Amendment.pdf
PDF 43 KB Posted
- Attached to
- Scaffolding Federal contract opportunity
- Solicitation number
- W912EF-17-R-0010
About this file
Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_W912EF-17-R-0010.pdf | ||
| A.07.24_Amend-0002_Section_05_50_05.00_26.pdf | ||
| Amend-0001_Plans.pdf | ||
| Offeror_Attachment_B.pdf | ||
| Solicitation.pdf | ||
| Offeror_Attachment_A.pdf | ||
| Plans.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions from industry, revise Clause 252.236-7001 "CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (AUG 2000)" , and to revise draw ing S-102 "PONTOON," Detail 3.
Note: Lack of acknow ledgement of this amendment may rendor your quote as non-responsive.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-R-0010
X 9B. DATED (SEE ITEM 11)
08-Nov-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Nov-2016
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
RUTH A. JOHNSON
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1976
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-17-R-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS FROM INDUSTRY
Q: What is the approx. weight of the pontoons, this is important since the contractor will be responsible for moving and positioning of the pontoons. They seem much too heavy for a single man to handle.
A: The pontoons weigh approximately 180-lbs each. The pontoons are provided with handholds to allow several persons to handle the pontoons as they are maneuvered through the draft tube door onto the safety/assembly float pool inside the draft tube.
Q: The pontoons are required to be seal welded, to prevent entry of water to maintain buoyancy. Has the ACOE considered filling the interior of the pontoons with foam and providing drainage holes, thus eliminating the costly requirement of seal welding the floats?
A: Foam fill of pontoons is not permitted. The government has experienced issues with the initial filling of the pontoons, repairing the pontoons, and the foam fill becoming water-logged at the other Corps-site where this pontoon float platform design concept has been in use for many years.
Q: Is the ACOE aware that foam filled floats are commercially available? They are Bureau of Reclamation approved, The use of this type of float would eliminate the possibility of leakage. We see that the ACOE has invest a great amount of time in the pontoon design, but suggest there is a much better and less costly way to accomplish the flotation of the TMP.
A: Commercially available floats are not part of the contract and will not be utilized.
Q: Has the ACOE considered the potential for galvanic action between the aluminum pontoons and the Steel surrounding structures, The use of commercially available plastic floats would eliminate this potential.
A: Plastic floats are not part of the contract and will not be utilized. Corrosion issues have been adequately addressed in the design.
Q: The design utilizes a pontoon float which doubles as a critical structural member. This member is a complicated fabrication with many weldments. The failure of any of these weldments may cause the collapse of the platform.
Has the ACOE considered that by use of such a complicated and overly welded design, they maybe jeopardizing the safety of there workers? We suggest that there is a way to design this platform without heavily welded members, by use of standard extruded structural shapes, combined with commercially available floats.. and it would cost less! We would like to propose such a design, and ask that such an option to the ACOE design receive equal consideration, even thou it does not use the ACOE designed floats/pontoons.
A: The complexity of the pontoon weldment is not a factor which adversely impacts worker safety in any way.
Design adequately addresses all aspects of worker safety.
Note: While the Contractor may elect to propose Value Engineering solutions which are equal to or improved from the contract for the government's consideration per the appropriate and relevant contract clauses, Contractor is advised to bid the job as per the contract requirements.
Q: Reference sheet s-102 detail 3 depicts a lifting lug composed of a 3/4 plat welded to a 1/4 plate with a 1/8 fillet weld onside only, Does the welding association allow such a small weld to be used to bond such a thick plate to a thin plate?
A: Weld of the 3/4" thick lug plate to the 1/4" thick load transfer plates should be a double 1/4" fillet weld. See forth coming amendment.
Q: Ref spec. section 05.50.05.00.26 pg 8, Allows GMAW on materials thicker than 1/8".. Given that the pontoons are composed of 1/8" material and there is a significant amount of weldments on the pontoons, If the contractor can produce an approved sample pontoon using GMAW would GMAW be allowed for welding of the pontoons?
Q: We have successfully welded 1/8 aluminum plate using GMAW, TIG is slow and tedious, and impractical for a project of this magnitude. If the contractor can demonstrate prior experience in welding aluminum 1/8 thick using the GMAW process to the satisfaction of the ACOE would that process be allowed for 1/8 aluminum plate?
A: Correct. The contract does allow the Contractor to use GMAW for 1/8" thick plate if they can demonstrate and prove their success. SECTION 05 50 05.00 26 para 1.6 item c. The government's concerns are over-sized welds, controlling the heat added to the weldment and the potential warping and shrinkage which can result. If the Contractor cannot demonstrate success, the GTAW weld process will be required for plate 1/8" and thinner. Note:
The Contractor's attention is also directed to SECTION 05 50 05.00 26 para 1.6 part a where a full scale prototype pontoon and prototype analogs for a gate beam and a decking panel are required. If the Contractor elects to pursue approval of GMAW, the prototyping effort can be a part of that.
Q: Specs, pg 18, allows the float leakage to be 1 cup/15 minutes.. is this correct?
A: The contract states that "excessive leakage is defined as greater than one cup in 15 minutes."
Q: The solicitation lists Item 001 on page 2 as "Turbine Maintenance Platform and Draft Tube Door Platform with Ladder and Decking. In accordance with Section 05 50 05.00 26 of the Technical Specifications". Item 003 is "Storage Carts". On page 15 of the solicitation, drawing numbers are provided for the "Personnel Hoist Assembly", "Scroll Stair Case", and "Blade Scaffold". Are these items to be included in the quotation?
A: Yes - these items are a part of the Turbine Maintenance Platform. Bid as specified.
Q: Are we to assume all drawings provided and items described in "Section 05 50 05.00 26 of the Technical Specifications" are to be quoted as well? Specific examples include the items under "1.2 Submittals": SD-02 Shop Drawings, and SD-03 Product Data.
A: Yes - required submittals are to be included in the Contractor's proposal. Bid as specified.
Q: In Section 01 78 00.00 28 "Closeout Submittals" paragraph 3.2, it is required to upload the CAD files of our drawings in Bentley Microstation Version V8. Our company does not have a license to this software. Is this necessary for the project? Would the required binder of shop drawings be enough to fulfill any future needs of the
USACE?
A: Yes - the Contractor is required to furnish a complete set of electronic files in Bentley MicroStation Version V8.
Bid as specified.
Q: Could you provide clarification who is considered the "Project Personnel"? Is it an assembly contractor hired by the prime or is it the Project Personnel from USACE?
A: Project personnel refers to the USACE Government personnel working at Little Goose Lock and Dam.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet
LITTLE GOOSE TURBINE
MAINTENANCE PLATFORM
Revision
Date
GENERAL
LGP-1.106-0-
0/1 G-001
PROJECT LOCATION AND VICINITY
MAPS
LGP-
1.106-0-0/2 G-002 INDEX OF DRAWINGS
1.106-0-0/2 G-003
TURBINE MAINTENANCE PLATFORM
- UPPER AND LOWER POSITIONS - UNITS
1-3
1.106-0-0/2 G-004
TURBINE MAINTENANCE PLATFORM
- UPPER AND LOWER POSITIONS - UNITS
4-6
STRUCTURAL
LGP-1.106-5-
5/1 S-101 TURBINE MAINTENANCE PLATFORM
1.106-5-5/2 S-102 PONTOON
A 11/22/2016
LGP-
1.106-5-5/3 S-103
INTERIOR WELDMENT - AND
PONTOON END DETAILS
1.106-5-5/4 S-104
BRACKET AND LIFTING HANDLE -
DETAILS
1.106-5-5/5 S-105 PINNING EAR - DETAILS
JDP-
1.106-5-5/3 S-106 BEAM DETAILS - SHEET 1
1.106-5-5/7 S-107 BEAM DETAILS - SHEET 2
1.106-5-5/8 S-108
PLATFORM DECK SEGMENTS -
ASSEMBLIES A, B, C AND D
1.106-5-5/9 S-109
PLATFORM DECK SEGMENTS - B1
AND C1 - AND DETAILS
1.106-5-5/10 S-110
PLATFORM DECK SEGMENT FRAMES
- ASSEMBLIES A, B, C AND D
1.106-5-5/11 S-111
PLATFORM DECK SEGMENT FRAMES
- ASSEMBLIES B1 AND C1 - AND DETAILS
1.106-5-5/12 S-112
PLATFORM DECK SEGMENT BENT -
STIFFENER DETAILS AND INTERIOR -
DECK EXTENSION SUPPORT DETAILS
1.106-5-5/13 S-113
PLYWOOD EXTERIOR, ALUMINUM
INTERIOR - DECKING EXTENSIONS,
DECKING BRACES - AND WOOD
BLOCKING DETAILS
1.106-5-5/14 S-114
DRAFT TUBE ACCESS PLATFORM -
ASSEMBLY
1.106-5-5/15 S-115
DRAFT TUBE ACCESS PLATFORM -
LOWER BRACKET ASSEMBLY - AND
DETAIL
1.106-5-5/16 S-116
DRAFT TUBE ACCESS PLATFORM -
UPPER BRACKET ASSEMBLY - AND
1.106-5-5/17 S-117
MAIN BEAM ASSEMBLY - AND SECTIONS
1.106-5-5/18 S-118
DRAFT TUBE ACCESS PLATFORM -
END BEAM AND SUPPORT BEAM -
ASSEMBLIES AND SECTIONS
1.106-5-5/19 S-119
HANDRAIL - ASSEMBLIES AND SECTIONS
1.106-5-5/20 S-120
DRAFT TUBE ACCESS PLATFORM -
DECKING - ASSEMBLIES AND SECTIONS -
SHEET 1
1.106-5-5/21 S-121
DRAFT TUBE ACCESS PLATFORM -
DECKING - ASSEMBLIES AND SECTIONS -
SHEET 2
1.106-5-5/22 S-122
TURBINE MAINTENANCE PLATFORM
- ACCESS HATCH FRAME AND COVER -
ASSEMBLIES AND SECTIONS
1.106-5-5/23 S-123
TURBINE MAINTENANCE PLATFORM
- ACCESS LADDER AND HAND GRIP -
ASSEMBLIES AND VIEWS
1.106-5-5/24 S-124
BLADE SCAFFOLD - VIEWS AND
JDP-
1.106-5-5/25 S-125
BLADE CLAMP AND - HUB
ATTACHMENT FIXTURE
1.106-5-5/26 S-126
SCROLL CASE STAIRS - HUB
ATTACHMENT FIXTURE
LGP- S-127 SCROLL CASE STAIRS - DETAILS
1.106-5-5/27
1.106-5-5/29 S-129
PERSONNEL HOIST ASSEMBLY -
VIEWS AND ISOMETRIC
1.106-5-5/30 S-130
PERSONNEL HOIST - DETAILS -
SHEET 1
1.106-5-5/31 S-131
PERSONNEL HOIST FRAME AND
PARTS - DETAILS - SHEET 2
LGP-1.106-5-
5/32 S-132
PERSONNEL HOIST FRAME AND
PARTS - DETAILS - SHEET 3
FOR INFORMATION ONLY
FIO-002 DECKING CARTS
FIO-003 LOWER PLATFORM CART
FIO-001 PONTOON CART - SHEET 1
FIO-004 LOWER PLATFORM CART - SECTIONS
FIO-005 CART UTILIZATION
FIO-006
LOWER PLATFORM CART -
UTILIZATION
FIO-007 LOWER PLATFORM CART - SECTIONS
FIO-008 CART UTILIZATION
FIO-009 DRAFT TUBE LINER
FIO-010
DRAFT TUBE LINER - DETAILS,
SECTIONS & DOOR
FIO-011
DISCHARGE RING - SECTIONAL
ELEVATION
FIO-012
ADJUSTABLE BLADE - RUNNER ASSY
SECTIONAL - ELEVATION
FIO-013 RUNNER HUB ELEVATION
FIO-014 RUNNER CONE AND CAP
FIO-015 ELEVATION OF RUNNER BLADE
FIO-016
DETAILS OF STAINLESS - STEEL
OVERLAY
FIO-017
DETAILS OF STAINLESS - DRAFT
TUBE MANDOOR FRAME
FIO-018
TUBE MANDOOR ASSEMBLY
FIO-019
DETAILS OF STAINLESS - STAY RING
ELEVATION
FIO-020
DETAILS OF STAINLESS - RUNNER
HUB SECTION
FIO-021
TUBE LINER - ELEV
FIO-022
HUB SECT
FIO-023
HUB PLAN
FIO-024
BLADE
LMP-1-3-
2/50 FIO-025
DETAILS OF STAINLESS - MOUNTING
FRAME DETAILS
LMP-1-
3-2/51 FIO-026
DETAILS OF STAINLESS - GUIDE
FRAME DETAILS
(End of drawing list)
Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.
(End of clause)
(End of Summary of Changes)