W912DW20Q0065 R0002.pdf

PDF 613 KB Posted

Attached to
Powerhouse Duct Cleaning at Libby Dam, Libby, MT
Solicitation number
W912DW20Q0065
Issued by

View the file

Other files

File Type Posted
W912DW20Q0065 R0001.pdf PDF
W912DW20Q0065 LIBBY DUCT CLEANING.pdf PDF
ATTACHMENT C DATA REPORTS.pdf PDF
ATTACHMENT B LIBBY DAM HECP.pdf PDF
ATTACHMENT C Result Tracking.xlsx XLSX spreadsheet
ATTACHMENT A DRAWINGS.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68MD901697842

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912DW20Q0065 R0002

Libby Dam Pow erhouse HVAC Duct Cleaning, Libby, MT

The purpose of this amendment is to provide answ ers to questions sent in by potential offerors and to incorporate a revised PWS. The due date for quotes is hereby extended to 12 Aug 2020 by 10:00 AM Pacific Time.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW20Q0065

X 9B. DATED (SEE ITEM 11)

03-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Aug-2020

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW20Q0065

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 11-Aug-2020 10:00 AM to 12-Aug-2020 10:00 AM.

The following have been added by full text:

Section 01 10 00

SCOPE OF WORK

POWERHOUSE DUCT CLEANING

LIBBY DAM, LIBBY, MT

Rev 1 – 8/5/2020

Rev 2 – 8/10/2020

ATTACHMENTS:

Appendix A – Drawings Appendix B – Libby Dam HECP Appendix C – Data Reports

1. DESCRIPTION

1.1 GENERAL

The Contractor shall furnish all services, permits, materials, supplies, labor, equipment, supervision, travel, and any and all other services as required for cleaning dust containing asbestos from ventilation systems, and disposal services necessary to complete this Scope of Work (SOW). The Contractor, its subcontractor(s) and appropriate employee(s) of each, shall be responsible for obtaining and maintaining any registration or certification as required by Federal, state of Montana, and local regulatory agencies, and any other licenses, permits, or other credentials or permissions required to perform these tasks. It is the Contractor’s sole responsibility for timely notification of such actions to Federal, state, or local agencies as required. The Contractor shall obey all laws and regulations of the United States and the state and local governments having jurisdiction over the activities addressed in this SOW regarding the removal, storage, transportation, and disposal of all material. Where the requirements of this specification and Federal, state, Regional or local regulations vary, the most stringent requirements shall be enforced. The government will not be responsible for the penalties or fees which are incurred as a result of contractor negligence.

Extensive sampling for asbestos was conducted from July 2019 through February of 2020 to determine the potential for employee exposure in the Libby Dam Powerhouse. It was determined that the dust in the Powerhouse does contain chrysotile structures. While the source of the structures has not been determined one potential source could have been asbestos in brake shoes in the units contributed in the dispersion of structures throughout the Powerhouse. The concentrations of structures in the dust are presented in Table X, The State of Montana determined that chrysotile in dust does not meet the requirements of an asbestos containing material and is therefore not regulated nor is considered an Asbestos Project per State rules. Libby Dam employees use best management practices when cleaning up dusty areas prior to work to reduce potential for employee exposure.

To evaluate potential employee exposure a significant amount of air samples have been conducted by Project staff, and OSHA in varying situations to determine airborne concentrations. All air samples conducted for time weighted averages for an 8 hour workday and 30 minute short-term sampling resulted in concentrations well below the personal exposure limit set by OSHA. It is imperative that the cleaning of debris from the Powerhouse ventilation system that best practices are put in place to minimize to the extent of possible the disruption of dust into the general atmosphere. Contractor employees should be aware of the situation of structure in the dust and protect themselves accordingly.

In addition, original construction specs indicate that an asbestos acoustic cloth was used to line the interior of the ventilation system. The cloth was abated by an asbestos contractor in the early 90's.

However, if the contractor does come across suspect material in the duct work that may have been missed during abatement, they should stop work and notify the Contracting Officer Representative immediately to evaluate the situation and work on a path forward to have the material abated properly if necessary.

Appendix C contains multiple data reports regarding the site conditions. The contractor will utilize best management practices and utilize the data to determine factors regarding worker protections and waste disposal.

The Contractor shall supply personnel with sufficient training and certification to perform all tasks accordance with all applicable laws and regulations. At a minimum, the work shall be supervised by an individual who meets the definition of a competent person in accordance with 29 CFR 1926.62 and 29 CFR 1926.1101, and all workers shall be provided asbestos awareness training in accordance with 29 CFR 1910.1001/29 CFR 1926.1101 and training in accordance with 29 CFR 1910.1025/29 CFR 1926.62. Libby Dam Project is an active facility with operational and security requirements for various activities. The Contractor will be subject to these limitations relative to coordination of activities, schedule, training and access, and will be responsible for all costs associated with complying with these restrictions.

The Contractor shall ensure the work is conducted in a manner that protects the safety and health of its employees, government employees, and members of the public; and that it complies with all current Occupational Safety and Health Administration (OSHA) and US Army Corps of Engineers (USACE) health and safety requirements.

Due to COVID-19 concerns and stringent timetable for Award and executing this contract a pre-bid site visit will not occur. Drawings have been provided of the system such that the project will be biddability purposes. See Appendices A and B.

Due to the security requirements of the project, limited photos and drawings are available of the powerhouse. A pre- bid site visit will be scheduled before bid due date. It is suggested that the contractor attend the pre-bid site visit in order to prepare a competitive bid. Failure to attend the site visit does not constitute a change in conditions.

1.2 BACKGROUND

The Libby Dam powerhouse is located on the Kootenai River near Libby, MT. Construction of the power plant began was complete in 1975. The Libby Dam Powerhouse contains five hydropower generating units.

2. WORK TO BE PERFORMED

The work required in this project consists of the cleanup and disposal of dust. These substances are believed to have been generated during routine operation, maintenance activities and previous contract activities at the facility. The areas to be cleaned in this project consist of the inside of the HVAC equipment/ventilation system and include all associated system components such as ducts, vents, diffusers, grills, blowers, coils and duct heaters.

Balancing of the HVAC system will not be required under this contract. The Contractor shall mark all air control equipment before cleaning and place the equipment in the same location after cleaning as required.

The Contractor shall include costs for contract or project administration, preparation of the required Work Plans and Appendices, pre‐construction conference, quality control reporting including Daily Quality Control Reports (DQCRs), all other interim reporting while work is in progress, final completion report, and mobilization/demobilization. DQCRs shall be submitted to the Government throughout the duration of the contract.

2.1 Work Plan:

A comprehensive Work Plan shall be prepared to fully describe all aspects of the work to be completed. The Work Plan shall contain, but not be limited to, the following:

Description of work to be performed including the overall approach to the work, the methods of operation, type of equipment, anticipated timeframes or production rates, definable features of work, personnel required, and other special considerations.

Description of methods to prevent contamination of adjacent work areas.

Schedule that presents the approach to completing the required work and key milestones to include a detailed phasing/sequencing plan.

Permits, licenses, and certificates, identification number, and location(s) of the disposal facility, if necessary.

Key personnel to be used and their responsibilities.

Training certificates and evidence of current medical surveillance for key personnel.

Examples of all logs, reports, and record keeping that will be utilized.

A Certified Industrial Hygienist (CIH) shall review and approve the work plan. The CIH shall be certified by the American Board of Industrial Hygiene and have a minimum of 2 years prior experience working on asbestos-related projects. A copy of the CIH certification along with name, address, and telephone number shall be submitted.

2.2 Contractor’s Project Schedule

The Contractor’s Project Schedules shall identify all planned work activities with estimated start dates, end dates, and durations. See Section 3 of this SOW for additional information regarding permitted work schedules. An updated schedule shall be submitted with every progress payment.

2.3 Accident Prevention Plan

The Contractor shall prepare an Accident Prevention Plan (APP) that complies with the requirements defined in the USACE Safety Manual (EM 385-1-1, Safety and Health Requirements). This document is available at http://www.usace.army.mil/ under library and publications. The APP shall include but is not limited to: site-specific fall protection plan; site-specific confined space entry; site-specific hazardous energy control plan; activity hazard analyses that address safe work practices, procedures, equipment, and personal protection equipment. The Accident Prevention Plan shall incorporate the current requirements of 29 CFR 1910, 29 CFR 1926, and EM 385-1-1. Because this work is related to asbestos and heavy metals, the Contractor’s APP shall specifically address potential for heavy metal and asbestos exposure and the Contractor shall comply with all applicable OSHA standards.

2.4 Safety

EM 385-1-1

The Contractor shall comply with the safety and health provisions of the Corps Safety Manual (EM 385-1-1, Safety and Health Requirements). This document is available at http://www.usace.army.mil/ under library and publications. The Contractor shall also comply with Occupational Safety and Health Act (OSHA) standards.

Site Safety and Health Officer (SSHO)

Provide an SSHO that meets the requirements of EM 385-1-1 Section 1. The SSHO must ensure that the requirements of 29 CFR 1926.16 are met for the project. The SSHO or an equally-qualified Alternate SSHO must be at the work site at all times to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO and Alternate SSHO must have the required training, experience, and qualifications in accordance with EM 385-1-1 Section 01.A.17, and all associated sub-paragraphs. The SSHO may also serve as the Quality Control Manager. The SSHO may not serve as the Superintendent. The SSHO shall have a minimum of 1 year specialized experience in implementing safety and occupational health programs at asbestos sites and/or lead sites. The SSHO shall be qualified as a competent person for asbestos in accordance with the training identified in 29 CFR 1926.1101. The SSHO shall meet 29 CFR 1910.1025/29 CFR

1926.62 requirements for training in lead.

Duties of the Site Safety And Health Officer (SSHO) The SSHO must:

a. Conduct daily safety and health inspections.

b. Conduct mishap investigations and complete required accident reports. Report mishaps and near misses.

c. Use and maintain OSHA's Form 300 to log work-related injuries and illnesses occurring on the project site for Prime Contractors and subcontractors, and make available to the Contracting Officer upon request.

d. Review the APP and AHAs for compliance with EM 385-1-1, and approve, sign, implement and enforce them.

e. Ensure subcontractor compliance with safety and health requirements.

f. Maintain a list of hazardous chemicals on site and their material Safety Data Sheets (SDS).

g. Maintain a weekly list of high hazard activities involving energy, equipment, excavation, entry into confined space, and elevation, and discuss during bi-weekly meetings.

Quality Control Manager

The Contractor shall identify as CQC System Manager an individual within the onsite work organization who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor. The CQC System Manager shall be a graduate engineer, graduate architect, a graduate of construction management, or an engineering technician with at least two years of college with a minimum of five years construction experience on construction similar to this contract. The CQC shall have completed the USACE Contractors Construction Quality Control Course. The CQC System Manager shall be on the site at all times during construction and shall be an employee of the prime Contractor. The CQC System Manager can have a dual position as the site supervisor and CQC System Manager. Identify an alternate for the CQC System Manager in the plan to serve in the event of the System Manager's absence. The requirements for the alternate shall be the same as for the designated CQC System Manager but the alternate may have other duties in addition to serving in a temporary capacity as the acting QC manager. The CQC System Manager shall have previous experience with the USACE Resident Management System (RMS) and be able to submit daily QC reports.

On-Site Personnel Training Requirements

At a minimum, all on-site personnel for this project shall receive asbestos awareness training in accordance with 29 CFR 1910.1001/29 CFR 1926.1101, and lead awareness training in accordance with 29 CFR 1910.1025/29 CFR 1926.62. Provide documentation/certification that each on-site personnel has received the required training.

Work Platform and Scaffold

It is assumed that access to some ventilation system components may require scaffolding, work platforms and/or mechanized equipment. For any work that requires scaffolding, the Contractor shall provide a detailed design document that describes the scaffold type, materials, and methods to erect all scaffolding. The Contractor is responsible for the design and adequacy of the scaffold. The Contractor is responsible for obtaining any required engineering certifications, load ratings, or any other required certifications related to the scaffold. Any acceptance of this document by the Government shall not be construed as a determination of adequacy or safety. All work platforms and/or scaffolding shall meet EM 385-1-1 requirements at a minimum. The Contractor shall provide a competent person for scaffolding who meets the requirements of EM 385-1-1, Section 22.B.02.

Scaffolding should not be required.

Competent Person, Scaffolding

The CP, Scaffolding is a person meeting the competent person requirements in EM 385-1-1 Appendix Q, and designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the scaffolding program. The CP for Scaffolding has enough training, knowledge and experience in scaffolding to correctly identify, evaluate and address existing and potential hazards and also has the authority to take prompt corrective measures with regard to these hazards. CP qualifications must be documented and include experience on the specific scaffolding systems/types being used, assessment of the base material that the scaffold will be erected upon, load calculations for materials and personnel, and erection and dismantling. The CP for scaffolding must have a documented, minimum of 8-hours of scaffold training to include training on the specific type of scaffold being used (e.g. mast-climbing, adjustable, tubular frame), in accordance with EM 385-1-1 Section 22.B.02.

The Competent Person identified in the Contractor's Safety and Health Program and accepted Accident Prevention Plan, must be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for information in consultation with the Safety Office.

Fall Protection Plan

Establish a fall protection program, for the protection of all employees exposed to fall hazards.

Within the program include company policy, identify roles and responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures in accordance with ASSE/SAFE Z359.2 and EM 385-1-1, Sections

21.A and 21.D. The plan must comply with the requirements of EM 385-1-1, Section 21.D and ASSE/SAFE Z359.2, be site specific, and address all fall hazards in the work place and during different phases of performance. Address how to protect and prevent workers from falling to lower levels when they are exposed to fall hazards above 6 feet. A competent person or qualified person for fall protection must prepare and sign the plan documentation. Include fall protection and prevention systems, equipment and methods employed for every phase of work, roles and responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods. Review and revise, as necessary, the Fall Protection and Prevention Plan documentation as conditions change reflecting any changes during the course of performance due to changes in personnel, equipment, systems or work habits. Keep and maintain the accepted Fall Protection and Prevention Plan documentation at the job site for the duration of the project. Include the Fall Protection and Prevention Plan documentation in the Accident Prevention Plan (APP).

Competent Person, Fall Protection

The CP, Fall Protection, is a person meeting the competent person requirements as defined in EM 385-1-1 Appendix Q and in accordance with ASSE/SAFE Z359.0, who has been designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards.

The Competent Person identified in the Contractor's Safety and Health Program and accepted Accident Prevention Plan, must be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for information in consultation with the Safety Office.

Qualified Person, Fall Protection

A QP for FP is a person meeting the requirements of EM 385-1-1 Appendix Q, and ASSE/SAFE Z359.0, with a recognized degree or professional certificate and with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, and evaluating and specifying fall protection and rescue systems.

Hazardous Energy Control Program (HECP)

Develop a HECP in accordance with EM 385-1-1 Section 12, 29 CFR 1910.147, 29 CFR 1910.333, 29 CFR 1915.89, ASSE/SAFE Z244.1, and ASSE/SAFE A10.44. Submit this HECP as part of the Accident Prevention Plan (APP). Conduct a preparatory meeting and inspection with all effected personnel to coordinate all HECP activities. Document this meeting and inspection in accordance with EM 385-1-1, Section 12.A.02, and local Libby Dam Project HECP lock out tag out procedures (see Appendix 2). Ensure that each employee is familiar with and complies with these procedures.

For work on the HVAC systems, USACE will lockout the HVAC systems being cleaned and the Contractor shall affix its own lockout device onto the USACE lockout systems.

Activity Hazard Analysis (AHA)

Before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. AHAs must be developed by the Prime Contractor, subcontractor, or supplier performing the work, and provided for Prime Contractor review and approval before submitting to the Contracting Officer. AHAs must be signed by the SSHO, Superintendent, QC

Manager and the subcontractor Foreman performing the work. Format the AHA in accordance with EM 385-1-1, Section 1 or as directed by the Contracting Officer. Submit the AHA for review at least 15 working days prior to the start of each activity task, or DFOW.

The Government reserves the right to require the Contractor to revise and resubmit the AHA if it fails to effectively identify the work sequences, specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented. AHAs must identify competent persons required for phases involving high risk activities, including confined entry, crane and rigging, excavations, trenching, electrical work, and fall protection. and scaffolding.

Accident Reporting

Conduct an accident investigation for recordable injuries and illnesses, property damage, and near misses as defined in EM 385-1-1, to establish the root cause(s) of the accident. Complete the applicable USACE Accident Report ENG Form 3394, and provide the report to the Contracting Officer within 5 calendar day(s) of the accident. The Contracting Officer will provide copies of any required or special forms. Near Misses: For Army projects, report all "Near Misses" to the GDA, using local mishap reporting procedures, within 24 hrs. The Contracting Officer will provide the Contractor the required forms. Near miss reports are considered positive and proactive Contractor safety management actions.

2.5 Waste Disposal Plan

The Contractor shall review all information provided in this SOW and develop the Waste Disposal Plan that shall include the transportation and disposal criteria, procedures, and practices sufficient to protect personnel and the environment from associated hazards. The Contractor shall provide a description regarding the type and volume of wastes anticipated to be generated, including cleaning wipes, cleaning and rinse water, personal protective equipment, and any other waste materials generated by performance of the work. The management and disposition of all wastes shall be described in the plan. The Contractor will coordinate disposal with the facility Environmental Compliance Coordinator (ECC) and shall provide 48-hour notice to the ECC for any disposal activities. The Contractor shall identify and perform any additional characterization (testing) necessary to ensure compliance with waste management requirements. Selection of the approved disposal facility shall be based upon cost‐effectiveness, compliance status, regulatory agency input and Government approval.

The Contractor shall be responsible for proper management (storage, transport and disposal) of all waste materials (including any hazardous waste) generated as a result of performing the work in this contract. All waste management practices shall be in accordance with the applicable laws and regulations. The Contractor shall obtain all necessary analytical testing for waste characterization purposes

Wastes shall be removed from the site by the Contractor and disposed of at a facility approved by the Government. The Contractor shall receive written acceptance from the disposal facility prior to mobilization for transportation and disposal. The Contractor shall not transport any wastes prior to Government approval of the proper manifests and documentation. The Contractor shall submit all waste analytical with submitted manifest or bill of lading for the government review. The Government will make every effort to conduct the approval process within five (5) working days after the Contractor submits the proper manifests and documentation.

2.6 COVID-19 Management Plan

The contractor shall be responsible for developing and submitting a plan that demonstrates how the contractor intends to identify and mitigate situations in the workplace which may introduce, ,expose or spread COVID-19. The written plan, unique to the operations under its control, will document the identification and mitigation measures taken, including all engineering controls, administrative controls and safe work practices, and will update that plan on a regular basis for the duration of the COVID-19 Situation.

2.7 Final Completion Report:

The Contractor shall prepare a final, comprehensive Completion Report that describes all of the ventilation system cleaning work completed under this contract. The Report shall include the following: narrative description of work performed in each functional area including any documented accidents or mishaps; before and after photographs of each area where work was performed including photographs from inside the ductwork; summary of all waste materials disposed including types, quantity, disposal facility, dates of shipment, copies of certificates of disposal; and copies of all DQCRs generated during the life of the project.

2.8 Submittals:

The following is a list of all required reports or other submittals. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.

When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. “DO” represents the Design Office. “RO” represents the Resident Office.

Preconstruction Submittals:

Work Plan; G, PO Project Schedule;

G, PO

Accident Prevention Plan; G, DO, PO Work Platform and Scaffold Design (if scaffolding is used) ; G, DO, PO Waste Disposal Plan; G, PO

Test Reports:

Analytical test reports; G, PO

Operation and Maintenance Data:

Final Completion Report; G, DO, PO

For Submittals that are written documents, the Contractor shall provide one electronic document (pdf or Word format) for Government review thru RMS 3.0 Contractor Mode (RMS3/CM). Contractor shall assume up to 20 days for Government review and approval. The Contractor shall notify the government representative via email any time a transmittal is submitted. Time will not begin until a notification has been sent and a date received is entered by the Government.

2.9 Ventilation Cleaning:

Ventilation cleaning shall include work for all of the ventilation areas described below. This task shall include containment measures, containment structures, or engineering controls necessary to protect building occupants and workers by controlling the dispersion of debris and dust from the work area. Include management and disposal of all hazardous and non‐hazardous waste generated as a result of the Contractor’s cleaning activities.

The contract includes cleaning the following HVAC systems (Central Ventilation System and UC- 1 thru 4) as highlighted on drawing LDP-1-3-7/1. UC-5 is shown on LDP-1-3-7/6.1.

1. Central Ventilation System

a. Outside Air, Return Air, Supply Air and Exhaust Air paths– all associated fans (SFV and EFV) , grilles, louvers, diffusers, fire dampers and ducting

b. Air Handling Unit internal enclosure containing SFV including Chilled Water Coil (excluding Electrostatic Air Filter)

c. Electric Preheaters EPH-1 and EPH-2

d. Electric Reheaters ERH 1 – 7.

e. Replace all filters in system

2. UC-1 Ventilation System

a. Return Air, Supply Air and Exhaust Air paths – all associated fans (UC-1, EF-1 and smoke fan) grilles, louvers, diffusers and ducting

b. Air Handling Unit internal enclosure UC-1 including Chilled Water Coil, fan and humidifier, Replace Filter

c. Electric Heaters EH-1A, EH-1B and EH-1C

d. Replace all filters in system

3. UC-2 Ventilation System

a. Return Air, Supply Air and Exhaust Air paths– all associated fans (UC-2 and EF-1), grilles, louvers, diffusers and ducting

b. Air Handling Unit internal enclosure UC-2 including Chilled Water Coil, fan and humidifier, Replace Filter

c. Electric Heaters EH-2A and EH-2B

d. Replace all filters in system

4. UC-3 Ventilation System

a. Return Air, Supply Air and Exhaust Air paths– all associated fans (UC-3 and EF-3), grilles, louvers, diffusers and ducting

b. Air Handling Unit internal enclosure UC-3 including Chilled Water Coil, fan and humidifier, Replace Filter

c. Electric Heaters EH-3

d. Replace all filters in system

5. UC-4 Ventilation System

a. Return Air, Supply Air and Exhaust Air paths– all associated fans (UC-4 and EFV), grilles, louvers, diffusers and ducting

b. Air Handling Unit internal enclosure UC-4 including Chilled Water Coil, fan and humidifier, Replace Filter

c. Electric Heaters EH-4A, EH-4B and EH-4C

d. Replace all filters in system

6. UC-5 Ventilation System

a. Return Air, Supply Air and Exhaust Air paths– all associated fans (UC-5, EF 4), grilles, louvers, diffusers and ducting

b. Air Handling Unit internal enclosure UC-5 including Chilled Water Coil, fan and humidifier, Replace Filter

c. Electric Heaters - EH-5A

d. Replace all filters in system

The Contractor shall clean each area. These locations will be subject to a visual inspection by the USACE QA representative.

The Ventilation systems slated to be cleaned are shown in the attached project drawings. These drawings are for reference of the ductwork only.

The Contractor’s work plan shall indicate the engineering controls and cleaning methods proposed for the ventilation system. The Contractor shall seal all openings into portions of the ventilations system that are being cleaned. The Contractor shall use HEPA-filtered equipment to capture dust.

The Contractor shall not use any cleaning chemicals in the HVAC system that may negatively impact USACE equipment or may be hazardous to human health. All chemical use for this project shall be in accordance with the manufacturer’s instructions. Identify all chemicals to be used in the Contractor’s Work Plan, along with the purpose for using the chemical. Safety data sheets (SDSs) for all chemicals used in this project shall be submitted as part of the APP.

At the conclusion of cleaning efforts for each system, the Contractor shall remove, dispose of, and install new USACE-supplied HVAC system filters. USACE will supply all necessary replacement filters.

The Contactor shall be responsible for the installation, maintenance and dismantling of any containment measures or containment structures necessary to complete the cleaning work. The Contractor shall conduct all cleaning work in a manner that does not contaminate other areas in the vicinity. If areas become contaminated with dust from the ventilation system, the Contractor shall be required to clean the impacted areas to clearance levels specified in this contract at no expense to the Government.

The Contractor shall be responsible for the collection, characterization, and disposal of all waste material collected and generated during the cleaning work.

All work activities and access shall be coordinated between the Contractor and the Government personnel at the plant. In certain areas, the Government employees may require unrestricted and unlimited access while the Contractor’s cleaning operations are taking place. These areas include but are not limited to the control room, the computer room, and administrative areas. The control room is manned 24 hours per day and it is necessary to limit system outages during cleaning of the system that services the control room (System UC-2). Some areas of the Plant may be closed to Government employees while the Contractor is working. The Contractor is advised that other Contractors may also be working in the Plant at the same time and that coordination with those other firms will be required in addition to coordination with the Government staff.

3. GENERAL REQUIREMENTS FOR ALL WORK:

3.1 Contractor Personnel

Self-Performance of Work

The contractor shall perform all work under this contract using his or her own forces except as provided in Paragraph 3.1.2 Subcontracting. Employees who perform this work shall be qualified persons on the contractors own payroll.

Subcontracting

The contractor shall not subcontract any work without written approval of the Contracting Officer. Compliance with the provisions of this contract by subcontractors shall be the responsibility of the contractor.

3.2 Scheduling

The contractor shall coordinate all project work with the onsite Government staff. Only one unit may be out of service at a time, and the contractor shall submit notice of this outage to the Government staff no less than 21 days before the scheduled outage. The Contractor shall supply the Government with a work plan and schedule with a detailed sequence of work tasks. The Contractor will supply sufficient notice to the Government and third party consultant in order to establish limits of work and coordinate housekeeping activities at the facility to minimize any disruption in power generation or other necessary operations associated with the facility.

3.3 Daily Work Schedules and Weekly Coordination Meetings

In order to monitor work under this contract, the Contractor shall attend a weekly coordination meeting with the Contracting Officer’s Representative at which time the Contractor shall submit for coordination, the areas being cleaned on a daily work schedule for the next two week period.

Proposed times and duration of interruptions and protection of adjoining areas shall be included with the Contractor's 2-week work schedule.

3.4 Work Hours:

Arrangement and scheduling of working hours and crews shall be coordinated with the Government.

The Contractor can work Monday through Thursday 0700 to 1700. Working outside these work hours will need written permission from the COR. The Contractor will not be allowed to work on Federal holidays. The following Federal legal holidays are observed by this project site:

New Year's Day Jan 1, 2020 Martin Luther King's Birthday Jan 20, 2020 President's Day Feb 17, 2020 Memorial Day May 25, 2020 Independence Day July 3, 2020 Labor Day Sep 7, 2020 Columbus Day Oct 12, 2020 Veterans Day Nov 11, 2020 Thanksgiving Day Nov 26, 2020 Christmas Day Dec 25, 2020

Work hours are 7:00 a.m. to 4:30p.m., Monday through Thursday. Admin personnel within the Power Plant work 6:30 a.m. to 5:00 p.m Monday thru Friday. Control Room personnel are onsite 24 hours a day.

USACE may allow alternative work hours to minimize impact to occupied locations. Alternative schedules must be submitted to the COR for approval. Limited use of alternative hours will be utilized.

3.5 Utilities

The Contractor is responsible for arranging telephone/Internet service as necessary through the local telephone company. Toilet facilities will be available for Contractor's use. The Government will make available, from existing outlets and supplies, all reasonably required amounts of water and electricity required in the performance of the work without charge to the Contractor. The Contractor shall carefully conserve utilities furnished without charge. The Contractor, at his own expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution, and he shall remove the same prior to final acceptance of the performance.

3.6 Elevator

The Libby Dam Powerhouse elevator will be available for limited used with COR approval.

There are two passenger elevators, each with a capacity of 4,000 pounds.

3.7 Powerhouse Overhead Bridge Crane

Only Government personnel will operate the Powerhouse Overhead Bridge Crane. If the Contractor requests to use the crane for movement of equipment and materials, the Contractor will be responsible for furnishing all rigging and signaling personnel for performing all lifts. The Government shall inspect and reserves the right to reject all Contractor supplied rigging prior to performing lifts. The Contractor will be responsible for all off-loading, movement and loading of required construction equipment and materials. The Contractor shall properly prepare and plan all lifts such that Government operators are required for a minimum number of occasions. Use of the crane will only be during normal Government working hours. A crane operator will not be furnished on a standby basis. The Contractor shall coordinate with the Contracting Officer or Government QA, in writing 24 hours in advance, all needs for a crane operator. The Government will operate the crane during the normal daytime working hours of 7:30 am to 4:30 pm, Monday thru Thursday, less holidays. The Contractor will be allowed up to 10 man-hours of crane operator travel to/from the Powerhouse Overhead Bridge Crane and crane operation time during the life of the Contract. If more than 10 man-hours is required, the Contractor is required to pay the Government, at the existing regular and/or overtime wage rates for the Government personnel involved, for all work performed by Government personnel at the request of the Contractor and costs be deducted by contract modification and from respective invoices.

3.8 Worksite Communication

Employees working alone in a remote location or away from other workers must be provided an effective means of emergency communications (i.e., cellular phone, two-way radios, land-line telephones or other acceptable means). The selected communication must be readily available (easily within the immediate reach) of the employee and must be tested prior to the start of work to verify that it effectively operates in the area/environment. An employee check- in/check-out communication procedure must be developed to ensure employee safety.

3.9 Verification of Dimensions:

The Contractor shall become familiar with details of the work, verify dimensions in the field and shall advise the Government of any discrepancy before performing the work.

3.10 Gate Access

Power Plant gates are locked during normal duty hours. The Contractors on‐site supervisor shall work with the Libby Dam Power Plant personnel for entry procedures. An Employee Identification and Control Procedure shall be submitted for approval for identification and control of employees entering or leaving the Power Plant. Contractor's personnel will not have access into the work area except during approved work hours. The security of the Contractor's property and items furnished under this contract, until accepted, are the responsibility of the Contractor whether stored inside or outside the power plant security gate.

3.11 Government Tools, Equipment and Personnel

Except as described above for the use of the elevator and the Powerhouse Overhead Bridge Crane, the Contractor is to be aware that no government tools, equipment, or personnel will be made available for Contractor use or assistance at any time during the project.

3.12 Protection of Existing Facilities

The Contractor shall be responsible for the protection of the work area from damage and upon completion of the work shall leave existing works in a condition equal to that which existed when the work started. The Contractor to shall photograph areas where the HVAC system will be accessed before and after performing the work. If it is necessary for the Contractor to create new access points into the HVAC to perform cleaning operations, these openings shall be sealed in accordance with industry standards by the conclusion of the work for that particular system. All work and storage of materials shall be kept within the limits of the areas assigned. The Contractor will be responsible for the protection of structures from any structural damage during the performance operations. Roads and surfaces shall be protected from damage by the work or if damaged shall be repaired with equal materials at no additional expense to the Government. At all times the plant and work areas shall be kept in a condition conducive to safety of workmen and the public and neat in appearance. Waste or surplus materials shall not be allowed to accumulate in the storage areas.

The Contractor shall be responsible for moving and replacing all furniture and equipment as necessary to clean the HVAC system. The Contractor shall coordinate with the USACE QA representative at least 48 hours in advance of relocating items. Disruptions to employee work stations shall be minimized.

The Contractor shall place field offices, staging areas, stockpile storage, and temporary buildings in areas as directed by the Contracting Officer. Temporary movement or relocation of Contractor facilities will be made only when approved.

3.13 Internal Combustion Engines

If the Contractor plans to use internal combustion engines, such as man-lifts or mobile aerial work platforms, within the powerhouse the contractor shall take all precautions to ensure exhaust is properly controlled. The Contractor shall monitor environmental exposure of employees, including Governmental employees on lower levels, to carbon monoxide whenever internal combustion engines discharge engine exhaust gases indoors to ensure that carbon monoxide levels do not exceed those given in 29 CFR 1926.55,Appendix A. The air monitoring shall be done during initial operation and at least monthly thereafter and during a period representing highest usage in areas where carbon monoxide exposure is most likely.

3.14 Security Requirements

ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS

3.14.1 Access and General Protection/Security Policy and Procedures

All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

3.14.1.1 Submit a complete, updated and signed, list of all Contractor and subcontractor personnel, including their titles and intended working hours, who will be working on site prior to start of work. This listing shall be revised and resubmitted when personnel changes occur. (SUBMITTAL FIO)

3.14.1.2 Personnel Risk Assessment

A minimum of seven days prior to engaging in work submit, to the CO or Project POC, a Personnel Risk Assessment (PRA) for each employee requiring authorized unescorted access to the Jobsite. The Contractor employee will only be allowed authorized unescorted physical access after the PRA is shown to and approved by the Government.

3.14.1.3 Authorized Unescorted Access Requirements

Perform a PRA on all Contractor personnel that require authorized unescorted access to the Jobsite.

Costs associated with the execution of the PRA shall be at the expense of the Contractor. The content of the PRA is defined by the requirements as follows:

3.14.1.3.1 Criminal Check - Obtain a criminal background check, completed within the last seven years, on all Contractor personnel that require authorized unescorted access to the Jobsite. A minimum of a 7-year criminal background check with the state patrol office shall be performed from all states of residence and employment, for the past seven years. The Project Security Officer through the Contacting Officer will approve, disapprove, or revoke authorized unescorted access to the Jobsite as a result of the seven-year background check.

3.14.1.3.2 Identity Verification - Contractor employees shall provide positive verification of individual identity prior to authorized unescorted access to the Jobsite. Acceptable forms of identity verification are documents issued by a federal Government agency that include:

the individual's photograph, name, and date of birth, such as a passport or military identification (ID) card. Additionally, a state issued driver's license or ID card is acceptable for identity verification.

3.14.1.3.3 The Criminal Check and Identity Verification shall be updated at least every seven years for each employee requiring authorized unescorted access to the Jobsite. d. Escort Requirements - Contractor personnel not cleared for authorized access to the Jobsite may be escorted by Government or Contractor personnel that have authorized unescorted access to the Jobsite. All costs related to the escorting of non-cleared personnel shall be at the expense of the Contractor.

Additional burden shall not be placed upon the Government to provide these escorts. Prior to access, coordination with the Project Security Officer is required, including but not limited to:

3.14.1.3.3.1 Verification of identity with photo identification

3.14.1.3.3.2 Name of escorting individual and verification of unescorted status

3.14.1.3.3.3 Time of entry into the Jobsite

3.14.1.3.3.4 Time exiting the Jobsite.

3.14.2 iWATCH and/or CorpsWatch Training

The Contractor and all associated subcontractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 days prior to mobilization and within 30 calendar days of new employees commencing performance with the results reported to the COR. (submittal: iWATCH and/or CorpsWatch Training Sign In Sheets).

http://www.myarmyonesource.com/cmsresources/Army%20OneSource/Media/Videos/Family%20Pr ograms%20and %20Services/iWatch_Program/iWATCH%2060_4streaming.wmv

3.14.3 OPSEC Training

All new Contractor employees will complete Level I OPSEC training within 30 calendar days prior to mobilization. Additionally, all Contractor employees must complete annual OPSEC awareness training. (submittal: OPSEC Training Sign In Sheets) https://securityawareness.usalearning.gov/opsec/

3.14.4 Pre-screen Candidates using E-Verify Program

The Contractor must pre-screen Candidates using the E-verify Program (http://www.dhs.gov/E- Verify) website to meet the established employment eligibility requirements.