Atch_4_Rev_Section_01_45_01.00_28.pdf
PDF 46 KB Posted
- Attached to
- New Bearings Multiple Locations Walla Walla District Federal contract opportunity
- Solicitation number
- W912EF18R0024
About this file
Amend 2 Revised section 01 45 01.00 28
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_R_W912EF18R00240003.pdf | ||
| A.07.24_W912EF18R00240002_.pdf | ||
| Atch_Rev_Specs_Table_of_Contents.pdf | ||
| Atch_1_Rev_BIDSCH.pdf | ||
| Atch_3_Rev_Section_01_22_00.10_28.pdf | ||
| Atch_5_Rev_Section_48_13_13.09_26.pdf | ||
| A.07.24_W912EF18R00240002.pdf | ||
| Atch_2_Rev_Section_01_11_01.00_28.pdf | ||
| Atch_6__Rev_FIO-003.pdf | ||
| 18R00240001_Amendment_1.pdf | ||
| W912EF18R0024NewBearings.pdf | ||
| 18R0024VOL_5_MNA_PLANS.pdf | ||
| 18R0024PastPerformanceInfo.pdf | ||
| 18R0024VOL_4_HLD_PLANS.pdf | ||
| 18R0024VOL_1_LLA_PLANS.pdf | ||
| 18R0024VOL_2_LGA_PLANS.pdf | ||
| W912EF18R0024Specs.pdf | ||
| 18R0024VOL_3_LMA_PLANS.pdf | ||
| 18R0024PastPerformanceQuestionnaires.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Main Unit Bearings W912EF18R0024 Amend-0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 45 01.00 28
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
PART 1 GENERAL
1.1 REFERENCES
1.2 CONTRACT ADMINISTRATION
1.2.1 Correspondence and Electronic Communications
1.2.2 Other Factors
1.3 RMS SOFTWARE
1.4 SYSTEM REQUIREMENTS
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
1.6 CONTRACT DATABASE - GOVERNMENT
1.7 CONTRACT DATABASE - CONTRACTOR
1.7.1 Administration
1.7.1.1 Contractor Information
1.7.1.1.1 New Contractors to RMS-CM
1.7.1.2 Subcontractor Information
1.7.1.3 Correspondence
1.7.1.4 Equipment
1.7.1.5 Management Reporting
1.7.1.6 Request For Information (RFI)
1.7.2 Finances
1.7.2.1 Pay Activity Data
1.7.2.2 Payment Requests
1.7.3 Quality Control (QC)
1.7.3.1 Daily Contractor Quality Control (CQC) Reports.
1.7.3.2 Deficiency Tracking.
1.7.3.3 QC Requirements
1.7.3.4 Three-Phase Control Meetings
1.7.3.5 Labor and Equipment Hours
1.7.3.6 Accident/Safety Reporting
1.7.3.7 Features of Work
1.7.3.8 Hazard Analysis
1.7.4 Submittal Management
1.7.5 Schedule
1.7.6 Import/Export of Data
1.8 IMPLEMENTATION
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 45 01.00 28 - Page 1 g4edddca Line
SECTION 01 45 01.00 28 - Page 2
SECTION 01 45 01.00 28
RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
Comply with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.2 CONTRACT ADMINISTRATION
The Government will use the Resident Management System (RMS) to assist in its monitoring and administration of this contract. The Government accesses the system using the Government Mode of RMS (RMS GM) and the Contractor accesses the system using the Contractor Mode (RMS CM). The term RMS will be used in the remainder of this section for both RMS GM and RMS CM. The joint Government-Contractor use of RMS facilitates electronic exchange of information and overall management of the contract. The Contractor accesses RMS to record, maintain, input, track, and electronically share information with the Government throughout the contract period in the following areas:
Administration Finances Quality Control Submittal Monitoring Scheduling Closeout Import/Export of Data
1.2.1 Correspondence and Electronic Communications
For ease and speed of communications, exchange correspondence and other documents in electronic format to the maximum extent feasible between the Government and Contractor.
1.2.2 Other Factors
Particular attention is directed to Contract Clause, "Schedules for Construction Contracts", Contract Clause, "Payments", 01 33 00 SUBMITTAL PROCEDURES which have a direct relationship to the reporting to be accomplished through RMS. Also, there is no separate payment for establishing and maintaining the RMS database; costs associated will be included in the contract pricing for the work.
SECTION 01 45 01.00 28 - Page 3
1.3 RMS SOFTWARE
RMS is a Windows-based program that can be run on a Windows-based PC meeting the requirements as specified in Paragraph: SYSTEM REQUIREMENTS.
Download, install and be able to utilize the latest version of the RMS software within 7 calendar days of receipt of the Notice to Proceed. RMS software, user manuals, access and installation instructions, program updates and training information are available from the RMS website (http://rmsdocumentation.com). The Government and the Contractor will have different access authorities to the same contract database through RMS.
The common database will be updated automatically each time a user finalizes an entry or change.
1.4 SYSTEM REQUIREMENTS
The following is the recommended system configuration to run the Contractor Mode RMS for full utilization of all features for all types and sizes of contracts. Smaller, less complicated, projects may not require the configuration levels described below. Required configuration also noted below.
Recommended RMS System Requirements
Hardware
Windows-based PC 1.7 GHz i3; AMD A6 3650 GHz or higher processor (REQUIRED)
RAM 8 GB
Hard drive disk 100 GB space for sole use by RMS system
Monitor Screen resolution 1366 x 768
Mouse or other pointing device
Windows compatible printer Laser printer must have 4 MB+ of RAM
Connection to the Internet minimum 4 Mbs per user
Software
MS Windows Windows 7 x 64 bit (RMS requires 64 bit O/S) or newer (REQUIRED)
Word Processing software Viewer for MS Word 2013, MS Excel 2013 or newer (REQUIRED)
E-mail MAPI compatible (REQUIRED)
Virus protection software Regularly upgraded with all issued Manufacturer's updates and is able to detect most zero day viruses
(REQUIRED)
SECTION 01 45 01.00 28 - Page 4
1.5 RELATED INFORMATION
1.5.1 RMS User Guide
After contract award, download instructions for the installation and use of RMS from the Government RMS Internet Website.
1.6 CONTRACT DATABASE - GOVERNMENT
The Government will enter the basic contract award data in RMS prior to granting the Contractor access. The Government entries into RMS will generally be related to submittal reviews, correspondence status, and Quality Assurance(QA)comments, as well as other miscellaneous administrative information.
1.7 CONTRACT DATABASE - CONTRACTOR
Contractor entries into RMS establish, maintain, and update data throughout the duration of the contract. Contractor entries generally include prime and subcontractor information, daily reports, submittals, RFI's, schedule updates and payment requests. RMS includes the ability to import attachments and export reports in many of the modules, including submittals. The contractor responsibilities for entries in RMS typically include the following items:
1.7.1 Administration
1.7.1.1 Contractor Information
Contain within the database the Contractor's name, address, telephone numbers, management staff, and other required items. Within 7 calendar days of receipt of RMS software from the Government, deliver Contractor administrative data in electronic format in RMS.
1.7.1.1.1 New Contractors to RMS-CM
Appoint a RMS-CM administrator. This administrator will be given appropriate administrative rights required to enter data by the Government.
1.7.1.2 Subcontractor Information
Contain within the database the name, trade, address, phone numbers, and other required information for all subcontractors. A subcontractor is listed separately for each trade to be performed. Assign each subcontractor/trade a unique Responsibility Code, provided in RMS. Within 7 calendar days of receipt of RMS software from the Government, deliver subcontractor administrative data in electronic format.
1.7.1.3 Correspondence
Identify all Contractor correspondence to the Government with a serial number. Prefix correspondence initiated by the Contractor's site office with "S". Prefix letters initiated by the Contractor's home (main) office with "H". Letters are numbered starting from 0001. (e.g., H-0001 or S-0001). The Government's letters to the Contractor will be prefixed with "C".
SECTION 01 45 01.00 28 - Page 5
1.7.1.4 Equipment
Contain within the Contractor's RMS database a current list of equipment planned for use or being used on the jobsite, including the most recent and planned equipment inspection dates.
1.7.1.5 Management Reporting
RMS includes a number of reports that Contractor management can use to track the status of the project. The value of these reports is reflective of the quality of the data input, and is maintained in the various sections of RMS. Among these reports are: Progress Payment Request worksheet, Quality Assurance/Quality Control (QA/QC) comments, Submittal Register Status, Three-Phase Control checklists.
1.7.1.6 Request For Information (RFI)
Exchange all Requests For Information (RFI) using the Built-in RFI generator and tracker in RMS. Email the RFI to the submittal transmittal mailbox specified in SECTION 01 33 00 SUBMITTAL PROCEDURES paragraph "Electronic Copies" and in the format specified in paragraph Format For Electronic Submittals.
1.7.2 Finances
1.7.2.1 Pay Activity Data
Include within the RMS database a list of pay activities that the Contractor develops in conjunction with the construction schedule. The sum of pay activities equals the total contract amount, including modifications. Each pay activity must be assigned to a Contract Line Item Number (CLIN). The sum of the activities equals the amount of each CLIN.
The sum of all CLINs equals the contract amount.
1.7.2.2 Payment Requests
Prepare all progress payment requests using RMS. Complete the payment request worksheet, prompt payment certification, and payment invoice in RMS. Update the work completed under the contract, measured as percent or as specific quantities, at least monthly. After the update, generate a payment request report using RMS. Submit the payment request, prompt payment certification, and payment invoice with supporting data using RMS
CM.
1.7.3 Quality Control (QC)
RMS provides a means to track implementation of the 3-phase QC Control System, prepare daily reports, identify and track deficiencies, document progress of work, and support other Contractor QC requirements. Maintain this data on a daily basis. Entered data will automatically output to the RMS generated daily report. Within seven calendar days of Government acceptance, submit a RMS update reflecting the information contained in the accepted CQC Plan: schedule, pay activities, features of work, submittal register, QC requirements, and equipment list.
1.7.3.1 Daily Contractor Quality Control (CQC) Reports.
RMS includes the means to produce the Daily CQC Report. The Contractor can use other formats to record basic Quality Control(QC) data. However, the
SECTION 01 45 01.00 28 - Page 6
Daily CQC Report generated by RMS must be the Contractor's official report. Summarize data from any supplemental reports by the Contractor and consolidate onto the RMS-generated Daily CQC Report. Electronically submit reports to the Government within 24 hours after the date covered by the report. Provide the Government a printed signed copy of the QC Daily Report.
1.7.3.2 Deficiency Tracking.
Use RMS to track deficiencies. Deficiencies identified by the Contractor will be numerically tracked using its Quality Control (QC) punch list items. Maintain a current log of its QC punch list items in the RMS database. The Government will log the deficiencies it has identified using its Quality Assurance (QA) punch list items. The Government's QA punch list items will be included in its export file to the Contractor.
Regularly update the correction status of both QC and QA punch list items.
1.7.3.3 QC Requirements
Develop and maintain a complete list of QC testing and required structural and life safety special inspections required by the International Code Council (ICC), transferred and installed property, and user training requirements in RMS. Update data on these QC requirements as work progresses, and promptly provide the information to the Government via RMS.
1.7.3.4 Three-Phase Control Meetings
Maintain scheduled and actual dates and times of preparatory and initial control meetings in RMS.
1.7.3.5 Labor and Equipment Hours
Log labor and equipment exposure hours on a daily basis. The labor and equipment exposure data will be rolled up into a monthly exposure report.
1.7.3.6 Accident/Safety Reporting
Both the Contractor and the Government enter safety related comments in RMS as a deficiency. Regularly update the correction status of the safety comments. In addition, utilize RMS to advise the Government of any accidents occurring on the jobsite. A brief supplemental entry of an accident is not to be considered as a substitute for completion of mandatory reports, e.g., ENG Form 3394 and OSHA Form 300.
1.7.3.7 Features of Work
Include a complete list of the features of work in the RMS database. A feature of work is associated with multiple pay activities. However, each pay activity (see subparagraph "Pay Activity Data" of paragraph "Finances") will only be linked to a single feature of work.
1.7.3.8 Hazard Analysis
Use RMS CM to develop a hazard analysis for each feature of work included in the CQC Plan. The Activity Hazard Analysis will include information required by EM 385-1-1, paragraph 01.A.13.
SECTION 01 45 01.00 28 - Page 7
1.7.4 Submittal Management
The Government will provide the initial submittal register in electronic format. Thereafter, maintain a complete list of submittals, including completion of data columns. Dates when submittals are received and returned by the Government will be included. Use RMS CM to track and transmit submittals. ENG Form 4025, submittal transmittal form, and the submittal register update is produced using RMS. RMS will be used to update, store and exchange submittal registers and transmittals. In addition to requirements stated in specification SECTION 01 33 00, actual submittals are to be stored in RMS CM, with hard copies also provided.
Exception will be where the Contracting Officer specifies only hard copies required, and where samples, spare parts, color boards, and full size drawings are to be provided.
1.7.5 Schedule
Develop a construction schedule consisting of pay activities, in accordance with SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS paragraph PROJECT SCHEDULE. Input and maintain in the RMS database the schedule either manually or by using the Standard Data Exchange Format (SDEF). Include with each pay request the updated schedule. Provide electronic copies of transmittals.
1.7.6 Import/Export of Data
RMS includes the ability to import schedule data using SDEF.
1.8 IMPLEMENTATION
Use of RMS CM as described in the preceding paragraphs is mandatory.
Ensure that sufficient resources are available to maintain contract data within the RMS CM system. RMS CM is an integral part of the Contractor's management of quality control.
1.9 MONTHLY COORDINATION MEETING
Update the RMS CM database each workday. At least monthly, generate and submit a schedule update. At least one week prior to submittal, meet with the Government representative to review the planned progress payment data submission for errors and omissions.
Make required corrections prior to Government acceptance of the export file and progress payment request. Payment requests accompanied by incomplete or incorrect data submittals will not be accepted. The Government will not process progress payments until all required corrections are processed.
1.10 NOTIFICATION OF NONCOMPLIANCE
The Contracting Officer will notify the Contractor of any detected noncompliance with the requirements of this specification. Take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, will be deemed sufficient for the purpose of notification.
PART 2 PRODUCTS
Not Used
SECTION 01 45 01.00 28 - Page 8
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 45 01.00 28 - Page 9
| PROJECT TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 11 01.00 28 - SUPPLEMENTARY REQUIREMENTS |
| SUPPLEMENTARY REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 PROJECT SCHEDULE |
| 1.3 CONTRACTOR RESPONSIBILITY FOR CONTRACT WORK |
| 1.4 PROJECT SECURITY |
| 1.4.1 Vehicle Access |
| 1.5 WORK SCHEDULES |
| 1.5.1 Government's Work Schedule |
1.6 DELIVERY OF NEW ITEMS
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| 01 22 00.10 28 - MEASUREMENT AND PAYMENT |
| MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 RETAINAGE OF PAYMENT |
| 1.2 ITEM 0001 ICE HARBOR UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS |
| 1.3 ITEM 0002 ICE HARBOR LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN UNITS |
| 1.4 ITEM 0003 LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN |
| 1.5 ITEM 0004 LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN |
| 1.6 ITEM 0005 LITTLE GOOSE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN |
| 1.7 ITEM 0006 LITTLE GOOSE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN |
| 1.8 ITEM 0007 LOWER GRANITE UPPER GENERATOR GUIDE BEARING SHOES FOR MAIN |
| 1.9 ITEM 0008 LOWER GRANITE LOWER GENERATOR GUIDE BEARING SHOES FOR MAIN |
| 1.10 ITEM 0009 LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR |
| 1.11 ITEM 0010 LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR |
| 1.12 ITEM 0011 LOWER MONUMENTAL UPPER GENERATOR GUIDE BEARING SHOES FOR |
| 1.13 ITEM 0012 LOWER MONUMENTAL LOWER GENERATOR GUIDE BEARING SHOES FOR |
| 1.14 ITEM 0013 MCNARY GENERATOR THRUST BEARING SHOES FOR MAIN UNITS 1-12 |
| 1.15 ITEM 0014 GENERATOR GUIDE BEARING SHIPMENT TO ICE HARBOR DAM |
| 1.16 ITEM 0015 GENERATOR GUIDE BEARING SHIPMENT TO LITTLE GOOSE DAM |
| 1.17 ITEM 0016 GENERATOR GUIDE BEARING SHIPMENT TO LOWER GRANITE DAM |
| 1.18 ITEM 0017 GENERATOR GUIDE BEARING SHIPMENT TO LOWER MONUMENTAL DAM |
| 1.19 ITEM 0018 GENERATOR THURST BEARING SHOES SHIPMENT TO MCNARY DAM |
| PART 2 PRODUCTS Not Applicable |
| PART 3 EXECUTION Not Applicable |
| 01 33 00 - SUBMITTAL PROCEDURES |
| SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.1.1 Submittal Descriptions SD |
| 1.1.2 Approving Authority |
| 1.1.2.1 Action Elements for Submittal Review |
1.1.3 Work
| 1.2 SUBMITTALS |
| 1.3 SUBMITTAL CLASSIFICATION |
| 1.3.1 Government Approved G |
| 1.3.2 Information Only |
| 1.4 PREPARATION |
| 1.4.1 Transmittal Form |
| 1.4.2 Identifying Submittals |
| 1.4.3 Format for SD-02 Shop Drawings |
| 1.4.4 Format of SD-03 Product Data and SD-08 Manufacturer's Instructions |
| 1.4.5 Format of SD-04 Samples |
| 1.4.6 Format of SD-05 Design Data and SD-07 Certificates |
| 1.4.7 Format of SD-06 Test Reports and SD-09 Manufacturer's Field Reports |
| 1.4.8 Format of SD-01 Preconstruction Submittals and SD-11 Closeout |
| 1.5 QUANTITY OF SUBMITTALS |
| 1.5.1 Electronic Copies |
| 1.5.2 Hard Copies HC |
| 1.5.3 Official Receipt of Transmittals |
| 1.5.4 Number of Hard Copies of SD-02 Shop Drawings |
| 1.5.4.1 Additional Hard Copies |
| 1.5.5 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's |
| 1.5.6 Number of Samples SD-04 Samples |
| 1.5.7 Number of Copies SD-05 Design Data and SD-07 Certificates |
| 1.5.8 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field |
| 1.5.9 Number of Copies of SD-10 Operation and Maintenance Data |
| 1.5.10 Number of Copies of SD-01 Preconstruction Submittals and SD-11 |
| 1.6 INFORMATION ONLY SUBMITTALS |
| 1.7 VARIATIONS REQUESTS |
| 1.7.1 Considering Variations |
| 1.7.2 Proposing Variations |
| 1.7.3 Warranting That Variations Are Compatible |
| 1.7.4 Review Schedule Is Modified |
| 1.8 SUBMITTAL REGISTER |
| 1.8.1 Use Of Submittal Register |
| 1.8.2 Contractor Use of Submittal Register |
| 1.8.3 Approving Authority Use of Submittal Register |
| 1.8.4 Contractor Action Code and Action Code |
| 1.8.5 Copies Delivered to the Government |
| 1.9 SCHEDULING |
| 1.10 GOVERNMENT APPROVING AUTHORITY |
| 1.10.1 Review Notations |
| 1.11 DISAPPROVED OR REJECTED SUBMITTALS |
| 1.12 APPROVED/ACCEPTED SUBMITTALS |
| 1.13 APPROVED SAMPLES |
| 1.14 WITHHOLDING OF PAYMENT |
| 1.15 General |
| 1.16 MAINTAIN WORKING AS-BUILT CONTRACT DRAWINGS AND FIO DRAWINGS |
| 1.17 FINAL APPROVED VERSIONS OF CONTRACTOR PREPARED DRAWINGSELECTRONIC |
| 1.18 STAMPS |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
| 01 42 00 - SOURCES FOR REFERENCE PUBLICATIONS |
| SOURCES FOR REFERENCE PUBLICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ORDERING INFORMATION |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 01 45 01.00 28 - RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE RMS CM |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 CONTRACT ADMINISTRATION |
| 1.2.1 Correspondence and Electronic Communications |
| 1.2.2 Other Factors |
| 1.3 RMS SOFTWARE |
| 1.4 SYSTEM REQUIREMENTS |
| 1.5 RELATED INFORMATION |
| 1.5.1 RMS User Guide |
| 1.6 CONTRACT DATABASE - GOVERNMENT |
| 1.7 CONTRACT DATABASE - CONTRACTOR |
| 1.7.1 Administration |
| 1.7.1.1 Contractor Information |
| 1.7.1.1.1 New Contractors to RMS-CM |
| 1.7.1.2 Subcontractor Information |
| 1.7.1.3 Correspondence |
| 1.7.1.4 Equipment |
| 1.7.1.5 Management Reporting |
| 1.7.1.6 Request For Information RFI |
| 1.7.2 Finances |
| 1.7.2.1 Pay Activity Data |
| 1.7.2.2 Payment Requests |
| 1.7.3 Quality Control QC |
| 1.7.3.1 Daily Contractor Quality Control CQC Reports. |
| 1.7.3.2 Deficiency Tracking. |
| 1.7.3.3 QC Requirements |
| 1.7.3.4 Three-Phase Control Meetings |
| 1.7.3.5 Labor and Equipment Hours |
| 1.7.3.6 Accident/Safety Reporting |
| 1.7.3.7 Features of Work |
| 1.7.3.8 Hazard Analysis |
| 1.7.4 Submittal Management |
| 1.7.5 Schedule |
| 1.7.6 Import/Export of Data |
| 1.8 IMPLEMENTATION |
| 1.9 MONTHLY COORDINATION MEETING |
| 1.10 NOTIFICATION OF NONCOMPLIANCE |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| DIVISION 05 - METALS |
| 05 05 23.20 26 - WELDING |
| WELDING |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALIFICATION OF WELDERS |
| 1.5 SYMBOLS |
| PART 2 PRODUCTS |
| 2.1 WELDING MATERIALS |
| PART 3 EXECUTION |
| 3.1 WELDING OPERATIONS |
| 3.1.1 Preparation for Welding |
| 3.1.2 Welding Procedure |
| 3.1.3 Preheat and Interpass Temperature |
| 3.1.4 Welding/Weld Repair |
| 3.1.5 Stress Relieving |
| 3.1.6 Temporary Welds |
| 3.1.7 Tack Welds |
| 3.2 INSPECTION |
| 3.2.1 General |
| 3.2.2 Contractor's Quality Control CQC Welding Program |
| 3.2.2.1 General |
| 3.2.2.2 Inspection |
| 3.2.2.3 Inspection Agency |
| 3.2.2.4 Inspection Procedure |
| 3.2.2.5 Acceptability of Welds |
| 3.2.2.6 Repairs |
| 3.2.3 Government Quality Assurance |
| 3.2.3.1 General |
| 3.2.3.2 Non-Destructive Inspection |
| 3.2.3.3 Test Coupons |
| 05 05 33.20 26 - NON-DESTRUCTIVE TESTING |
| NON-DESTRUCTIVE TESTING |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 PRODUCTS - NOT USED |
| PART 3 EXECUTION |
| 3.1 NONDESTRUCTIVE TESTING NDT |
| 3.1.1 General |
| 3.1.2 Visual Examination VT |
| 3.1.3 Magnetic Particle Inspection MT |
| 3.1.4 Ultrasonic Inspection UT |
| 3.1.4.1 Equipment |
| 3.1.4.2 Procedure |
3.1.5 Liquid Penetrant Inspection PT
| 05 50 03.20 26 - METALWORK FABRICATION, MACHINE WORK AND MISCELLANEOUS PROVISIONS |
| METALWORK FABRICATION, MACHINE WORK AND MISCELLANEOUS PROVISIONS |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 METAL WORK AND MACHINE WORK DETAIL DRAWINGS |
| 1.5 QUALITY CONTROL |
| PART 2 PRODUCTS |
| 2.1 MISCELLANEOUS METALS AND STANDARD METAL ARTICLES |
| 2.1.1 General |
2.2 FABRICATED METAL ITEMS
| PART 3 EXECUTION |
| 3.1 METALWORK FABRICATION |
| 3.1.1 General |
| 3.1.2 Dimensional Tolerances for Structural Work |
| 3.1.3 Structural-Steel Fabrication |
| 3.2 MACHINE WORK |
| 3.2.1 General |
| 3.2.2 Finished Surfaces |
| 3.2.3 Unfinished Surfaces |
| 3.2.4 Shafting |
| 3.2.5 Bolt Holes |
| 3.3 INSPECTION |
| 3.4 MISCELLANEOUS PROVISIONS |
| 3.4.1 Protection of Machined Surfaces |
3.5 WELDING
| DIVISION 48 - ELECTRICAL POWER GENERATION |
| 48 13 13.06 26 - FURNISH GENERATOR THRUST BEARING SHOES MCNARY UNITS 1-12 |
| FURNISH GENERATOR THRUST BEARING SHOES MCNARY UNITS 1-12 |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Scope |
| 1.1.2 Equipment Description |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Bronze for Plugs |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL |
| 3.1.1 General Information |
| 3.1.2 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPPING |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 General |
| 3.4.2 General Fabrication Requirements |
| 3.4.3 Fabrication Process |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |
3.11 TOLERANCES FOR STATIONARY THRUST BEARING SHOE SEGMENTS
| 48 13 13.07 26 - FURNISH GENERATOR GUIDE BEARING SHOES ICE HARBOR UNITS 4-6 |
| FURNISH GENERATOR GUIDE BEARING SHOES ICE HARBOR UNITS 4-6 |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Description of Work |
| 1.1.2 Description of Generator Guide Bearings |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 FINAL INSPECTION AND ACCEPTANCE |
| 1.5 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Tool Steel |
| 2.1.4 Bolts/Capscrews |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL INFORMATION |
| 3.1.1 Duplication of Bearings from Reference Drawings |
| 3.1.2 RESERVED |
| 3.1.3 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPMENT |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.3.3 RESERVED |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 Fabrication Process |
| 3.4.2 Weld Repair |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.6.2 Finishing Segments |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |
| 48 13 13.08 26 - FURNISH GENERATOR GUIDE BEARING SHOES LITTLE GOOSE UNITS 1-3 AND LOWER |
| FURNISH GENERATOR GUIDE BEARING SHOES LITTLE GOOSE UNITS 1-3 AND LOWER |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Description of Work |
| 1.1.2 Description of Generator Guide Bearings |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 FINAL INSPECTION AND ACCEPTANCE |
| 1.5 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Tool Steel |
| 2.1.4 Bolts/Capscrews |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL INFORMATION |
| 3.1.1 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPMENT |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 Fabrication Process |
| 3.4.2 Weld Repair |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.6.2 Finishing Segments |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |
| 48 13 13.09 26 - FURNISH GENERATOR GUIDE BEARING SHOES LOWER GRANITE UNITS 4-6, LITTLE GOOSE |
| FURNISH GENERATOR GUIDE BEARING SHOES LOWER GRANITE UNITS 4-6, LITTLE GOOSE |
| PART 1 GENERAL |
| 1.1 GENERAL INFORMATION |
| 1.1.1 Description of Work |
| 1.1.2 Description of Generator Guide Bearings |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 FINAL INSPECTION AND ACCEPTANCE |
| 1.5 WARRANTY |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 General |
| 2.1.2 Steel Plates |
| 2.1.3 Tool Steel |
| 2.1.4 Bolts/Capscrews |
2.2 BABBITTING MATERIALS
| PART 3 EXECUTION |
| 3.1 GENERAL INFORMATION |
| 3.1.1 RESERVED |
| 3.1.2 Duplication of Bearings from Government-furnished Samples |
| 3.1.3 Drawings |
| 3.2 FINAL INSPECTION AND ACCEPTANCE |
| 3.3 PACKAGING, MARKING, AND SHIPMENT |
| 3.3.1 Packaging |
| 3.3.2 Marking |
| 3.3.3 Shipment of Existing Governement Sample |
| 3.4 BEARING COMPONENT FABRICATION |
| 3.4.1 Fabrication Process |
| 3.4.2 Weld Repair |
| 3.5 BABBITTING |
| 3.5.1 General Requirements |
| 3.5.2 Babbitting Process |
| 3.5.3 Babbitt Repair |
| 3.6 FINISHING |
| 3.6.1 General |
| 3.6.2 Finishing Segments |
| 3.7 INSPECTION |
| 3.7.1 General |
| 3.7.2 Notification |
| 3.7.3 Instrument Calibrations |
| 3.7.4 Preliminary Inspections |
| 3.7.5 Final Inspections |
| 3.8 NONDESTRUCTIVE TESTING NDT |
| 3.8.1 General |
| 3.8.2 Independent Party NDT Report |
| 3.9 NONDESTRUCTIVE TESTING OF BASE METAL |
| 3.10 NONDESTRUCTIVE TESTING OF BABBITT |
| 3.10.1 General |
| 3.10.2 Babbitt Liquid Penetrant PT Testing |
| 3.10.3 Acceptance Standards |
| 3.10.4 Babbitt Bond Acceptance |
File details come from the government source that posted it.