts Catalogs.
b. Final Approved Versions of Contractor Prepared Drawings.
c. As-built contract drawings and FIO drawings.
d. Return of Government Issued Items.
1.2 ITEM 0001 ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6
(UPPER & LOWER)
Ice Harbor generator guide bearing shoes for main units 4 - 6 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Ice Harbor generator guide bearing shoes for main units 4 - 6 (Upper & Lower).
Payment will be made at the unit price for CLIN No. 0001, "ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER & LOWER)," which price and payment shall be full compensation for all work required for the Ice Harbor generator guide bearing shoes for main units 4 - 6, (Upper & Lower)complete, as specified and approved.
1.3 ITEM 0001 ICE HARBOR UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
4 - 6
Ice Harbor upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0001, "ICE HARBOR UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Ice Harbor upper generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.
1.4 ITEM 0002 ICE HARBOR LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
4 - 6
Ice Harbor lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0002, "ICE HARBOR LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Ice Harbor lower
SECTION 01 22 00.10 28 - Page 2 generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.
1.3 ITEM 0002 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 -
3 (UPPER & LOWER)
Little Goose generator guide bearing shoes for main units 1 - 3 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Little Goose generator guide bearing shoes for main units 1 - 3 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0002, "LITTLE
GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3 (UPPPER & LOWER),"
which price and payment shall be full compensation for all work required for the Little Goose generator guide bearing shoes for main units 1 - 3 (Upper & Lower), complete, as specified and approved.
1.4 ITEM 0003 LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 1 - 3
Little Goose upper generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0003, "LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish the Little Goose upper generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.
1.5 ITEM 0004 LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 1 - 3
Little Goose lower generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0004, "LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish Little Goose lower generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.
1.4 ITEM 0003 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 -
6 (UPPER & LOWER)
Little Goose generator guide bearing shoes for main units 4 - 6 (Upper & lower) will be measured for payment as the number of sets (SET) for the Little Goose generator guide bearing shoes for main units 4 - 6 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0003, "LITTLE
GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER & LOWER),"
which price and payment shall be full compensation for all work required for the Little Goose generator guide bearing shoes for main units 4 - 6 (Upper & Lower), complete, as specified and approved.
1.5 ITEM 0005 LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6
Little Goose upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0005, "LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 ," which price and payment shall be full compensation for all work required to furnigh the Little Goose upper generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.
SECTION 01 22 00.10 28 - Page 3
1.6 ITEM 0006 LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6
Little Goose lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0006, "LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Little Goose lower generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.
1.5 ITEM 0004 LOWER GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4
- 6 (UPPER & LOWER)
Lower Granite generator guide bearing shoes for main units 4 - 6 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Lower Granite generator guide bearing shoes for main units 4 - 6 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0004, "LOWER
GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER & LOWER) ,"
which price and payment shall be full compensation for all work required for the Lower Granite generator guide bearing shoes for main units 4 - 6 (Upper & Lower), complete, as specified and approved.
1.6 ITEM 0007 LOWER GRANITE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6
Lower Granite upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0007, "LOWER GRANITE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 ," which price and payment shall be full compensation for all work required to furnish the Lower Granite upper generator guide bearing shoes for main units 4 - 6 , complete, as specified and approved.
1.7 ITEM 0008 LOWER GRANITE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6
Lower Granite lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0008, "LOWER GRANITE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Lower Granite lower generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.
1.8 ITEM 0001AA LOWER GRANITE GENERATOR THRUST BEARING SHOES FOR MAIN UNITS
4 - 6
Lower Granite generator thrust bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0001AA, "LOWER GRANITE GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required for construction of Lower Granite generator thrust bearing shoes for main units 4 - 6, complete, as specified and approved.
SECTION 01 22 00.10 28 - Page 4
1.6 ITEM 0005 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
1 - 3 (UPPER & LOWER)
Lower Monumental generator guide bearing shoes for main units 1 - 3 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Lower Monumental generator guide bearing shoes for main units 1 - 3 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0005, "LOWER
MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3 (UPPER &
LOWER)," which price and payment shall be full compensation for all work required for the Lower Monumental generator guide bearing shoes for main units 1 - 3(Upper & Lower), complete, as specified and approved.
1.7 ITEM 0009 LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 1 - 3
Lower Monumental upper generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0009, "LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish the Lower Monumental upper generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.
1.8 ITEM 0010 LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 1 - 3
Lower Monumental lower generator guide bearing shoes for main units 1 - 3 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0010, "LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - 3," which price and payment shall be full compensation for all work required to furnish the Lower Monumental lower generator guide bearing shoes for main units 1 - 3, complete, as specified and approved.
1.7 ITEM 0006 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS
4 - 6 (UPPER & LOWER)
Lower Monumental generator guide bearing shoes for main units 4 - 6 (Upper & Lower) will be measured for payment as the number of sets (SET) for the Lower Monumental generator guide bearing shoes for main units 4 - 6 (Upper & Lower). Payment will be made at the unit price for CLIN No. 0006, "LOWER
MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 (UPPER &
LOWER)," which price and payment shall be full compensation for all work required for the Lower Monumental generator guide bearing shoes for main units 4 - 6 (Upper & Lower), complete, as specified and approved.
1.8 ITEM 0011 LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6
Lower Monumental upper generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0011, "LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Lower Monumental upper generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.
SECTION 01 22 00.10 28 - Page 5
1.9 ITEM 0012 LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN
UNITS 4 - 6
Lower Monumental lower generator guide bearing shoes for main units 4 - 6 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0012, "LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6," which price and payment shall be full compensation for all work required to furnish the Lower Monumental lower generator guide bearing shoes for main units 4 - 6, complete, as specified and approved.
1.8 ITEM 0007 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12
McNary generator thrust bearing shoes for main units 1-12 will be measured for payment as the number of times (EA) for the McNary generator thrust bearing shoes for main units 1-12. Payment will be made at the unit price for CLIN No. 0007, "MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12," which price and payment shall be full compensation for all work required for the McNary generator thrust bearing shoes for main units 1-12, complete, as specified and approved.
1.9 ITEM 0013 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12
McNary generator thrust bearing shoes for main units 1-12 will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for Item No. 0013, "MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12," which price and payment shall be full compensation for all work required to furnish the McNary generator thrust bearing shoes for main units 1 - 12, complete, as specified and approved. Payment shall include labor, material, and equipment required to furnish the thrust bearing shoe set in accordance with Section 48 13 13.06 26
1.10 CLIN 000X UNIT PRICE
Xxxxx will be measured for payment as the number of times (EA) the xxxx.
Payment will be made at the unit price for CLIN No. 00x, "Xxxxxx," which price and payment shall be full compensation for all work required for xxxxxx, complete, as specified and approved.
1.11 CLIN 000X UNIT PRICE
Xxxxx will be measured for payment as the number of times (EA) the xxxx.
Payment will be made at the unit price for CLIN No. 00x, "Xxxxxx," which price and payment shall be full compensation for all work required for xxxxxx, complete, as specified and approved.
1.12 ITEM 0014 GENERATOR GUIDE BEARING SHIPMENT TO ICE HARBOR DAM
Generator guide bearing shipment to Ice Harbor Dam will be measured for payment as the number of times (EA) one turbine guide bearing shipment is performed to Lower Monmental Dam. Payment will be made at the unit price for Item No. 0014, "GENERATOR GUIDE BEARING SHIPMENT TO ICE HARBOR DAM," which price and payment shall be full compensation for all work required for the Generator guide bearing shipment to Ice Harbor Dam, complete, as specified and approved.
1.13 ITEM 0015 GENERATOR GUIDE BEARING SHIPMENT TO LITTLE GOOSE DAM
Generator guide bearing shipment to Little Goose Dam will be measured for
SECTION 01 22 00.10 28 - Page 6 payment as the number of times (EA) one generator guide bearing shipment is performed to Little Goose Dam. Payment will be made at the unit price for Item No. 0015, "GENERATOR GUIDE BEARING SHIPMENT TO LITTLE GOOSE DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to Little Goose Dam, complete, as specified and approved.
1.14 ITEM 0007B GENERATOR THRUST BEARING SHIPMENT TO LOWER GRANITE DAM
Generator thrust bearing shipment to Lower Granite Dam will be measured for payment as the number of times (EA) the generator thrust bearing shipment is performed to Little Goose Dam. Payment will be made at the unit price for Item No. 0007B, "GENERATOR THRUST BEARING SHIPMENT TO LOWER GRANITE DAM," which price and payment shall be full compensation for all work required for the generator thrust bearing shipment to Lower Granite Dam, complete, as specified and approved.
1.15 ITEM 0016 GENERATOR GUIDE BEARING SHIPMENT TO LOWER GRANITE DAM
Generator guide bearing shipment to Lower Granite Dam will be measured for payment as the number of times (EA) the generator guide bearing shipment is performed to Lower Granite Dam. Payment will be made at the unit price for Item No. 0016, "GENERATOR GUIDE BEARING SHIPMENT TO LOWER GRANITE DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to Lower Granite Dam, complete, as specified and approved.
1.16 ITEM 0017 GENERATOR GUIDE BEARING SHIPMENT TO LOWER MONUMENTAL DAM
Generator guide bearing shipment to Lower Monumental Dam will be measured for payment as the number of times (EA) the generator guide bearing shipment is performed to Lower Monumental Dam. Payment will be made at the unit price for Item No. 0017, "GENERATOR GUIDE BEARING SHIPMENT TO LOWER MONUMENTAL DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to Lower Monumental Dam, complete, as specified and approved.
1.17 ITEM 0018 GENERATOR THURST BEARING SHOES SHIPMENT TO MCNARY DAM
Generator thrust bearing shoes shipment to McNary Dam will be measured for payment as the number of times (EA) the generator thurst bearing shoes shipment is performed to McNary Dam. Payment will be made at the unit price for Item No. 0018, "GENERATOR THURST BEARING SHOES SHIPMENT TO MCNARY DAM," which price and payment shall be full compensation for all work required for the generator guide bearing shipment to McNary Dam, complete, as specified and approved.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.10 28 - Page 7
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 01.00 28 - SUPPLEMENTARY REQUIREMENTS |
| SUPPLEMENTARY REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.1.1 Contract Drawings |
| 1.1.2 Contractor Prepared Shop Drawings |
| 1.1.3 As-Built Drawings |
| 1.2 SUBMITTALS |
| 1.3 PROJECT SCHEDULE |
| 1.4 CONTRACTOR RESPONSIBILITY FOR CONTRACT WORK |
| 1.5 PROJECT SECURITY |
| 1.5.1 Vehicle Access |
| 1.6 WORK SCHEDULES |
| 1.6.1 Government's Work Schedule |
| 1.7 DELIVERY OF NEW ITEMS |
| 1.8 FINAL AS-BUILT DRAWINGS |
| 1.9 SUPERSEDED AND/OR OBSOLETE FIO DRAWINGS |
| 1.10 FINAL CONTRACTOR PREPARED SHOP DRAWINGS HC AND ELECTRONIC COPY |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 01 22 00.10 28 - MEASUREMENT AND PAYMENT |
| MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 RETAINAGE OF PAYMENT |
| 1.2 ITEM 0001 ICE HARBOR GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - 6 |
| 1.3 ITEM 0002 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 1 - |
| 1.4 ITEM 0003 LITTLE GOOSE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 - |
| 1.5 ITEM 0004 LOWER GRANITE GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS 4 |
| 1.6 ITEM 0005 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS |
| 1.7 ITEM 0006 LOWER MONUMENTAL GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS |
| 1.8 ITEM 0007 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12 |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION Not Applicable |
| 01 33 00 - SUBMITTAL PROCEDURES |
| SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.1.1 Submittal Descriptions SD |
| 1.1.2 Approving Authority |
| 1.1.2.1 Action Elements for Submittal Review |
1.1.3 Work
| 1.2 SUBMITTALS |
| 1.3 SUBMITTAL CLASSIFICATION |
| 1.3.1 Government Approved G |
| 1.3.2 Information Only |
| 1.4 PREPARATION |
| 1.4.1 Transmittal Form |
| 1.4.2 Identifying Submittals |
| 1.4.3 Format for SD-02 Shop Drawings |
| 1.4.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions |
| 1.4.5 Format of SD-04 Samples |
| 1.4.6 Format of SD-05 Design Data and SD-07 Certificates |
| 1.4.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports |
| 1.4.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout |
| 1.5 QUANTITY OF SUBMITTALS |
| 1.5.1 Electronic Copies |
| 1.5.2 Hard Copies HC |
| 1.5.3 Official Receipt of Transmittals |
| 1.5.4 Number of Hard Copies of SD-02 Shop Drawings |
| 1.5.4.1 Additional Hard Copies |
| 1.5.5 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's |
| 1.5.6 Number of Samples SD-04 Samples |
| 1.5.7 Number of Copies SD-05 Design Data and SD-07 Certificates |
| 1.5.8 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field |
| 1.5.9 Number of Copies of SD-10 Operation and Maintenance Data |
| 1.5.10 Number of Copies of SD-01 Preconstruction Submittals and SD-11 |
| 1.6 INFORMATION ONLY SUBMITTALS |
| 1.7 VARIATIONS REQUESTS |
| 1.7.1 Considering Variations |
| 1.7.2 Proposing Variations |
| 1.7.3 Warranting That Variations Are Compatible |
| 1.7.4 Review Schedule Is Modified |
| 1.8 SUBMITTAL REGISTER |
| 1.8.1 Use Of Submittal Register |
| 1.8.2 Contractor Use of Submittal Register |
| 1.8.3 Approving Authority Use of Submittal Register |
| 1.8.4 Contractor Action Code and Action Code |
| 1.8.5 Copies Delivered to the Government |
| 1.9 SCHEDULING |
| 1.10 GOVERNMENT APPROVING AUTHORITY |
| 1.10.1 Review Notations |
| 1.11 DISAPPROVED OR REJECTED SUBMITTALS |
| 1.12 APPROVED/ACCEPTED SUBMITTALS |
| 1.13 APPROVED SAMPLES |
| 1.14 WITHHOLDING OF PAYMENT |
| 1.15 General |
| 1.16 MAINTAIN WORKING AS-BUILT CONTRACT DRAWINGS AND FIO DRAWINGS |
| 1.17 FINAL APPROVED VERSIONS OF CONTRACTOR PREPARED DRAWINGSELECTRONIC |
| 1.18 STAMPS |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| SOURCES FOR REFERENCE PUBLICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ORDERING INFORMATION |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 01.00 28 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 CONTRACT ADMINISTRATION |
| 1.2.1 Correspondence and Electronic Communications |
| 1.2.2 Other Factors |
| 1.3 RMS SOFTWARE |
| 1.4 SYSTEM REQUIREMENTS |
| 1.5 RELATED INFORMATION |
| 1.5.1 RMS User Guide |
| 1.6 CONTRACT DATABASE - GOVERNMENT |
| 1.7 CONTRACT DATABASE - CONTRACTOR |
| 1.7.1 Administration |
| 1.7.1.1 Contractor Information |
| 1.7.1.1.1 New Contractors to RMS-CM |
| 1.7.1.2 Subcontractor Information |
| 1.7.1.3 Correspondence |
| 1.7.1.4 Equipment |
| 1.7.1.5 Management Reporting |
| 1.7.1.6 Request For Information RFI |
| 1.7.2 Finances |
| 1.7.2.1 Pay Activity Data |
| 1.7.2.2 Payment Requests |
| 1.7.3 Quality Control QC |
| 1.7.3.1 Daily Contractor Quality Control CQC Reports. |
| 1.7.3.2 Deficiency Tracking. |
| 1.7.3.3 QC Requirements |
| 1.7.3.4 Three-Phase Control Meetings |
| 1.7.3.5 Labor and Equipment Hours |
| 1.7.3.6 Accident/Safety Reporting |
| 1.7.3.7 Features of Work |
| 1.7.3.8 Hazard Analysis |
| 1.7.4 Submittal Management |
| 1.7.5 Schedule |
| 1.7.6 Import/Export of Data |
| 1.8 IMPLEMENTATION |
| 1.9 MONTHLY COORDINATION MEETING |
| 1.10 NOTIFICATION OF NONCOMPLIANCE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| DIVISION 05 - METALS |
| 05 05 23.20 26 - WELDING |
| WELDING |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALIFICATION OF WELDERS |
| 1.5 SYMBOLS |
| PART 2 PRODUCTS |
| 2.1 WELDING MATERIALS |
| PART 3 EXECUTION |
| 3.1 WELDING OPERATIONS |
| 3.1.1 Preparation for Welding |
| 3.1.2 Welding Procedure |
| 3.1.3 Preheat and Interpass Temperature |
| 3.1.4 Welding/Weld Repair |
| 3.1.5 Stress Relieving |
| 3.1.6 Temporary Welds |
| 3.1.7 Tack Welds |
| 3.2 INSPECTION |
| 3.2.1 General |
| 3.2.2 Contractor's Quality Control CQC Welding Program |
| 3.2.2.1 General |
| 3.2.2.2 Inspection |
| 3.2.2.3 Inspection Agency |
| 3.2.2.4 Inspection Procedure |
| 3.2.2.5 Acceptability of Welds |
| 3.2.2.6 Repairs |
| 3.2.3 Government Quality Assurance |
| 3.2.3.1 General |
| 3.2.3.2 Non-Destructive Inspection |
| 3.2.3.3 Test Coupons |
| 05 05 33.20 26 - NON-DESTRUCTIVE TESTING |
| NON-DESTRUCTIVE TESTING |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS - NOT USED |
| PART 3 EXECUTION |
| 3.1 NONDESTRUCTIVE TESTING NDT |
| 3.1.1 General |
| 3.1.2 Visual Examination VT |
| 3.1.3 Magnetic Particle Inspection MT |
| 3.1.4 Ultrasonic Inspection UT |
| 3.1.4.1 Equipment |
| 3.1.4.2 Procedure |
3.1.5 Liquid Penetrant Inspection PT
| 05 50 03.20 26 - METALWORK FABRICATION, MACHINE WORK AND MISCELLANEOUS PROVISIONS |
| METALWORK FABRICATION, MACHINE WORK AND MISCELLANEOUS PROVISIONS |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 METAL WORK AND MACHINE WORK DETAIL DRAWINGS |
| 1.5 QUALITY CONTROL |
| PART 2 PRODUCTS |
| 2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES |
| 2.1.1 General |
2.2 FABRICATED METAL ITEMS
| PART 3 EXECUTION |
| 3.1 METALWORK FABRICATION |
| 3.1.1 General |
| 3.1.2 Dimensional Tolerances for Structural Work |
| 3.1.3 Structural-Steel Fabrication |
| 3.2 MACHINE WORK |
| 3.2.1 General |
| 3.2.2 Finished Surfaces |
| 3.2.3 Unfinished Surfaces |
| 3.2.4 Shafting |
| 3.2.5 Bolt Holes |
| 3.3 INSPECTION |
| 3.4 MISCELLANEOUS PROVISIONS |
| 3.4.1 Protection of Machined Surfaces |
3.5 WELDING
| DIVISION 48 - ELECTRICAL POWER GENERATION |
| 48 13 13.06 26 - FURNISH GENERATOR THRUST BEARING SHOES MCNARY UNITS 1-12 |
| FURNISH GENERATOR THRUST BEARING SHOES MCNARY UNITS 1-12 |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Scope |
| 1.1.2 Equipment Description |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Bronze for Plugs |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL |
| 3.1.1 General Information |
| 3.1.2 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPPING |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 General |
| 3.4.2 General Fabrication Requirements |
| 3.4.3 Fabrication Process |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |
3.11 TOLERANCES FOR STATIONARY THRUST BEARING SHOE SEGMENTS
| 48 13 13.07 26 - FURNISH GENERATOR GUIDE BEARING SHOES ICE HARBOR UNITS 4-6 |
| FURNISH GENERATOR GUIDE BEARING SHOES ICE HARBOR UNITS 4-6 |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Description of Work |
| 1.1.2 Description of Generator Guide Bearings |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 FINAL INSPECTION AND ACCEPTANCE |
| 1.5 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Tool Steel |
| 2.1.4 Bolts/Capscrews |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL INFORMATION |
| 3.1.1 Duplication of Bearings from Reference Drawings |
| 3.1.2 RESERVED |
| 3.1.3 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPMENT |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.3.3 RESERVED |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 Fabrication Process |
| 3.4.2 Weld Repair |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.6.2 Finishing Segments |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |
| 48 13 13.08 26 - FURNISH GENERATOR GUIDE BEARING SHOES LITTLE GOOSE UNITS 1-3 AND LOWER |
| FURNISH GENERATOR GUIDE BEARING SHOES LITTLE GOOSE UNITS 1-3 AND LOWER |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Description of Work |
| 1.1.2 Description of Generator Guide Bearings |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 FINAL INSPECTION AND ACCEPTANCE |
| 1.5 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Tool Steel |
| 2.1.4 Bolts/Capscrews |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL INFORMATION |
| 3.1.1 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPMENT |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 Fabrication Process |
| 3.4.2 Weld Repair |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.6.2 Finishing Segments |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |
| 48 13 13.09 26 - FURNISH GENERATOR GUIDE BEARING SHOES LOWER GRANITE UNITS 4-6, LITTLE GOOSE |
| FURNISH GENERATOR GUIDE BEARING SHOES LOWER GRANITE UNITS 4-6, LITTLE GOOSE |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Description of Work |
| 1.1.2 Description of Generator Guide Bearings |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 FINAL INSPECTION AND ACCEPTANCE |
| 1.5 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Tool Steel |
| 2.1.4 Bolts/Capscrews |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL INFORMATION |
| 3.1.1 RESERVED |
| 3.1.2 Duplication of Bearings from Government-furnished Samples |
| 3.1.3 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPMENT |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.3.3 Shipment of Existing Governement Sample |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 Fabrication Process |
| 3.4.2 Weld Repair |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.6.2 Finishing Segments |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |