- O & M CONTRACT FOR LAKE CHICOT PUMPING PLANT
- Solicitation number
- W912EE-15-T-0043
About this file
Solicitation for New Cleaning and mowing O M contract for Lake Chicot Pumping Plant
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22__Solicitation_W912EE-15-T-0043_amendment_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912EE-15-T-0043 31-Jul-2015
b. TELEPHONE NUMBER
601-631-7905
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 14 Aug 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912EE9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SPENLINDA L LAKE
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W807PM50684649
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE B4R0000 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
OD OPS DIV
4155 CLAY ST
VICKSBURG MS 39183-3435
TEL: FAX:
601-631-7261FAX:
TEL: 601-631- SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
7.5M
NAICS:
561730
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF79
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
NEW O&M CONTRACT AT LCPP-LAKE CHICOT PUM
FFP
PING PLANT --- PROJECT NO.: 107206
FOB: Destination
MILSTRIP: W807PM50684649
PURCHASE REQUEST NUMBER: W807PM50684649
NET AMT
BID SCHEDULE
Section B - (BIDDING SCHEDULE / TO BE INCLUDED WITH BID SUBMISSION)
BASE YEAR: 01 September 2015 – 31 August 2016
0001 BASE YEAR – O&M Lake Chicot Pumping Plant
0001AA Cleaning and Janitorial Services in accordance with the Scope of Work
12 Months $____________ $____________
0001AB Provide Grounds Inspection and Litter Pickup in accordance with the Scope of Work
0001AC Mowing and trimming
Services for March & October in accordance with the Scope of Work
2 Months $____________ $____________
0001AD Mowing and trimming services for April through September in accordance with
6 Months $____________ $____________
0001AE Provide spraying of Rip Rap areas in accordance with the Scope of Work
1 Lump Sum $____________ $____________
0001AF Provide fire ant treatment in accordance with the Scope of Work
TOTAL BASE YEAR $____________
1st OPTION YEAR: 01 September 2016 – 31 August 2017
0002 1ST Option Year – O&M Lake Chicot Pumping Plant
0002AA Cleaning and Janitorial
0002AB Provide Grounds Inspection accordance with the Scope of
0002AC Mowing and trimming in accordance with the Scope
0002AD Mowing and trimming
September in accordance with
0002AE Provide spraying of Rip Rap
0002AF Provide fire ant treatment in
Work
1 Lump Sum $____________ $____________
TOTAL 1st OPTION
YEAR
2nd OPTION YEAR: 01 September 2017 – 31 August 2018
0003 2nd Option Year – O&M Lake Chicot Pumping Plant
0003AA Cleaning and Janitorial
0003AB Provide Grounds Inspection accordance with the Scope of
0003AC Mowing and trimming in accordance with the Scope
0003AD Mowing and trimming
September in accordance with
0003AE Provide spraying of Rip Rap
0003AF Provide fire ant treatment in
Work
1 Lump Sum $____________ $____________
TOTAL 2nd OPTION
YEAR
3rd OPTION YEAR: 01 September 2018 – 31 August 2019
0004 3rd Option Year – O&M Lake Chicot Pumping Plant
0004AA Cleaning and Janitorial
0004AB Provide Grounds Inspection accordance with the Scope of
0004AC Mowing and trimming in accordance with the Scope
0004AD Mowing and trimming
September in accordance with
0004AE Provide spraying of Rip Rap
0004AF Provide fire ant treatment in
Work
1 Lump Sum $____________ $____________
TOTAL 3rd OPTION
YEAR
4th OPTION YEAR: 01 September 2019 – 31 August 2020
0005 4th Option Year – O&M Lake Chicot Pumping Plant
0005AA Cleaning and Janitorial
0005AB Provide Grounds Inspection accordance with the Scope of
0005AC Mowing and trimming in accordance with the Scope
0005AD Mowing and trimming
September in accordance with
0005AE Provide spraying of Rip Rap
0005AF Provide fire ant treatment in
Work
1 Lump Sum $____________ $____________
TOTAL 4th OPTION
YEAR
TOTAL BASE & 4
OPTION YEARS
Section C - Descriptions and Specifications
SOW
SCOPE OF WORK
FOR
PERFORMANCE BASED
LCPP CLEANING AND MOWING SERVICES
1. DESCRIPTION OF SERVICES. The Contractor shall perform janitorial services at the visitor center at Lake Chicot Pumping Plant (LCPP); mowing and trimming services and optional herbicide spraying of rip-rap areas at Lake Chicot Pumping Plant, Connerly Bayou Dam, & Ditch Bayou Dam in Arkansas; and fire ant treatment at the aforementioned locations, as set forth in the bidding schedule and in accordance with these specifications.
FACILITIES DESCRIPTION. LCPP visitor center has three levels consisting of two restrooms, an elevator, stairwell, observation deck, and interpretive displays.
CONTRACT FORMAT. This is a fixed-priced performance based contract containing performance oriented requirements.
Performance requirements specify that services be performed to achieve a desired result. In these cases the Contractor’s performance shall be measured by his/her outcome to performance requirements contained in this contract.
1.1. JANITORIAL SERVICES. The Contractor shall provide the
following janitorial services for the visitor center at LCPP.
1.1.1. CLEANING PERFORMANCE STANDARDS - GENERAL: Visitor Center shall be cleaned and maintained so as to provide an aesthetically pleasing and sanitary environment in accordance with contract specifications and in a manner that does not damage any of the infrastructure or interfere with normal use of facility.
Historically, cleaning has been done in accordance with the following procedures and performed in the order that this procedure is presented.
1.1.2 CEILINGS, UNDERSIDE ROOF DECKING, HEATING UNITS, EXTERIOR
EAVES, EXTERIOR WALLS, ELECTRICAL CONDUITS, AND LIGHT FIXTURES.
Remove all cobwebs, insect nests (including dirt dauber and wasp nests), insects, dust, and other loose material from ceilings, the exposed underside of roof decking, heating units, vents, exterior eaves, exterior walls, electrical conduits, and light fixtures. Subsequently, remove all stains, growths, mold, mildew, and other material adhering to these items with a suitable cleaning compound, and follow this process by removing all remaining cleaning compound residues with a damp cloth or sponge. Wetting of wooden and electrical components, excluding exterior walls, by hosing off, is not an acceptable procedure.
1.1.3 WALLS, PARTITIONS, DOORS, WINDOWS, SCREENS, AND LOUVERS.
Remove all cobwebs, insects, insect nests (including dirt dauber and wasp nests), and other foreign material from windows, screens, louvers, and screen doors. Also, remove all stains, growths, mildew, graffiti, and other material adhering to the walls, partitions, and doors with a suitable cleaning compound, and follow this process by washing with a solution of water and a biodegradable disinfectant cleaner. Spot removal procedure using cleaning compound shall not result in damage to the surfaces of the items being cleaned. Also, graffiti removal which requires sanding, re-surfacing, and/or painting is not a requirement of this contract. The disinfectant solution shall be mixed according to the cleaner manufacturer's label instructions for the application. Upon completion of disinfectant cleaning, remove all remaining cleaning compounds and wipe with a damp cloth or sponge to remove all streaks, water droplets, cleaners, and foreign material. Rinsing wooden components and electrical equipment and outlets, by hosing off, are not an acceptable removal procedure.
1.1.4. LAVATORIES, MIRRORS, COUNTER TOPS, COMMODES, URINALS,
SOAP DISPENSERS AND DISHES, STALL HAND RAILS, TOILET PAPER
DISPENSERS, AND PAPER TOWEL DISPENSERS - SANITARY ITEMS AND
SURFACES. Remove all loose material from lavatories, mirrors, counter tops, commodes, urinals, soap dispensers and soap dishes, stall hand rails, toilet paper dispensers, and paper towel dispensers. Both the interior and exterior of toilets and urinals shall be cleaned with a toilet bowl brush. However, this brush shall not be used to clean any other items. Then remove all stains, growths, mildew, graffiti, fingerprints, and other material adhering to all items with a suitable cleaning compound, and follow this process by washing them with a solution of water and biodegradable disinfectant cleaner. Spot removal procedure using cleaning compounds shall not result in damage to the surfaces of the items being cleaned. Also, graffiti removal which requires sanding, re-surfacing, and/or painting is not a requirement of this contract. The disinfectant solution shall be mixed according to the cleaner manufacturer's label instructions for this application. Upon completion of disinfectant cleaning, rinse and remove all remaining cleaning compounds, and wipe with a damp cloth or sponge to remove all streaks, water droplets, cleaners, and foreign material. Finally, replenish all dispensers with toilet paper, paper towels, and soap solution of a sufficient quantity to last until the next cleaning based upon the level of consumption of this material, regardless of the presence or absence of hand blowers. The Contractor shall furnish all toilet paper, paper towels, and soap solution, at his/her own expense, in accordance with paragraph entitled “Contractor Furnished Supplies” of this contract.
1.1.5. INTERIOR TRASH RECEPTACLES. Remove all trash together
with plastic bag inserts from trash receptacles. Subsequently, remove all stains, growths, mildew, graffiti, and other material adhering to this item, both inside and outside, with a suitable cleaning compound and follow this process by washing it with a solution of water and biodegradable disinfectant cleaner. Spot removal procedure using brushes and/or cleaning compounds shall not result in damage to the surfaces of the items being cleaned.
Also, graffiti removal which requires sanding, resurfacing, and/or painting is not a requirement of this contract. The disinfectant solution shall be mixed according to the cleaner manufacturer's label instructions for this application. Upon completion of disinfectant cleaning, rinse and remove all remaining cleaning compounds, and wipe with a damp cloth or sponge to remove all streaks, water droplets, cleaners, and foreign material, and insert new plastic bag liners.
Appropriately sized plastic bag liners shall be provided by the Contractor at his/her own expense in accordance with paragraph entitled “Contractor Furnished Supplies” of this contract.
1.1.6. FLOOR CLEANING (SANITARY ITEM AND SURFACE). Floors
shall be cleaned as appropriate for the floor covering, so as to leave them free of dirt, dust, litter, liquids, and other foreign material.
1.1.7. FLOORS (SANITARY ITEM AND SURFACE) AND RELATED
SIDEWALKS. Sweep and remove all dirt, dust, mud, gravel, and other loose material from floors, breezeway floors, and related sidewalks. Related sidewalks include sidewalks leading to the visitor center and pumping plant from adjacent parking areas.
Subsequently, remove all stains, growths, and other material adhering to the interior floors, breezeway floors, and sidewalks with a suitable cleaning compound, and follow this process by mopping all interior floors with a solution of water and a biodegradable disinfectant cleaner. This solution shall be mixed according to the cleaner manufacturer's label instructions for this application. Then rinse and remove all remaining cleaner and foreign material. Standing water shall be removed by dry-mopping and also foreign material removed from the floor drains, if they exist. Also, any of the above mentioned foreign material which is washed, swept, or otherwise deposited over the edge of sidewalks or floors, and accumulates on the surrounding grounds as a result of the cleaning operation, shall be removed by the Contractor and disposed of in accordance with paragraph entitled “Liquid Disposal.”
1.1.8. FLOOR MAINTENANCE. Tile floors, 196 sq. ft., including the elevator, at Lake Chicot Visitor Center, shall be stripped, waxed, and buffed as necessary in order to maintain a clear and durable protective finish. This work shall be accomplished during non-office hours as coordinated with the COR. Carpeted floors, approximately 804 sq. ft. at Lake Chicot Visitor Center, shall be shampooed as necessary to remove stains and to provide deep cleaning. Interim cleanings, no more than four per year may be requested by the COR to accommodate special events.
1.1.9. FURNITURE, PICTURES, INTERPRETIVE DISPLAYS, WALL MAPS,
AND OFFICE EQUIPMENT CLEANING. Furniture, pictures, interpretive displays, wall maps, and office equipment shall be dusted to remove all dirt and dust. This operation shall not disturb work papers, and shall be accomplished using a dusting agent that does not harm the surfaces or cause wax build-up. Glass desk and table tops shall be cleaned with an ammoniated glass cleaner.
1.1.10. WINDOW CLEANING. Windows, window shades/blinds, and
screens shall be cleaned to remove all smudges, fingerprints, dirt, dust, cobwebs, insects, insect nests, and other foreign material. All interior and exterior glass surfaces shall be cleaned with an ammoniated glass cleaner to remove all finger prints, smudges, streaks, dirt and other foreign material.
However, ammoniated glass cleaner shall not be used on Plexiglas surfaces.
1.1.11. WALLS AND DOOR CLEANING. All walls and doors shall be inspected and cleaned, as necessary, to remove all finger-prints, smudges, dirt, and other foreign material.
1.1.12. CORNERS, CREVICES, MOLDINGS, LEDGES, BASE BOARDS,
SWITCH PLATES, RECEPTACLE PLATES, STAIRWELL, AND LIGHT FIXTURES.
The Contractor shall inspect all corners, crevices, moldings, ledges, base boards, switch plates, receptacle plates, stairwell, and light fixtures and keep these areas and items free of dirt, dust, insect and spider nests, dead insects, mold, mildew, fingerprints, smudges and other foreign material.
1.1.13. WATER SUPPLY. Inasmuch as water is essential to the
cleaning operations specified herein, the Contractor shall provide a portable, pressurized water supply, if needed, with a single tank capacity of not less than twenty (20) gallons to affect the cleaning of those facilities which do not have pressurized water available, i.e., in the event that a pressurized water source is inoperative. Where pressurized water is available, the Contractor may utilize this supply for cleaning, provided that care is exercised to not be wasteful in its use.
1.2. EXTERIOR TRASH RECEPTACLE INSPECTION AND CLEANING
SERVICES. The Contractor shall inspect each exterior trash receptacle and perform necessary emptying and cleaning to keep these receptacles free of all trash and any material adhering to the receptacles and their tops. If a plastic trash receptacle insert (bag) is either torn, soiled, or missing, then it shall be replaced. Any receptacle that is either soiled internally or externally shall be washed and disinfected. Also, where nuisance insects are noticed, i.e., flies or yellow jacket wasps, then the containers shall be sprayed with insecticide furnished by the Contractor and approved by the COR. Insecticide shall be applied in accordance with manufacturer's label instructions for the application. The Contractor shall also remove any overflow or excess trash deposited around any trash receptacle. All trash and debris collected by the Contractor shall be disposed of in accordance with paragraph entitled “Solid Waste Disposal” of the contract.
1.3. GROUNDS INSPECTION AND LITTER PICKUP AND DISPOSAL
SERVICES. The Contractor shall inspect all grounds, roads, boat ramps, sidewalks, steps, and parking areas. These areas shall be free of all trash, paper, cans, pop top tabs, cigarette butts, bottles, wire, rope, string, dead animals and fish; fallen trees and fallen limbs not exceeding 6 inches in diameter, and all other foreign materials deposited thereon. All litter and debris collected by the Contractor shall be disposed of in accordance with paragraph entitled “Solid Waste Disposal” of the contract.
Additional information is listed for the Contractor’s use:
1.3.1. For road and parking area rights-of-way, litter removal shall be completed weekly with the result that no litter shall be left in the rights-of-way, irrespective of litter's distance or visibility from the roadway. The areas to be cleaned under this requirement shall be designated by the COR.
1.3.2. All maintained grounds, roadways, parking areas, roofs, and other public facilities shall be inspected for the presence of fallen trees and fallen limbs weekly. All fallen trees and tree limbs not exceeding 6 inches in diameter shall be removed when found. All fallen trees and fallen limbs exceeding this diameter shall be reported to the COR. The Contractor shall dispose of all limbs and trees in accordance with paragraph entitled “Solid Waste Disposal” of the contract.
1.4. MOWING, TRIMMING, AND PLANT BED MAINTENANCE.
1.4.1. PUBLIC USE AREA & ACCESS ROAD RIGHT-OF-WAY MOWING AND
TRIMMING. The Contractor shall perform mowing and trimming operations for LCPP. All grass, weeds, vines, and other vegetation shall be mowed or trimmed not less than 2.5 inches to maintain an average height not to exceed 5 inches, except in September and October, when this average height shall not exceed 6 inches. The approximate acreage and general description for mowing and trimming this area is shown in Exhibit B. The specific locations for mowing or trimming within this area shall be provided by the COR. This is a performance based contract, and therefore, mowing and trimming services are to be accomplished as needed for compliance with contract specifications. Contractors are encouraged to develop schedules that will minimize cost and provide contract proficiency. The minimum time spacing will be developed by the contractor for mowing and trimming services.
In the event that rainfall, high water, or other circumstances cause a delay in the performance of mowing and trimming in any area which subsequently results in mowing services being delayed, the Government is obligated to pay for only those accepted services meeting Acceptable Quality Levels (AQL) successfully completed during the billing period.
1.4.2. MOWING & TRIMMING PERFORMANCE STANDARDS AND OPERATIONAL
LIMITATIONS. The following performance standards are supplied for the Contractor’s use for mowing and trimming operations:
1.4.3. Mowing and trimming in a given area should be conducted concurrently so as to help maintain uniform grass height and aesthetic appearance.
1.4.4. Mowing or trimming operations may be conducted at Lake Chicot Pumping Plant Monday through Friday during daylight hours and on Saturdays, Sundays and Federal Holidays with advanced approval by the COR .
1.4.5. Mowing and trimming operations should be conducted in a prudent manner to protect the grass sod, project features, equipment, buildings, trees, shrubbery, and ground cover, and also to insure the safety of all persons and equipment around the mowing operations. Relatedly, the Contractor shall not allow the alignment or facing of any mower discharge in the general direction of buildings, vehicles, or persons within the potential range of objects which might be thrown from the mower. All mowers shall be equipped with deflector shields at the clipping discharge points to help alleviate the safety problem associated with thrown objects. However, the use of these shields shall not relieve the Contractor of any other requirements contained in this contract, including liability.
1.4.6. Mower blades shall be kept sharp to help assure clean
cutting and minimize grass foliage breakage and bruising as evidenced by the browning of the grass turf following mowing operations.
1.4.7. Prior to mowing in any area, the Contractor shall
inspect the area to be mowed, and remove all objects, fallen limbs up to 6 inches in diameter, and litter which could be scattered by or thrown from the mower during the operation. The Contractor shall not avoid the removal of any of this material by mowing around it. Should any litter or objects be inadvertently scattered by the mowing operation, the Contractor shall immediately retrieve and dispose of this material. All material collected by this operation shall be disposed of in accordance with paragraph entitled “Materials Hauling” of the contract.
1.4.8. The Contractor shall mow and trim to a uniform height so as to maintain an aesthetic appearance of the grounds.
1.4.9. In conducting mowing operations, the Contractor shall
not cause any rutting or sod damage. The Contractor is not relieved of any requirements for mowing and trimming in soft and damp areas unless all mowing procedures and/or equipment cannot be adjusted to prevent rutting or sod damage.
1.4.10. The Contractor shall utilize trimming methods, i.e., the use of sickles, sling blades, and mechanical trimmers and edger’s within those locations where the use of mowing equipment potentially endangers persons, property, or natural resources.
Such locations include, but are not necessarily limited to, the perimeters of buildings, posts, trees, shrubs, ground cover, sidewalks, curbs, parking blocks, telephone poles, guard rails, rip rap areas, recreational equipment, signs, piezometer markers, ditches, drains, and culvert headwalls. The Contractor shall exercise special care in trimming so as to avoid damage to the above items.
1.4.11. The COR may direct the Contractor to selectively not mow or trim certain areas containing vegetation which has aesthetic value, i.e., wildflowers at certain times of the year.
1.4.12 The Contractor may apply herbicide, in lieu of trimming, around non-living objects with prior written approval of the type, mixture, location, and method of application by the COR.
The Contractor shall provide herbicide at his/her own expense.
Prior to commencing any herbicide application, the Contractor shall submit copies of certifications and licenses indicating that all herbicide applicators proposed for use on the job are qualified and licensed in accordance with State of Louisiana, State of Arkansas and/or Federal requirements.
1.4.13. In the event that any mowing or trimming operation
results in the production of piles of clippings or other deposits of cut vegetation which, in the COR's opinion, may result in damage to the grass sod if left in place, then the COR may direct the Contractor to remove and dispose of such piles or deposits.
All clipping removal shall be at the expense of the Contractor.
1.4.14. Upon completion of mowing and trimming in any area, all grass clippings and debris deposited on sidewalks and paved surfaces by the operation shall be removed by sweeping or blowing.
1.4.15 MOWING OF PRECIPITOUS SLOPES. The Contractor shall be
aware of the hazard presented by steep and/or slippery slopes.
In these areas conventional mowing methods and equipment may be dangerous due to overturning and sliding hazards. Accordingly, the Contractor shall employ specialized mowing procedures to avoid the hazard in these areas. Also, the Contractor shall exercise extra caution under these circumstances so as to minimize the hazard and prevent damage to sod.
1.4.16 WEED AND GRASS REMOVAL FROM PAVED SURFACES. In
conjunction with each scheduled mowing and trimming operation, the Contractor shall kill (by the application of an approved herbicide) all weeds and grass growing in cracks and expansion joints in paved surfaces. The use of herbicides shall be in accordance with requirements contained in paragraph entitled “Mowing & Trimming Performance Standards and Operational Limitations”.
1.5. MATERIALS HAULING. All materials hauling conducted by the Contractor in the performance of work under this contract shall include the use of appropriate methods to prevent any material, including solid waste, from falling or blowing out of the transporting equipment. Also, the Contractor shall be responsible for the recovery of all materials which fall or blow out, regardless of the location. All hauling equipment or containers shall be sealed to prevent the drainage or leakage of liquids there from. All liquids which accumulate in these vehicles and containers shall be disposed of in accordance with paragraph entitled “Liquid Disposal”.
1.6. SOLID WASTE DISPOSAL. For the purpose of this contract, solid waste is defined as all solid materials, trash, or other debris which is either generated or accumulated by the Contractor in the performance of this contract. The Contractor shall haul and dispose of all solid waste which he/she generated or collected in the performance of this contract to an off-project location which is approved both by the COR, and by the applicable State and/or local governmental agencies having jurisdiction over hauling and solid waste disposal operations. The Contractor shall assume all costs associated with solid waste disposal. If the Contractor utilizes any landfill which is owned or leased by a non-public entity, the Contractor must provide written evidence to the COR of appropriate State approval of the landfill prior to beginning work under this contract. If the Contractor utilizes any publicly-owned and State-approved landfill, then he/she shall present written evidence to the COR that he/she has the owner's approval to use such landfill prior to beginning work under this contract. All trash, litter, and other solid waste material collected by the Contractor under the terms of this contract becomes the property of the Contractor at the time it is removed from its point of origin. The point of origin is defined as the definitive point where the Contractor picks the solid waste material up, and not the general location of a recreation area or a project. Additionally, the Contractor shall not store or accumulate any solid waste within the Corps of Engineers' property boundaries without COR approval.
1.7. LIQUID DISPOSAL. The Contractor shall dispose of all
excess or residual water and mixtures of water, and non-volatile cleaning agents used for cleaning purposes or generated by cleaning processes, either at on-project locations approved by the COR, or at off-project locations approved by the State and local government agencies having jurisdiction over the disposal of such material. The Contractor shall dispose of all other liquids including, but not limited to, chemical cleaning agents, pesticides, and herbicides, as well as their containers, in a manner and at off-project locations approved by State or local government agencies having jurisdiction over such matters. Upon request by the COR, the Contractor shall provide written evidence to the COR of State and local approval of these activities.
1.8. PROHIBITED METHODS AND EQUIPMENT: The Contractor shall not use any cleaning, mowing, or trimming methods, equipment, or agents which endanger his own employees or other persons in the area, or which generate noise levels which, in the COR's determination, are disruptive to public use and/or public enjoyment of an area or its facilities. The COR may require the Contractor to discontinue the use of unsafe or noisy devices, methods, or agents at any time during the period of this contract. Also, specific devices and methods included in this prohibition are listed as follows:
1.8.1. The use of any type of wheeled or hand-held blower for grill cleaning. Specifically included are devices commonly referred to as leaf or back-pack blowers. However, such devices may be used for the collection and removal of litter and grass clippings.
1.8.2. Mowing with the wing of a bat-wing bush hog mower in
the raised position.
1.8.3. Driving any equipment, excluding mowing equipment, off of designated road or parking area surfaces without prior approval of COR.
1.8.4. Using bush hog, belly-type, or hustler-type mowers for mowing within a 3-foot distance from any tree, shrub, post, building, or other man-made objects.
1.8.5. The deposit of any cleaning agent, petroleum product, chemical, or wash water onto project grounds, sidewalks, or other areas or facilities. See paragraph entitled “Liquid Disposal” for liquid disposal requirements.
1.9. OPTIONAL SPRAYING OF RIP-RAP AREAS. The spraying of rip-rap areas is an optional award item and the decision to award this will be at the discretion of the government. The Contractor, if and when directed by the COR, will spray rip-rap areas for control of unwanted vegetation with an Environmental Protection Agency (EPA) and Vicksburg District approved herbicide for use around water surfaces in accordance with all label directions and all applicable state and federal laws. Herbicide must be uniformly applied over the treatment areas. Applicator shall protect, preserve, and maintain the land, waters, and non-target vegetative resources within the designated treatment areas. Applicator will provide proof of current state certified commercial applicators license for the categories of "right-of-way" and "aquatic" applications prior to commencing work.
Applicator will complete and submit to the COR a spill prevention plan (Exhibit L) prior to commencement of work. Applicator will complete the post application herbicide treatment documentation form (Exhibit K) upon completion of work. All unused product and chemical containers shall be removed from project lands and disposed of in accordance with label directions, and pesticide application warning signage shall be posted during spraying.
Some areas will necessitate the use of a Jon boat for spraying.
The minimum rating for the Jon boat shall be a four (4) person capacity (regardless of the number of occupants actually in the boat during spraying) with a weight of no less than 750 pounds, with an overall minimum rating of no less than 1,200 pounds which includes the weight of persons, equipment, and motor. The boat motor will not exceed the maximum horsepower as specified by the Boating Industries Association plate affixed to the boat. The boat shall be rigged with the following safety equipment (regardless of the number of occupants in the boat during spraying): one (1) fire extinguisher with a minimum rating of 1A-10BC, one (1) paddle or oar, one (1) first aid kit, one (1) twenty (20) inch diameter ring buoy with ninety (90) feet of 3/8 inch line attached, four (4) personal flotation devices, one (1) signaling device, adequate mooring lines in good condition, and one (1) bilge pump or bailer. The boat shall not be approved for night operations. Additionally, this boat shall meet all requirements of current EM-385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. Rip-rap areas to be sprayed are designated in Exhibit B.
1.10. TREATMENT OF FIRE ANT MOUNDS. The Contractor will treat LCPP for control of fire ants with an approved pesticide, by broadcast application, during the period 1-15 March of each year.
Areas to be treated will be the same areas, acreage, and descriptions to be mowed as found in Exhibit B. Pesticide shall be uniformly applied in accordance with label instructions.
Applicator will complete the post-application pesticide treatment documentation form (Exhibit K) upon completion of work. All unused product and pesticide containers shall be removed from project lands and disposed of in accordance with label directions.
1.11 OCCASIONAL MOWING AND TRIMMING OF CLOSURE DAMS. The
contractor shall perform mowing and trimming operations at the Ditch Bayou and Connerly Bayou Closure Dams; and in accordance with the requirements under paragraph entitled “Mowing Trimming, and Plant Bed Maintenance”. These areas shall be mowed and trimmed once per month in the following months; May, July, and October or as directed by the COR. Also, all scheduled mowing and trimming operations in these areas shall be approved in advance by the COR.
2.0. PERFORMANCE STANDARDS. The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Upon notification of ‘Not Met(s)’, via Inspection Reports or by the COR, the Contractor has 24 hours or less for correction pending requirements of the area(s).
Performance Objective PWS Sect
Performance Threshold Deductions
Litter Pick-Up Services.
Litter and trash is removed from all grounds in public use areas, access and circulation roads, and their rights-of-way, parking areas, planters, plant beds, shoreline areas (including those surfaced with riprap) and earthen dams. Roadways and parking areas rights-of-ways shall be cleaned with no visible litter or trash. Contractor has hauled and disposed of all litter, trash, and solid waste which he/she has generated, removed or collected in the performance of this contract to an off-project location approved by the COR.
1.2.
Not to exceed 2 customer/public complaints per month and/or Not to exceed a total of 2 ‘not mets’ from the total inspections performed per month. (for ex: 3 ‘not met’ on 2 reports = deduction)
3-4 ‘not mets’ = %5 5-6 ‘not mets’ = %10 7 ‘not mets’ = %15 8 or more ‘not mets’ will be pro-rated at a percentage rate.
The deduction percentages will be applied to the total monthly bid amount for this item.
Cleaning & Janitorial Services.
Restrooms, water fountains, benches, surfaces, exterior-interior trash receptacles, overlook patios, pedestrian walkways, steps and related sidewalks are clean and free of all foreign matter such as cobwebs, insect nests, dead insects, dead animals, feces, fish, dust, stains, growths, and all other foreign matter.
Supply restrooms with approved supplies/materials.
1.1.
complaints per month and/or Not to exceed a total of 2 ‘not mets’ from the total inspections performed per month. (for ex: 3 ‘not met’ on 2 reports = deduction)
3-4 ‘not mets’ = %5 5-6 ‘not mets’ = %10 7 ‘not mets’ = %15 8 or more ‘not mets’ will be pro-rated at a percentage rate.
The deduction percentages will be applied to the total monthly bid amount for this item.
Mowing, Trimming, Edging Services.
All litter and other debris has been removed from the area prior to mowing. Site is cut in its entirety and all grass within an area is cut uniformly and after mowing operations, with no scalping or high spots.
No damage to sod from tractors or large piles of grass clippings. All areas adjacent to project facilities and features including riprap areas, buildings, signposts, and other manmade features are completely and uniformly trimmed. Areas along the edges of concrete slabs, buildings, and other improved surfaces have been completely edged. All grass growing through surfaces such as asphalt parking areas and expansion joints has been either cut or sprayed with an approved herbicide. Sidewalks and other improved surfaces are free of any debris. All grass and unwanted vegetation have been completely removed from plant beds and landscaped areas.
1.4.
complaints per month and/or Not to exceed a total of 2 ‘not mets’ from the total inspections performed per month.
(for ex: 3 ‘not met’ on 2 reports = deduction)
3-4 ‘not mets’ = %5 5-6 ‘not mets’ = %10 7 ‘not mets’ = %15 8 or more ‘not mets’ will be pro-rated at a percentage rate.
The deduction percentages will be applied to the total monthly bid amount for this item.
Spraying Rip-Rap Services.
Perform services for control of unwanted vegetation and ensure performance is complete.
1.9.
Not to exceed 1 customer/public complaints per service and/or Not to exceed a total of 1 ‘not mets’ from the total inspection performed.
(for ex: 1 ‘not met’ on 1 reports
1 - ‘not met’ = %100
The deduction percentages will be applied to the total monthly bid amount for this item.
Fire Ant Treatment Services.
Perform services for Fire Ant Treatment using the broadcast method and ensure performance is complete.
1.10.
Not to exceed a total of 1 ‘not mets’ from the total inspection performed.
amount for this item.
Occasional Mowing & Trimming of Closure Dams Same as “Mowing, Trimming, Edging Services” as noted above.
1.11.
Not to exceed a total of 1 ‘not mets’ from the total inspection performed.
amount for this item.
3. INSPECTION AND ACCEPTANCE
3.1. GENERAL: Reference Contract Clause 52.212-4(a). The
inspection and acceptance procedures specified herein set forth a general policy that only the services performed by the Contractor in strict accordance with the contract requirements will merit payment. This policy will be implemented through close Government inspection of the services performed and acceptance or rejection of the services by the Government. However, neither the presence nor absence of Government inspection shall relieve the contractor from any requirements of contract.
3.2. INSPECTION REPORT FORM: Exhibit E is the inspection
report form to be used by the Government in advising the Contractor of performance deficiencies.
3.3. CONTRACTOR'S CHECKLIST: Exhibit M is the contractor's
inspection report form to be submitted to the COR within three days following each mowing cycle.
3.4. QUALITY ASSURANCE SURVEILLANCE: The Government will
monitor and inspect the Contractor’s performance using any reasonable inspection method. The Government will record all surveillance observations. The Government may inspect services provided by the Contractor both during and/or after performance is complete. When an observation indicates defective performance, the COR may request the Superintendent or Contractor’s Representative to initial the observation. The Government may use a combination of unscheduled, 100%, random and/or planned inspection(s).
The COR will inform the Contractor how the Government intends to inspect the contract and who is in charge of Quality Assurance.
The COR will appoint authorized representative(s), Quality Assurance Inspector (QAI), to perform quality assurance inspections. The QAI will keep a daily log of all communications with the Contractor and/or Contractor Superintendent(s) or Representative(s). The Contractor and the QAI shall coordinate work schedules and inspections to best evaluate Contractor performance
3.4.1. QUALITY ASSURANCE SURVEILLANCE PLAN:
Reference Contract Clause 52.212-4(a), Inspection/Acceptance.
The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights---
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
The inspection and acceptance procedures specified within this contract set forth a general policy that only the services performed by the Contractor in strict accordance with the PWS will merit payment. The Government will inspect and monitor the Contractor’s performance by appointing a representative(s), Quality Assurance Inspector (QAI), to monitor performance to ensure services are received under this contract. The Government representative will evaluate the Contractor’s performance through close on-site inspections and receipt of complaints from the public. The Government will also receive and investigate complaints from the public. The COR shall be responsible for initially validating customer complaints and shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s).
This plan is provided for information purposes only. This Quality Assurance Surveillance Plan is not part of the Request for Proposal (or Invitation for Bid) nor will it be made part of any resulting contract. The Government has the right to change or modify inspection methods at its discretion.
3.5. EFFECT OF UNSATISFACTORY PERFORMANCE ON CONTRACT PAYMENTS:
If performance of any required service is determined to be unsatisfactory, and that performance is the result of actions (or lack of action) by the Contractor, the Government may reduce the payments for such performance to reflect the reduced value of the services performed in accordance with Paragraphs 6.2.3 or 6.2.4 of this contract.
3.6. COMMUNICATIONS WITH CONTRACTING OFFICER'S REPRESENTATIVE
(COR) OR ALTERNATE COR: The Contractor will make verbal contact with the COR or alternate COR after 1615 and prior to 1630 every Monday and Friday to discuss contract performance.
3.7. SAFETY INSPECTION: All of the Contractor's activities
conducted within the project boundaries as well as his/her equipment and facilities maintained or operated within the project boundaries, are subject to inspection by the Government for compliance with the safety provisions of this contract. Any violation of these provisions shall be promptly corrected by the Contractor and any Contractor equipment which is not in compliance shall be immediately removed from service until the problem is corrected. The Contracting Officer, his/her authorized representative, and his/her alternate each have on-site authority to totally or partially suspend any of the Contractor's operation due to unsafe conditions. In the event that the unsafe conditions were either caused by the Contractor or were allowed to arise or exist by the Contractor, any work stoppages will be the responsibility of the Contractor and no requirements of this contract will be waived. If work is not completed per entirety due to suspended unsafe operations, a non-compliance report will be issued.
3.8. REQUIRED PRESENCE OF CONTRACTOR'S CHIEF EXECUTIVE
OFFICER/OWNER DURING INSPECTION: Upon verbal, written, or email request by the Contracting Officer or his/her authorized representative, the Chief Executive Officer/Owner of the Contractor shall be present at specified inspections for the purpose of alleviating any misunderstanding concerning the contract requirements or illustrating performance deficiencies.
3.9. GOVERNMENT POSITION ON AVAILABLE OPTIONS IN HANDLING
DEFICIENT WORK: The Contractor shall be aware that the Government has several unilateral options available in handling deficient contractor work as provided in the Contract Clause 52.212-4(a). These options are listed below:
a. Require the Contractor to perform the services again.
b. Require the Contractor to take necessary action to insure that future performance meets the contract requirements.
c. No payment will be made for services performed that failed to meet AQL performance thresholds.
If the Contractor subsequently fails to promptly perform the services again (if option a. is selected by the Government), or if the Contractor fails to take the necessary action to insure that future performance meets the contract requirements, then the Government may either perform the services and charge the Contractor for any and all related and other cost related to paragraph: 3.10.1. or terminate the contract for default.
The Contractor shall be advised that, absent an accompanying notation on the inspection form of the Government's election of option a, the identification of performance deficiencies on the inspection report form automatically constitutes the notification to the Contractor of the Government's election of option b.
Subsequently, in the event that future performance of the same type of work by the Contractor does not meet the contract requirements, no further notices or communications are owed to the Contractor prior to the Government electing to perform the services and charge the Contractor for any and all related costs.
The Contractor shall also be advised that the Government has determined that the re-performance of deficient work (option a) is not normally practical under the circumstances of this contract. Basically, work can not be rescheduled without creating prohibitive administrative expenses to the Government such as those for after-hours inspection. Also, rescheduling tends to adversely impact follow-on work schedules.
3.10. PAYMENT ADJUSTMENTS ASSOCIATED WITH DEFICIENCY CORRECTION:
In the event that the Government corrected Contractor performance deficiencies, and the Contracting Officer advised the Contractor of this action in accordance with Contract Clause 52.212-4(a) entitled Inspection/Acceptance, the Government may charge the Contractor for the related costs; 3.10.1. In this instance, the Contractor shall include the cost of the deficient work in the invoice, and the Government will deduct from the invoice amount the total related cost of deficiency corrections. The actual Government costs for correcting deficiencies may be affected by available resources, time of performance, travel distance, number of deficiencies corrected by a single crew, and the extent of the deficiencies. Also, corrective work performed may include only certain aspects of the requirements of this contract and exclude other aspects due to limited resources to perform such work. See
3.10.1. for further guidance.
3.10.1. PAYMENT DEDUCTION CLAUSE: In the event that work is
found unsatisfactory and not re-performed by anyone, or work not performed at all:
20% of service value lost for administrative costs plus cost of service value lost.
If the Government had to use an additional contractor to complete the work, then 20% of service value lost for administrative costs plus the contract price for the additional contractor.
If the Government performed/re-performed to complete the work, then 20% of service value lost for administrative costs plus the contract price for the additional contractor.
3.10.2. FAILURE TO PROVIDE SUPERINTENDENT (S) AND MEET
ADMINISTRATIVE REQUIREMENTS OR PROVIDE SERVICES: Should the Contractor fail to provide an on-site Superintendent or fail to meet the administrative requirements or provide the services of this contract, the Government may make deductions from the payment due the Contractor.
3.10.3. DEDUCTION SCHEDULE: These deductions may be made from payment due the Contractor by the Government should the Contractor fail to provide a Superintendent(s) and/or meet the administrative and performance requirements or provide the services of this contract:
FAILURE TO: DEDUCTION
Produce acceptable level of uniform mowed and trimmed areas – performed areas
$150.00/day/area
Provide authorized Superintendent(s) on-site and available when work is in progress
$100.00/day
Provide proper equipment $100.00/day Attend performance evaluation meeting $50.00/day Submit quality control reports within allowable time-frame – 24 hours
$50.00/day
Have and provide for inspection a copy of current contract in possession while on project lands.
$50.00/day
Maintain mobile cellular phone service in Superintendent(s) vehicle
$50.00/day Per Supt.
Submit accident, incident, and damage reports within allowable time-frame-24 hrs.
$25.00/day
Maintain required Federal, State, and local licenses and permits
$25.00/day
Respond to deficiency reports within allowable time-frame – 24 hours.
$25.00/day
Submit accurate pay invoice $25.00/invoice Submit required contract submittals $25.00/day Have and provide for inspection a copy of the…