Amendment_8__17R0071_2JUL18.pdf

PDF 636 KB Posted

Attached to
HPCMP Program Administrative Support Services (H-PASS) Federal contract opportunity
Solicitation number
W912DY17R0071
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

Amendment 0008 address NTE values

View the file

Other files for this federal contract opportunity

Other files attached to HPCMP Program Administrative Support Services (H-PASS), newest first.
File Type Posted
Conformed_Solicitation_W912DY17R0071.pdf PDF
Price_Model_Worksheet_R2_(1).xlsx XLSX spreadsheet
Amendment_7_Conformed_Copy.pdf PDF
Amendment_7_Modification_Copy.pdf PDF
Amendment_0007_17R0071_27JUN18.pdf PDF
Price_Model_Worksheet_R2.xlsx XLSX spreadsheet
Conformed_Solicitation_W912DY17R0071.pdf PDF
Amendment_0006_17R0071_22_JUN_18.pdf PDF
Price_Model_Worksheet_R1.xlsx XLSX spreadsheet
Amendment_5.pdf PDF
H-Pass_Amendment_4.pdf PDF
H-Pass_Amendment_4_conformed_copy.pdf PDF
amendment_3.pdf PDF
amendment_3_conformed_copy.pdf PDF
ATTACHMENT_-_Past_Performance_Questionnaire.doc DOC document
DD254_(HISS)_-_ERDC_concurred_version.pdf PDF
HPASS_revision_2_pricing_sheet_6_4.xlsx XLSX spreadsheet
amendment_2.pdf PDF
Amendment_01_17R0071_53018.pdf PDF
conformed_copy_17R0071_53018.pdf PDF
projnet_05.30.18.pdf PDF
HPASS_revision_2_pricing_sheet_6_4.xlsx XLSX spreadsheet
amendment_2.pdf PDF
DD254_(HISS)_-_ERDC_concurred_version.pdf PDF
projnet_05.30.18.pdf PDF
Amendment_01_17R0071_53018.pdf PDF
conformed_copy_17R0071_53018.pdf PDF
HPASS_price_analysis_sheet_for_soliciation_5_24.xlsx XLSX spreadsheet
WD_15_Montgomery_county_MD.docx DOCX document
W912DY17R0071_HPASS_solicitation_17_May_18_KO.pdf PDF
WD_15_Charles_county_MD_and_Fairfax_county_VA.docx DOCX document
DD254_(HISS)_-_ERDC_concurred_version.pdf PDF
WD_15_Warren_county_MS.docx DOCX document
Price_Worksheet_15_May_18.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to: (1) amend CLIN 0032, 1032, 2032, 3032, 4032, 5032 NTE values to match pricing w orksheet R2; (2) correct the solicitation closing date in SECTION A to match the actual closing date; (3) add CEHNC-HPASS@usace.army.mil as the email for submitting PPQs. No additional changes apply.

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DY17R0071

X 9B. DATED (SEE ITEM 11)

17-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jul-2018

CODE

US ARMY ENGINEERING & SUPPORT CENTER

HUNTSVILLE ENGINEERING & SUPPORT CENTER

P.O. BOX 1600

HUNTSVILLE AL 35807-4301

W912DY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

x 1

W912DY17R0071

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0032

The CLIN extended description has changed from:

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $32,376.00

To:

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $12,376

CLIN 1032

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $34,347.70

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $12,747.28

CLIN 2032

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $34,347.70

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $13,129.70

CLIN 3032

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $35,378.13

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $13523.59

CLIN 4032

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $36,394.47

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $13,929.30

CLIN 5032

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $18,766.33

All Materials and Other Direct Costs in support of the High Performance Computing Modernization Program - Security in accordance with the Performance Work Statement, shall be funded individually as SubCLINs with the appropriate accounting classifications. There is a potential fluctuation of 20% for each year and administrative costs are to be captured in the labor CLINS only. Funding for this CLIN may be done incrementally at the discretion of the Government. NTE $7173.59

The following have been modified:

EXECUTIVE SUMMARY

**PREVIOUS PAGES OMITTED INTENTIONALLY

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

This is a Request for Proposal (RFP), W912DY-17-R-0071

Point of Contact: Rachel Sanders Rachel.S.Sanders@usace.army.mil (256) 895-1547

Issued by: USACE Huntsville Center

4820 University Sq

Huntsville, AL 35816

A.1 Objective. The High Performance Computing Modernization Program (HPCMP) Office requires skilled business management and administrative support to provide the Program Office with the resources necessary to execute mission. The contractor shall supply the business management and operational resources necessary for efficient and effective administration, operations, and control of all duties as required by the Performance Work Statement (PWS).

These duties include: Records management and file maintenance, including protection of sensitive information; Database maintenance and management; HPC systems data analysis, requirements gathering and support; Maintain HPCMP access control points to ensure authorized entry for all employees and visitors, and Program Office Budgeting and Accounting.

Funding is subject to the Availability of Funds (Federal Acquisition Regulations (FAR) 52.232- 18 and Limitation of Government’s Obligation Department of Defense Federal Acquisition Regulations (DFARS) 252.232-7007).

A.2 The contract type and outcome(s) to be satisfied:

a. This Commercial, Firm-Fixed Price (FFP) contract with travel, materials, and ODCs, will provide up to five years of administrative support for HPCMP in all phases of planning and execution of its mission, including administrative support, business and financial analysis, and logistical support.

b. This contract has been determined to be 100% service therefore the Service Contract Labor Standards (formerly known as Service Contract Act) apply. The Service Contract Labor Standards Requirement for this effort is Wage Determination Numbers:

2015-5173, Revision 9, dated 01/10/2018 2015-4281, Revision 9, dated 01/10/2018 2015-4269, Revision 5, dated 01/10/2018

All three copies of applicable Wage Determinations are enclosed and can be located at:

http://www.wdol.gov/.”

c. 100% of this requirement is set-aide for 8(a) Small Business concerns, per FAR 19.5.

The North American Industry Classification System (NAICS) code for this acquisition is 541611, Administrative Management and General Management Consulting Services Estimated which has a Small Business Size Standard of $15M.

A.3 Contract Term. This Contract will have a 12 month base with four-12 month options, for an ordering period of five years. The government will evaluate the options at the time of award.

There is no guarantee the options will be exercised on the awarded contract and the period of performance shall be set at time of award. The government may extend the contract in accordance with (IAW) FAR 52.217-9, Option to Extend the Term of the Contract and FAR 52.217-8, Option to Extend Services (not to exceed six months). The evaluated rate of the last exercised option year remains the same during the six month extension.

A.4 All questions must be submitted in writing no later than Monday, 21 May 2018, 2:00 P.M Central Time (see Instructions to Offerors).

A.5 Proposal Due Date. Proposal submission shall arrive no later than Thursday, 5 July 2018, 02:00 P.M. Central Time and must be signed.

SECTION B

INSTRUCTIONS TO OFFERORS

SECTION L PROPOSAL SUBMISSION

Copies of the solicitation are available by INTERNET ACCESS ONLY. All solicitation and amendment documents will be posted to the FedBizOpps (FBO) website. It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in the solicitation.

The proposal shall be prepared clearly and concisely to demonstrate the Offeror has a complete understanding of the requirements. Offerors shall prepare proposals on the presumption that the Government has no previous knowledge of the Offeror’s capabilities. Proposals will be evaluated only on the information specifically presented in respective submittals, with the exception of the past performance evaluations. See FAR 52.212-1 for rules concerning submission of offers and late proposals. Proposals will be retained by the Government for official record purposes. When applicable, the Offeror should cross reference to the solicitation by annotating solicitation reference in parenthesis, (i.e. Sec C, para 4.0).

ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED. ELECTRONIC

SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL NOT BE ACCEPTED.

DIRECTIONS FOR SUBMITTING PROPOSALS

In an effort to reduce paperwork, reduce cost and streamline this acquisition, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format, with exception of labor rates sheets that shall be submitted in Excel format.

Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912DY17R0071_COMPANY NAME_ VOLUME I

W912DY17R0071_COMPANY NAME_ VOLUME II

W912DY17R0071_COMPANY NAME_ VOLUME III

SUBMIT PROPOSALS ELECTRONICALLY VIA CD AND THE AMRDEC SAFE

WEBSITE.

The CD proposal is to be submitted to:

U.S. Army Corps of Engineers, Huntsville Center ATTN: Ms. Rachel Sanders - CT PreAward 5021 Bradford Drive NW, Suite B Huntsville AL 35805

Hand carried submissions shall be dropped off at the aforementioned location for this acquisition. The mailroom entrance is located at the back of the building and is clearly marked from the outside. The mailroom personnel will receive the packages, date stamp, x-ray as appropriate and call the person identified on the package. The mailroom hours for proposal package deliveries are 0800-1500 Central Daylight Time, Monday-Friday, excluding federal holidays. Hand carried submissions must be date stamped by the mailroom personnel by the specified proposal due date and time.

At the AMRDEC SAFE website, https://safe.amrdec.army.mil/SAFE/Welcome.aspx, select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).

When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter e-mail addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer Kijafa.T.Johnson-Cooper@usace.army.mil; Contract Specialist Ms. Rachel Sanders at Rachel.S.Sanders@usace.army.mil.and CEHNC-HPASS@usace.army.mil.

After uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. Follow the instructions on the AMRDEC website and save the confirmation emails you receive from AMRDEC.

The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.

Proposal is due 5 July 2018 at 02:00 PM CST

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

Proposals submitted AMRDEC take precedence over the CD.

OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents shall be submitted no later than 2:00 PM CT, 21 May 2018, in order that they may be given adequate consideration or appropriate actions taken prior to receipt of offers. All questions and/or comments must be submitted via Bidder Inquiry.

BIDDER INQUIRY

Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is W912DY-17-R-0071 The Bidder Inquiry Key is JGVNU3-WJN7XH

The Bidder Inquiry System will be closed for new inquiries effective 2:00 PM CT, 21 May 2018, in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the solicitation in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center is available for help and is on U.S. Central Time Zone.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

SMALL BUSINESS SIZE STANDARD/NAICS CODE

a. The North American Industry Classification System (NAICS) code for this acquisition is 541611, Administrative Management and General Management Consulting Services

b. The small business size standard is less than $15M

c. It is the Offerors responsibility to ensure that its classification data on the System for Award Management (SAM) website is correct and current.

JOINT VENTURE /MENTOR-PROTÉGÉ PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the proposal cover page unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal in Volume III. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration.

If this is an 8(a), HUBZone, or Service-Disabled Veteran-Owned joint venture, the Offeror should ensure that it complies with the applicable requirements of 13 CFR Part 124, 13 CFR Part 125, and 13 CFR Part 126 respectively.

When proposing as part of a Mentor-Protégé Agreement, include a copy of the agreement and the Small Business Administration approval of the agreement in Volume III

PROPOSAL FORMAT

Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.

Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

Electronic Matter Submissions. Written material shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.

Number of Electronic Files. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I, Volume II, and Volume III. Offerors SHALL submit only three files in PDF format (i.e. Volume I, Volume II, and Volume III). These three files should be named in a specific format: Solicitation Number, Offerors Company and the volume (e.g.

W912DY17R0071_USACE_Volume I.pdf). Offerors shall propose rate and pricing information using the attachment EXCEL model. All EXCEL file cells must be visible and all calculations must be visible. Submission of the EXCEL pricing model to the Government shall not be in pdf format. Presentation and page limitations for the proposal shall be as follows:

Page Limitation Table of Contents 2

VOLUME I – Factor 1: Technical 50 pages comprised of the page limitations stated for each element

Element 1 – Technical and Management Approach

Element 2 – Technical Qualifications 20 Element 3 – Transition/Phase-In 10 VOLUME II – Factor 2: Past Performance See Below

Past Performance Questionnaires (PPQ’S) 2-5 PPQs

VOLUME III – Factor 3: Cost/Price No Limit

Each volume shall be clearly indexed and logically assembled and include the following:

Volume number on proposal cover.

Table of contents.

List of tables/figures.

RFP Number, complete company name, and date shall appear on each page (header or footer).

Volume number and page number shall appear in the bottom right corner of each page

(along with the proposal revision number for the amended page, if necessary).

PDF or compatible files shall use the following page setup parameters:

Margins – Top, Bottom, Left, Right - 1” Gutter – 0” From Edge – Header, Footer - 0.5” Page Size, – 8.5” x 10” Page Size spreadsheets, table, charts, etc. may be 11” x 17” but counts as 2 pages per side.

The following additional restrictions apply:

Each paragraph shall be separated by at least one blank line.

Font type: Times New Roman; font size: 10, font size for headers and footers may be increased to 14 or reduced to 10 Font size for spreadsheets, tables, charts, etc. may be reduced to font size 8.

The use of hyperlinks in proposals is prohibited.

Page Limitation – Only pages within the respective page limits as follows will be evaluated:

Volume I: Technical - 50 Pages Volume II: Past Performance – Minimum two (2) –maximum five (5) Projects within the past five (5) years using attached past performance questionnaire (PPQ).

Volume III: Cost/Price.

Proprietary information shall be clearly marked.

NOTE: The proposal cover, cover letter, glossaries or indices, title page; the list of tables/figures, acronyms, separator tabs, cross-reference to the solicitation paragraphs, past performance reference sheets, resumes, subcontractor commitment letters (if required), questionnaires and supporting past performance documents, and cost or pricing data in support of the price proposal, are excluded from the page limitation count. Pages that exceed the required page limitations will not be evaluated. Additional pages will be removed from back to front of the proposal, and will not be evaluated by the Government.

For proposal preparation purposes only, the total hours for this acquisition is estimated to be 345,600 (for five year period) when 69,120 hours are alloted for each year. The anticipated allocation of these hours among the PWS functional areas are as shown in Section 5.1 of the

PWS.

PROPOSAL CONTENT

Proposals must be responsive to and comply with the terms of the solicitation in order to be eligible to receive an award. The Government will reject any proposal determined to be materially non-responsive or that does not conform to the terms of the RFP. To be eligible to receive an award, proposals submitted in response to this RFP shall consist of the contents required in the sub-paragraphs described below:

VOLUME I – Factor 1 –TECHNICAL:

This volume will cover your Technical proposal to accomplish the tasks identified in the attached PWS. Your proposal must describe the technical capability of your organization to perform this requirement and accomplish the tasks for HPCMPO. Your proposal must address the following elements and show the correlation to your firm’s capability to meet the requirements of the PWS.

Evaluation Criteria: All elements within Factor1, Technical are not individually rated. Factor 1 will be evaluated based on the strengths, weaknesses and deficiencies of each offeror’s proposal as it relates to the combination of the elements. Any aspect of the offeror’s proposal which is unclear or inconsistent will be treated as an uncertainty, and not a deficiency. A material failure in the proposal is constituted as a deficiency, and will result in a proposal that is not awardable.

The Government evaluation team has been instructed to evaluate on the basis of the information provided in the proposal. The Government shall not assume that an offeror possesses any capability unless specified in the proposal.

Submission Requirement Element 1 – Technical and Management Approach (LIMIT 20 PAGES):

This volume will cover your Technical proposal to accomplish the tasks identified in the attached PWS. The Offeror’s proposal must describe the technical capability of your organization to perform this requirement and accomplish the tasks for HPCMPO. The proposal must address the following elements and show the correlation to your firm’s capability to meet the requirements of the PWS.

Technical Approach. The contractor will provide details of their technical approach to support each element of the contract as depicted in the PWS sections:

o 4.1 Program and Project Management Support o 4.2 Program Management Support o 4.3 Requirements Analysis, Data Analysis and Resource Allocation Management o 4.4 Business Analysis Support o 4.6 Security Support o 4.7 Administrative and Meeting Support.

Organizational Structure and Teaming/Subcontract Arrangements. Fully describe the structure of the proposed organization/team (including major subcontractors/team members) that will be utilized to accomplish the tasks identified in the PWS. The Government will also want to see how this proposed team fits into its overall corporate structure and the reporting and review relationship with corporate management. Delineate responsibilities (of the prime and subcontractors), management of key subcontractors, lines of authority, and spans of control as well, as how the offeror will control the flow of information and communications among team members, customers, CORs/COTRs, and the Contracting Officer. For any key subcontractors (defined as any subcontractor used to substitute or supplement the Offeror’s capabilities and experience or subcontract which equals 20% or more of the total cost of the prime contract or performing more than 10% of the work), provide a detailed description of all teaming/subcontracting arrangements. Any key subcontractor identified must complete the Letter of Commitment. Letters of Commitment do not count against the page limitation for this section.

Also, describe how the key subcontractors will be managed and how risk will be mitigated to ensure successful performance of the tasks detailed in the PWS. The discussion shall include the processes that will be employed to maintain privity of contract restrictions while, at the same time, efficiently conveying Government technical requirements to team members/subcontractors, implementing changes in technical direction, monitoring/measuring their performance, and ensuring that all task objectives are achieved. Discuss any unique organizational business practices or management of subcontractors that will be implemented to facilitate the successful execution of the HPCMP program.

Key Personnel. Identify the prime offeror and major subcontractor/team key personnel as described in the PWS, Section 1.5.2. For this submittal, the offeror shall provide the following information for key personnel:

o Name o Security Clearance and Date Granted o Education o Colleges Attended, Major, Dates Of Attendance, And Degree Attained and/or

Hours Completed o Special Training o Experience (In Reverse Chronological Order, List the Inclusive Dates, Employer, and a Brief Description of the Task Performed and Job Title.);

o Related Experience: (Specify The Experience That Meets Or Exceeds The

Minimum Qualifications Necessary To Perform the Requirement. Include The Relevant Data/Information that Establishes “Why” This Person is the Best Choice for HPCMP) o The Most Significant Managerial Accomplishment in the Last Five Years Related to this Effort;

o The Most Significant Technical Accomplishment In The Last Five Years Related to this Effort o The Most Significant Skill That Relates To The Proposed Effort o Planned Percentage of Time to this Effort o Date Of Availability o Letter of Commitment from Key Personnel

Discuss the qualifications of the overall Program Manager, specifically addressing his/her experience in managing programs similar to HPCMP in terms of technical and contractual complexity and magnitude. The discussion shall include the following information: Describe their qualifications (education and experience) as it relates to the functional area requirements of the PWS and demonstrate how these qualifications meet or exceed the applicable minimum qualifications established elsewhere in this solicitation.

Element 2 – Technical Qualification (LIMIT 20 PAGES):

The offeror shall provide a comprehensive description of each member’s significant capabilities and corporate experience relate to performing the PWS requirements and shall clearly delineate how team member strengths will be aligned to ensure accomplishment of all functional area requirements. Each description shall clearly delineate the correlation between the identified capability and corporate experience, and shall identify the specific PWS functional area requirement(s) to which the capability/experience applies. Descriptions of corporate experience shall clearly specify the following; (i) contract/task order number, (ii) title of effort, (iii) total potential dollar value; (iv) performance period; (v) contractor role (prime or subcontractor); and brief description of the effort. Any identified corporate experience performed within the past three years must be traceable to the information provided in Volume II, Past Performance.

Offeror’s shall further indicate whether each subcontractor/team member is considered “major”,as defined by this solicitation, and whether the subcontractor/team member will serve either in a “lead” or “support” role. Identify the planned level of support that each member will provide, in total and for each functional area requirement of the PWS, as indicated by a percentage of the Government’s total estimated labor hours for the total effort and for each functional area.This identification shall be presented in a summary matrix depicting the planned level of support by prime and subcontractor/team member. The planned level of support must be consistent with the allocation of labor hours in Volume III, Cost/Price

Element 3 – Transition/Phase-in (LIMIT 10 PAGES):

The transition/phase in submittal shall address the offeror’s approach to ramping up the program;

hiring or assigning personnel to fully staff the program shall be presented. The plan should address the Offeror’s approach to ensure a seamless transition with outgoing contractors on task order efforts requiring continued support under this acquisition. This transition plan shall include transition period length and key activities. A transition period of 30 calendar days is intended to provide an orderly transfer of support responsibilities from the incumbent contractor to the contractor selected for this effort.

All aspect of the transition planning phase should be addressed to include, but not limited to:

o How incoming contractor will be organized structurally during the transition period o What personnel specialties will be required during the transition period.

o What the incoming contractor identifies as their critical learning and action processes.

o Equipment, documentation, records and information technology systems the incoming contractor will need to coordinate with the incumbent during the transition period.

o Physical infrastructure.

o How the incoming contractor intends to comply with HPCMPO entrance/exit and information technology security procedures during the transition period.

o Schedule for transition and integration.

VOLUME II – FACTOR 2 PAST PERFORMANCE:

Evaluation Criteria: The Government will evaluate past performance of prime contractor or subcontractor . The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance.

Each prime contractor will be rated on its own performance or that of its predecessor, if relevant.

If the Government does not obtain past performance information and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance risk will be considered “unknown”.

Submission Requirement: Offerors shall submit a minimum of two (2) and maximum of five (5) client completed Past Performance Questionnaires - PPQs. In this volume, provide correct and current phone numbers and email addresses for the client point of contact that your firm distributed PPQs to. Completed Past Performance Questionnaires shall be submitted to the Government by the client. Clients shall provide the complete PPQ (ONLY) to Rachel Sanders via e-mail to rachel.s.sanders@usace.army.mil. and CEHNC-HPASS@usace.army.mil. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the solicitation closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s).

Past Performance is limited to projects that are relevant to the type of work being solicited and were performed within the last five (5) years prior to the RFP release date. For Federal Government projects, a complete project is one in which a final report has been accepted by the Government. For non-Federal Government projects, a completed project are ones in which there is no work remaining to be performed by the Offeror.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all

CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), and any other known sources not provided by the Offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror Volume III: Cost/Price.

The contractor is to complete the price worksheet provided by the government as an attachment.

FINANCIAL CAPABILITY ( inlcude in Volume III, Factor 3, Section II)

This information will be used to establish responsibility in accordance with FAR Part 9.1.

Financial capability audits are performed by DCAA when requested by the Contracting Officer.

DFARS 232.072 requires the Contracting Officer to make a determination of financial responsibility. The Contracting Officer may request financial information to the extent required to protect the Government’s interest (not to be submitted with initial proposal). DFARS 232.072-2(b) (1) thru (10) examples include :

1. Balance sheet and Income Statements for the current fiscal year and two recent fiscal years.

2. Summary history of the contractor and its principal managers, disclosing any previous insolvencies.

3. Statement of all affiliations disclosing material financial interests of the contractor, major financial interests in the contractor, material affiliations of owners, officers, directors, major stockholders.

4. Statement of all forms of compensation to each officer, manager, partner, joint venture, or proprietor.

TECHNICAL EXCEPTIONS AND DEVIATIONS (Include in Volume I, Factor 1- Technical, if required)

The Offeror shall identify and explain any exceptions and/or deviations from the requirements of the solicitation or conditional assumptions made with respect to the technical requirements of the solicitation in the technical proposal. Any explanation of exceptions and/or deviations taken must contain sufficient information and justification to permit evaluation. All benefits to the Government shall be explained for each exception taken. Such exceptions will not, of themselves, automatically cause a proposal to be deemed unacceptable; however, a large number of exceptions, or one or more significant exceptions that do not provide benefit to the Government, could result in the proposal being determined unacceptable.

SPECIAL CONTRACT REQUIREMENTS

Section H - Special Contract Requirements

H.1. INSURANCE REQUIREMENTS.

1.1 The Contractor shall maintain the following minimum insurance coverage throughout the performance period of this contract. The successful offeror(s) must present evidence of insurance coverage as describe below to the Contracting Officer prior to award.

1.2. Workers’ compensation and employer’s liability. Contractors are required to comply with applicable Federal and State workers’ compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a Contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers’ compensation to be written by private carriers.

1.3. Commercial General Liability. The Contractor shall maintain throughout the contract performance period bodily injury and property damage liability insurance written on the Commercial General Liability (CGL) Form of at least $3,000,000 per occurrence. The policy shall not have any exclusions relating to claims arising from “explosive” or asbestos exposure. If coverage for the explosive exposure is provided by a form other than the CGL form, a copy of that form shall be included with the Contractor’s submittal.

1.4. Automobile liability. The Contractor shall maintain throughout the contract performance period automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

1.5. Errors & Omissions Liability. $3,000,000 per claim and in the aggregate. This policy shall not exclude claims due to pollution.

1.6. Corporate Policies. The Contractor may use corporate policies to cover Workman's Compensation, Automobile, General Liability, and Errors & Omissions Liability insurance requirements specified in this Section H. If a contractor uses a corporate policy for this work, the aggregate limits that apply to the General Liability, Automobile Liability and Errors and Omissions Insurance should be $5,000,000.

1.7. Common Coverage Elements to the General Liability, Automobile Liability Policies.

Each policy shall provide for a separation of the insured’s for defense of claims. With the exception of non-payment of premium, the actions of the named insured will not affect the coverage provided to the Government under these policies.

H.2. ORGANIZATIONAL CONFLICTS OF INTEREST.

2.1. Disclosure. The Contractor shall provide a disclosure statement with its proposal, which concisely describes all relevant facts concerning any past or present organizational conflicts of interest relating to the work in the contract. In the same statement, the Contractor shall provide the information required in the following paragraph to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award, the Contracting Officer will make a decision whether to terminate or rescind the contract at that time.

2.2. Potential Conflicts of Interest. This request for proposals is open to any offeror to compete as a prime contractor, subcontractor or in any teaming arrangement. In order to avoid any organizational conflicts of interest, or even the appearance of any organizational conflicts of interest, any contractor performing environmental services work at the follow-on sites(s) under contract will need to avoid, neutralize, and/or mitigate -- prior to contract award – significant potential conflicts of interest that may prejudice effective competition. The contractor shall not withhold from the Government any information about site contamination collected as a result of contract performance, nor shall any such information be regarded as proprietary to the contractor, nor shall the contractor seek competitive advantage in regards to such information.

The Contracting Officer has determined that at a minimum contractors currently performing work on the identified sites(s) under contract must ensure that all data pertaining to contamination at the sites compiled by or in the possession of such contractors shall be made available to the Contracting Officer in a timely fashion.

H.3. FINES, PENALTIES, AND DAMAGES.

3.1 If required in the contract, the Contractor shall be solely liable for fines and/or penalties assessed by state regulators and/or other cognizant regulatory agencies for failure to comply with any requirements of this contract. "Compliance" shall include performance and completion of the work under each task as defined by the Performance Work Statement or work plan or other approved plan in accordance with all applicable requirements of law, the contract, and any other approved plans and documents, and within the specified time schedules established under this contract. Any amounts assessed against and paid directly by the Government and that are attributable to fines and penalties resulting from the Contractor’s performance or failure to perform will be deducted from the payment(s) to the contractor in accordance with FAR 32.6. If the fines or penalties are assessed against the Contractor, and if paid directly by the Contractor, the amounts would not be deducted from the payment(s) to the Contractor.

3.2. If required in the contract, the Contractor shall be solely liable for all indirect, special, punitive, and consequential damages attributable to any negligence or intentional acts on behalf of the Prime Contractor, its employees, or its Subcontractors and their employees.

3.3 If required in the contract, the Contractor shall be financially liable to the U.S. Government, the Department of Defense, its officers, agents, and employees for all claims, demands, suits, actions, liabilities, judgments, civil fines or penalties, criminal fines or penalties, costs and expenses as may arise out of the Contractor's failure to satisfy its contractual obligation for completion of the work as defined in Section C of this contract.

H.4. PROGRESS REPORTS.

4.1 In addition to reports/data as may be required under Section C of this contract for the purposes of tracking contract capacity/expenditures, the Contractor shall provide to the Contracting Officer and Contracting Officer Representative (COR) a consolidated monthly summary progress report for all currently active tasks. This report shall include detailed information about expended funds, summary of progress toward completion, and estimates to complete each active tasks.

H.5. EMPLOYMENT ELIGIBILITY VERIFICATION.

5.1 The Contractor shall comply, for the period of this contract, with the requirements of the Employment Verify Program as required by FAR 52.222-54. Information on registration for and use of the Employment Verify Program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/EVerify.

H.6. ORDER OF PREFERENCE FOR WORK EXECUTION.

6.1 On-going military operations at active installations shall take precedence over environmental services described under this contract. Work stoppages due to any military operations that have been planned/scheduled and published by the installation will not be grounds for contract modification of cost and/or schedule. The Government will provide a planned/likely schedule of interrupted operations due to military operations, e.g., the number of expected downtime days.

However, it is the responsibility of the Contractor to provide pricing to account for any impacts to their schedule. Should additional military operations be scheduled by the installation after award of the contract, the Contractor will be allowed to adjust its schedule as necessary and the Government will make equitable adjustments, if justified.

H.7. CORPS-WIDE CONTRACT ACCESS.

7.1. The resulting contract(s) may be used for work throughout the United States, including Alaska and Hawaii, the U.S. territories, outlying areas as defined by FAR 2.101, and territorial waters. Any U.S. Army Corps of Engineers District or Center wishing to use these contract(s) will request the needed contract capacity from the U.S. Army Engineering and Support Center, Huntsville Contracting Officer through a Transfer of Contract Capacity Agreement (TCCA) which will be signed by both the Directors/Chiefs of Contracting. The U.S. Army Engineering and Support Center, Huntsville, will award the basic contract(s).

H. 8. SECURITY CONTRACT LANGUAGE FOR ALL UNCLASSIFIED CONTRACTS.

8.1. All Contractor employees who are US citizens working under this contract who require access to Information Technology (IT) Systems, (standalone computers, network computers/systems, e-mail etc.) shall, at a minimum, be designated into an IT I, II or III position in accordance with AR 25-2, Information Assurance. The investigative requirement for an IT I position is a favorable Single Scope Background Investigation (SSBI), IT II and IT III positions require a favorable National Agency Check with Law and Credit (NACLC).

8.2. A Common Access Card (CAC) is also required for access to government IT Systems. Proof of the appropriate investigative requirement/background check will be confirmed through the Joint Personnel Adjudication System (JPAS) by the Huntsville Center (CEHNC) security personnel. When proof of a background check cannot be confirmed, the CEHNC security personnel will obtain the appropriate background check for the contractor employee.

8.3. To obtain or renew a CAC, fax the following information to 256-895-1076, ATTN:

CEHNC-SL: Full Name, SSN, and Date/Place of Birth, Contract #and the CEHNC Contracting Officer Representative (COR) for the contract. Also include the name and phone number of the contractor agency’s Security Manager.

8.4. Non US Citizens. Foreign nationals who work on a Corps of Engineers’ contract shall be approved by the HQUSACE Foreign Disclosure Officer before beginning work on the contract.

This approval requirement also includes subcontractor employees. The contractor shall submit to the Contracting Officer the names of all foreign nationals proposed for performance under this contract, along with documentation to verify that he/she was legally admitted into the United States and has authority to work in the US. Such documentation may include a passport with I- 551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I- 688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). A photograph is required with all documentation.

H.9. KEY PERSONNEL.

9.1. The key personnel positions listed in Section C are considered to be critical to the successful performance of this contract. Prior to filling or replacing these key personnel identified in Exhibit 6, the contractor shall obtain written consent of the contracting officer.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.