About this file

Amendment 0007

View the file

Other files for this federal contract opportunity

Other files attached to Lower Monumental Navigation Lock Downstream Gate Hoist Machinery Upgrades, newest first.
File Type Posted
W912EF-15-R-0048-0011.pdf PDF
W912EF-15-R-0048_Amendment_0010.pdf PDF
W912EF-15-R-0048-0009.pdf PDF
W912EF-15-R-0048-0009.pdf PDF
W912EF-15-R-0048-0008.pdf PDF
W912EF-15-R-0048-0006.pdf PDF
W912EF-15-R-0048_Amendment_0005.pdf PDF
W912EF-15-R-0048_Amendment_0004.pdf PDF
W912EF-15-R-0048_Amendment_0003.pdf PDF
Site_Visit_Attendees_W912EF-15-R-0048.pdf PDF
W912EF-15-R-0048-0002_Amendment_to_Solicitation.pdf PDF
W912EF-15-R-0048-0001_Amendment_to_Solicitation.pdf PDF
Amend-0001_Plans.pdf PDF
TechSpec_Amend-0001.pdf PDF
BrandNameJustificationLMAGeokonLC.pdf PDF
BrandNameJustificationLMASheaveBearing.pdf PDF
W912EF-15-R-0048.pdf PDF
Site_Visit_Information.pdf PDF
Plans.pdf PDF
Plans-FIOs.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV51203542

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

TITLE: Low er Monumental Navlock Dow nstream Gate Hoist Upgrade

The purpose of this amendment is to make the changes indicated in the Summary of Changes.

The offer due date is extended to Thursday, October 15, 2015 at 2:00 p.m.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Oct-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0048

X 9B. DATED (SEE ITEM 11)

28-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Oct-2015

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

KENT R. BERNARD 201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-15-R-0048

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. Revised the following Specifications (see revised Specifications for details):

a. SECTION 26 05 00.00 28 COMMON WORK RESULTS FOR ELECTRICAL

Revised Paragraph 1.3 REFERENCES Added Paragraph 3.1.2 Rigid Nonmetallic Conduit.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

BASIS FOR AWARD

The award will be made based on the best overall (i.e., best value-tradeoff) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the three (3) evaluation factors: Technical, Past Performance, and Price.

All subfactors of Factor I, Technical, are equal in importance to each other. Factor I, Technical, is more important than Factor II, Past Performance. When combined, the non-price factors (Factors I and II) are significantly more important than Factor III, Price. As proposals become more equal in their technical (non-price) merit, the evaluated price becomes more important in determining the best value proposal.

FACTORS AND SUBFACTORS TO BE EVALUATED

The following evaluation factors and subfactors will be used to evaluate each proposal. Award will be made to the offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors and subfactors described below.

1. FACTOR I Technical - The technical evaluation will be comprised of three (3) subfactors.

Risk assesses the degree to which the offeror’s proposed technical approach for the requirements of the solicitation may cause disruption of schedule, increased price, degradation of performance, the need for increased Government oversight, or the likelihood of unsuccessful contract performance. Risk will be evaluated as one aspect of the technical evaluation, inherent in the technical evaluation factor or subfactor ratings.

Subfactor A: Electrical and Controls Construction Experience Subfactor B: Mechanical Construction Experience

Subfactor C: Structural Construction Experience

Evaluation of the offeror’s proposal shall address each subfactor as it applies to the scope of work. A detailed explanation of the criteria for the evaluation is set forth in the Evaluation Approach, Paragraph C of this section. During evaluation of each proposal, the Government will assign each subfactor an adjectival rating and write a narrative evaluation reflecting the identified findings.

2. FACTOR II Past Performance - Each offeror’s current and past performance will be reviewed to determine relevancy and confidence.

3. FACTOR III Price - The resulting award will be a firm-fixed price contract. Price reasonableness will be utilized in the evaluation of the proposal.

C. EVALUATION APPROACH

All proposals will be evaluated by the Source Selection Evaluation Board (SSEB).

1. The overarching evaluation approach for all factors and subfactors is as follows:

a. Adequacy of Response. The proposal will be evaluated to determine whether the offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP. Marginal levels of overall detail could indicate a lack of understanding concerning the requirements and may result in the entire factor receiving an unfavorable rating and/or being eliminated from the competitive range.

2. Factor I Technical - This factor is comprised of the following subfactors:

a. Subfactor A: Electrical and Controls Construction Experience

Offerors shall submit the following for Subfactor A:

Proposals will be evaluated to determine electrical and control construction experience for relevant projects of the scope and complexity required in this solicitation. Offerors must demonstrate electrical and controls construction experience of at least three (3) projects within the last five (5) years that include the installation, replacement, or upgrade of power and control features for hoisting systems. Each reference project used to demonstrate electrical and controls construction experience must include relevant scope of work, but is not required to involve all of the fully relevant elements defined in this subfactor. Proposals will be determined to be acceptable if three (3) reference projects combined demonstrate fully relevant experience, as defined in this subfactor. Proposals that demonstrate fully relevant experience across more than three (3) projects will be considered more favorable.

Offerors must demonstrate that the proposed manufacturer of the control and equipment panels is a UL-certified panel shop with a minimum of five (5) years experience in the manufacture of products similar to the type and complexity required by this solicitation.

Use Attachment “Offeror Experience Form” to describe the projects in which the Offeror has relevant electrical and controls construction experience. Provide a description of relevant projects to include the title and location of the project, contract amount, the start and completion dates (or anticipated completion date) of the construction phase of the project, a brief description of the work, the offeror’s specific role on the project, and a point of contact for the project customer/client that includes the person’s name, title, and current phone number. Project descriptions shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.

If the prime contractor proposes self-performing the electrical and controls construction, ensure the proposal is clear that the Offeror will be performing this function. If the prime contractor proposes to use a subcontractor for electrical and controls construction experience, the offeror must submit a Letter of Commitment from the subcontractor with the proposal.

If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects, than an offer with a prime and subcontractor with no prior experience working together on relevant projects.

If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the joint venture entity working successfully together previously on relevant projects, than an offer with a joint venture with no prior experience working together on relevant projects.

Fully Relevant Technical Experience for this subfactor is defined as projects including all of the following:

i. At least 50% physically complete at the time of proposal submission or was completed within the last five (5) years.

ii. Electrical and controls construction which required the installation, replacement, or upgrade of power and control systems for hoisting gates, bridges, or similar structures weighing a minimum of 75100 tons.

iii. Controls installation, replacement, or upgrade involving: 480V Variable Frequency Drives (VFD) rated 40-200 HP, Programmable Logic Controllers (PLC), Human Machine Interfaces (HMI), synchronization of hoist drive equipment, position indication equipment, and system controls software.

c. Subfactor B: Mechanical Construction Experience

Offerors shall submit the following for Subfactor B:

Proposals will be evaluated to determine mechanical construction experience for relevant projects of the scope and complexity required in this solicitation. Offerors must demonstrate relevant mechanical construction experience of at least three (3) projects within the last ten (10) years. Each reference project used to demonstrate mechanical construction experience must include relevant scope of work, but is not required to involve all of the fully relevant elements defined in this subfactor.

Proposals will be determined to be acceptable if three (3) reference projects combined demonstrate fully relevant experience, as defined in this subfactor. Proposals that demonstrate fully relevant experience across more than three (3) projects will be considered more favorable.

Offerors must demonstrate relevant experience of at least five years for the proposed designer and manufacturer of pinion gears and shafts (whether self-performed or subcontracted).

Proposals shall include relevant experience with design and fabrication of gears in accordance with American Gear Manufacturers Association (AGMA) standards. Offerors shall demonstrate relevant experience with laser alignment of equipment shafts and open gear alignment to verify gear tooth contact at working loads.

Offerors must demonstrate relevant experience of at least five (5) years for the proposed source (whether self-performed or subcontracted) to perform hoist cable tensioning and load balancing with vibrating wire load cells.

Use Attachment “Offeror Experience Form”to describe the projects in which the offeror, subcontractors, and suppliers have relevant mechanical construction experience. Provide a description of relevant projects to include the title and location of the project, contract amount, the start and completion dates (or anticipated completion date) of the construction phase of the project, a brief description of the work, the firm’s specific role on the project, and a point of contact for the project customer/client that includes the person’s name, title, and current phone number. Project descriptions shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.

If the prime contractor proposes self-performing the mechanical construction, ensure the proposal is clear that the offeror will be performing this function. If the prime contractor proposes to use a subcontractor for mechanical construction experience, the offeror must submit a Letter of Commitment from the subcontractor with the proposal.

If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects, than an offer with a prime and subcontractor with no prior experience working together on relevant projects.

If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the joint venture entity working successfully together previously on relevant projects, than an offer with a joint venture with no prior experience working together on relevant projects.

Fully Relevant Technical Experience for this sub-factor is defined as projects including all of the following:

i. At least 50% physically complete at the time of proposal submission or was completed within the last ten (10) years.

ii. Mechanical construction which required the installation, replacement, or upgrade of hoist machinery for gates, bridges, or similar structures weighing a minimum of 100 75 tons.

iii. Design and fabrication of gears larger than 8 inches in diameter in accordance with American Gear Manufacturers Association (AGMA) standards.

iv. Design and fabrication of shafts larger than 4 inches in diameter.

v. Hoist machinery installation, replacement, or upgrade involving: two-point lift configuration, skew control, tensioning and load balancing for multiple hoist cables, laser alignment of equipment shafts, and gear alignment for open gear sets measuring a minimum of 5 ft center to center.

d. Subfactor C: Structural Construction Experience

Offerors shall submit the following for Subfactor C:

Proposals will be evaluated to determine structural construction experience for relevant projects of the scope and complexity required in this solicitation.

Offerors must demonstrate relevant experience of at least three (3) projects completed within the last five (5) years that included on-site welding, welding inspection, and nondestructive examination of welds in conformance with American Welding Society (AWS) D1.5 Bridge Welding Code. Proposals shall also include relevant experience with carbon equivalence testing of metals to determine welding conditions for specified weld repairs, development of welding procedures, and performing quality control for welding activities conducted at the work site meeting the requirements of AWS D1.5. Each reference project used to demonstrate structural construction experience must include relevant scope of work, but is not required to involve all of the fully relevant elements defined in this subfactor. Proposals will be determined to be acceptable if three (3) reference projects combined demonstrate fully relevant experience, as defined in this subfactor. Proposals that demonstrate fully relevant experience across more than three (3) projects will be considered more favorable.

Offerors must demonstrate relevant experience of at least three (3) projects completed within the last five (5) years that included the installation and testing of epoxy or vinylester adhesive anchors used in concrete structural applications, and undercut concrete anchors used for machinery and equipment anchorage.

Use Attachment “Offeror Experience Form” to describe the projects in which the offeror, subcontractors, and suppliers have relevant structural construction experience. Provide a description of relevant projects to include the title and location of the project, contract amount, the start and completion dates (or anticipated completion date) of the construction phase of the project, a brief description of the work, the firm’s specific role on the project, and a point of contact for the project customer/client that includes the person’s name, title, and current phone number. Project descriptions shall include adequate detail to demonstrate the relevancy of the scope of work for comparison to that required in this solicitation.

If the prime contractor proposes self-performing the structural construction, ensure the proposal is clear that the offeror will be performing this function. If the prime contractor proposes to use a subcontractor for structural construction experience, the offeror must submit a Letter of Commitment from the subcontractor with the proposal.

If a subcontractor is proposed, the proposal will be considered more favorable if the proposal contains evidence of the prime and subcontractor working successfully together previously on relevant projects, than an offer with a prime and subcontractor with no prior experience working together on relevant projects.

If a joint venture is proposed, the proposal will be considered more favorable if the proposal contains evidence of the joint venture entity working successfully together previously on relevant projects, than an offer with a joint venture with no prior experience working together on relevant projects.

Fully Relevant Technical Experience for this sub-factor is defined as projects including all of the following:

i. At least 50% physically complete at the time of proposal submission or was completed within the last five (5) years.

ii. Development of welding procedures, conducting carbon equivalence testing of metals, on-site welding, welding inspection, nondestructive examination of welds, and performing quality control for welding activities conducted at the work site in conformance with the requirements of American Welding Society (AWS) D1.5 Bridge Welding Code.

iii. Installation and testing of epoxy or vinylester adhesive anchors and undercut concrete anchors.

The Technical Factor Ratings, excerpted below focus on the strengths, deficiencies, weaknesses, risks and uncertainties of the offeror’s proposal. The rating depicts how well the offeror’s proposal meets the Technical subfactor requirements.

Rating Description Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.

Good Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance.

Risk of unsuccessful performance is no worse than moderate.

Marginal Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is not awardable.

4. Factor II - Past Performance - The Government will evaluate the offeror’s record of current and past performance to ascertain the probability of successfully performing the required efforts of the scope of work.

a. Evaluation of past performance shall be in accordance with this plan solicitation utilizing the attached forms and questionnaires set forth in Appendix D.

b. The Government will focus its inquiries on the offeror’s (major subcontractors’ and fabricators’) record of performance as it relates to all solicitation requirements, including price, schedule, performance and management of subcontractors. Major subcontractors are defined as members of an offeror’s overall team who are expected to perform ten (10) percent or more of the proposed effort. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process. Therefore, offerors will be reminded to include the most current and relevant past efforts (within the past six years) in their proposal. Absent any current and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an “unknown confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Federal, State or Local government or commercial contracts for same or similar services as compared to the North American Industry Classification System NAICS 237990, Other Heavy and Civil Engineering Construction. Data used in conducting performance risk assessments shall not extend past six years prior to the issue date of the RFP, but may include performance data generated during the past six years without regard to the contract award date.

c. Offerors shall submit all Government and/or commercial contract numbers and descriptions for the prime offeror and each major subcontractor in performance or awarded during the past six years, from the issue date of this RFP, which are relevant to the efforts required by this RFP. The Government may consider a wide array of information from a variety of sources, but is not compelled to rely on all of the information available.

d. The past performance factor considers each offeror’s demonstrated current and relevant past record of performance in supplying products and services that meet the contract requirements.

There are two aspects to the past performance evaluation: relevancy and performance confidence assessment.

(i) RELEVANCY: The Government will conduct a performance assessment based on the relevancy of the Offeror's current and past performance, as well as that of its major subcontractors and fabricators, as it relates to the probability of successful accomplishment of the required effort. These efforts include all aspects of schedule, performance and customer support, including the Offeror’s submitted subcontracting plan for this project and the Offeror’s record of: 1) Conforming to specifications and standards of good workmanship; 2) Maintaining program execution within price; 3) Adherence to contract schedules, including the administrative aspects of performance; 4) Ability to resolve technical and manufacturing problems quickly and effectively; 5) Businesslike concern for the interest of its customers; 6) Establishing and maintaining adequate management of subcontractors; and 7) Compliance with subcontracting plans submitted on previous projects.

Past Performance Relevancy Ratings

Rating Definition

Very Relevant Current/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Current/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Current/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Current/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

(ii) PERFORMANCE CONFIDENCE ASSESSMENT: The final step is for the team to arrive at a single consensus performance confidence assessment for the offeror, selecting the most appropriate rating from the chart below. This rating considers the assessed quality of the relevant/current efforts gathered.

Performance Confidence Assessments

Rating Definition

Substantial Confidence Based on the offeror’s relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence Based on the offeror’s relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

Unknown Confidence (Neutral)

No relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

3. Factor III - Price - The contract will be a Firm Fixed-Price Contract. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). The Government will evaluate offers for award purposes by evaluating the prices proposed in the Bid Schedule. The Offeror must provide a price proposal by completing the Bid Schedule as instructed in Section 00100.

Firm Fixed Price Requirements

a. The RFP requires firm-fixed-price contract line items. A price reasonableness approach will be utilized by the Government to determine that the proposed prices offered are fair and reasonable and that a “buy-in” or unbalanced pricing between CLINs is not occurring.

b. The Government will examine price proposals for artificially low unit prices. Offers found to be unreasonably high, unrealistically low (an indication of “buy – in”), or unbalanced, may be considered unacceptable and may be rejected on that basis.

D. PROPOSAL SUBMISSION

1. Introduction. The offeror’s proposal shall be submitted in hard copy, with accompanying digital copies, as set forth below. The RFP shall provide the Government address and receipt date for proposal submittal.

The offeror’s proposal shall consist of two (2) volumes. The Volumes are:

Volume I - Technical, Past Performance Volume II - Price, Solicitation, Offer and Award Documents and Certifications/Representations.

Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.

Proposals must be submitted in hard copy AND electronically. The electronic files shall contain identical information to the hard copy files.

Offerors are cautioned that “parroting” or “re-stating” the technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.

2. Proposal Submission Requirements.

a. Each volume shall be submitted in a separate three-ring binder. Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated. Each binder shall be clearly labeled with its Title and a copy number (e.g., copy 1 of 5).

b. Printing should be single spaced. Each paragraph shall be separated by at least one blank line. A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 8-point and may be landscape.

c. The following volumes of material shall be submitted:

VOLUME TITLE

PRINTED

COPIES

ELECTRONIC

COPIES

Volume I Original + 5 1 Volume II Original + 5 1

3. Proposal Files.

a. Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and RFP number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right – 1” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”

NOTE: 11X17 folded pages are acceptable for tables/graphic representations

The following additional restrictions apply:

b. File Packaging. All of the proposal files shall be compressed (zipped) into one file entitled proposal zip using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc., and provided on CDs or DVDs. Zip disks are not permitted.

Files shall be in read-only format, using PDF files. All price breakdown information to aid in the Price evaluation shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007. Each disc shall be externally labeled with the volume number, date, and the offeror’s name. **Please note – Self extracting exe files are not acceptable. **If the hard-copy proposal differs from the electronic version, the electronic copy will govern.

c. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion. The Summary Section shall contain a brief abstract of the file. Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:

(i) VOLUME I, TAB 1 -Technical. The volume Tab shall be organized into the following section:

(1) Section 1 - Subfactor A: Electrical and Controls Construction Experience

(2) Section 2 - Subfactor B: Mechanical Construction Experience

(3) Section 3 - Subfactor C: Structural Construction Experience

(ii) VOLUME I, TAB 2 – Past Performance. This volumetab shall contain current and past performance information regarding similar contracts. This tabvolume shall not exceed 25 pages for the Prime Contractor plus five pages each for major subcontractor and fabricator, excluding Past Performance Questionnaire Forms. Offerors shall submit all Government and/or commercial contracts for the prime offeror and each major contract currently in performance or awarded during the past six years, from the issue date of this RFP, which are relevant to the efforts required by this solicitation. Relevant efforts are defined as services/efforts that are the same as or similar to the effort required by the RFP. Data concerning the offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. The Offeror shall also submit the written consent of its major subcontractors to allow the disclosure of its subcontractor’s past performance information to the Offeror. In addition, letters of commitment shall be included for all major subcontractors for their past performance to be considered. This volume tab shall be organized into the following sections:

(1) Section 1 – Contract Descriptions. This section shall include the following information in the following format. Ensure all information is current and accurate.

(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS

Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

(b) Government contracting activity, (or private firm) and current address, Procuring Contracting

Officer’s name, e-mail address, telephone and fax numbers.

(c) Technical representative/COR and current email address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative

Contracting Officer’s name, current e-mail address, telephone and fax number.

(e) Government contract administration activity’s Pre-Award point of contact name, and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers.

(g) Contract Type (specific type such as Fixed-Price (FP), Cost Reimbursement

(CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.).

(h) Awarded price.

(i) Final or projected final price.

(j) Original delivery schedule, including dates of start and completion or work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

(2) Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 - Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The offerors shall also provide copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the offeror or proposed subcontractor.

The offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) For all contracts, the offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the offeror’s delivered product.

(3) Section 3 – Subcontracts. Offerors shall provide an outline of how the effort required by the RFP will be assigned for performance within the offeror’s corporate entity and among the proposed subcontractors. The information provided for the prime offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government technical specification. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 10% of the total proposed Price.

(4) Section 4 – New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above. Letters of Commitment shall be included in the proposal for these employees in order to be considered.

(5) Section 5-Past Performance Questionnaire. For all contracts identified in Section 1

- Contract Descriptions, a Past Performance Questionnaire , Appendix D, must be completed and submitted. The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the current and past contract. The Point of Contacts (POCs) shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to Kent.R.Bernard@usace.army.mil. The offeror must submit, with its proposal, a list of all the POCs who were sent questionnaires. The POC List shall be submitted in Word for Windows Table Format to include the following fields:

Solicitation Number; Company Name; Contract Number; Government Agency; POC

Last Name, First Name; POC Title; POC Telephone Number; POC E-mail Address;

and Date E-Mail to POC (month/day).

(6) Section 6-Submissions. Offerors are discouraged from providing points of contact with another contractors’ facility, i.e., in case an offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. Offerors shall provide and submit the prime contract number and all Governmental agency points of contact (POC) in lieu of subcontract numbers or prime contract POCs in situations as described above.

(iii) VOLUME II, TAB 1 – Price. This volume tab shall consist of all information, required to support proposed prices. Certified pricing data is not currently required;

however, the Government reserves the right to request such data prior to award. There are no page limitations for this volume.

The offeror shall ensure that the information submitted in this volume tab is consistent with and fully supports the amounts set forth in the SF1442 and continuation sheets.

(v) VOLUME II, TAB 2 – SOLICITATIONS, OFFER AND AWARD DOCUMENTS

AND CERTIFICATIONS/REPRESENTATIONS

Certifications and Representations – Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF 1442 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.

Section 00010 – Standard Form 1442 Solicitation, Offer and Award (Construction, Alteration or Repair)

Section 00600 – Representations, Certification and Other Statements of Offerors

Solicitations, Offer and Award Documents and Certifications/Representations shall not be submitted separately from that submitted in VOLUME II – SOLICITATIONS, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS

/REPRESENTATIONS.

E. DISCUSSIONS

1. GENERAL INFORMATION. In accordance with FAR provision 52.215-1, The Government intends to evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

(End of Summary of Changes)

Lower Mon. Navlock Downstream Gate Hoist Machinery Upgrade W912EF-15-R-0048 Amend-0007

SECTION TABLE OF CONTENTS

DIVISION 26 - ELECTRICAL

SECTION 26 05 00.00 28

COMMON WORK RESULTS FOR ELECTRICAL

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 ADDITIONAL INFORMATION

1.3 REFERENCES

1.4 DEFINITIONS

1.5 WORKMANSHIP

1.6 SUBMITTALS

1.7 PREVENTION OF CORROSION

1.8 GENERAL REQUIREMENTS

1.9 MANUFACTURER'S NAMEPLATE

1.10 EQUIPMENT LABELING

1.11 DATA FOR ARC FLASH STUDY

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Rigid Steel Conduit

2.1.2 Flexible Metallic Conduit

2.1.3 Nonmetallic Wiring Duct (Channel)

2.2 WIRE AND CABLE

2.3 ELECTRICAL GROUNDING AND BONDING EQUIPMENT

2.4 SWITCHES

2.4.1 Safety Switches

2.5 OUTLET BOXES

2.5.1 Cast Junction Boxes

2.6 ENCLOSURES

2.7 CONTROL EQUIPMENT

2.8 PROGRAMMABLE LOGIC CONTROLLER

2.9 FIBER OPTICS

PART 3 EXECUTION

3.1 CONDUITS, RACEWAYS AND FITTINGS

3.1.1 Rigid Steel Conduit

3.1.2 Rigid Nonmetallic Conduit

3.1.3 Exposed Conduit

3.1.4 Flexible Metallic Conduit

3.1.5 Coordination or Interference with Other Work

3.2 IDENTIFICATION PLATES AND WARNINGS

3.3 REPAIR OF EXISTING WORK

3.4 FIELD TESTING

3.4.1 Operating Tests

3.4.2 Safety

-- End of Section Table of Contents --

SECTION 26 05 00.00 28

G4EDHCMP

Line

G4EDHCMP

Line

SECTION 26 05 00.00 28

SECTION 26 05 00.00 28

COMMON WORK RESULTS FOR ELECTRICAL

PART 1 GENERAL

1.1 GENERAL INFORMATION

This section contains the general electrical specifications for Lower Monumental Down Stream Gate Machinery Upgrade Project. The following features of work are covered in this section:

Conduits, Raceways and Fittings Electrical Grounding and Bonding Equipment Safety Switches Device Boxes, Outlet Boxes, Pull Boxes and Fittings Enclosures Control Equipment Installation Testing

1.2 ADDITIONAL INFORMATION

All replaced switchgear should be Arc Flash rated equipment. The Contractor shall comply with OSHA Lockout/ Tagout regulations.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

ANSI Z535.1 (2006) American National Standard for Safety--Color Code

ANSI/NEMA FB 1 (2007; AMD 2010) Standard for Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable

NEMA KS 1 (2001; R 2006) Enclosed and Miscellaneous Distribution Equipment Switches (600 V Maximum)

NEMA RN 1 (2005) Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit

NEMA TC 2 (2003) Standard for Electrical Polyvinyl Chloride (PVC) Conduit(2013) Standard for

SECTION 26 05 00.00 28

Electrical Polyvinyl Chloride (PVC) Conduit

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3 2014) National Electrical Code

UNDERWRITERS LABORATORIES (UL)

UL 1 (2005; Reprint Jul 2007) Standard for Flexible Metal Conduit

UL 6 (2007) Electrical Rigid Metal Conduit-Steel

UL 651 (2011; Reprint May 2014) Standard for Schedule 40 and 80 Rigid PVC Conduit and Fittings

UL 651A (2011) Type EB and A Rigid PVC Conduit and HDPE Conduit

1.4 DEFINITIONS

a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, shall be as defined in IEEE 100.

b. The technical sections referred to herein are those specification sections that describe products, installation procedures, and equipment operations and that refer to this section for detailed description of submittal types.

c. The technical paragraphs referred to herein are those paragraphs in PART 2 - PRODUCTS and PART 3 - EXECUTION of the technical sections that describe products, systems, installation procedures, equipment, and test methods.

1.5 WORKMANSHIP

All work shall be completed in a thorough and workmanlike manner and shall conform to the best modern practice in the class of work regardless of any omission in the drawings and specifications.

1.6 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

SD-03 Product Data

Submit manufacturer's catalog data for the following items:

Conduits, Raceways and Fittings; I EL

SECTION 26 05 00.00 28

G4EDHCMP

Line

Wire and Cable; I EL

Electrical Grounding and Bonding Equipment; G EL

Switches; I EL

SD-05 Design Data

Data for Arc Flash Study; G EL

SD-06 Test Reports

Insulation-resistance Test Report; G EL

Continuity Test Report; G EL

Phase-rotation Tests Report; G EL

SD-08 Manufacturer's Instructions

Submit Manufacturer's Instructions; I EL

1.7 PREVENTION OF CORROSION

Protect metallic materials against corrosion. Provide equipment enclosures with the standard finish by the manufacturer when used for most indoor installations. Do not use aluminum when in contact with earth or concrete and, where connected to dissimilar metal, protect by approved fittings and treatment. Ferrous metals such as, but not limited to, anchors, bolts, braces, boxes, bodies, clamps, fittings, guards, nuts, pins, rods, shims, thimbles, washers, and miscellaneous spare parts not of corrosion-resistant steel shall be hot-dip galvanized in accordance with ASTM A 123/A 123M except where other equivalent protective treatment is specifically approved in writing.

1.8 GENERAL REQUIREMENTS

Submit manufacturer's instructions including special provisions required to install equipment components and system packages. Special notices shall detail impedances, hazards and safety precautions.

1.9 MANUFACTURER'S NAMEPLATE

Refer to Section 26 00 00.00 28 BASIC ELECTRICAL MATERIALS AND METHODS.

1.10 EQUIPMENT LABELING

a. Equipment markings shall be furnished as required by NEC 430.8 (Motor Controllers), NEC 430.98 (Motor Control Centers), NEC

409.110 (Industrial Control Panels), NEC 110.22 (Disconnects), NEC 450.11(Transformers), and other applicable sections.

b. The contractor shall utilize the services of a Professional Engineer Registered in the State of Washington to perform the required calculations & labeling of equipment.

1.11 DATA FOR ARC FLASH STUDY

Submit data for an arc flash study to be performed by others. For each piece of equipment, submit the following data in a tabular format.

1. Cables over 240 Volts

a. Size

b. Copper or aluminum

c. Type of insulation

d. Separate phases, bundled phases, or bus

e. Magnetic or non-magnetic raceway

f. Length, rounded to nearest 50 feet

2. Protective devices over 240 Volts

a. Trip settings

b. Interrupt and trip ratings

c. Brand and model

d. Fuse, molded-case breaker, etc.

3. Transformers

a. Percent impedance

b. kVA

c. Dry or oil

d. Tap settings

e. Voltages

f. Delta or wye

4. Motor loads

a. Horsepower

b. Power factor

7. Switchgear and motor control centers

a. Short-circuit rating

b. Continuous current rating

8. Starters:

a. Does it prevent the motor from back-feeding power to the fault location?

PART 2 PRODUCTS

2.1 MATERIALS

Materials and equipment to be provided shall be the standard cataloged products of manufacturers regularly engaged in the manufacture of the products.

2.1.1 Rigid Steel Conduit

Rigid steel conduit shall comply with UL 6 and be galvanized by the hot-dip process. Where underground and in corrosive areas, rigid steel conduit shall be polyvinylchloride (PVC) coated in accordance with NEMA RN 1, or must be painted with bitumastic.

Fittings for rigid steel conduit shall be threaded.

Gaskets shall be solid. Conduit fittings with blank covers shall have gaskets, except in clean, dry areas or at the lowest point of a conduit run where drainage is required.

Covers shall have captive screws and be accessible after the work has been completed.

2.1.2 Flexible Metallic Conduit

Flexible metallic conduit shall comply with UL 1 and be galvanized steel.

Fittings for flexible metallic conduit shall be specifically designed for such conduit.

Provide liquidtight flexible metallic conduit with a protective jacket of PVC extruded over a flexible interlocked galvanized steel core to protect wiring against moisture, oil, chemicals, and corrosive fumes. It shall accept standard connectors with grounding bushings to provide positive ground continuity. A separate ground wire shall be run in all flexible conduits.

Length of flexible metallic conduit shall not exceed 36 inches.

2.1.3 Nonmetallic Wiring Duct (Channel)

Non-metallic wiring duct shall be of 2-piece, rigid vinyl or polycarbonate construction. Duct shall have open slotted base with solid snap-on cover.

Wiring duct shall only be used to train wire within enclosures, unless approved otherwise. Size of duct shall be in accordance with manufacturer's recommendations for NEC wire fill requirements unless shown otherwise.

Thomas & Betts "Ty-Duct", Panduit "Panduct" or approved equal.

2.2 WIRE AND CABLE

Conductors installed in conduit shall be copper 600-volt type. All conductors AWG No. 8 and larger, shall be stranded.

Conductors installed in plenums shall be marked plenum rated.

2.3 ELECTRICAL GROUNDING AND BONDING EQUIPMENT

ASTM B 1, solid bare copper wire for sizes No. 8 AWG and smaller diameter;

ASTM B 8, Class A stranded bare copper wire for size No. 6 AWG and larger diameter.

2.4 SWITCHES

2.4.1 Safety Switches

Safety switches shall comply with NEMA KS 1, and be the heavy-duty type with enclosure, voltage, current rating, number of poles, and fusing as indicated. Switch construction shall be such that, when the switch handle in the "ON" position, the cover or door cannot be opened. Cover release device shall be coinproof and be so constructed that an external tool shall be used to open the cover. Make provisions to lock the handle in the "OFF" position, but the switch shall not be capable of being locked in the "ON" position.

Provide switches of the quick-make, quick-break type. Approve terminal lugs for use with copper conductors.

Safety color…