W68SBV62595424
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise specif ications and draw ings as stated in the Summary of Changes. See revised plans and specif icaions. Spec changes are identif ied w ith a red line in left border. Bid opening date remains June 21 @ 2pm PST.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-B-0003
X 9B. DATED (SEE ITEM 11)
17-May-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jun-2017
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CYNTHIA H JACOBSEN
201 N. THIRD AVE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-17-B-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0003
Specifications:
Updated submittal register provided.
01 14 00.10 28
• 1.2: Added items 5, 6 and 7.
01 35 29.10 28 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
• 1.3: Previous submittal titled “Crane Wheel and Outrigger Loading Diagram and Deck Protection for Outriggers” has been changed to “Crane wheel and outrigger loading diagram and outrigger bearing mats”
• 1.13.5: Modified the paragraph for the Contractor’s cranes to require additional calculations to demonstrate soil bearing capacity and soil pressure imposed by the crane on the navigation lock wall.
09 96 00 WATERPROOF HIGH-PERFORMANCE COATINGS
• 1.1.5: Revised to clarify board replacement requirements
35 01 70.13 WIRE ROPE FOR TRASH SHEAR BOOM
• 2.3: Added paragraph
Drawings:
G-002: Updated to show addition of FIOs 238, 239, 240, 315, 316 C-113: New drawing added with Boring Locations M-003: Corrected dimension for Roller Journal Bearing Fabrications Details S-100: Revised welding detail S-210: Revised Section A note S-211: Revised Intermediate Anchor Section A note. Added Note 5.
S-500: Revised Section A note for upper plates. Revised Note 10.
FIO-238, 239, 240, 315, 316: Added
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
Title
Revision Number
Date
LITTLE GOOSE BOOMS AND BARRIERS
VOLUME 1 Trash Shear & Log Boom
GENERAL
LGG-1-0-1/404 G-001 COVER SHEET AND LOCATION MAPS
LGG-1-0-1/405 G-002 INDEX TO DRAWINGS A 6/15/17
LGG-1-0-1/406 G-003 GENERAL NOTES AND ABBREVIATIONS
LGG-1-0-0/11 G-101 SITE STAGING AREAS
LGG-1-0-0/12 G-102 SITE STAGING AREAS
LGG-1-0-0/13 G-103 SITE STAGING AREAS
LGG-1-0-0/14 G-104 SITE STAGING AREAS
CIVIL
LGG-1-0-7/1 C-100 SITE PLAN
LGG-1-0-7/2 C-110 SITE LAYOUT
LGG-1-0-7/3 C-111 TRASH BOOM ENLARGED PLAN
LGG-1-0-7/4 C-112 INTERMEDIATE FLOAT RESTRAINT
ANCHOR SITE LAYOUT
LGG-1-0-7/11 C-113 SITE PLANS BORING LOCATIONS 6/15/17
STRUCTURAL
LGG-1-13-1/14 S-001 STRUCTURAL NOTES
LGG-1-13-1/15 S-100 TRUSS FRAME SLIDING ANCHOR
ELEVATION, SECTIONS, AND DETAILS
A
6/15/17
LGG-1-13-1/16 S-110 TRUSS FRAME ROLLER ASSEMBLY PLAN,
ELEVATION, SECTION AND DETAILS
LGG-1-13-1/17 S-120 TRUSS FRAME CLOSURE DETAILS
LGG-1-13-1/18 S-200 UPSTREAM ANCHOR FLOAT CONNECTION
DETAILS
LGG-1-13-1/19 S-210 CONCRETE INTERMEDIATE ANCHOR FLOAT
PLAN AND SECTIONS
LGG-1-13-1/20 S-211 ANCHOR SCHEMATIC SECTIONS A 6/15/17
LGG-1-13-1/21 S-220 CABLE ATTACHMENT DETAILS
LGG-1-13-1/22 S-230 ANCHOR DETAILS
LGG-1-13-1/23 S-231 PRECAST CONCRETE ANCHOR DETAILS
LGG-1-13-1/24 S-232 ANCHOR CONCRETE PLATE DETAILS
LGG-1-13-1/25 S-233 LIFTING EYE DETAILS
LGG-1-13-1/26 S-300 FENCE SUPPORT AND CABLE ATTACHMENT
LGG-1-13-1/27 S-310 SHEAR FENCE SUPPORT AND BRACKETS
LGG-1-13-1/28 S-400 INTERMEDIATE FLOAT A-FRAME PLAN AND
LGG-1-13-1/29 S-410 SADDLE ASSEMBLY AND SUPPLEMENTARY
FLOAT ELEVATION AND DETAILS
LGG-1-13-1/30 S-420 SADDLE ASSEMBLY DETAILS
LGG-1-13-1/31 S-500 CONCRETE FLOAT PLAN, ELEVATION,
SECTIONS AND DETAILS
LGG-1-13-1/32 S-600 MISCELLANEOUS DETAILS 1
LGG-1-13-1/33 S-700 EXISTING FLOAT CONDITION KEY PLAN
AND NOTES
LGG-1-13-1/34 S-710 EXISTING FLOAT CONDITION DETAILS 1
LGG-1-13-1/35 S-711 EXISTING FLOAT CONDITION DETAILS 2
LGG-1-13-1/36 S-712 EXISTING FLOAT CONDITION DETAILS 3
LGG-1-13-1/37 S-713 EXISTING FLOAT CONDITION DETAILS 4
LGG-1-13-1/38 S-714 EXISTING FLOAT CONDITION DETAILS 5
LGG-1-13-1/39 S-715 EXISTING FLOAT CONDITION DETAILS 6
LGG-1-13-1/40 S-800 LOGBOOM LAYOUT
LGG-1-13-1/41 S-810 LOGBOOM DETAILS
MECHANICAL
LGG-1-3-1/1 M-001 ROLLER AND PIN ASSEMBLY
LGG-1-3-1/2 M-002 ROLLER FRAME MACHINING DETAILS
SHEET 1
LGG-1-3-1/3 M-003 ROLLER PIN MACHINING DETAILS SHEET 2 A 6/15/17
LGG-1-3-1/4 M-004 ROLLER ASSEMBLY AND JOURNAL
BEARING INSTALLATION ROLLER BODY
MACHING DETAILS
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
LGG-1-0-1/213 FIO-001 VICINITY MAP, GENERAL SITE PLAN, INDEX
TO DRAWINGS
LGG-1-0-1/214 FIO-002 SITE PLAN, ABBREVIATIONS, AND
GENERAL NOTES
LGG-1-0-1/215 FIO-003 GENERAL ARRANGEMENT PLAN
LGD-1-13-1/1 FIO-004 DAM ANCHORAGE PARTIAL PLAN
LGD-1-13-1/2 FIO-005 CONCRETE FLOAT PLAN, ELEVATION, AND
SECTIONS
LGD-1-13-1/3 FIO-006 ANCHOR SCHEMATIC SECTIONS
LGD-1-13-1/4 FIO-007 BOTTOM ANCHOR DETAILS
LGD-1-13-1/5 FIO-008 DAM SLIDING ACHOR PLAN, ELEVATION,
SECTIONS, AND DETAILS
LGD-1-13-1/6 FIO-009 DAM SLIDING ANCHOR ROLLER ASSEMBLY
PLAN, ELEVATION, SECTIONS, AND
LGD-1-13-1/7 FIO-010 CONCRETE INTERMEDIATE ANCHOR FLOAT
PLAN AND SECTIONS
LGD-1-13-1/8 FIO-011 UPSTREAM ANCHOR FLOAT PLAN,
SECTIONS, AND DETAILS
LGD-1-13-1/9 FIO-012 CONCRETE FLOAT DESIGN CRITERIA
LGD-1-13-1-10 FIO-013 DAM CLOSURE AND MISCELLANEOUS
LGD-1-13-1/11 FIO-014 MISCELLANEOUS SECTIONS AND DETAILS
LGD-1-13-1/12 FIO-015 FENCE SUPPORT AND CABLE ATTACHMENT
LGD-1-13-1/13 FIO-016 A-FRAME PLAN, SECTIONS, AND DETAILS
LGD-1-13-1/14 FIO-017 FENCE SUPPORT AND CABLE ATTACHMENT
LGD-1-13-1/15 FIO-018 SUPPLEMENTAL FLOATATION SADDLE
LGD-1-13-1/16 FIO-019 SUPPLEMENTAL FLOATATION BUOY
LGD-1-13-1/18 FIO-100 TRASH BOOM FRAME PLANS
LGD-1-13-1/19 FIO-101 TRASH BOOM FRAME ELEVATIONS
LGD-1-13-1/20 FIO-102 TRASH BOOM FRAME DEBRIS SHIELD
SECTION, ELEVATION AND DETAIL
LGD-1-13-1/21 FIO-103 TRASH BOOM FRAME DETAILS 1
LGD-1-13-1/22 FIO-104 TRASH BOOM FRAME DETAILS 2
LGD-1-13-1/28 FIO-110 CONNECTION AT UPSTREAM ANCHOR
FLOAT DISASSEMBLY
LGD-1-13-1/17 FIO-120 TRASH BOOM RELOCATION PLAN
ASSEMBLY1.DGN FIO-200 FLOAT #1 LAYOUT AND DETAILS
ASSEMBLY.DGN FIO-201 LAYOUT AND DETAILS
ASSEMBLY2.DGN FIO-202 INTERMEDIATE FLOAT LAYOUT & DETAILS
ASSEMBLY3.DGN FIO-203 FLOAT #22 LAYOUT AND DETAILS
SECTION.DGN FIO-204 SECTIONS AND DETAILS
METAL3.DGN FIO-205 METAL FABRICATION
METAL5.DGN FIO-206 METAL FABRICATION
SADDLE.DGN FIO-207 METAL FABRICATION
SADDLE2.DGN FIO-208 METAL FABRICATION
SADDLE3.DGN FIO-209 METAL FABRICATION
WAGSTOP.DGN FIO-210 INTERMEDIATE FLOAT TIE BACKS
SITELAYOUT.DGN FIO-220 SITE LAYOUT
SECTION2.DGN FIO-221 SECTIONS AND DETAILS
SECTION3.DGN FIO-222 SECTIONS AND DETAILS
FENCEASSY.DGN FIO-223 FENCE ASSEMBLY
FENCEASSY2.DGN FIO-224 FENCE ASSEMBLY
WOOD3.DGN FIO-225 WOOD FABRICATION INTERMEDIATE
FLOAT
WOOD.DGN FIO-226 WOOD FABRICATION
WOOD2.DGN FIO-227 WOOD FABRICATION
WOOD4.DGN FIO-228 WOOD FABRICATION
METAL.DGN FIO-229 METAL FABRICATION
METAL4.DGN FIO-230 METAL FABRICATION
METAL6.DGN FIO-231 METAL FABRICATION
METAL2.DGN FIO-232 METAL FABRICATION
RUBBERUHMW1.D
GN
FIO-233 RUBBER AND U.H.M.W. FABRICATION
RUBBERUHMW2.D
GN
FIO-234 RUBBER AND U.H.M.W. FABRICATION
GAPCLOSURE.DG
N
FIO-235 FENCE REVISIONS
HAWSEPIPE.DGN FIO-236 METAL FABRICATION
HAWSEPIPEFAB.D
GN
FIO-237 METAL FABRICATION
1FLOATFAB.DGN FIO-238 CLEAT FLOAT FABRICATION
6/15/17
2FLOATFAB.DGN FIO-239 NO CLEAT FLOATS FABRICATION
6/15/17
INTERMEDIATEFL
OATFAB1.DGN
FIO-240 INTERMEDIATE FLOAT FABRICATION
6/15/17
3OF5.DGN FIO-250 DAM ANCHOR
1OF7.DGN FIO-251 ROLLER ASSEMBLY LAYOUT
2OF7.DGN FIO-252 FRAME STEEL BARS DETAIL
3OF7.DGN FIO-253 STAINLESS STEEL ROLLER
4OF7.DGN FIO-254 ROLLER PIN AND KEEPER PIN
5OF7.DGN FIO-255 MISCELLANEOUS ROLLER ASSEMBLY
PARTS
6OF7.DGN FIO-256 SHEAR FACE AND SUPPORT FRAME
LAYOUT
7OF7.DGN FIO-257 SHEAR SUPPORT FRAME PARTS DETAIL
8OF9.DGN FIO-258 UPSTREAM ANCHOR FLOAT
LGG-1-9-1/130 FIO-300 EXPLORATIONS
LGG-1-9-1/146 FIO-301 LOG RECORDS NO. 16 RIVER MILE 70.3 AND
VICINITY DH-89 THRU DH-96
LGG-1-9-1/147 FIO-302 LOG RECORDS NO. 17 RIVER MILE 70.3 AND
VICINITY DDH-97 THRU DDH-102
LGG-1-9-1/148 FIO-303 LOG RECORDS NO. 18 RIVER MILE 70.3 AND
VICINITY DH-103 THRU DH-107
LGG-1-9-1/149 FIO-304 LOG RECORDS NO. 19 RIVER MILE 70.3 AND
VICINITY DH-107 THRU DH-111
LGG-1-9-1/164 FIO-305 LOG RECORDS NO. 34 RIVER MILE 70.3 AND
VICINITY D-206 THRU DDH-211
LGG-1-9-1/167 FIO-306 LOG RECORDS NO. 37 RIVER MILE 70.3 AND
VICINITY D-225 THRU D-231
LGG-1-9-1/168 FIO-307 LOG RECORDS NO. 38 RIVER MILE 70.3 AND
VICINITY D-232 THRU DH-239
LGG-1-9-1/169 FIO-308 LOG RECORDS NO. 39 RIVER MILE 70.3 AND
VICINITY DDH-240 THRU DDH-244
LGG-1-9-1/170 FIO-309 LOG RECORDS NO. 40 RIVER MILE 70.3 AND
VICINITY DDH-244 THRU DDH-248
LGG-1-9-1/185 FIO-310 CONCRETE AGGREGATE SOURCE TEST PIT
LOGS
LGG-1-9-2/45 FIO-311 LOGS OF TEST PITS
LGG-1-9-2/46 FIO-312 LOGS OF TEST PITS
LGG-1-9-2/47 FIO-313 SUMMARY, SAND GRADATIONS LOGS OF
TEST PITS
LGG-1-9-1/150 FIO-314 LOG RECORDS NO. 20 RIVER MILE 70.3 AND
VICINITY DH-112 THRU DH-117
LGG-1-9-1/162 FIO-315 LOG RECORD NO.32-RIVER MILE 70.3 AND
VICINITY – DHH-191 THRU DHH-198
LGN-1-4-3/1 FIO-316 NAVIGATION LOCK – UPPER APPROACH
WALL A
(End of drawing list)
(End of clause)
Contract drawings created on CAD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM.
(End of Summary of Changes)