W912EF-15-R-0048_Amendment_0005.pdf
PDF 9 MB Posted
- Attached to
- Lower Monumental Navigation Lock Downstream Gate Hoist Machinery Upgrades Federal contract opportunity
- Solicitation number
- W912EF-15-R-0048
About this file
Amdnement 0005 to revise specifications drawings and update an existing clause.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EF-15-R-0048-0011.pdf | ||
| W912EF-15-R-0048_Amendment_0010.pdf | ||
| W912EF-15-R-0048-0009.pdf | ||
| W912EF-15-R-0048-0009.pdf | ||
| W912EF-15-R-0048-0008.pdf | ||
| Amendment_0007.pdf | ||
| W912EF-15-R-0048-0006.pdf | ||
| W912EF-15-R-0048_Amendment_0004.pdf | ||
| W912EF-15-R-0048_Amendment_0003.pdf | ||
| Site_Visit_Attendees_W912EF-15-R-0048.pdf | ||
| W912EF-15-R-0048-0002_Amendment_to_Solicitation.pdf | ||
| W912EF-15-R-0048-0001_Amendment_to_Solicitation.pdf | ||
| Amend-0001_Plans.pdf | ||
| TechSpec_Amend-0001.pdf | ||
| BrandNameJustificationLMAGeokonLC.pdf | ||
| BrandNameJustificationLMASheaveBearing.pdf | ||
| W912EF-15-R-0048.pdf | ||
| Site_Visit_Information.pdf | ||
| Plans.pdf | ||
| Plans-FIOs.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV51203542
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise specifications, draw ings and include an updated clause (FAR 252.204-7012). See draw ing changes highlighted in yellow .
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0048
X 9B. DATED (SEE ITEM 11)
28-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Sep-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
KENT R. BERNARD 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-R-0048
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The 'issued by' organization has changed from
USAED, WALLA WALLA - CONTRACTING DIV.
JANI C. LONG
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
to
USAED, WALLA WALLA - CONTRACTING DIV.
KENT R. BERNARD 201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
The following have been added by full text:
AMENDMENT 0005
The following Specifications have been revised (see revised Specifications for details):
a. SECTION 01 78 23.00 28 OPERATION AND MAINTENANCE DATA Revised Paragraph 1.4 O&M DATA PACKAGES FOR MAJOR EQUIPMENT
b. SECTION SECTION 01 91 00.00 28 SYSTEMS TESTING AND COMMISSIONING Revised Paragraph 3.2 COMMISSIONING AND TESTING TABLE
c. SECTION SECTION 26 29 23.00 28 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600
VOLTS
Revised Paragraph 2.1 VARIABLE FREQUENCY DRIVES
d. SECTION SECTION 35 01 43.00 28 VERTICAL LIFT GATE SYSTEMS Revised Paragraph 2.3.4 Shaft Couplings
e. SECTION SECTION 40 94 43.01 28 PROCESS CONTROLLERS - PROGRAMMABLE LOGIC
CONTROLLERS (PLC)
Revised Paragraph 2.4.8 Salient Features of Absolute Encoders Revised Paragraph 3.1 PLC PROGRAM DEVELOPMENT
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
252.204-7012 Safeguarding of Unclassified Controlled Technical
Information
AUG 2015
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet
Title
Revision
Date
LOWER MONUMENTAL LOCK AND DAM
Navigation Lock Downstream Gate Hoist Machinery Upgrades
GENERAL
LMG‐1‐0‐1/308 G‐001 COVER SHEET AND LOCATION MAPS
LMG‐1‐0‐1/309 G‐002 INDEX TO DRAWINGS A 9/23/2015
LMG‐1‐0‐1/310 G‐003 FOR INFORMATION ONLY' DRAWINGS
LMG‐1‐0‐1/311 G‐003 FOR INFORMATION ONLY' DRAWINGS
LMG‐1‐0‐1/314 G‐101 WORK LOCATION ‐ KEY PLAN
LMG‐1‐0‐1/315 G‐102 LAY‐DOWN LOCATION ‐ PLAN
STRUCTURAL
LMN‐1‐5‐6/1 SB102
TOWER MACHINERY ROOM ‐ MACHINERY
SUPPORT STRUCTURES ‐ EL. 599.5 PLAN
A 9/21/15
LMN‐1‐5‐6/2 SB201
TOWER MACHINERY ROOM ‐ MACHINERY
SUPPORT STRUCTURES ‐ LOCKSIDE & UPSTREAM
ELEVATIONS
LMN‐1‐5‐6/3 SB202
TOWER MACHINERY ROOM ‐ PINION GEAR
SUPPORT STRUCTURE ‐ DOWNSTREAM
ELEVATION
LMN‐1‐5‐6/4 SB401
SUPPORT STRUCTURE ‐ DETAILED VIEWS
LMN‐1‐5‐6/5 SB402
TOWER MACHINERY ROOM ‐ GEARBOX &
MOTOR PEDESTALS ‐ DETAILED VIEWS
LMN‐1‐5‐6/6 SB501
SUPPORT STRUCTURE ‐ DETAILS
LMN‐1‐5‐6/7 SC401 TOWER ROOF ‐ GUARDRAIL ‐ PLAN AND DETAILS
LMN‐1‐5‐6/8 SC402
TOWER MACHINERY ROOM ‐ NEW PLATFORM,
LADDER AND CAGE ‐ PLAN AND SECTIONS
LMN‐1‐5‐6/9 SC502
TOWER MACHINERY ROOM ‐ PLATFORM AND
LADDER ‐ SECTIONS AND DETAILS I
LMN‐1‐5‐6/10 SC503
LADDER ‐ SECTIONS AND DETAILS II
LMN‐1‐5‐6/11 SC504
LADDER ‐ SECTIONS AND DETAILS III
LMN‐1‐5‐6/12 SC505 TOWER ROOF ‐ GUARDRAIL ‐ DETAILS
LMN‐1‐5‐6/13 SD101
TOWER MACHINERY ROOM ‐ MACHINERY
SUPPORTS DEMOLITION ‐ EL. 599.5 PLAN
LMN‐1‐5‐6/14 SJ202
TOWER MACHINERY ROOM ‐ OVERHEAD ‐
MAINTENANCE CRANE CORBEL MODS ‐
ELEVATION, SECTIONS & DETAILS
LMN‐1‐5‐6/15 SK401
TOWER MACHINERY ROOM ‐ GATE HOIST
SHEAVE IMPROVEMENTS ‐ NEW PLATES ‐
ELEVATION & DETAILS
A 9/21/15
LMN‐1‐5‐6/16 SK402
TOWER MACHINERY ROOM ‐ GATE HOIST
SHEAVE IMPROVEMENTS ‐ EXISTING WELD
MODIFICATIONS
ARCHITECTURAL
LMN‐1‐3‐6/30 A‐401 ROOFING REPAIRS ‐ PLAN AND DETAILS
MECHANICAL
LMN‐1‐3‐6/31 M‐101
NEW MOTOR, GEAR, DIRVE ‐ MACHINERY
ARRANGEMENT ‐ EL. 599.5 PLAN
LMN‐1‐3‐6/32 M‐301
NEW MOTOR, GEAR, DRIVE ‐ MACHINERY
ARRANGEMENT ‐ ELEVATIONS
A 9/23/2015
LMN‐1‐3‐6/33 M‐401 GATE HOIST MACHINERY ‐ ASSEMBLY DETAILS
LMN‐1‐3‐6/34 M‐402 OVERHEAD MAINTENANCE CRANE ‐ ELEVATIONS
LMN‐1‐3‐6/35 M‐403
OVERHEAD MAINTENANCE CRANE ‐ HOIST
ACCESS AREA ‐ PLAN
LMN‐1‐3‐6/36 M‐501 INDICATING MECHANISM ‐ DETAILS A 9/23/2015
LMN‐1‐3‐6/37 M‐502 PINION SHAFT ‐ DETAILS
LMN‐1‐3‐6/38 M‐503 PINION GEAR ‐ DETAILS
LMN‐1‐3‐6/39 M‐504 GATE CONTROL SPEEDS
LMN‐1‐3‐6/40 M‐505 GATE POSITION ENCODER BRACKET ‐ DETAILS A 9/23/2015
LMN‐1‐3‐6/41 M‐506 VALVE POSTION ENCODER BRACKET ‐ DETAILS A 9/23/2015
LMN‐1‐3‐6/42 MD101 DEMOLITION ‐ EL. 599.5 PLAN
LMN‐1‐3‐6/43 MD301 DEMOLITION ‐ ELEVATIONS
LMN‐1‐3‐6/44 MD501 DEMOLITION ‐ INDICATING MECHANISM DETAILS
ELECTRICAL
LMN‐1‐6‐6/5 E‐001 ELECTRICAL LEGEND
LMN‐1‐6‐6/6 E‐101 OVER ALL ‐ NAV LOCK ‐ PLAN A 9/23/2015
LMN‐1‐6‐6/7 E‐102 ROUTE ‐ FROM LR‐8
LMN‐1‐6‐6/8 E‐103 ROUTE ‐ FROM LR‐9 A 9/23/2015
LMN‐1‐6‐6/9 E‐104 D/S GATE TOWER ‐ PLAN VIEW
LMN‐1‐6‐6/10 E‐105
NAVIGATION LOCK ‐ WATER LEVEL SENSOR
LAYOUT ‐ DECK PLAN
LMN‐1‐6‐6/11 E‐401 WATER LEVEL SENSORS
LMN‐1‐6‐6/12 E‐402 VALVE POSITIONER A 9/23/2015
LMN‐1‐6‐6/13 E‐501 PANEL LR‐6 ‐ D/S SOUTH LABELS
LMN‐1‐6‐6/14 E‐502 PANEL LR‐7 ‐ D/S NORTH LABELS
LMN‐1‐6‐6/15 E‐503
NAVIGATION LOCK ‐ INTERLOCKING ‐
ILLUSTRATION
LMN‐1‐6‐6/16 E‐504
NAVIGATION LOCK ‐ INTERLOCKING ‐
ILLUSTRATION
LMN‐1‐6‐6/17 E‐601 D/S GATE ‐ ELECTRICAL ‐ ONELINE A 9/23/2015
LMN‐1‐6‐6/18 E‐602 LCQ1 & LCQ2 LAYOUT A 9/23/2015
LMN‐1‐6‐6/19 E‐606 LR‐6 AND LR‐7 LAYOUT
LMN‐1‐6‐6/20 E‐619 AUTO COMMUNICATION ‐ DIAGRAM
A B
9/18/2015 9/23/2015
LMN‐1‐6‐6/21 E‐621 LR‐8 LAYOUT
LMN‐1‐6‐6/22 E‐632 LR‐9 ‐ LAYOUT
LMN‐1‐6‐6/23 E‐638 LS‐1 ‐ LAYOUT A 9/9/2015
LMN‐1‐6‐6/24 E‐801 HMI SCREEN GRAPHICS A 9/18/2015
LMN‐1‐6‐6/25 E‐901 ELECTRICAL ‐ PHOTOGRAPHS
LMN‐1‐6‐6/32 E‐902 ELECTRICAL – PHOTOGRAPHS 2 Added 9/23/2015
LMN‐1‐6‐6/26 ED101 D/S GATE TOWER ‐ DEMOLITION PLAN A 9/23/2015
LMN‐1‐6‐6/27 ED501 MCC LCQ1 AND ‐ MCC LCQ2 ‐ DEMOLITION
LMN‐1‐6‐6/28 ED502 SELSYN MOTORS ‐ AND ROTARY LIMIT ‐ SWITCH A 9/23/2015
DEMOLITION
LMN‐1‐6‐6/29 ED601 POWER FEEDS ‐ AND MCCs ‐ DEMOLITION
LMN‐1‐6‐6/30 ED602
CONNECTION DIAGRAM ‐ FOR LCQ2 ‐
LMN‐1‐6‐6/31 ED603
CONNECTION DIAGRAM ‐ FOR LCQ1 ‐
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
LMN‐1‐4‐2/44 I‐001
NAVIGATION LOCK ‐ TOWERS ‐ CONCRETE
OUTLINE
LMN‐1‐4‐2/46 I‐002 NAVIGATION LOCK ‐ TOWERS ‐ REINFORCEMENT I
LMN‐1‐4‐2/47 I‐003
NAVIGATION LOCK ‐ TOWERS ‐ REINFORCEMENT
II
LMN‐1‐4‐2/47 I‐004
DETAILS (MISC)
62‐I86‐159 I‐005
DOWNSTREAM LOCK GATE ‐ MACHINERY TOWER
SERVICE CRANE
62‐I86‐158 I‐006
DOWNSTREAM LOCK GATE ‐ MACHINERY TOWER
‐ ANCHOR BOLTS
LMN‐1‐6‐14/6 I‐007
NAVIGATION LOCK ‐ POWER AND LIGHTING ‐
ONE LINE DIAGRAM
LMN‐1‐6‐14/8 I‐008
NAVIGATION LOCK ‐ POWER & ‐ LIGHTING ‐ R / S
SERVICE GALLERY ‐ DOWNSTREAM ‐ WIRING
DIAGRAM
LMN‐1‐6‐14/10 I‐009
NAVIGATION LOCK ‐ POWER AND ‐ LIGHTING ‐ R /
S SERVICE GALLERY ‐ UPSTREAM ‐ WIRING
LMN‐1‐6‐14/11 I‐010
NAVIGATION LOCK ‐ POWER AND ‐ LIGHTING ‐ L /
S SERVICE GALLERY ‐ DOWNSTREAM ‐ WIRING
LMN‐1‐6‐14/14 I‐011
NAVIGATION LOCK ‐ POWER ‐ AND LIGHTING ‐
BRIDGE SERVICE ‐ GALLERY ‐ WIRING DIAGRAM
LMN‐1‐6‐14/15 I‐012
NAVIGATION LOCK ‐ POWER & LIGHTING ‐ OFFICE
BLDG. U / S CTW. RMS. & ‐ MONS. 3 & 4
STAIRWELL ‐ WIRING DIAGRAM
LMN‐1‐6‐14/16 I‐013
NAVIGATION LOCK ‐ POWER AND ‐ LIGHTING ‐
PUMP DECK, D/S CWT. RM. & ‐ STAIRWELL‐MON.
27 ‐ WIRING DIAGRAM
LMN‐1‐6‐14/17 I‐014
NAVIGATION LOCK ‐ POWER AND ‐ LIGHTING ‐
RIGGERS RM, D/S CWT. RM & ‐ STAIRWELL‐MON.
28 ‐ WIRING DIAGRAM
LMN‐1‐6‐14/18 I‐015
NAVIGATION LOCK ‐ POWER AND LIGHTING ‐
TOWERS ‐ MONO. 27 & 28 ‐ WIRING DIAGRAM
LMN‐1‐6‐14/19 I‐016
NAVIGATION LOCK ‐ POWER AND ‐ LIGHTING ‐ EL.
548.0 DECK AND ‐ LOCK CHAMBER ‐ WIRING
DIAGRAMS
LMN‐1‐6‐14/20 I‐017
NAVIGATION LOCK ‐ POWER & LIGHTING ‐
DETAILS
LMN‐1‐6‐14/21 I‐018
NAVIGATION LOCK ‐ POWER & LIGHTING ‐ D/S
GUIDE WALLS & UNWATERING PUMPS ‐ NOS. 1,2
& 3 ‐ CONNECTION DETAILS
LMN‐1‐6‐14/25 I‐019
NAVIGATION LOCK ‐ POWER, LIGHTING ‐ &
CONTROL ‐ GATE NO. 1 MACHINERY ‐ ROOM ‐
WIRING DIAGRAM ‐ SHEET 1
LMN‐1‐6‐14/26 I‐020
CONTROL ‐ GATE NO. 1 MACHINERY ‐ ROOM ‐
WIRING DIAGRAM ‐ SHEET 2
LMN‐1‐6‐14/27 I‐021
NAVIGATION LOCK ‐ POWER AND ‐ CONTROL ‐
GATE NO. 2 MACHINERY ‐ ROOMS ‐ WIRING
LMN‐1‐6‐14/28 I‐022
NAVIGATION LOCK ‐ POWER & ‐ CONTROL ‐
TAINTER VALVES 1 & 2 ‐ ELEMENTARY AND
WIRING DIAGRAM
LMN‐1‐6‐14/29 I‐023
TAINTER VALVES 3 & 4 ‐ ELEMENTARY AND
LMN‐1‐6‐14/30 I‐024
TAINTER VALVE MACHINERY ‐ ROOMS ‐ WIRING
LMN‐1‐6‐14/34 I‐025
NAVIGATION LOCK ‐ POWER, ‐ LIGHTING &
CONTROL CABLE SYS. ‐ RIVERSIDE GALLERY
UPSTREAM
LMN‐1‐6‐14/35 I‐026
CONTROL CABLE SYSTEM ‐ LANDSIDE ‐ &
RIVERSIDE GALLERIES DOWNSTREAM
LMN‐1‐6‐14/36 I‐027
NAVIGATION LOCK ‐ POWER, ‐ LIGHTING &
CONTROL CABLE SYS. ‐ LANDSIDE GALLERY
UPSTREAM
LMN‐1‐6‐14/37 I‐028
NAVIGATION LOCK ‐ POWER, LIGHTING &
CONTROL ‐ CABLE SYSTEM ‐ BRIDGE
LMN‐1‐6‐14/38 I‐029
NAVIGATION LOCK ‐ POWER, LIGHTING &
CONTROL ‐ CABLE SYSTEMS ‐ CABLE POSITIONS
LMN‐1‐6‐14/39 I‐030
CONTROL CABLE SYSTEM ‐ CABLE ‐ ROUTING
SCHEDULE ‐ SHEET 1
LMN‐1‐6‐14/40 I‐031
CONTROL CABLE SYSTEM ‐ CABLE ‐ ROUTING
SCHEDULE ‐ SHEET 2
LMN‐1‐6‐14/42 I‐032
NAVIGATION LOCK ‐ CONTROL STAND S1 AND S2
‐ GENERAL ARRANGEMENT
LMN‐1‐6‐14/50 I‐033 ELECTRICAL ‐ LOCK ‐ SERVICE GALLERY I
LMN‐1‐6‐14/51 I‐034 ELECTRICAL ‐ LOCK ‐ SERVICE GALLERY I I
LMN‐1‐6‐14/52 I‐035 ELECTRICAL ‐ LOCK ‐ SERVICE GALLERY I I I
LMN‐1‐6‐14/53 I‐036
ELECTRICAL ‐ LOCK ‐ UPSTREAM GALLERY AT ‐
ELEVATION 508
LMN‐1‐6‐14/56 I‐037 ELECTRICAL ‐ LOCK ‐ CABLE SCHEDULE
LMN‐1‐6‐14/61 I‐038
ELECTRICAL ‐ LOCK ‐ DOWNSTREAM GALLERY ‐ AT
EL. 508
LMN‐1‐6‐14/64 I‐039
LOWER MOUNUMENTAL ‐ TAINTER VALVE NO. 1 ‐
ELECTRICAL MODIFICATIONS
LMN‐1‐6‐14/65 I‐040
LOWER MONUMENTAL ‐ TAINTER VALVE NO. 2 ‐
LMN‐1‐6‐14/66 I‐041
LOWER MOUNUMENTAL ‐ TAINTER VALVE NO. 3 ‐
LMN‐1‐6‐14/67 I‐042
LOWER MONUMENTAL ‐ TAINTER VALVE NO. 4 ‐
LMN‐1‐6‐14/68 I‐043
LOWER MONUMENTAL PUMP MOTOR ‐ AND OIL
HEATER POWER ‐ WIRE ROUTING ISOMETRICS
LMN‐1‐6‐14/70 I‐044 CISP ‐ NAV LOCK ‐ OVERALL GALLERY PLAN
LMN‐1‐6‐14/22 I‐045
NAVIGATION LOCK ‐ POWER ‐ & LIGHTING ‐
CONTROL STAND ‐ SHELTER ‐ WIRING DIAGRAM
VMM‐84‐1 I‐046
CONNECTION DIAGRAM FOR ‐ LOWER LIFT GATE
NAV. LOCK 28 ‐ CONTROL PANEL ‐ LCQ1
VMM‐84‐2 I‐047
CONNECTION DIAGRAM FOR ‐ LOWER LIFT GATE
NAV. LOCK #27 ‐ CONTROL PANEL ‐ LCQ2
VMM‐87‐1 I‐048
CONNECTION DIAGRAM FOR ‐ UPPER LIFT GATE
NAV. LOCK #4 ‐ CONTROL PANEL ‐ LCQ3
VMM‐87‐2 I‐049
CONNECTION DIAGRAM FOR ‐ UPPER LIFT GATE
NAV. LOCK #3 ‐ CONTROL PANEL ‐ LCQ4
642‐M‐1 I‐050
UPPER AND LOWER LIFT GATE ‐ DIFFERNTIAL
PRESSURE SENSING ‐ SYSTEM ‐ DETAILS
378D515 I‐051 CONTROL STAND S1 & S2
LMN‐1‐2‐15/3 I‐052 NAVIGATION LOCK ‐ CONTROL STAND SHELTERS
619‐E‐A6 I‐053
TAINTER VALVE L.S. & T.S. ‐ INTERLOCK CONTACT
SCHEM.
LMN‐1‐4‐1/1 I‐054 NAVIGATION LOCK ‐ GENERAL PLAN & SECTIONS
LMN‐1‐4‐2/31 I‐055
NAVIGATION LOCK ‐ MONOLITH 27 ‐ PLANS &
SECTIONS I
LMN‐1‐4‐2/32 I‐056
SECTIONS I I
LMN‐1‐4‐2/33 I‐057
SECTIONS I I I
LMN‐1‐4‐2/36 I‐058
NAVIGATION LOCK ‐ MONOLITH 28 ‐ PLANS &
SECTIONS I
LMN‐1‐4‐2/39 I‐059
NAVIGATION LOCK ‐ MONOLITHS 27 & 28 ‐
REINFORCEMENT I
LMN‐1‐4‐2/40 I‐060
REINFORCEMENT I I
LMN‐1‐4‐2/41 I‐061
REINFORCEMENT I I I
LMN‐1‐4‐2/42 I‐062
REINFORCEMENT IV
LMN‐1‐4‐2/45 I‐063
NAVIGATION LOCK ‐ TOWERS ‐ MISCELLANEOUS
METAL
LMN‐1‐4‐2/47 I‐064
DTLS (MISC)
LMN‐1‐5‐5/4 I‐065
NAVIGATION LOCK ‐ DOWNSTREAM GATE ‐
BLOCKOUT & GUIDE DETAILS IV
LMN‐1‐5‐5/16 I‐066
NAVIGATION LOCK ‐ DOWNSTREAM GATE ‐
COUNTERWEIGHT SUPPORT BEAMS
LMN‐1‐5‐5/17 I‐067
NAVIGATION LOCK ‐ DOWNSTREAM GATE ‐ GATE
POSITIONS
LMN‐1‐3‐6/1 I‐068
NAVIGATION LOCK ‐ LOWER LIFT GATE ‐
OPERATING MACHINERY ASSEMBLY
LMN‐1‐3‐6/2 I‐069
NAVIGATION LOCK ‐ LOWER LIFT GATE ‐
OPERATING MACHINERY DETAILS
LMN‐1‐3‐6/3 I‐070
NAVIGATION LOCK ‐ LOWER LIFT GATE ‐ SHEAVE
& SHEAVE SUPPORT
IHN‐1‐3‐32/7 I‐071
NAVIGATION LOCK ‐ LOWER LIFT GATES ‐
HYDRAULIC EQUIPMENT
LMN‐1‐5‐5/32 I‐072
LIFT GATE REPLACEMENT ‐ PLAN, ELEVATION
AND SECTIONS
LMN‐1‐5‐5/36 I‐073
LIFT GATE REPLACEMENT ‐ JACKING LUGS AND
MISC. DETAILS
LMN‐1‐5‐5/38 I‐074 LIFT GATE REPLACEMENT ‐ SEAL DETAILS 2
LMN‐1‐5‐5/39 I‐075
LIFT GATE REPLACEMENT ‐ COUNTERWEIGHT
MODIFICATIONS
LMN‐1‐5‐5/40 I‐076
LIFT GATE REPLACEMENT ‐ GATE CABLE
CONNECTIONS
LMN‐1‐5‐5/41 I‐077
CABLE CONNECTIONS
LMN‐1‐5‐5/43 I‐078
MODIFICATIONS ‐ GATE POSITIONS
LMN‐1‐3‐6/21 I‐079
LIFT GATE REPLACEMENT ‐ LOCK GATE HOIST
ROPES AND FITTINGS ‐ WR1 & WR2 ROPE
DETAILS
LMN‐1‐3‐6/22 I‐080
LIFT GATE REPLACEMENT ‐ HOIST ROPE
WOUNTERWEIGHT CONNECTING
APPURTENANCES ‐ DETAILS
LMN‐1‐3‐6/23 I‐081
LIFT GATE REPLACEMENT ‐ GUIDE SLOT BEARING
PLATE ‐ DETAILS
LMN‐1‐3‐6/24 I‐082
LIFT GATE REPLACEMENT ‐ GATE WHEELS ‐
ASSEMBLY AND DETAILS
LMN‐1‐3‐6/25 I‐083
LIFT GATE REPLACEMENT ‐ DOWNSTREAM GATE ‐
GUIDE WHEEL ASSEMBLY
LMN‐1‐3‐6/26 I‐084
LIFT GATE REPLACEMENT ‐ GATE END SHOES ‐
ASSEMBLY AND DETAILS
Y‐620627‐2 I‐085
DOWNSTREAM LOCK GATE ‐ OPERATING
MACHINERY ASSEMBLY ‐ SOUTH TOWER
Y‐620628‐2 I‐086
MACHINERY ASSEMBLY ‐ NORTH TOWER
Y‐620629‐2 I‐087
MACHINERY ‐ NORTH & SOUTH TOWER ELEV.
Y‐620630‐2 I‐088
MACHINERY ‐ NORTH & SOUTH TOWER ELEV.
MC2480‐4 I‐089 WIRING DIAGRAM S1
MC248D14 I‐090 WIRING DIAGRAM S2
107218 I‐091 GEARBOX ‐ OUTLINE DIMENSIONS
21952‐095 I‐092
NAVIGATION LOCK ‐ LIFT GATE REPLACEMENT ‐
COUNTERWEIGHT SUPPORT BEAM
X‐620637 I‐093
SOUTH TOWER ‐ DOWNSTREAM LOCK GATE ‐
SYNCHRO DRIVE FRAME DETAIL
X‐620639 I‐094
SOUTH TOWER ‐ DOWNSTREAM LOCK GATE ‐
SYNCHRO DRIVE ASSEMBLY
X‐620640 I‐095
NORTH TOWER ‐ DOWNSTREAM LOCK GATE ‐
SYNCHRO DRIVE FRAME DETAIL
X‐620644 I‐096
NORTH TOWER ‐ DOWNSTREAM ‐ LOCK GATE ‐
SYNCHRO ‐ DRIVE & LIMIT SWITCH ASSEMBLY
PLATE 24.01‐3 I‐097
NORMAL LOCKAGE PRODEDURES ‐ GENERAL
INSTRUCTIONS
PLATE 24.01‐3.3 I‐098
NORMAL LOCKAGE PROCEDURES ‐
DOWNSTREAM LOCKAGE
PLATE 24.01‐3.4 I‐099
NORMAL LOCKAGE PRODEDURES ‐
DOWNSTREAM LOCKAGE
PLATE 24.01‐3.1 I‐100
NORMAL LOCKAGE PROCEDURES ‐ UPSTREAM
LOCKAGE
PLATE 24.01‐3.2 I‐101
NORMAL LOCKAGE PROCEDURES ‐ UPSTREAM
LOCKAGE CONTINUED
PLATE 24.01‐3.5 I‐102
NORMAL LOCKAGE PROCEDURES ‐ PREPARE LOCK
IDLE CONDITION ‐ CONTROL STAND S‐1
PLATE 24.01‐3.6 I‐103
NORMAL LOCK PROCEDURES ‐ PREPARE LOCK
IDLE CONDITION ‐ CONTROL STAND S‐2
PLATE 24.01‐4 I‐104 ABNORMAL LOCKAGE PROCEDURES
LMN‐1‐4‐2/3 I‐105 NAVIGATION LOCK ‐ MONOLITH 3 ‐ PLANS AND
SECTIONS
LMN‐1‐4‐2/4 I‐106
NAVIGATION LOCK ‐ MONOLITH 3 ‐ ELEVATIONS
AND DETAILS
LMN‐1‐4‐2/12 I‐107
NAVIGATION LOCK ‐ MONOLITH 7 ‐ PLANS AND
SECTIONS
LMN‐1‐4‐2/13 I‐108
NAVIGATION LOCK ‐ MONOLITH 7 ‐ ELEVATIONS
AND SECTIONS
LMN‐1‐4‐2/14 I‐109 NAVIGATION LOCK ‐ MONOLITH 7 ‐ SECTIONS
LMN‐1‐4‐2/25 I‐110 NAVIGATION LOCK ‐ REINFORCEMENT ‐ TYPICAL
LMN‐1‐4‐2/26 I‐111
NAVIGATION LOCK ‐ REINFORCEMENT ‐
MONOLITHS 3 AND 4
LMN‐1‐4‐2/28 I‐112
NAVIGATION LOCK ‐ REINFORCEMENT ‐
MONOLITH 7
LMN‐1‐4‐2/37 I‐113
NAVIGATION LOCK ‐ MONOLITH 28 ‐ PLANS &
SECTIONS I I
LMN‐1‐4‐2/38 I‐114 NAVIGATION LOCK ‐ MONOLITH 28 ‐ ELEVATIONS
LMN‐1‐4‐2/42 I‐115
REINFORCEMENT IV
LMN‐1‐4‐2/43 I‐116
REINFORCEMENT V
LMN‐1‐5‐10/2 I‐117
NAVIGATION LOCK ‐ FLOATING MOORING BITT
RECESS
LMN‐1‐5‐11/4 I‐118
NAVIGATION LOCK ‐ FLOATING BULKHEAD
GUIDES ‐ PLANS AND SECTIONS
JDN‐1.103‐6/19 I‐119
NAVLOCK CONTROL UPGRADES ‐ LCQ1 ‐ REVISED
LAYOUT
JDN‐1.103‐6/20 I‐120
NAVLOCK CONTROL UPGRADES ‐ LCQ1 ‐ REVISED
JDN‐1.103‐6/21 I‐121
NAVLOCK CONTROL UPGRADES ‐ LCQ2 ‐ REVISED
JDN‐1.103‐6/22 I‐122
NAVLOCK CONTROL UPGRADES ‐ LCQ2 ‐ REVISED
JDN‐1.103‐6/23 I‐123
NAVLOCK CONTROL UPGRADES ‐ LG1N ‐ REVISED
JDN‐1.103‐6/24 I‐124
SCHEMATIC I
JDN‐1.103‐6/25 I‐125
SCHEMATIC I I
JDN‐1.103‐6/26 I‐126
WIRING DIAGRAM I
JDN‐1.103‐6/27 I‐127
WIRING DIAGRAM I I
JDN‐1.103‐6/68 I‐128
NAVLOCK CONTROL UPGRADES ‐ LG1N ‐ PLC
WIRING
JDN‐1.103‐6/29 I‐129
NAVLOCK CONTROL UPGRADES ‐ LG1S ‐ REVISED
JDN‐1.103‐6/30 I‐130
JDN‐1.103‐6/31 I‐131
JDN‐1.103‐6/32 I‐132
JDN‐1.103‐6/33 I‐133
JDN‐1.103‐6/34 I‐134
NAVLOCK CONTROL UPGRADES ‐ LG1S ‐ PLC
JDN‐1.103‐6/35 I‐135
NAVLOCK CONTROL UPGRADES ‐ LG1P ‐ PLC
JDN‐1.103‐6/36 I‐136
NAVLOCK CONTROL UPGRADES ‐ LG2N ‐ EXISTING
JDN‐1.103‐6/37 I‐137
NAVLOCK CONTROL UPGRADES ‐ LG2N ‐ REVISED
JDN‐1.103‐6/38 I‐138
JDN‐1.103‐6/39 I‐139
JDN‐1.103‐6/40 I‐140
NAVLOCK CONTROL UPGRADES ‐ U/S NORTH
EXISTING ‐ INTERCONNECT WIRING DIAGRAM
JDN‐1.103‐6/41 I‐141
NAVLOCK CONTROL UPGRADES ‐ LG2N ‐ EXISTING
JDN‐1.103‐6/42 I‐142
NAVLOCK CONTROL UPGRADES ‐ U/S NORTH
REVISED ‐ INTERCONNECT WIRING DIAGRAM
JDN‐1.103‐6/43 I‐143
JDN‐1.103‐6/44 I‐144
JDN‐1.103‐6/45 I‐145
NAVLOCK CONTROL UPGRADES ‐ LG2S ‐ EXISTING
JDN‐1.103‐6/46 I‐146
NAVLOCK CONTROL UPGRADES ‐ LG2S ‐ REVISED
JDN‐1.103‐6/47 I‐147
JDN‐1.103‐6/48 I‐148
JDN‐1.103‐6/49 I‐149
NAVLOCK CONTROL UPGRADES ‐ U/S SOUTH
JDN‐1.103‐6/50 I‐150
NAVLOCK CONTROL UPGRADES ‐ LG2S ‐ EXISTING
JDN‐1.103‐6/51 I‐151
NAVLOCK CONTROL UPGRADES ‐ U/S SOUTH
JDN‐1.103‐6/52 I‐152
JDN‐1.103‐6/53 I‐153
JDN‐1.103‐6/54 I‐154
NAVLOCK CONTROL UPGRADES ‐ LG2P ‐ LAYOUT
AND WIRING DIAGRAM
JDN‐1.103‐6/55 I‐155
NAVLOCK CONTROL UPGRADES ‐ AUTO
COMMUNICATIONS DIAGRAM
JDN‐1.103‐6/56 I‐156
NAVLOCK CONTROL UPGRADES ‐ GATE
POSITIONING DIAGRAM
JDN‐1.103‐6/57 I‐157
NAVLOCK CONTROL UPGRADES ‐ CC1 ‐ EXISTING
JDN‐1.103‐6/58 I‐158
NAVLOCK CONTROL UPGRADES ‐ CC1 ‐ REVISED
JDN‐1.103‐6/59 I‐159
NAVLOCK CONTROL UPGRADES ‐ CC1 ‐
JDN‐1.103‐6/60 I‐160
NAVLOCK CONTROL UPGRADES ‐ CC1 ‐
JDN‐1.103‐6/61 I‐161
NAVLOCK CONTROL UPGRADES ‐ CC1 ‐ WIRING
JDN‐1.103‐6/62 I‐162
NAVLOCK CONTROL UPGRADES ‐ CC1 ‐ PLC
JDN‐1.103‐6/63 I‐163
NAVLOCK CONTROL UPGRADES ‐ CC2 ‐ EXISTING
JDN‐1.103‐6/64 I‐164
NAVLOCK CONTROL UPGRADES ‐ CC2 ‐ REVISED
JDN‐1.103‐6/65 I‐165
NAVLOCK CONTROL UPGRADES ‐ CC2 ‐
JDN‐1.103‐6/66 I‐166
NAVLOCK CONTROL UPGRADES ‐ CC2 ‐
JDN‐1.103‐6/67 I‐167
JDN‐1.103‐6/68 I‐168
JDN‐1.103‐6/69 I‐169
NAVLOCK CONTROL UPGRADES ‐ CC2 ‐ PLC
JDN‐1.103‐6/70 I‐170
NAVLOCK CONTROL UPGRADES ‐ CC3 ‐ EXISTING
JDN‐1.103‐6/71 I‐171
NAVLOCK CONTROL UPGRADES ‐ CC3 ‐ REVISED
JDN‐1.103‐6/72 I‐172
NAVLOCK CONTROL UPGRADES ‐ CC3 ‐
SCHEMATIC AND WIRING
JDN‐1.103‐6/73 I‐173
NAVLOCK CONTROL UPGRADES ‐ RIO1 ‐ EXISTING
JDN‐1.103‐6/74 I‐174
NAVLOCK CONTROL UPGRADES ‐ RIO1 ‐ REVISED
JDN‐1.103‐6/75 I‐175
NAVLOCK CONTROL UPGRADES ‐ VALVE 1 ‐
SCHEMATIC
JDN‐1.103‐6/76 I‐176
NAVLOCK CONTROL UPGRADES ‐ VALVE 2 ‐
JDN‐1.103‐6/77 I‐177
NAVLOCK CONTROL UPGRADES ‐ VALVES 1 & 2 ‐
REVISED WIRING DIAGRAM I
JDN‐1.103‐6/78 I‐178
NAVLOCK CONTROL UPGRADES ‐ VALVES 1 & 2 ‐
REVISED WIRING DIAGRAM I I
JDN‐1.103‐6/79 I‐179
NAVLOCK CONTROL UPGRADES ‐ VALVES 1 & 2
(RIO1) ‐ PLC WIRING
JDN‐1.103‐6/80 I‐180
NAVLOCK CONTROL UPGRADES ‐ RIO3‐RIO4 ‐
EXISTING LAYOUTS
JDN‐1.103‐6/81 I‐181
NAVLOCK CONTROL UPGRADES ‐ RIO3 ‐ REVISED
JDN‐1.103‐6/82 I‐182
NAVLOCK CONTROL UPGRADES ‐ VALVE 3 ‐
JDN‐1.103‐6/83 I‐183
NAVLOCK CONTROL UPGRADES ‐ VALVE 3 ‐
REVISED WIRING DIAGRAM
JDN‐1.103‐6/84 I‐184
NAVLOCK CONTROL UPGRADES ‐ RIO3 ‐ PLC
JDN‐1.103‐6/85 I‐185
NAVLOCK CONTROL UPGRADES ‐ RIO4 ‐ REVISED
JDN‐1.103‐6/86 I‐186
NAVLOCK CONTROL UPGRADES ‐ VALVE 4 ‐
JDN‐1.103‐6/87 I‐187
NAVLOCK CONTROL UPGRADES ‐ VALVE 4 ‐
JDN‐1.103‐6/88 I‐188
NAVLOCK CONTROL UPGRADES ‐ RIO4 ‐ PLC
JDN‐1.103‐6/89 I‐189
NAVLOCK CONTROL UPGRADES ‐ TAINTER VALVE
SOLENOID CONTROL
JDN‐1.103‐6/90 I‐190
NAVLOCK CONTROL UPGRADES ‐ LS‐1 ‐ EXISTING
JDN‐1.103‐6/91 I‐191
NAVLOCK CONTROL UPGRADES ‐ LS‐1 ‐ REVISED
JDN‐1.103‐6/92 I‐192
NAVLOCK CONTROL UPGRADES ‐ LS‐1 ‐
SCHEMATICS
JDN‐1.103‐6/93 I‐193
JDN‐1.103‐6/94 I‐194
JDN‐1.103‐6/95 I‐195
NAVLOCK CONTROL UPGRADES ‐ LS‐2 ‐ EXISTING
JDN‐1.103‐6/96 I‐196
NAVLOCK CONTROL UPGRADES ‐ LS‐2 ‐ REVISED
JDN‐1.103‐6/97 I‐197
NAVLOCK CONTROL UPGRADES ‐ LS‐2 ‐
SCHEMATICS
JDN‐1.103‐6/98 I‐198
JDN‐1.103‐6/99 I‐199
LMN‐1‐6‐14/22 I‐200
NAVIGATION LOCK ‐ POWER & ‐ LIGHTING ‐
CONTROL STAND ‐ SHELTER ‐ WIRING DIAGRAM
(End of drawing list)
(End of clause)
Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.
The following have been deleted:
252.204-7012 Safeguarding of Unclassified Controlled Technical
Information
NOV 2013
(End of Summary of Changes)
Lower Mon. Navlock Downstream Gate Hoist Machinery Upgrade W912EF-15-R-0048 Amend-0005
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 78 23.00 28
OPERATION AND MAINTENANCE DATA
PART 1 GENERAL
1.1 SUBMITTALS
1.2 SUBMISSION OF OPERATION AND MAINTENANCE DATA
1.2.1 Package Quality
1.2.2 Package Content, Types and Number of Copies
1.2.3 Changes to Submittals
1.2.4 Electronic Copies
1.3 LIST AND SCHEDULE OF O&M DATA PACKAGE ITEMS
1.3.1 O&M Data Package 1
1.3.2 O&M Data Package 2
1.3.3 O&M Data Package 3
1.3.4 O&M Data Package 4
1.3.5 O&M Data Package 5
1.3.6 Controls O&M Data Packages
1.4 O&M DATA PACKAGES FOR MAJOR EQUIPMENT
1.5 DEFINITIONS OF O&M DATA PACKAGE ITEMS
1.5.1 Operating Instructions
1.5.1.1 Safety Precautions
1.5.1.2 Operator Prestart
1.5.1.3 Startup, Shutdown, and Post-Shutdown Procedures
1.5.1.4 Normal Operations
1.5.1.5 Emergency Operations
1.5.1.6 Operator Service Requirements
1.5.1.7 Environmental Conditions
1.5.2 Preventive Maintenance
1.5.2.1 Lubrication Data
1.5.2.2 Consumables
1.5.2.3 Preventive Maintenance Plan and Schedule
1.5.3 Corrective Maintenance (Repair)
1.5.3.1 Troubleshooting Guides and Diagnostic Techniques
1.5.3.2 Wiring Diagrams and Control Diagrams
1.5.3.3 Maintenance and Repair Procedures
1.5.3.4 Removal and Replacement Instructions
1.5.4 Corrective Maintenance Work-Hours
1.5.5 Appendices
1.5.5.1 Product Submittal Data
1.5.5.2 Manufacturer's Instructions
1.5.5.3 O&M Submittal Data
1.5.5.4 Parts Identification
1.5.5.5 Spare Parts and Supply Lists
1.5.5.6 Warranty Information
1.5.5.7 Personnel Training Requirements
1.5.5.8 Testing Equipment and Special Tool Information
1.5.5.9 Testing and Performance Data
1.5.5.10 Contractor Information
SECTION 01 78 23.00 28
G4EDHCMP
Line
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
SECTION 01 78 23.00 28
SECTION 01 78 23.00 28
OPERATION AND MAINTENANCE DATA
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES.
SD-10 Operation and Maintenance Data
Preliminary O&M Manuals and Parts Catalogs for Data Packages (1)
(2) (3) (4) (5); G C
Draft O&M Manuals and Parts Catalogs for Data Packages (1) (2) (3)
(4) (5); G C
SD-11 Closeout Submittals
Final O&M Manuals and Parts Catalogs for Data Packages (1) (2) (3)
(4) (5); G C
1.2 SUBMISSION OF OPERATION AND MAINTENANCE DATA
Submit Operation and Maintenance (O&M) Data specifically applicable to this contract and a complete and concise depiction of the provided equipment, product, or system, stressing and enhancing the importance of system interactions, troubleshooting, and long-term preventative maintenance and operation. Compile and prepare a preliminary version, a draft version and a final version of the aggregate O&M data, including clarifying and updating the original sequences of operation to as-built conditions.
Organize and present information based on the O&M Data Package called out in the individual technical specifications and in sufficient detail to clearly explain O&M requirements at the system, equipment, component, and subassembly level. Include an index preceeding each submittal. Submit in accordance with this SECTION, SECTION 01 78 00.00 28 CLOSEOUT SUBMITTALS (only for SD-11 submittals) and SECTION 01 33 00 SUBMITTAL PROCEDURES.
1.2.1 Package Quality
Documents must be fully legible. Poor quality copies and material with hole punches obliterating the text or drawings will not be accepted.
1.2.2 Package Content, Types and Number of Copies
Data package content shall be as shown in the paragraph titled "List and Schedule of O&M Data Package Items." Comply with the data package requirements specified in paragraph O&M DATA PACKAGES FOR MAJOR EQUIPMENT, including the content of the packages and addressing each product, component, and system designated for data package submission, except as follows. Commissioned items without a specified data package requirement in the individual technical sections shall use Data Package 3. Different Data Package items are required for each O&M Data Submittal. These items are detailed in the tables under paragraph SCHEDULE OF OPERATIONS AND MAINTENANCE DATA PACKAGES in this SECTION. O&M Data types are defined as follows:
a. Preliminary O&M Data - Shall cover the equipment required to be included in the O&M manuals as specified in the technical sections.
Submit four (4) Preliminary O&M Manuals and Parts Catalogs for each type and class of equipment, a minimum of 60 calendar days prior to commencement of on-site construction.
b. Draft O&M Data - Shall cover the equipment required to be included in the O&M manuals as specified in the technical sections. Submit four
(4) Draft O&M Manuals and Parts Catalogs for each type and class of equipment, not later than 14 calendar days after final commissioning.
The Contracting Officer will return two (2) draft copies of the data either "APPROVED" or "RETURNED FOR CORRECTION." Resubmit corrected and additional data as directed by the Contracting Officer.
c. Final O&M Data - A minimum of 14 calendar days after final approval of all draft O&M Manuals, submit five (5) Final O&M Manuals and Parts Catalogs for approval, for each type and class of equipment. If the final O&M Manuals are "RETURNED FOR CORRECTION," four (4) of the five
(5) sets of manuals will be returned to the Contractor with all submitted final binders. The final submittal, after corrections, shall consist of five (5) copies of the approved O&M Manuals. If final O&M Manuals are "APPROVED," the Government will retain all five (5) copies and return a signed ENG Form 4025 to the Contractor.
1.2.3 Changes to Submittals
Manufacturer-originated changes or revisions to submitted data shall be furnished by the Contractor if a component of an item is so affected subsequent to acceptance of the O&M Data. Changes, additions, or revisions required by the Contracting Officer for final acceptance of submitted data, shall be submitted by the Contractor within 30 calendar days of the notification of this change requirement.
1.2.4 Electronic Copies
Provide electronic copies of the O&M material in the form of a CD-ROM.
Submit the CDs with the hard copies of the O&M Manuals (Preliminary, Draft and Final). The documents placed on the CDs shall be in either Adobe Acrobat PDF or Microsoft Office formats. Label all CD-ROMs with the following information:
1. Name of project.
2. Contract number.
3. Name and address of Contractor.
4. Specific item or materials covered by the manual.
5. Date of submittal.
Set up an index of all O&M information linked to the location named in the index. The documents (electronic files) placed on the CD-ROM shall meet the following criteria:
1. Be an exact duplicate of the Approved Final hard copy O&M Manual.
2. Comprehensive Maintenance Table shall be provided in "Read Only" and Microsoft Excel format.
3. Be in the latest PDF version of Adobe Acrobat.
4. All documents must be configured to be searchable using a key word when the file is opened by a user.
5. All documents must be "Read Only.
6. Page numbering, indexing and the marking out of irrelevant parts shall be consistent with the hard copies of the O&M Manuals and ARE required for the documents.
1.3 LIST AND SCHEDULE OF O&M DATA PACKAGE ITEMS
Furnish the O&M data packages specified in individual technical sections.
For definition of Data Package information requirements see paragraph DEFINITIONS OF O&M DATA PACKAGE ITEMS. The aggregate list of Data Package Items is as follows:
a. Safety precautions
b. Cleaning recommendations
c. Maintenance and repair procedures
d. Warranty information
e. Contractor information
f. Spare parts and supply list
g. Normal operations
h. Environmental conditions
i. Lubrication data
j. Preventive maintenance plan and schedule
k. Removal and replacement instructions
l. Parts identification
m. Operator prestart
n. Startup, shutdown, and post-shutdown procedures
o. Emergency operations
p. Troubleshooting guides and diagnostic techniques
q. Wiring diagrams and control diagrams
r. Product submittal data
s. O&M submittal data
t. Testing equipment and special tool information
u. Testing and performance data
v. Operator service requirements
w. Corrective maintenance man-hours
x. Personnel training requirements
y. Manufacturer's instructions
1.3.1 O&M Data Package 1
Furnish the following items for each O&M Data Package 1 submittal:
Preliminary O&M Data Items
Draft O&M Data Items
Final O&M Data Items a, b, c a, b, c, f a, b, c, d, e, f
1.3.2 O&M Data Package 2
Furnish the following items for each O&M Data Package 2 submittal:
Preliminary O&M Data Items
Draft O&M Data Items
Final O&M Data Items a, b, c, g, i, j a, b, c, f, g, h, i, j, a, b, c, d, e, f, g, h, i j
1.3.3 O&M Data Package 3
Furnish the following items for each O&M Data Package 3 submittal:
Preliminary O&M Data Items
Draft O&M Data Items
Final O&M Data Items a, b, c, g, i, j, m, n, o, p, q, s a, b, c, f, g, h, i, j, k, l, m, n, o, p, q, r, s, t, u a, b, c, d, e, f, g, h, i, j, k, l, m, n, o, p, q, r, s, t, u, y
1.3.4 O&M Data Package 4
Furnish the following items for each O&M Data Package 4 submittal:
Preliminary O&M Data Items
Draft O&M Data Items
Final O&M Data Items a, b, c, g, i, j, m, n, o, p, q, s, v, w, x a, b, c, f, g, h, i, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x a, b, c, d, e, f, g, h, i, j, k, l, m, n, o, p, q, r, s, t, u, v, w, x,
1.3.5 O&M Data Package 5
Furnish the following items for each O&M Data Package 5 submittal:
Preliminary O&M Data Items
Draft O&M Data Items
Final O&M Data Items a, c, g, j, m, n, p, q, s, y a, c, f, g, h, j, k, l, m, n, p, q, r, s, t, y a, c, d, e, f, g, h, j, k, l, m, n, o, p, q, r, s, t, u, y
1.3.6 Controls O&M Data Packages
Include Data Package 5 and the following items in the Final O&M Manual Data submittal for control systems:
a. Narrative description on how to perform and apply all functions, features, modes, and other operations, including unoccupied operation, seasonal changeover, manual operation, and alarms. Include detailed technical manual for programming and customizing control loops and algorithms.
b. Full as-built sequence of operations.
c. List of all error codes and complete step-by-step instructions to clear all error codes.
d. Copies of all checkout tests and calibrations performed by the Contractor. Does not include Commissioning Test results. See Section 01 91 00.00 28 SYSTEMS TESTING AND COMMISSIONING for Commissioning test requirements.
e. Full print out of all schedules and set points after testing and acceptance of the system. Include final settings, alignments, balances, etc. of all equipment impacted by work on this project.
f. Full as-built print out of software program.
g. Electronic copy on disk or CD of the entire program for all work under this contract.
1.4 O&M DATA PACKAGES FOR MAJOR EQUIPMENT
Refer to the following table to determine which Data Package is required for each type of major equipment and which submittals are required for that Data Package. For each O&M Data submittal required, submit all items in the corresponding Data Package table in paragraph LIST AND SCHEDULE OF O&M DATA PACKAGE ITEMS above. For example, Variable Frequency Drives (VFDs) require Data Package 5, so the Preliminary O&M Data submittal for the VFDs would require items a, c, g, j, m, n, p, q, s, y based on the Data Package 5 table above. For equipment that does not require a Preliminary O&M Data Package, submit only the manufacturer's standard O&M Manual(s).
O&M DATA PACKAGES TABLE FOR MAJOR EQUIPMENT
EQUIPMENT DATA PACKAGE PRELIMINARY
O&M DATA
DRAFT O&M DATA FINAL O&M
DATA
Variable Frequency Drives (VFDs)
5 YES YES YES
Hoist Drive Motors
5 YES YES YES
EQUIPMENT DATA PACKAGE PRELIMINARY
O&M DATA
DRAFT O&M DATA FINAL O&M
DATA
Brakes 3 YES YES YES
Load Cells 5 YES YES YES
Programmable Logic Controller
(PLC)
5 YES YES YES
PLC Central Processor Unit (CPU)
5 YES YES YES
Input/Output (I/O) Modules
5 YES YES YES
Power Supply Modules
5 YES YES YES
Absolute Valve Position
5 YES YES YES
Human Machine Interfaces
(HMI)
5 YES YES YES
Media Converting
5 YES YES YES
Absolute Gate Position Encoders
5 YES YES YES
Control Panels 5 YES YES YES
3.5-Ton Overhead Maintenance Cranes
3 YES YES YES
Gearboxes 3 YES YES YES
Pinion bearings
3 YES YES YES
Sheave bearings
3 YES YES YES
Pinion Shafts 3 YES YES YES
Pinion Gears 3 YES YES YES
Couplings 3 YES YES YES
1.5 DEFINITIONS OF O&M DATA PACKAGE ITEMS
1.5.1 Operating Instructions
Include specific instructions, procedures, and illustrations for the following phases of operation for the installed model and features of each system:
SECTION 01 78 23.00 28
G4EDHCMP
Line
1.5.1.1 Safety Precautions
List personnel hazards and equipment or product safety precautions for all operating conditions.
1.5.1.2 Operator Prestart
Include procedures required to install, set up, and prepare each system for use.
1.5.1.3 Startup, Shutdown, and Post-Shutdown Procedures
Provide narrative description for Startup, Shutdown and Post-shutdown operating procedures including the control sequence for each procedure.
1.5.1.4 Normal Operations
Provide narrative description of Normal Operating Procedures. Include Control Diagrams with data to explain operation and control of systems and specific equipment. Include functional descriptions of operating parts.
1.5.1.5 Emergency Operations
Include Emergency Procedures for equipment malfunctions to permit a short period of continued operation or to shut down the equipment to prevent further damage to systems and equipment. Include Emergency Shutdown Instructions for fire, explosion, spills, or other foreseeable contingencies. Provide guidance and procedures for emergency operation of all utility systems including required valve positions, valve locations and zones or portions of systems controlled.
1.5.1.6 Operator Service Requirements
Include instructions for services to be performed by the operator such as lubrication, adjustment, inspection, and recording gage readings.
1.5.1.7 Environmental Conditions
Include a list of Environmental Conditions (temperature, humidity, and other relevant data) that are best suited for the operation of each product, component or system. Describe conditions under which the item equipment should not be allowed to run.
1.5.2 Preventive Maintenance
Include the following information for preventive and scheduled maintenance to minimize corrective maintenance and repair for the installed model and features of each system. Include potential environmental and indoor air quality impacts of recommended maintenance procedures and materials.
1.5.2.1 Lubrication Data
Include preventative maintenance lubrication data, in addition to instructions for lubrication provided under paragraph titled "Operator Service Requirements":
a. A table showing recommended lubricants for specific temperature ranges and applications.
b. Charts with a schematic diagram of the equipment showing lubrication points, recommended types and grades of lubricants, and capacities.
c. A Lubrication Schedule showing service interval frequency.
d. Where the Contractor or the supplier has installed a lubricant or oil prior to shipment to the project, the "Brand Name" as well as the specification shall be indicated.
1.5.2.2 Consumables
Provide a list of all consumable (grease, oil, filters, etc.) products used in equipment provided under this contract. Where the Contractor has installed a consumable product prior to Government acceptance, provide the "Brand Name" as well as the specification for each product. Include the following information:
a. Manufacturer's name and contact information.
b. Manufacturer's model number, part number, and serial number as applicable.
c. Current sources/vendors with contact information.
d. Current prices for each consumable.
1.5.2.3 Preventive Maintenance Plan and Schedule
Include manufacturer's schedule for routine preventive maintenance, inspections, tests and adjustments required to ensure proper and economical operation and to minimize corrective maintenance. Provide manufacturer's projection of preventive maintenance work-hours on a daily, weekly, monthly, and annual basis including craft requirements by type of craft.
For periodic calibrations, provide manufacturer's specified frequency and procedures for each separate operation.
1.5.3 Corrective Maintenance (Repair)
Include manufacturer's recommended procedures and instructions for correcting problems and making repairs..
1.5.3.1 Troubleshooting Guides and Diagnostic Techniques
Include step-by-step procedures to promptly isolate the cause of typical malfunctions. Describe clearly why the checkout is performed and what conditions are to be sought. Identify tests or inspections and test equipment required to determine whether parts and equipment may be reused or require replacement.
1.5.3.2 Wiring Diagrams and Control Diagrams
Wiring diagrams and control diagrams shall be point-to-point drawings of wiring and control circuits including factory-field interfaces. Provide a complete and accurate depiction of the actual job specific wiring and control work. On diagrams, number electrical and electronic wiring and pneumatic control tubing and the terminals for each type, identically to actual installation configuration and numbering.
1.5.3.3 Maintenance and Repair Procedures
Include instructions and a list of tools required to repair or restore the product or equipment to proper condition or operating standards. Include recommended clearances, bolt torques, pressure settings, etc.
1.5.3.4 Removal and Replacement Instructions
Include step-by-step procedures and a list required tools and supplies for removal, replacement, disassembly, and assembly of components, assemblies, subassemblies, accessories, and attachments. Provide tolerances, dimensions, settings and adjustments required. Instructions shall include a combination of text and illustrations.
1.5.4 Corrective Maintenance Work-Hours
Include manufacturer's projection of corrective maintenance work-hours including requirements by type of craft. Corrective maintenance that requires completion or participation of the equipment manufacturer shall be identified and tabulated separately.
1.5.5 Appendices
Provide information required below and information not specified in the preceding paragraphs but pertinent to the maintenance or operation of the product or equipment. Include the following:
1.5.5.1 Product Submittal Data
Provide a copy of all SD-03 Product Data submittals required in the applicable technical sections.
1.5.5.2 Manufacturer's Instructions
Provide a copy of all SD-08 Manufacturer's Instructions submittals required in the applicable technical sections.
1.5.5.3 O&M Submittal Data
Provide a copy of all SD-10 Operation and Maintenance Data submittals required in the applicable technical sections.
1.5.5.4 Parts Identification
a. Provide identification and coverage for all parts of each component, assembly, subassembly, and accessory of the end items subject to replacement. Parts identification lists shall contain the following information:
1. Special hardware requirements, such as requirement to use high-strength bolts and nuts.
2. Identification of all parts by manufacturer's make, model, serial number, and National Stock Number (NSN).
3. Manufacturer's name, address, phone number, and website where parts can be ordered to allow reordering without further identification.
4. Current sources\vendor names for the parts, their respective addresses and telephone numbers.
5. Purchase price, where applicable.
6. Current replacement costs for each part.
7. Clear and legible illustrations, drawings, and exploded views to enable easy identification of the items. When illustrations omit the part numbers and description, both the illustrations and separate listing shall show the index, reference, or key number that will cross-reference the illustrated part to the listed part.
8. Cross referencing of Manufacturer's reference numbers with Contractor's reference numbers and shop drawings where applicable.
b. Parts shown in the listings shall be grouped by components, assemblies, and subassemblies in accordance with the manufacturer's standard practice. Parts data may cover more than one model or series of equipment, components, assemblies, subassemblies, attachments, or accessories, such as typically shown in a master parts catalog.
Include all information in an Excel Spreadsheet as part of the electronic copy of the "Operation And Maintenance Manuals And Parts Catalogs".
1.5.5.5 Spare Parts and Supply Lists
a. When specified, include lists of spare parts and supplies required for maintenance and repair to ensure continued service or operation without unreasonable delays. Special consideration is required for facilities at remote locations. Identify spare parts and supplies that have a long lead-time to obtain.
b. All spare parts lists, for both recommended spare parts and those provided under this contract, shall contain the information identified in paragraph "Parts Identification". Include all information in an Excel Spreadsheet as part of the electronic copy of the "Operation And Maintenance Manuals And Parts Catalogs".
c. Supply/Parts Lists shall also include the following:
1. Full description and nomenclature of each part.
2. Required number of each part for equipment operation.
3. Recommended list of spare parts to be stocked at the Project.
4. Actual spare parts supplied under this contract.
5. Serial numbers of spare parts received from the Contractor.
1.5.5.6 Warranty Information
List and explain the various warranties and clearly identify the servicing and technical precautions prescribed by the manufacturers or contract documents in order to keep warranties in force. Include warranty information for primary components such as the compressor of air conditioning system.
1.5.5.7 Personnel Training Requirements
Provide information available from the manufacturers that is needed for use in training designated personnel to properly operate and maintain the equipment and systems.
1.5.5.8 Testing Equipment and Special Tool Information
Include information on test equipment required to perform specified tests and on special tools needed for the operation, maintenance, and repair of components.
1.5.5.9 Testing and Performance Data
Include completed prefunctional checklists, functional performance test forms, and monitoring reports. Include recommended schedule for retesting and blank test forms.
1.5.5.10 Contractor Information
Provide a list that includes the name, address, and telephone number of the General Contractor and each Subcontractor who installed the product or equipment, or system. For each item, also provide the name address and telephone number of the manufacturer's representative and service organization that can provide replacements most convenient to the project site. Provide the name, address, and telephone number of the product, equipment, and system manufacturers.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
This page intentionally left blank
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 91 00.00 28
SYSTEMS TESTING AND COMMISSIONING
PART 1 GENERAL
1.1 DESCRIPTION
1.2 REFERENCED PUBLICATIONS
1.3 ROLES AND RESPONSIBILITIES
1.3.1 Construction Test Phase
1.3.2 Pre-Operational Test Phase
1.3.3 Operational Test Phase
1.4 SUBMITTALS
1.5 GENERAL REQUIREMENTS
1.5.1 Equipment Commissioning Testing Plan and Schedule
1.5.2 Government Commissioning and Testing Plan
1.5.3 Equipment Commissioning Testing Report
1.6 QUALIFICATIONS
1.6.1 Contractor's Commissioning Agent
1.6.2 Equipment Manufacturer's Commissioning Services
1.7 GENERAL RESPONSIBILITIES OF CONTRACTOR'S COMMISSIONING AGENT
1.8 RESPONSIBILITIES OF CONTRACTOR'S COMMISSIONING AGENT DURING
CONTRACTOR'S COMMISSIONING
1.9 RESPONSIBILITIES OF CONTRACTOR'S COMMISSIONING AGENT DURING
GOVERNMENT'S COMMISSIONING
1.10 COMMISSIONING SUPPORT
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION
3.1 FIELD TESTING
3.2 COMMISSIONING AND TESTING TABLE
3.3 FINAL GOVERNMENT COMMISSIONING AND TESTING
ATTACHMENTS:
Commissioning List Narrative
-- End of Section Table of Contents --
SECTION 01 91 00.00 28
SECTION 01 91 00.00 28
SYSTEMS TESTING AND COMMISSIONING
PART 1 GENERAL
1.1 DESCRIPTION
This SECTION covers the testing and commissioning of mechanical, electrical and control equipment installed under this contract. Commissioning will be a collaborative effort between the Government and the Contractor.
Satisfactory completion of all commissioning activities will be a condition for turnover of the gate hoist machinery from the Contractor to the Government.
The work under this contract alters and interfaces with numerous systems within an operating Navigation Lock. Therefore, final acceptance of installed equipment shall consist of: the commissioning of the installed work and the verification of the overall Government system.
The Contractor has lead responsibility for the commissioning of the installed work and the Government has lead responsibility for the verification of the overall Government system.
Furnish labor and material to accomplish and complete the testing and commissioning as specified herein.
1.2 REFERENCED PUBLICATIONS
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.3 ROLES AND RESPONSIBILITIES
During commissioning, the Government and the Contractor will each have roles and responsibilities which will be phase dependent as follows:
1.3.1 Construction Test Phase
During the Construction Test Phase, the Contractor will have the lead role and…