Volume_4_FY20_P2-465896_WYCK_DRAWING_PACKAGE.pdf
PDF 16 MB Posted
- Solicitation number
- W912DW19B0006
About this file
Invitation for Bid (IFB) W912DW19B0006, Wyckoff Access Road Construction, Bainbridge Island, WA Drawings, File 4 of 4
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
11:05:25 AM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
Y
G
F
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: I:\AECDesigns\FY20_P2-465896_WYCK\Con_Docs\CAD_Sheets\Landscape\FY20_P2-465896_WYCK_L-102_LANDSCAPE SITE PLAN 2.dgn
Plot Date:
F Y P
-4
W
Y C
K
S E
A T
T L E
W A
S H
IN
G T
O N
E
A S
T M
A R
G
IN
A L W
A Y S
O U
T H
R O
B E
R T L
Y U
S T
A N
S I
D
W Y
C K
O F F A
C C
E S
S R
O A
D
E N
V
IR
O N
M E
N T
A L P
R O
T E
C T
IO
N A
C E
N C
Y
J
U N
E
E -5
-1 -2
P A
V E
M E N T
G R
A V E L E D
P A
V E
M E
N T
A S P
H A
L T
P A
V E
M E
N T
A S P
H A
L T
S
IG
N
D
D
WALK TRAIL
WALL
RETAINING
S T
A
IR
S
D
IT
C H
C E N
TE
R
LI
N E
DIT
CH
TOP
M B
S P
A
D
D
D
D
D
65 65
70 70
D
L-102
0 20' 40'
N
A1 1" = 20'
LANDSCAPE SITE PLAN 2
L A
N D
S C
A P
E S
IT
E P
L A
N
L
C A
S S
K S
W A
N S
O N
M A
T C
H L
IN
E T
O S
H E
E T L -1
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
SEE NOTE 2
L-001
A4
SEE NOTE 6
PROTECT TREE,
TREE PROTECTION
TYPICAL
L-001
A4
SEE NOTE 6
PROTECT TREE,
TREE PROTECTION
TYPICAL
A1
L-001TYPICAL
TREE PLANTING
SEE NOTE 2
CONSTRUCTION LIMITS
SEE NOTE 2
A8
L-001
PLANTING SOIL
PREPARATION, TYP
L-001
A4
SEE NOTE 6
PROTECT TREE,
TREE PROTECTION
TYPICAL
SEE NOTE 5
SEE NOTE 5
EXISTING TREE
MULCH COVERED AREAS
WATERBARS, SEE CIVIL
SCIENTIFIC NAME COMMON NAME
QUERCUS GARRYANA
ACER CIRCINATUM VINE MAPLE
PRUNUS EMARGINATA BITTER CHERRY
ARBUTUS MENZIESII PACIFIC MADRONE
GARRY OAK
MATCHLINE
GRADING, SEE CIVIL
SEE NOTE 7
SEEDED,
SWALE DITCH
SEE NOTE 7
SEEDED,
SWALE DITCH
PRAIRIE SEEDED AREAS
SWALE SEEDED AREAS
CONSTRUCTION LIMITS
LEGEND:
PLANTING NOTES:
SPEC SECTION 32 92 19.
SWALE DITCH SEEDED, SEE7.
SEE TREE PROTECTION NOTES A4/L-001.
TREE PROTECTION HIGH VISIBILITY FENCE.6.
DEMOLITION PLANS.
WITH EXISTING UTILITIES, GRADING AND
SEE CIVIL SHEETS FOR REQUIRED COORDINATION5.
FOR PLANTING INSTALLATION DETAILS SEE SHEET L-001. 4.
GENERAL NOTES, SEE SHEET L-001.
FOR PLANTING LEGEND, ABBREVIATIONS AND 3.
SEED MIX. SEE SEEDING SPEC SECTION 32 92 19.
CONSTRUCTION ACTIVITIES WITH PRAIRIE
RE-SEED ALL AREAS DISTURBED DUE TO 2.
PRIOR TO PROCEEDING WITH PLANT INSTALLATION.
TO THE ATTENTION OF CONTRACTING OFFICER
SPECS AND SITE CONDITIONS SHALL BE BROUGHT
ANY DISCREPANCIES W/THE DRAWINGS AND/OR1.
SEE CIVIL
WATERBAR, TYP
NEW
ROAD
ALIG
NMENT
NEW ROAD ALIGNMENT
O L D R
O A
D
A
LI
G N
M E N T
TREE LEGEND
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
1:11:28 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: I:\AECDesigns\FY20_P2-465896_WYCK\Con_Docs\CAD_Sheets\Telecom\FY20_P2-465896_WYCK_T-001 - LEGEND, ABBREVIATIONS, AND GENERAL NOTES.dgn
Plot Date:
F Y P
-4
W
Y C
K
S E
A T
T L E
W A
S H
IN
G T
O N
E
A S
T M
A R
G
IN
A L W
A Y S
O U
T H
R O
B E
R T L
Y U
S T
A N
S I
D
W Y
C K
O F F A
C C
E S
S R
O A
D
E N
V
IR
O N
M E
N T
A L P
R O
T E
C T
IO
N A
C E
N C
Y
J
U N
E
E -5
-1 -2
PROJECT GENERAL NOTES:
REFERENCE SYMBOL LEGEND
SHEET REFERENCE NOTE SYMBOL
SECTION OR ELEVATION SYMBOL
B-SHEET WHERE SECTION IS SHOWN
A-IDENTIFYING NUMBER
A-IDENTIFYING NUMBER
B-SHEET WHERE DETAIL IS SHOWN
DESCRIPTION
A - NOTE NUMBER
REVISION SYMBOL
NORTH ARROW
DETAIL SYMBOL
SYMBOL
A
REFERENCE PHOTO NUMBER AND DIRECTION1
A
B
B
A
OSP CABLE IDENTIFICATION LEGEND
COPPER CABLES:
FIBER OPTIC CABLES:
AWG WIRE SIZE
NO. OF PAIRS IN HUNDREDS
(CABLE SIZE AND TYPE)
FIRST LINE:
03, 1-900
PAIR ASSIGNMENTS (NOTE 4)
CABLE IDENTIFICATION NUMBER
(IDENTIFICATION AND COUNT)
SECOND LINE:
BLDG 2160
CABLE ORIGIN (NOTE 5)(CABLE ORIGIN)
THIRD LINE:
F7, 1-12
STRAND IDENTIFICATION
CABLE IDENTIFICATION NUMBERNUMBER OF STRANDS)
(CABLE IDENTIFICATION AND
FIRST LINE:
12SM
12-STRAND
(TYPE OF CABLE)
SECOND LINE:
BLDG 2160
CABLE ORIGIN (NOTE 5)(CABLE ORIGIN)
THIRD LINE:
LEGEND NOTES:
THE LAST RUN IS TAKEN TO THE BUILDING.
ORIGIN AND DESTINATION ON THE CABLE TAG IN THE MANHOLE WHERE
INCLUDE CABLE ORIGIN ON ALL CABLE TAGS. INCLUDE THE CABLE 5.
07, 1-1500 + T1, 1501-1800
P18-24PF
EXAMPLE OF LABEL FOR TWO CABLES UNDER THE SAME SHEATH:4.
REPRESENTS A 12-PAIR CABLE).
(I.E. P12-24PF REPRESENTS A 1200-PAIR CABLE WHILE P12X-24PF
CABLES WITH FEWER THAN 25 PAIRS SHALL INCLUDE AN 'X' IN THE LABEL 3.
CONTRACT SHALL BE RELABELED WITH NEW INFORMATION.
CABLE PULL-THROUGH. CABLES THAT ARE RE-HOMED IN THIS
PULL-THROUGH, AND TWO TAGS ARE REQUIRED FOR A FIBER OPTIC
MAINTENANCE LOOPS. ONE TAG IS REQUIRED FOR A COPPER CABLE
SPLICES AND THE WALL, AND ON BOTH SIDES OF SPLICE OR
THE LIMITS OF THIS PROJECT SHALL BE TAGGED/RETAGGED BETWEEN
EXISTING CABLES IN MANHOLES THAT ARE WITHIN ANDSPLICES. NEW
INSTALL CABLE IDENTIFICATION TAGS AT ALL TERMINATION POINTS AND 2.
ENVIRONMENT. HANDWRITTEN LABELS ARE NOT ACCEPTABLE.
MACHINE PRODUCED ON A DURABLE MATERIAL SUITABLE FOR THE
FINAL CABLE TAGS SHALL BE ASSIGNED BY NEC. LABELS SHALL BE
THIS LEGEND REPRESENTS GENERAL REQUIREMENTS FOR CABLE TAGS. 1.
(NOTE 3 EXCEPTIONS)
(POLYETHYLENE, FILLED)
SINGLE-MODE FO CABLE
C-P12-24PF
'C' OR 'CA' SHALL PRECEED
CABLE NUMBER
MH
J JUNCTION BOX
GROUND CONNECTION
LIGHT LINEWEIGHT INDICATES EXISTING INFORMATION
HEAVY LINEWEIGHT INDICATES NEW WORK
CONDUIT OR CABLE TURNING DOWN
CONDUIT STUB - TERMINATE WITH BUSHING
CONDUIT OR CABLE TURNING UP
OVERHEAD TELECOMMUNICATIONS CABLING
MANHOLE WITH DESIGNATION
OR CAP IF UNDERGROUND
SYMBOL
DIAGRAMPLAN
DESCRIPTION
SYMBOLS LEGEND - TELECOMMUNICATIONS
W
UNDERGROUND TELECOMMUNICATIONS CONDUIT OR DUCT BANKUG/T
OH/T
UG/T
OH/T
POLE WITH DESIGNATION(S4)4(S4)4
MH
HH HANDHOLE WITH DESIGNATIONHH
J
W
CONNECTORS FOR DATA, AND ONE BLANK INSERT
18" AFF WITH ONE RJ45 CONNECTOR FOR TELEPHONE, TWO RJ45 PLATE
CONCEALED REDUCING RING AND MODULAR SINGLE-GANG COMM FACE WITH
TELEPHONE/DATA OUTLET MOUNTED IN 4-11/16" x 4-11/16" x 2-5/8" DEEP OUTLET BOX
A
SYMBOL
DIAGRAMPLAN
DESCRIPTION
SYMBOLS LEGEND - SECURITY SYSTEM
WP - WEATHERPROOF
CARD READER
RTU
DOOR ELECTROMAGNETIC LOCK
BALANCED MAGNETIC SWITCH WITH TAMPER PLATE
D
CR
K
CR
K
J
MAG-LOCK
J
BMS
BMS
MS MOTION DETECTORJ
MS
MAIN DISTRIBUTION FRAMEMDF
NORTH
TO OVERRIDE DOOR ELECTROMAGNETIC LOCK
KNOX BOX - RECESSED AT EXTERIOR WALL WITH TOGGLE SWITCH
MODULES, POWER SUPPLIES AND BATTERY BACKUP
REMOTE TERMINAL UNIT WITH KEYPAD, CARD READER INTERFACE
BEYOND BOTH SIDES OF WALL
FIRESTOPPING - PROVIDE LENGTH AS REQUIRED TO EXTEND 4"
PLENUM-RATED SLEEVE ASSEMBLY WITH BUSHINGS AND UL LISTED
TWO RJ45 CONNECTORS
54" ABOVE FINISHED FLOOR WITH SINGLE-GANG FACEPLATE AND
DATA OUTLET MOUNTED IN SINGLE-GANG 2-1/4" DEEP OUTLET BOX
WALL-MOUNT TELEPHONE AND ONE RJ45 CONNECTOR
ABOVE FINISHED FLOOR WITH SINGLE-GANG FACEPLATE AND STANDOFFS FOR
WALL TELEPHONE OUTLET MOUNTED IN SINGLE-GANG 2-1/4" DEEP OUTLET BOX 60"
TIA/EIA GROUNDING AND BONDING REQUIREMENTS
TELECOMMUNICATIONS LADDER RUNWAY COMPLY WITH I3A AND
ABANDON EXISTING LINE IN PLACE (CROSS-HATCHED)
REPRESENTATIVE FOR REVIEW AND ACCEPTANCE.
CENTURYLINK THROUGH THE CONTRACTING OFFICER'S
PROVIDE A TELECOMMUNICATIONS SYSTEM TESTING PLAN TO 14.
AND NETWORK SYSTEMS.
FOR SPLICING COPPER AND FIBER CABLES FOR FACILITY TELEPHONE
ONE-LINE DIAGRAMS, DETAILED PROCEDURES AND SCHEDULES AR
CENTURYLINK, FOR GOVERNMENT APPROVAL. INCLUDE PLANS,
SUBMIT A PRE-CONSTRUCTION PLAN, COORDINATED WITH 13.
TELECOMMUNICATIONS SUBCONTRACTOR.
CENTURYLINK, THE PRIME CONTRACTOR AND THE
INCLUDE THE CONTRACTING OFFICER'S REPRESENTATIVE,
A MEETING SHALL BE CONDUCTED PRIOR TO SYSTEM LABELING TO 12.
RATING TO MATCH FIRE RATING OF WALL OR FLOOR PENETRATED.
FIRESTOPPED. PROVIDE UL LISTED SLEEVES WITH FIRE/SMOKE
ALL PATHWAYS THAT PENETRATE FIRE-RATED BARRIERS SHALL BE 11.
SUBSYSTEM (FP), AND LIGHTNING PROTECTION SYSTEM.
FOR EARTH ELECTRODE SUBSYSTEM (EES), FAULT PROTECTION
GROUNDING DIAGRAM ON SHEET T4-2 AND TO ELECTRICAL DRAWINGS
REFER TO TELECOMMUNICATIONS SIGNAL REFERENCE SUBSYSTEM
CRITERIA, ANSI J-STD-607-A, IEEE STD 1100 AND UL REQUIREMENTS.
GROUNDING AND BONDING SHALL COMPLY WITH I3A TECHNICAL 10.
COORDINATED WITH THE FACEPLATE COLOR.
PROVIDE BLANK INSERTS AT SPARE LOCATIONS IN FACEPLATES, 9.
PROVIDE 12" MINIMUM SLACK AT EACH CABLE DROP.
CABLES SHALL BE TERMINATED USING T568B PIN/PAIR ASSIGNMENTS.
PROVIDE CATEGORY 6 CABLES TO VOICE JACKS, WHITE IN COLOR.
HORIZONTAL DATA CABLING SHALL BE CATEGORY 6, BLUE IN COLOR. 8.
TO MAINTAIN WORKING CLEARANCE FOR ADDS, MOVES AND CHANGES.
BUSWAYS AND POWER CONNECTIONS TO EQUIPMENT CABINETS AND
CABLE RUNWAYS SHALL BE COORDINATED WITH ELECTRICAL
CABLING FOR THE INITIAL INSTALLATION AND FOR FUTURE BUILDOUT.
ASSEMBLIES TO SUPPORT DC POWER AND TELECOMMUNICATIONS
HARDWARE, AUXILIARY FRAMING, SEISMIC BRACING AND GROUNDING
SPLICE PLATES, END CLOSING BARS, HANGER BRACKETS, FASTENERS,
CONNECTORS, CABLE RETAINING POSTS, JUNCTIONS, COUPLINGS,
SHALL PROVIDE SHOP DRAWINGS DETAILING ALL FITTINGS,
THE CONTRACTOR SHALL PROVIDE THE CABLE RUNWAY SYSTEM AND 7.
DRY AND AIRTIGHT SEAL.
NOT BE USED. FLASH TEST USING DRY NITROGEN GAS TO ENSURE
BE TYCO OR APPROVED EQUAL. ENCAPSULATING COMPOUNDS SHALL
STRETCH CASES ARE NOT ALLOWED. SPLICE CASES FOR FIBER SHALL
SPLICE CASES SHALL BE PRE-FORMED STAINLESS STEEL FOR COPPER. 6.
ACCORDANCE WITH TIA 569-B.
TELECOMMUNICATIONS SPACES AND CABLING PATHWAYS IN
INFRASTRUCTURE ARCHITECTURE (I3A), FEBRUARY 2010. PROVIDE ALL
TECHNICAL CRITERIA FOR THE INSTALLATION INFORMATION
TELECOMMUNICATIONS SYSTEM INSTALLATION SHALL COMPLY WITH 5.
CENTURYLINK.
CENTURYLINK. ALL DEMOLITION WORK SHALL BE COORDINATED WITH
ALL TELECOMMUNICATIONS WORK SHALL BE COORDINATED WITH 4.
CENTURY LINK STANDARDS, AND TIA/EIA STANDARDS.
INSTALLATION INFORMATION INFRASTRUCTURE ARCHITECTURE (I3A),
THE LATEST EDITION OF THE ARMY TECHNICAL CRITERIA FOR
WORKMANSHIP SHALL FULLY COMPLY WITH THE REQUIREMENTS OF
COMPLETE AND OPERATIONAL INSTALLATION. MATERIALS AND
PROVIDE ALL MATERIALS, LABOR AND EQUIPMENT REQUIRED FOR A 3.
CONTRACTING OFFICER.
ACTUAL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE
WORK. ANY DISCREPANCIES BETWEEN INFORMATION SHOWN AND
SYSTEMS WITHIN THE IDENTIFIED AREAS PRIOR TO STARTING ANY
CONTRACTOR SHALL LOCATE AND VERIFY ALL TELECOMMUNICATIONS
RECORD DOCUMENT INFORMATION AND FIELD INVESTIGATION. THE
CONDITIONS SHOWN ON DOCUMENTS WERE TAKEN FROM AVAILABLE 2.
MAY APPLY TO THIS PROJECT.
SYMBOLS SHOWN IN THE LEGEND ARE TYPICAL. NOT ALL SYMBOLS 1.
T-001
.B
O L
O S
T E
L E
C O
M M
U N
IC
A T
IO
N S
L E
G E
N D
A B
B R
E V
IA
T
IO
O N
S
A N
D G
E N
E R
A L N
O T
E S
S .B
O L
O S
G .B
A Z
E
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
9:47:31 AM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: I:\AECDesigns\FY20_P2-465896_WYCK\Con_Docs\CAD_Sheets\Telecom\FY20_P2-465896_WYCK_TD101 - TELECOMMUNICATIONS DEMOLITION PLAN.dgn
Plot Date:
F Y P
-4
W
Y C
K
S E
A T
T L E
W A
S H
IN
G T
O N
E
A S
T M
A R
G
IN
A L W
A Y S
O U
T H
R O
B E
R T L
Y U
S T
A N
S I
D
W Y
C K
O F F A
C C
E S
S R
O A
D
E N
V
IR
O N
M E
N T
A L P
R O
T E
C T
IO
N A
C E
N C
Y
J
U N
E
E -5
-1 -2
EAGLE HARBOR DRIVE NE
PAVEMENT
GRAVELED
PAVEMENT
ASP
HALT
ASPHALT
ASPHALT PAVEMENT
C-1850
C-1851
C-1856
C-2109
C-1807
C-2107
C-1418
(APS-1)
C-2323
(APS-2)
C-2322
(APS-6)
C-2328
P A
V E
M E
N T
A S
P H
A L T
SIGN
W/ EAVES
LG. SIGN
C-1191
C-1196
C-1146
C-1151
W A L K
T R
A
IL
(APS-4)
MISC-2321
(APS-5)
C-2324
(APS-7)
C-2329
(APS-9)
C-2330
(APS-10)
C-2333
C-1152
GRAVEL
GRAVEL
C
C
SPA
C
C
C
C
SPA
C
STORY BUILDING
CONC. TWO
C
C
C
C
C
SPA
C C
SPA
C
SPA
C
SPA
C
C
C
C
C
SPA
SPA
C
C
C
C
C
C
GENERAL NOTES:
0 30' 60'
N
1" = 30'A1
DEMOLITION PLAN
D E
M O
L
IT
IO
N P
L A
N
S .B
O L
O S
T E
L E
C O
M M
U N
IC
A T
IO
N S
KEYNOTES:
2. RETURN THE EXISTING EQUIPMENT TO CENTURY LINK.
1. ABANDON EXISTING LINE IN PLACE.
S .B
O L
O S
G .B
A Z
E
N1
N2
N3
N4
PED #37
START OF ANY WORK.
3. COORDINATE WITH CENTURYLINK 3 WEEKS PRIOR TO THE
WORK.
SECTION 01 14 00 BEFORE DOING ANY TELECOMMUNICATIONS
2. FOLLOW THE WORK RESTRICTIONS SPECIFICATION -
SEE SHEET T-001.
1. FOR LEGEND, ABBREVIATIONS, AND GENERAL NOTES,
TD-101
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
9:48:37 AM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: I:\AECDesigns\FY20_P2-465896_WYCK\Con_Docs\CAD_Sheets\Telecom\FY20_P2-465896_WYCK_TS101 - TELECOMMUNICATIONS SITE PLAN.dgn
Plot Date:
F Y P
-4
W
Y C
K
S E
A T
T L E
W A
S H
IN
G T
O N
E
A S
T M
A R
G
IN
A L W
A Y S
O U
T H
R O
B E
R T L
Y U
S T
A N
S I
D
W Y
C K
O F F A
C C
E S
S R
O A
D
E N
V
IR
O N
M E
N T
A L P
R O
T E
C T
IO
N A
C E
N C
Y
J
U N
E
E -5
-1 -2
T
T
T
T
T
T
T
T
T
T
C-1850
C-1851
C-1856
SIGN
W/ EAVES
LG. SIGN
C-1191
C-1196
C-1151
W A L K
T R
A
IL
ROCKS
TRAIL
ROCKS
SIGN
G
G
EAGLE HARBOR DR NE
TS1010 50' 100'
N
1" = 50'
GENERAL SITE PLAN
A1
G E
N E
R A
L S
IT
E P
L A
N
S .B
O L
O S
T E
L E
C O
M M
U N
IC
A T
IO
N S
S .B
O L
O S
G .B
A Z
E
GENERAL NOTES:
KEY NOTES:
C
C
T
T
PEDISTAL
COMM
C-1152
EXISTING
PED #39
PEDISTAL
COMM
C-1418
EXISTING
PED #37
1 3
1 3
2 4
WITH CENTURYLINK FOR INSTALLATION AND SPLICING.
THE EXISTING TELECOMMUNICATIONS CABLES. COORDINATE
HAND DIGGING TO AVOID DAMAGE. PLACE NEW PEDISTAL NEAR
DIRECT BURIAL CABLES EITHER BY VACUUM EXCAVATOR OR
4. CONTRACTOR SHALL LOCATE EXISTING TELECOMMUNICATIONS
INSTALLATION AND SPLICING
CENTURYLINK. COORDINATE WITH CENTURYLINK FOR CABLE
3. NEW TELECOMMUNICATION CABLES SHALL BE PROVIDED BY
CENTURYLINK FOR THE NEW PEDISTAL.
PROVIDED BY CENTURYLINK. COORDINATE WITH
2. NEW TELECOMMUNICATION CABLES PEDISTAL SHALL BE
FOR CONDUIT AND TRENCH DETAILS.
1. PROVIDE 4-INCH SCHEDULE 40 PVC. REFER TO SHEET T-501
PED #40
N4
N3
PED #38
EXCEPT THE SWEEP UP INTO THE PEDESTAL.
5. CONDUIT BENDS MUST BE WIDE SWEEPS (20' RADIUS)
THE CONDUIT BEFORE PLACE A NOTHER PULL BOX.
4. NO MORE THAN 180 DEGREES IN BENDS ARE ALLOWED IN
START OF ANY WORK.
3. COORDINATE WITH CENTURYLINK 3 WEEKS PRIOR TO THE
NEXT SUBMITTAL.
2. TELECOMMUNICATIONS DRAWINGS SHALL BE COMPLETED BY
SHEET T-001.
1. FOR LEGEND, ABBREVIATIONS, AND GENERAL NOTES, SEE
PEDISTAL
COMM
C-2107
EXISTING
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
1:12:18 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: I:\AECDesigns\FY20_P2-465896_WYCK\Con_Docs\CAD_Sheets\Telecom\FY20_P2-465896_WYCK_T-501 - TELECOMMUNICATIONS - TYPICAL PED INSTALLATION.dgn
Plot Date:
F Y P
-4
W
Y C
K
S E
A T
T L E
W A
S H
IN
G T
O N
E
A S
T M
A R
G
IN
A L W
A Y S
O U
T H
R O
B E
R T L
Y U
S T
A N
S I
D
W Y
C K
O F F A
C C
E S
S R
O A
D
E N
V
IR
O N
M E
N T
A L P
R O
T E
C T
IO
N A
C E
N C
Y
J
U N
E
E -5
-1 -2
PED.
TEL. TRANSFORMER
POWER
CATV
20" - 36"
12"
R/W
GND. SYSTEM
POWER CO.
TO PED.
36" RADIUS (MIN) HORIZONTAL SWEEP.
36" RADIUS (MIN) VERTICAL SWEEP AND
PED BY DEVELOPER WITH PULL LINE.
2" SCHEDULE 40 PVC FROM PED TO
GROUNDING CLAMP ATTACHMENT
BY DEVELOPER
CONDUITS TOGETHER
STRAP MULTIPLE
BY DEVELOPER
COPPER WIRE
#6 AWG, BARE
INSTALLATION BY DEVELOPER
SHOWN WITH CONDUIT
BY CENTURY LINK
TYPICAL PED INSTALLATION
CAP
CONDUIT
CONDUIT
(MIN)
36" RADIUS
OF PULL STRIING
LEAVE A 5' / 6' TAIL
PULL STRING -
AND/OR RIGHT - OF - WAY
WITHIN THE EASEMENT
LEVLE BY DEVELOPER
LESS THAN 18" ABOVE GND.
MUST BE CAPPED AND NO
ENDS OF ALL CONDUITS
SAME HEIGHT (APPROXIMATELY 18 INCHES).
4. STUBBED-UP CONDUITS ALL NEED TO BE CUT OFF AT THE
3. ALL CONDUIT AND SWEEPS MUST BE A MINIMUM OF 36" DEEP.
MARKER PEN.
2. IDENTIFY CONDUIT "FOR TELEPHONE ONLY" WITH INDELIBLE
OFF WITH DUCT TAPE WITH THE MULE TAPE TAIL EXPOSED.
1. IF CAPS ARE UNAVAILABLE, CONDUIT ENDS MUST BE SEALED
NOTE:
T-501
.B
O L
O S
T E
L E
C O
M M
U N
IC
A T
IO
N S
G .B
A Z
E
S .B
O L
O S
P E
D I
N S
T A
L L
A T
IO
N
T Y
P
IC
A L
File details come from the government source that posted it.