This federal contract opportunity notice seeks proposals for the construction of an Access Control Point at the Watervliet Arsenal in Watervliet, New York. The project includes constructing a combined gate house and search area building, guard booths, overwatch, truck and POV search canopies, active and passive vehicle barriers, entry gates, traffic arms, crash beams, traffic signals, an anti-ram wall, roads and pavements, a standby generator, uninterrupted power system and automatic transfer switch. Existing buildings and structures will be demolished. Required work elements are earthwork, structures, water and sewer utilities, thermal and moisture protections, finishes, electrical distribution and lighting, fire detection and alarm, and demolition. The solicitation will be posted on the SAM website on or about June 30th, with proposals due approximately 30 days later. The contract is valued between $10-20 million and is set aside for small businesses. Questions must be submitted in writing to the named contracting officer by email.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Watervliet Arsenal, Commercial Access Control Point, Gillespie Gate
Watervliet, New York
PROJECT W912-DS-22-______
Volume 5
Structural Interior Design (SID)
Ready to Advertise
Prepared for:
USACE, New York District
26 Federal Plaza
New York, NY 10278-0090
Prepared By:
KZF Design 700 Broadway Street
Cincinnati, Ohio 45202
W9128-F-17-D-0010
01 April 2022
Gillespie Gate, Watervliet NY Ready to Advertise
Commercial Vehicle Access Control Point April 1, 2022
Interiors Narrative
GENERAL
All work shall be designed and constructed in accordance with the applicable provisions of the documents below. UFC’s are the governing documents unless specifically stated otherwise in the applicable UFC.
• UFC 3-101-01 (Change 5, Sept 2019) Architecture
• ER-1110-345-122 (1989) Interior Design
• IBC 2015
• NFPA
• ABA Architectural Barriers Act Accessibility Guidelines
• ANSI/ASHRAE/USGBC/IES Standard 189.1 (2014) Standard for the Design of High Performance, Green Buildings Except Low Rise Residential Buildings
NEW WORK
Gatehouse
The Gatehouse will contain a Command-and-Control room, Restroom, Inside Storage, Mechanical/Electric, and Communications rooms. Interior partitions are to be metal framing with 5/8” gypsum board. Exterior doors and frames to be hollow metal, painted in semigloss finish.
Porcelain tile floors with coordinating tile wall base will be provided at the Command & Control room, Restroom, and Inside Storage. Sealed concrete floors are to be provided for Communications, and Mech/Elec
Rooms with coordinating rubber wall base.
Provide suspended acoustical tile ceiling with recessed light fixtures, hold down clips and exposed grid in
Command & Control Room. All other rooms to receive painted, gypsum board ceilings with recessed light fixtures.
Walls are to be painted with an eggshell finish, epoxy finish at masonry walls.
All windowsills are to be solid surface material. Provide mop sink and mop holder with shelf for the Inside
Storage room. See drawing I-101 for Finish Specifications.
Search Building
The Search Building will contain an Office, Breakroom, Restroom, Inside Storage, Outside Storage, Mechanical/Electric, and Communications rooms. Interior partitions are to be metal framing with 5/8” gypsum board. Interior doors and frames to be hollow metal, painted in semigloss finish.
Porcelain tile floors with coordinating tile wall base will be provided at the Office, Breakroom, Restroom and
Inside Storage. Sealed concrete floors with coordinating rubber wall base are to be provided for
Communications, Mech/Elec, and Outside Storage.
Provide suspended acoustical tile ceiling in a grid pattern with recessed light fixtures, and an exposed grid in the Office and Breakroom. All other rooms to receive painted gypsum board ceilings with recessed light fixtures.
Gillespie Gate, Watervliet NY Ready to Advertise
Commercial Vehicle Access Control Point April 1, 2022
Walls are to be painted with an eggshell finish, epoxy finish at masonry walls. All windowsills are to be solid surface material. Provide mop sink and mop holder with shelf for the Inside Storage room.
See drawing I-101 for Finish Specifications.
Furnishings consists of the following: For the Office space; an ergonomic task chair, two guest chairs and wardrobe/storage tower for the Office, a round table with four chairs and a recycling unit for the Break room.
Refer to the FFE package for details.
Guard Booth
Guard Booths (2) will be pre-manufactured units 4’-0” wide by 10’-0” long minimum.
An ergonomic task stool is provided, for the Command-and-Control room, in the FFE package.
T
COMMUNICATIONS
MECH / ELEC
INSIDE
STORAGE
RESTROOM
COMMAND AND
CONTROL
F01
F01
F01
F01
F03
N01
INTERIOR FINISH SPECIFICATIONS
FT-1
FLOOR TILE (FT)
P-1
PAINT (P)
RB-1
RESILIENT BASE (RB)
TB-1
TILE BASE (TB)
SS-1
SOLID SURFACE (SS)
ACT-1
ACOUSTICAL CEILING TILE (ACT)
P-2
SC-1
SEALED/STAINED CONCRETE (SC)
MFR: DALTILE
STYLE: HAUT MONDE
COLOR: ELITE GREY
FINISH: MATTE
SIZE: 12" X 24" x 3/8"
INSTALLATION: PATTERN TO RUN
NORTH TO SOUTH
GROUT: MAPEI 47 CHARCOAL
SEE SPECIFICATIONS FOR
DETAILS
MFR: JOHNSONITE
STYLE: COVE
COLOR: CHARCOAL 20
SIZE: 4"
MFR: DALTILE
STYLE: HAUT MONDE S36C9S36C9
COLOR: ELITE GREY
FINISH: MATTE
SIZE: 6" X 12" x 3/8"
INSTALLATION:
GROUT: MAPEI 47 CHARCOAL
MFR: SHERWIN WILLIAMS
COLOR: REPOSE GREY SW7015
FINISH: EGGSHELL
FINISH: EPOXY AT MASONRY WALLS
MFR: SHERWIN WILLIAMS
COLOR: GRIZZLE GREY SW7068
FINISH: SEMIGLOSS
INSTALL: HOLLOW METAL FRAMES
MFR: LG HAUSYS MI-MACS
STYLE: EBONY CONCRETE
THICKNESS: 1/2"
INSTALL: CASEWORK AND WINDOW SILLS
MFR: ARMSTRONG CEILINGS
STYLE: CALLA
COLOR: WHITE
SIZE: 2' X 2' x 1"
GRID: 15/16 EXPOSED GRID
SOUND RATING: 0.85
CP-1
CEILING PAINT (CP)
MFR: SHERWIN WILLIAMS
COLOR: PURE WHITE SW7005
FINISH: FLAT
PL-1
PLASTIC LAMINATE (PL-1)
MFR: FORMICA
STYLE: BRUSH
COLOR: 9319-BH
STAINLESS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
I-101
G A
T E
H O
U S
E
F
IN
IS
H
P L A
N
S C
H E
D U
L E
A N
D S
P E
C
IF
IC
A
T
IO
N S
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y S
T C
IN
C
IN
N
A T
I, O
H
K E
L L Y
K E
L L Y
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
F
IR
S T
T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
1/4" = 1'-0"A7
GATEHOUSE - FINISH PLAN
INTERIOR FINISH SCHEDULE
ROOM
NO
ROOM
NAME FLOOR
FLOOR Base Finish
WALL FINISH CEILING FINISH
REMARKSFIN NORTH EAST SOUTH WEST FIN
100 COMMAND AND CONTROL TOP / SLAB FT-1 TB-1 P-1 P-1 P-1 P-1 ACT-1 EXTERIOR
101 RESTROOM TOP / SLAB FT-1 TB-1 P-1 P-1 P-1 P-1 CP-1
102 INSIDE STORAGE TOP / SLAB FT-1 TB-1 P-1 P-1 P-1 P-1 CP-1
103 MECH / ELEC TOP / SLAB SC-1 RB-1 P-1 P-1 P-1 P-1 CP-1 EXTERIOR
104 COMMUNICATIONS TOP / SLAB SC-1 RB-1 P-1 P-1 P-1 P-1 CP-1 EXTERIOR
A REFERENCE THIS FINISH PLAN I-101
FOR FINISH LOCATIONS AND INTERIOR
FINISH SCHEDULE.
B REFERENCE CEILING PLANS AND
SCHEDULE FOR CEILING TYPES. PAINT
ALL GYP. BD. CEILINGS, SOFFITS AND
BULKHEADS CP-1, UNLESS NOTED
OTHERWISE ON FINISH PLAN AND
FINISH SCHEDULE.
C ALL WALLS ARE TO BE PAINTED P-1
UNLESS NOTED OTHERWISE ON THIS
PLAN OR SCHEDULE. ANY
DISCREPANCIES ARE TO BE BROUGHT
TO THE DESIGNERS ATTENTION PRIOR
TO PAINTING.
D PROVIDE WINDOW SILLS IN SOLID
SURFACING SS-1.
E ALL ACCESS PANELS OR DIFFUSERS
ARE TO BE PAINTED A SEMI-GLOSS
FINISH TO MATCH ADJACENT WALL
FINISH UNLESS NOTED OTHERWISE.
F CONTINUE SPECIFIED PAINT ABOVE
AND BELOW ALL MILLWORK COUNTERS
AND CABINETS.
G ALL FREESTANDING COLUMNS, IF ANY,
ARE TO BE PAINTED P-1 UNLESS
NOTED OTHERWISE.
H ALL BUILDING HOLLOW METAL DOORS
AND DOOR FRAMES TO BE PAINTED P-2
UNLESS NOTED OTHERWISE.
I ALL DOORS CALLED OUT TO BE
PAINTED ARE TO BE PAINTED P-2
UNLES NOTED OTHERWISE.
J PAINT ALL EXPOSED PIPING, CONDUIT,
ELECTRICAL DEVICES, DUCTWORCT,
ETC, TO MATCH P-2 UNLESS NOTED
OTHERWISE.
K INSTALL FLOORING UNDER ALL BASE
CABINETS AND INSTALL SCHEDULED
BASE ON TOEKICK OF ALL BASE
CABINETS, UNLESS NOTED OTHERWISE
ON THE ELEVATION, FINISH PLAN OR
THE DETAIL.
L ALL CHANGES IN FLOORING BETWEEN
ROOMS IS TO OCCUR AT CENTERLINE
OF DOOR.
M ALL TRIM AND BASE TO TERMINATE
INTO NEAREST INSIDE CORNER,
UNLESS NOTED OTHERWISE.
GENERAL NOTES
F01 PROVIDE APPROPRIATE FLOOR TRANSITION TO
EXTERIOR. SEE ARCHITECTURAL DRAWINGS.
F03 SOLID SURFACE COUNTER TOP TO BE SS-1.
DRAWING NOTES
1 REFERENCE FINISH PLANS FOR DRAWING NOTES.
FINISH REMARKS
0 2' 4' 8'
N N
TRUE NORTH PLAN NORTH
N01 TAG: S2, SEE FFE PACKAGE FOR CHAIR DETAILS.
COMMUNICATIONS
MECH / ELEC
INSIDE
STORAGE
RESTROOM
COMMAND AND
CONTROL
S05
S03
S02
S05
S04
S04
S06S06
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
I-121
G A
T E
H O
U S
E
S
IG
N A
G E
P L A
N A
N D
S C
H E
D U
L E
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y S
T C
IN
C
IN
N
A T
I, O
H
K E
L L Y
K E
L L Y
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
F
IR
S T
T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
1/4" = 1'-0"1
GATEHOUSE - SIGNAGE PLAN
N N
TRUE NORTH PLAN NORTH
GENERAL NOTES
A ALL SIGNS TO FOLLOW ADAAG GUIDELINES,
CONTRACTORS TO VERIFY THESE GUIDELINES.
REFERENCE SPECIFICATION SECTION 10 14 02 FOR
DETAILS.
B REFERENCE I-511 DRAWING FOR SIGN
GRAPHICS/DETAILS. SIGNAGE DETAILS TO FOLLOW
AIRFORCE SIGN STANDARDS UFC 3-120-01 AND
DEPARTMENT OF ARMY MANUAL 5-807-10, SECTION
4.1.
C CONTRACTOR TO VERIFY WITH BASE ANY FACILITY
STANDARDS OR ORGANIZATIONAL
EMBLEMS/SYMBOLS TO BE USED.
D ALL SIGNS TO BE LOCATED 3" FROM LATCH SIDE OF
DOOR, MOUNTED 60 INCHES A.F.F TO THE
CENTERLINE OF SIGN. IF THERE IS INSUFFICIENT
ROOM ON THE LATCH SIDE OF THE DOORTO INSTALL
THE SIGN, THEN SIGNS ARE TO BE POSITIONED TO
THE NEAREST ADJACENT WALL OF THE DOOR LATCH.
E ANY SIGN PLAQUE MOUNTED TO WINDOW GLAZING IS
TO HAVE A BLANK SIGN PLAQUE WITH MATCHING
FINISHES MOUNTED TO BACK SIDE OF THE GLASS.
F MOUNTING HEIGHTS IDENTIFYING ROOMS MUST BE
MOUNTED SO THAT THE BOTTOM OF THE RAISED
CHARACTERS ARE BETWEEN 48 INCHES AND 60
INCHES ABOVE THE FLOOR.
G ALL SIGNS TO BE LOCATED 3" FROM LATCH SIDE OF
DOOR, MOUNTED 60 INCHES A.F.F TO THE
H INTERIOR SIGN FINISHES - COPY/TEXT TO BE WHITE,
BACKGROUND COLOR TO BE BLACK.
INTERIOR SIGNAGE SCHEDULE
Number Name Sign Type
Sign Quantity
Sign Header Panel Sign Line Text 1
Sign Line Text 2 Mounting Braille Comments
100 COMMAND AND
CONTROL
S5 2 100 COMMAND AND CONTROL EXTERIOR
WALL
NO EXTERIOR
100 COMMAND AND
CONTROL
S6 2 --- (NO SMOKING SYMBOL) NO SMOKING WALL NO
101 RESTROOM S3 1 101 (UNISEX 'GRAPHIC SYMBOL') RESTROOM WALL YES
102 INSIDE STORAGE S2 1 102 STORAGE WALL YES
103 MECH / ELEC S4 1 103 MECHANICAL AND ELECTRICAL EXTERIOR
WALL
NO EXTERIOR
104 COMMUNICATIONS S4 1 104 COMMUNICATIONS EXTERIOR
WALL
NO EXTERIOR
S02 PROVIDE SIGN TYPE S2 AT THIS LOCATION.
S03 PROVIDE SIGN TYPE S3 AT THIS LOCATION.
S04 PROVIDE SIGN TYPE S4 AT THIS LOCATION.
S05 PROVIDE SIGN TYPE S5 AT THIS LOCATION.
S06 PROVIDE SIGN TYPE S6 AT THIS LOCATION.
DRAWING NOTES
BREAK ROOM
OFFICE
COMMUNICATIONS
116 MECH / ELEC
OUTSIDE
STORAGE
INSIDE
STORAGE
RESTROOM
F01
F01
F01
F02
INTERIOR FINISH SPECIFICATIONS
FT-1
FLOOR TILE (FT)
P-1
PAINT (P)
RB-1
RESILIENT BASE (RB)
TB-1
TILE BASE (TB)
SS-1
SOLID SURFACE (SS)
ACT-1
ACOUSTICAL CEILING TILE (ACT)
P-2
SC-1
SEALED/STAINED CONCRETE (SC)
MFR: DALTILE
STYLE: HAUT MONDE
COLOR: ELITE GREY
FINISH: MATTE
SIZE: 12" X 24" x 3/8"
INSTALLATION: PATTERN TO
RUN EAST TO WEST
GROUT: MAPEI 47 CHARCOAL
SEE SPECIFICATIONS FOR
DETAILS
MFR: JOHNSONITE
STYLE: COVE
COLOR: CHARCOAL 20
SIZE: 4"
MFR: DALTILE
STYLE: HAUT MONDE S36C9S36C9
COLOR: ELITE GREY
FINISH: MATTE
SIZE: 6" X 12" x 3/8"
INSTALLATION:
GROUT: MAPEI 47 CHARCOAL
MFR: SHERWIN WILLIAMS
COLOR: REPOSE GRAY SW7015
FINISH: EGGSHELL
FINISH: EPOXY AT MASONRY WALLS
MFR: SHERWIN WILLIAMS
COLOR: GRIZZLE GRAY SW7068
FINISH: SEMIGLOSS
INSTALL: HOLLOW METAL FRAMES
MFR: ARMSTRONG CEILINGS
STYLE: CALLA
COLOR: WHITE
SIZE: 2' x 2' X 1"
GRID: 15/16 EXPOSED GRID
SOUND RATING: 0.85 NRC
CP-1
CEILING PAINT (CP)
MFR: SHERWIN WILLIAMS
COLOR: PURE WHITE SW7005
FINISH: FLAT
PL-1
PLASTIC LAMINATE (PL-1)
MFR: FORMICA
STANDARD HPL
STYLE: BRUSH
COLOR: 9319-BH
STAINLESS
MFR: LG HAUSYS HI-MACS
STYLE: M553 EBONY CONCRETE
THICKNESS: 1/2"
INSTALL: CASEWORK AND WINDOW SILLS
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
I-102
S E
A R
C H
B L D
G
F
IN
IS
H
P L A
N
S C
H E
D U
L E
A N
D S
P E
C
IF
IC
A
T
IO
N S
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K
D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y S
C
IN
C
IN
N
A T
I O
H
ID
K E
L L Y
K E
L L Y
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
O P
T
IO
N A
L F
IE
L D
F
IR
S
T T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
P R
O J E
C T
O P
T
IO
N A
L F
IE
L D
1/4" = 1'-0"A7
SEARCH BLDG - FLOOR PLAN
USACE_FINISH SCHEDULE
ROOM
NO
ROOM
NAME FLOOR
FLOOR Base Finish
WALL FINISH CEILING FINISH
REMARKSFIN NORTH EAST SOUTH WEST FIN
110 OFFICE TOP / SLAB FT-1 TB-1 P-1 P-1 P-1 P-1 ACT-1 EXTERIOR
111 BREAK ROOM TOP / SLAB FT-1 TB-1 P-1 P-1 P-1 P-1 ACT-1
112 INSIDE STORAGE TOP / SLAB FT-1 TB-1 P-1 P-1 P-1 P-1 CP-1
113 RESTROOM TOP / SLAB FT-1 TB-1 P-1 P-1 P-1 P-1 CP-1
114 OUTSIDE STORAGE TOP / SLAB SC-1 RB-1 P-1 P-1 P-1 P-1 CP-1 EXTERIOR
115 MECH / ELEC TOP / SLAB SC-1 RB-1 P-1 P-1 P-1 P-1 CP-1 EXTERIOR
116 COMMUNICATIONS TOP / SLAB SC-1 RB-1 P-1 P-1 P-1 P-1 CP-1 EXTERIOR
F01 PROVIDE APPROPRIATE FLOOR TRANSITION TO EXTERIOR. SEE
ARCHITECTURAL DRAWINGS.
F02 SOLID SURFACE COUNTER TOP TO BE SS-1. BASE CABINETS, PL-1.
DRAWING NOTES
A REFERENCE THIS FINISH PLAN I-102 FOR FINISH LOCATIONS AND INTERIOR FINISH
SCHEDULE.
B REFERENCE CEILING PLANS AND SCHEDULE FOR CEILING TYPES. PAINT ALL GYP. BD.
CEILINGS, SOFFITS AND BULKHEADS CP-1, UNLESS NOTED OTHERWISE ON FINISH PLAN
AND FINISH SCHEDULE.
C ALL WALLS ARE TO BE PAINTED P-1 UNLESS NOTED OTHERWISE ON THIS PLAN OR
SCHEDULE. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE DESIGNERS ATTENTION
PRIOR TO PAINTING.
D PROVIDE WINDOW SILLS IN SS-1.
E ALL ACCESS PANELS OR DIFFUSERS ARE TO BE PREFABBED WHITE UNLESS NOTED
OTHERWISE.
F CONTINUE SPECIFIED PAINT ABOVE AND BELOW ALL MILLWORK COUNTERS AND CABINETS.
G ALL FREESTANDING COLUMNS, IF ANY, ARE TO BE PAINTED P-1 UNLESS NOTED
OTHERWISE.
H ALL BUILDING HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED P-2 UNLESS
NOTED OTHERWISE.
I ALL DOORS CALLED OUT TO BE PAINTED ARE TO BE PAINTED P-2 UNLES NOTED
OTHERWISE.
J PAINT ALL EXPOSED PIPING, CONDUIT, ELECTRICAL DEVICES, DUCTWORCT, ETC, TO MATCH
P-2 UNLESS NOTED OTHERWISE.
K INSTALL FLOORING UNDER ALL BASE CABINETS AND INSTALL SCHEDULED BASE ON
TOEKICK OF ALL BASE CABINETS, UNLESS NOTED OTHERWISE ON THE ELEVATION, FINISH
PLAN OR THE DETAIL.
L ALL CHANGES IN FLOORING BETWEEN ROOMS IS TO OCCUR AT CENTERLINE OF DOOR.
M ALL TRIM AND BASE TO TERMINATE INTO NEAREST INSIDE CORNER, UNLESS NOTED
OTHERWISE.
GENERAL NOTES
FINISH REMARKS
1 REFERENCE FINISH PLAN FOR DRAWING NOTES.
N
0 4'2' 8'
N
TRUE NORTH PLAN NORTH
1 1/2" TACTILE ROOM NUMBER
WITH BRAILLE, HELVETICA
MEDIUM (38 MM)
1/2" (13 MM) TACTILE
ROOM DESCRIPTION
STORAGE
(PERMANENT ROOM ID SIGN)
REMOVABLE END
CAPS (BOTH SIDES)
8 1/2"
9"
6" (152MM)
APPROPRIATE
SYMBOL PER SIGN
SCHEDULE
UNISEX 1" (25MM) TACTILE ROOM
DESCRIPTION WITH
BRAILLE, HELVETICA
NEUE 65 MEDIUM
REMOVABLE END
CAPS (BOTH SIDES)
OPTIONAL 1 1/2"
(38MM) TACTILE
ROOM NUMBER
WITH BRAILLE
HELVETICA NEUE
65 MEDIUM
(ACCESSIBLE RESTROOM ID SIGNS)
9"
8 1/2"
ROOM NUMBER,
HELVETICA NEUE 65
MEDIUM 38MM FLUSH
LEFT
UPPER CASE
HELVETICA NEUE
19MM CAPITAL
LETTER HEIGHT
FLUSH LEFT.
COMMUNICATIONS
3MM REVEAL
(EXTERIOR GRADE SIGN)
9"
BLDG NUMBER
3/8" (10 MM)
HELVETICA NEUE 75
BOLD UPPER &
LOWER CASE
Gatehouse
Anti-terrorism Perimeter Security Entry Control Facility
(BUILDING ENTRANCE SIGN)
HEADQUARTERS
HELVETICA NEUE
MEDIUM (STREET
ADDRESS MAY BE
USED HERE)
EXTERIOR GRADE
2'-0"
UPPER CASE
HELVETICA
MEDIUM, 4" (100MM)
HEIGHT
LETTERS AND
NUMBERS IN WHITE
TEXT ON BROWN
BACKGROUND, BASE
STANDARD
SYMBOL:
BLACK AND
RED ON WHITE
BACKGROUND
No Smoking
UPPER AND LOWER CASE
HELVETICA NEUE 55 ROMAN,
19MM CAPITAL LETTER
HEIGHT
END CAPS
(MANDATORY & PROHIBITORY SIGNS)
6"
" PAPER INSERT
M
IN
IM
U
M
SIGN
TYPE
0' - 3"
RAISED CHARACTERS SHALL BE 48 INCHES MINIMUM ABOVE
THE FLOOR, MEASURED TO THE BASELINE OF THE LOWEST
RAISED CHARACTER AND 60 INCHES MAXIMUM ABOVE THE
FLOOR, MEASURED TO THE BASELINE OF THE HIGHEST RAISED
CHARACTER. PER ABAAS GUIDE LINES.
M A
X
SIGN TYPE
S5
1'-6"1'-0"
D O
O R
F R
A M
E H
E
IG
H T
BUILDING-MOUNTED ENTRY SIGN PLACEMENTWALL MOUNTED INTERIOR SIGN PLACEMENT
M
IN
IM
U
M
SIGN
TYPE
1' - 3 3/4"0' - 8 1/2"1' - 3 3/4"
M A
X
DOOR MOUNTED INTERIOR SIGN PLACEMENT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
I-511
G A
T E
H O
U S
E
S
IG
N A
G E
D E
T A
IL
S
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y S
T C
IN
C
IN
N
A T
I, O
H
K E
L L Y
K E
L L Y
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
F
IR
S T
T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
1 : 51
SIGN TYPE S2
1 : 52
SIGN TYPE S3
1 : 53
SIGN TYPE S4
1 : 54
SIGN TYPE S5
1 : 55
SIGN TYPE S6
GENERAL NOTES
A REFER TO I-121 FOR SIGNAGE PLAN, SCHEDULE, AND NOTES.
1/2" = 1'-0"6
SIGNAGE MOUNTING HEIGHTS
A
B
C01
C03
C02
9'-4"
8'-0"
9'-4"
9'-4"
9'-4"
C05
C05 C05
C05
C05
C03
C03
C03
C03
EF EF C06
C08
CEILING LEGEND
ACOUSTICAL LAY-IN
CEILING - 2'x2'
SUSPENDED GYPSUM
BOARD CEILING
SURFACE MOUNTED LIGHT FIXTURE
LAY-IN LIGHT FIXTURE - 2x2
AIR DEVICE - SUPPLY
AIR DEVICE - RETURN
EXHAUST FAN
RETURN AIR GRILLE
EF
EMERGENCY LIGHTING
EMERGENCY LIGHTING
TOP / SLAB
0' - 0"
TRUSS BEARING
9' - 4"
1 2
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
A-105
G A
T E
H O
U S
E R
E F
L E
C T
E D
C E
IL
IN
G P
L A
N
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K D
IS
T
R
IC
T
F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y S
T C
IN
C
IN
N
A T
I, O
H
S C
H M
IT
Z
S C
H M
IT
Z
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
F
IR
S T
T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
1/4" = 1'-0"A6
GATEHOUSE CEILING PLAN
C01 METAL PANEL SOFFIT
C02 PRE-FINISHED GUTTER
C03 PRE-FINISHED DOWNSPOUT
C05 EXTERIOR LIGHT FIXTURE - REFER
ELECTRICAL DRAWINGS
C06 WALL MOUNTED LIGHT FIXTURE - REFER
ELECTRICAL DRAWINGS
C08 DUCTLESS HEAT PUMP - REFER
MECHANICAL DRAWINGS
DRAWING NOTES
0 2' 4' 8'
ENVELOPE AREAS
NORTH WALL 148 SF
SOUTH WALL 148 SF
EAST WALL 462 SF
WEST WALL 462 SF
FLOOR 867 SF
ROOF 1195 SF
1/4" = 1'-0"A1
AIR BARRIER SECTION
SLAB ON GRADE
REINFORCED CONCRETE SLAB ON GRADE OVER
VAPOR BARRIER AND CONTINUOUS RIGID
INSULATION
FINISH FLOOR AS SCHEDULED
EXTERIOR WALLS
EXTERIOR - CONCRETE MASONRY UNITS WITH
CONTINUOUS RIGID INSULATION AND BRICK VENEER
FLUID APPLIED MEMBRANE AIR BARRIER OVER EXTERIOR
FACE OF CMU. PROVIDE CONTINUOUS SEALANT AT ALL
PENETRATIONS
INTERIOR - GYPSUM BOARD OVER METAL STUDS WITH
CLOSED CELL SPRAY FOAM INSULATION PER PLAN.
PROVIDE CONTINUOUS SEALANT AT ALL PENETRATIONS
OPENINGS
STOREFRONT - AS SCHEDULED BALLISTIC RATED
ALUMINUM FRAME / GLAZING. FRAMING ANCHORED
TO CMU WALL AND SEALED ALL AROUND EXTERIOR
AND INTERIOR.
DOORS - AS SCHEDULED. HOLLOW METAL DOORS
AND FRAMES ANCHORED TO CMU WALL OPENING
AND SEALED ALL AROUND EXTERIOR AND
INTERIOR. WEATHER SEALS AT DOOR PERIMETER
MECHANICAL PENETRATIONS - AS INDICATED.
SEAL ALL AROUND EXTERIOR AND INTERIOR.
ROOFS
STANDING SEAM METAL ROOFING OVER RIGID INSULATION
OVER AIR BARRIER OVER ROOF SHEATHING OVER METAL
DECK. CLOSED CELL SPRAY FOAM INSULATION UNDERSIDE
OF DECKING. PROVIDE CONTINOUS SEALANT ALL AROUND
AT ALL ROOF PENETRATIONS
OFFICE
COMMUNICATIONS
116 MECH / ELEC
OUTSIDE
STORAGE
INSIDE
STORAGE
RESTROOM
TOWER
R E
C Y
C L
IN
G
S1
S3(2) S4(4)
PO1
T1
M1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
I-112
S E
A R
C H
B L D
G
F U
R N
IT
U
R E
P L A
N
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K
D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y
C
IN
N
A T
I O
H
ID
K E
L L Y
K E
L L Y
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
O P
T
IO
N A
L F
IE
L D
F
IR
S
T T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
P R
O J E
C T
O P
T
IO
N A
L F
IE
L D
1/4" = 1'-0"1
SEARCH BLDG - FURNITURE PLAN
NN
TRUE NORTH PLAN NORTH
A ALL FURNITURE SHOWN IS REPRESENTATIVE AND DOES NOT NECESSARILY REFLECT ACTUAL
SPECIFICATIONS. REFER TO FFE PACKAGE FOR ALL FURNITURE SPECIFICATIONS AND FINISHES.
B ALL AUDIO VISUAL (A/V) EQUIPMENT BY OTHERS TO BE COORDINATED WITH THE ARCHITECT, GENERAL CONTRACTOR (GC), AND THE A/V CONSULTANT AND/OR CONTRACTOR PRIOR TO ANY
RELATED CONSTRUCTION.
C ALL POWER, DATA AND TELCOM LOCATIONS SHALL BE COORDINATED BETWEEN THE
CONTRACTOR, FURNITURE VENDOR AND GOVERNMENT BASED ON PRODUCT SELECTED.
REFERENCE FURNITURE, ELECTRICAL, DATA AND TELECOM DRAWINGS FOR THE FURNITURE
LOCATION, SIZE, AND TYPE. FURNITURE VENDOR/CONTRACTOR TO COORDINATE QUANTITY OF
CABLES AND ANY WIRING NEEDED PER AWARDED PRODUCT.
GENERAL NOTES
FURNITURE LEGEND
M1 RECYCLE CENTER
PO1 PRIORITY WORKSTATION
S1 ERGONOMIC TASK CHAIR
S2 ERGONOMIC TASK STOOL (GATEHOUSE BUILDING)
S3 GUEST CHAIR WITH ARMS, UPHOLSTERED
S4 STACKABLE POLY CHAIR
T1 MEETING TABLE, 42" ROUND
OFFICE
COMMUNICATIONS
116 MECH / ELEC
OUTSIDE
STORAGE
INSIDE
STORAGE
RESTROOM
S04
S04
S05
S02S03
S01 S06
S06
S04
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
I-122
S E
A R
C H
B L D
G
S
IG
N A
G E
P L A
N
S C
H E
D U
L E
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K
D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y
C
IN
N
A T
I O
H
ID
K E
L L Y
K E
L L Y
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
O P
T
IO
N A
L F
IE
L D
F
IR
S
T T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
P R
O J E
C T
O P
T
IO
N A
L F
IE
L D
1/4" = 1'-0"1
SEARCH BLDG - FLOOR PLAN
N
0 4'2' 8'
N
TRUE NORTH PLAN NORTH
A ALL SIGNS TO FOLLOW ADAAG GUIDELINES, CONTRACTORS TO
VERIFY THESE GUIDELINES.REFERENCE SPECIFICATION SECTION 10
14 02 FOR DETAILS.
B REFERENCE DRAWING I-512 FOR SIGN GRAPHICS/DETAILS. SIGNAGE
DETAILS TO FOLLOW THE CURRENT REVISION OF AIRFORCE SIGN
STANDARDS UFC 3-120-01 AND DEPARTMENT OF ARMY 5-807-10
SIGNAGE MANUAL, SECTION 4.1.
C CONTRACTOR TO VERIFY WITH BASE ANY FACILITY STANDARDS OR
ORGANIZATIONAL EMBLEMS/SYMBOLS TO BE USED.
D ALL SIGNS TO BE LOCATED 3" FROM LATCH SIDE OF DOOR, MOUNTED
60 INCHES A.F.F TO THE CENTERLINE OF SIGN. IF THERE IS
INSUFFICIENT ROOM ON THE LATCH SIDE OF THE DOOR TO INSTALL
THE SIGN, THEN SIGNS ARE TO BE POSITIONED TO THE NEAREST
ADJACENT WALL OF THE DOOR LATCH.
E ANY SIGN PLAQUE MOUNTED TO WINDOW GLAZING IS TO HAVE A
BLANK SIGN PLAQUE WITH MATCHING
F MOUNTING HEIGHTS IDENTIFYING ROOMS MUST BE MOUNTED SO
THAT THE BOTTOM OF THE RAISED CHARACTERS ARE BETWEEN 48
INCHES AND 60 INCHES ABOVE THE FLOOR. SEE MOUNTING DETAIL
ON THIS DRAWING.
G SIGNS DESIGNATED FOR THE EXTERIOR OF BUILDING TO BE
EXTERIOR GRADE ALUMINUM .080, POWDER COATED.
H INTERIOR SIGN FINISHES - COPY/TEXT COLOR TO BE WHITE,
BACKGROUND COLOR TO BE BLACK.
I EXTERIOR SIGNS - FINISH TO BE WHITE TEXT ON BROWN
BACKGROUND, TO MATCH BASE STANDARDS
GENERAL NOTES
INTERIOR SIGNAGE SCHEDULE
Number Name Sign Type
Sign Quantity
Sign Header Panel Sign Line Text 1
Sign Line Text 2 MOUNTING BRAILLE Comments
110 OFFICE S5 1 110 SEARCH BUILDING EXTERIOR WALL NO EXTERIOR
110 OFFICE S6 1 --- (SYMBOL 'NO SMOKING') NO SMOKING EXTERIOR WALL NO EXTERIOR
111 BREAK ROOM S1 1 111 BREAK ROOM WALL YES
111 BREAK ROOM S6 1 --- (SYMBOL 'NO SMOKING') NO SMOKING WALL NO
112 INSIDE STORAGE S2 1 112 STORAGE WALL YES
113 RESTROOM S3 1 113 (UNISEX & ADA SYMBOL) RESTROOM WALL YES
114 OUTSIDE STORAGE S4 1 114 STORAGE EXTERIOR WALL NO EXTERIOR
115 MECH / ELEC S4 1 115 MECHANICAL / ELECTRICAL EXTERIOR WALL NO EXTERIOR
116 COMMUNICATIONS S4 1 116 COMMUNICATIONS EXTERIOR WALL NO EXTERIOR
S01 PROVIDE SIGN TYPE S1 AT THIS LOCATION.
S02 PROVIDE SIGN TYPE S2 AT THIS LOCATION.
S03 PROVIDE SIGN TYPE S3 AT THIS LOCATION.
S04 PROVIDE SIGN TYPE S4 AT THIS LOCATION.
S05 PROVIDE SIGN TYPE S5 AT THIS LOCATION.
S06 PROVIDE SIGN TYPE S6 AT THIS LOCATION.
DRAWING NOTES
1 1/2" TACTILE ROOM NUMBER
WITH BRAILLE, HELVETICA
NEUE MEDIUM (38 MM)
PRINTED PAPER INSERT WITH
ROOM DESCRIPTION BEHIND
CLEAR ACRYLIC
3/4" PRINTED MESSAGE HELVETICA NEUE
MEDIUM (19MM), UPPER AND LOWER CASE
BLACK LETTERS ON WHITE BACKGROUND
Office Branch Personnel
(ROOM ID SIGN WITH PAPER INSERT)
REMOVABLE END
CAPS (BOTH SIDES)
8 1/2"
9"
1 1/2" TACTILE ROOM NUMBER
WITH BRAILLE, HELVETICA
NEUE 65 MEDIUM (38 MM)
1/2" (13 MM) TACTILE
ROOM DESCRIPTION
STORAGE
(PERMANENT ROOM ID SIGN)
REMOVABLE END
CAPS (BOTH SIDES)
8 1/2"
9"
6" (152MM)
APPROPRIATE
SYMBOL PER SIGN
SCHEDULE
UNISEX 1" (25MM) TACTILE ROOM
DESCRIPTION WITH
BRAILLE, HELVETICA
NEUE 65 MEDIUM
REMOVABLE END
CAPS (BOTH SIDES)
OPTIONAL 1 1/2"
(38MM) TACTILE
ROOM NUMBER
WITH BRAILLE
HELVETICA NEUE
65 MEDIUM
(ACCESSIBLE RESTROOM ID SIGNS)
9"
8 1/2"
ROOM NUMBER,
HELVETICA NEUE
MEDIUM 38MM FLUSH
LEFT
UPPER CASE
HELVETICA NEUE
19MM CAPITAL
LETTER HEIGHT
FLUSH LEFT.
COMMUNICATIONS
3MM REVEAL
(EXTERIOR GRADE SIGN)
9"
SYMBOL:
BLACK AND
RED ON WHITE
BACKGROUND
No Smoking
UPPER AND
LOWER CASE
HELVETICA NEUE
55 ROMAN, 19MM
CAPITAL LETTER
HEIGHT
END CAPS
(MANDATORY & PROHIBITORY SIGNS)
6"
M
IN
IM
U
M
SIGN
TYPE
0' - 3"
RAISED CHARACTERS SHALL BE 48 INCHES MINIMUM ABOVE
THE FLOOR, MEASURED TO THE BASELINE OF THE LOWEST
RAISED CHARACTER AND 60 INCHES MAXIMUM ABOVE THE
FLOOR, MEASURED TO THE BASELINE OF THE HIGHEST RAISED
CHARACTER. PER ABAAS GUIDE LINES.
M A
X
SIGN TYPE
S5
1'-6"1'-0"
D O
O R
F R
A M
E H
E
IG
H T
BUILDING-MOUNTED ENTRY SIGN PLACEMENTWALL MOUNTED INTERIOR SIGN PLACEMENT
BLDG NUMBER
3/8" (10 MM)
HELVETICA NEUE 75
BOLD UPPER &
LOWER CASE
Gatehouse
Anti-terrorism Perimeter Security Entry Control Facility
(BUILDING ENTRANCE SIGN)
HEADQUARTERS
HELVETICA NEUE
MEDIUM (STREET
ADDRESS MAY BE
USED HERE)
EXTERIOR GRADE
2'-0"
UPPER CASE
HELVETICA
MEDIUM, 4" (100MM)
HEIGHT
LETTERS AND
NUMBERS IN WHITE
TEXT ON BROWN
BACKGROUND, BASE
STANDARD
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
I-512
S E
A R
C H
B L D
G
S
IG
N A
G E
D E
T A
IL
S
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K
D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y
C
IN
N
A T
I O
H
ID
K E
L L Y
K E
L L Y
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
O P
T
IO
N A
L F
IE
L D
F
IR
S
T T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
P R
O J E
C T
O P
T
IO
N A
L F
IE
L D
1 : 51
SIGN TYPE S1
1 : 52
SIGN TYPE S2
1 : 53
SIGN TYPE S3
1 : 55
SIGN TYPE S4
1 : 56
SIGN TYPE S6
1/2" = 1'-0"7
SIGNAGE MOUNTING HEIGHTS
1 : 54
SIGN TYPE S5
A REFER TO I-122 FOR SIGNAGE PLAN, SCHEDULE, AND NOTES.
GENERAL NOTES
OS
OS
A
B
C01
C02 C03 A7
A-301
A5
A-301
C05
C05
C05
C05
9'-4"
9'-4"9'-4"9'-4"
8'-0"8'-0"
9'-4"
C03
C03
C03
EF
EF
A1
A-106
C07
C06
CEILING LEGEND
ACOUSTICAL LAY-IN
CEILING - 2'x2'
SUSPENDED GYPSUM
BOARD CEILING
SURFACE MOUNTED LIGHT FIXTURE
LAY-IN LIGHT FIXTURE - 2x2
AIR DEVICE - SUPPLY
AIR DEVICE - RETURN
EXHAUST FAN
RETURN AIR GRILLE
EF
EMERGENCY LIGHTING
EMERGENCY LIGHTING
OCCUPANCY SENSOROS
TOP / SLAB
0' - 0"
TRUSS BEARING
9' - 4"
TOF
-3' - 0"
1 2
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
04-01-2022
A-106
S E
A R
C H
B L D
G R
E F
L E
C T
E D
C E
IL
IN
G P
L A
N
G
IL
L E
S P
IE
G
A T
E
W
A T
E R
V L
IE
T N
Y
N E
W Y
O R
K
D
IS
T
R
IC
T F
E D
E R
A L P
L A
Z A
T
H F
L O
O R
N E
W Y
O R
K N
Y
K Z
F D
E S
IG
N
B
R O
A D
W A
Y
C
IN
N
A T
I O
H
ID
S C
H M
IT
Z
S C
H M
IT
Z
S C
H M
IT
Z
-0
-2
W D
S F
W F
D
O P
T
IO
N A
L F
IE
L D
F
IR
S
T T
IT
L E
S E
C O
N D
T
IT
L E
04-01-2022 READY TO ADVERTISE SET
C O
M M
E R
C
IA
L V
E H
IC
L E
A C
C E
S S
C O
N T
R O
L P
O
IN
T
P R
O J E
C T
O P
T
IO
N A
L F
IE
L D
1/4" = 1'-0"A5
SEARCH BLDG CEILING PLAN
DRAWING NOTES
C01 METAL PANEL SOFFIT
C02 PRE-FINISHED GUTTER
C03 PRE-FINISHED DOWNSPOUT
C05 EXTERIOR LIGHT FIXTURE - REFER
ELECTRICAL DRAWINGS
C06 WALL MOUNTED LIGHT FIXTURE - REFER
ELECTRICAL DRAWINGS
C07 UNIT HEATER - REFER MECHANICAL
DRAWINGS
0 4'2' 8'
ENVELOPE AREAS
NORTH WALL 220 SF
SOUTH WALL 220 SF
EAST WALL 225 SF
WEST WALL 225 SF
FLOOR 658 SF
ROOF 900 SF
SLAB ON GRADE
REINFORCED CONCRETE SLAB ON GRADE OVER
VAPOR BARRIER AND CONTINUOUS RIGID
INSULATION
FINISH FLOOR AS SCHEDULED
EXTERIOR WALLS
EXTERIOR - CONCRETE MASONRY UNITS WITH
CONTINUOUS RIGID INSULATION AND BRICK VENEER
FLUID APPLIED MEMBRANE AIR BARRIER OVER EXTERIOR
FACE OF CMU. PROVIDE CONTINUOUS SEALANT AT ALL
PENETRATIONS
INTERIOR - GYPSUM BOARD OVER METAL STUDS WITH
CLOSED CELL SPRAY FOAM INSULATION PER PLAN.
PROVIDE CONTINUOUS SEALANT AT ALL PENETRATIONS
OPENINGS
STOREFRONT - AS SCHEDULED BALLISTIC RATED
ALUMINUM FRAME / GLAZING. FRAMING ANCHORED
TO CMU WALL AND SEALED ALL AROUND EXTERIOR
AND INTERIOR.
DOORS - AS SCHEDULED. HOLLOW METAL DOORS
AND FRAMES ANCHORED TO CMU WALL OPENING
AND SEALED ALL AROUND EXTERIOR AND
INTERIOR. WEATHER SEALS AT DOOR PERIMETER
MECHANICAL PENETRATIONS - AS INDICATED.
SEAL ALL AROUND EXTERIOR AND INTERIOR.
ROOFS
STANDING SEAM METAL ROOFING OVER RIGID INSULATION
OVER AIR BARRIER OVER ROOF SHEATHING OVER METAL
DECK. CLOSED CELL SPRAY FOAM INSULATION UNDERSIDE
OF DECKING. PROVIDE CONTINUOUS SEALANT ALL AROUND
AT ALL ROOF PENETRATIONS
1/4" = 1'-0"A1
AIR BARRIER SECTION
Gillespie Gate, Watervliet NY Contract: W9128F17D0010 Commercial Vehicle Access Control Point 90% Submittal January 26, 2021
ROOM TYPE: COMMAND CONTROL / INSIDE STORAGE / OFFICE / BREAK RM / RESTROOM
(Page 1 of 2)
TAG / SPEC
SAMPLES
P-1
SHERWIN WILLIAMS
COLOR: REPOSE GRAY
SW7015
FINISH:
EGGSHELL,;EPOXY
FINISH AT MASONRY
WALLS
Location: Main Wall Paint
P-2
COLOR: GRIZZLE GRAY
SW7068
FINISH: SEMI-GLOSS
Location: Hollow Metal Doors and Frames
P-3
COLOR: PURE WHITE
SW7005
FINISH: FLAT
Location: Ceiling Paint
GT-1
MAPEI
COLOR: 47 CHARCOAL
Location: Floor Tile Grout
FT-1
DALTILE
STYLE: HAUT MONDE
COLOR: ELITE GREY
FINISH: MATTE
SIZE: 12 X 24”
BULLNOSE BASE
GROUT: GT-1
Location: Floor tile and Tile Base
CP-1 FT-1
RTA Submittal April, 1, 2022
SS-1
HI-MACS
COLOR: M553 EBONY
CONCRETE
Location: Casework and Windowsills
PL-1
FORMICA
COLOR: 9319-BH
STAINLESS
FINISH: BRUSH
Location: Casework
ROOM TYPE: OUTSIDE STORAGE / COMMUNICATION / MECHANICAL / ELECTRICAL (Page 1 of 1)
P-1
COLOR: REPOSE GRAY
SW7015
FINISH: EGGSHELL
Location:
Main Wall Paint
P-2
COLOR: GRIZZLE GRAY
SW7068
FINISH: SEMI-GLOSS
Location:
Hollow Metal Doors and Frames
RB-1
JOHNSONITE
COLOR: CHARCOAL 20
STYLE: COVE BASE
SIZE: 4” HIGH
Rubber Base
SC-1
SEALED CONCRETE
Sealed Concrete Floors
CEILING FINISHES (Page 1 of 1)
ACT-1
ARMSTRONG
STYLE: CALLA
COLOR: WHITE
SIZE: 2’ X 2’
EDGE: BEVELED
TEGULAR 9/16”
GRID: PRELUDE XL
15/16” EXPOSED TEE
SOUND RATING: NRC
0.75
Acoustical Ceiling Tile
USACE - ACP - Watervliet NY 653003
SECTION 09 30 10
CERAMIC, QUARRY, AND GLASS TILING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A137.1 (2012) American National Standards Specifications for Ceramic Tile
ASTM INTERNATIONAL (ASTM)
ASTM C373 (2018)Standard Test Methods for Determination of Water Absorption and Associated Properties by Vacuum Method for Pressed Ceramic Tiles and Glass Tiles and Boil Method for Extruded Ceramic Tiles and Non-tile Fired Ceramic Whiteware Products
ASTM C648 (2004; R 2009) Breaking Strength of Ceramic Tile
ASTM C1027 (2009; R 2017) Standard Test Method for Determining Visible Abrasion Resistance of Glazed Ceramic Tile
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D2103 (2015) Standard Specification for Polyethylene Film and Sheeting
ASTM D4068 (2017) Standard Specification for Chlorinated Polyethylene (CPE) Sheeting for Concealed Water-Containment Membrane
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
TILE COUNCIL OF NORTH AMERICA (TCNA)
TCNA Hdbk (2017) Handbook for Ceramic, Glass, and Stone Tile Installation
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
36 CFR 1191 Americans with Disabilities Act (ADA)
SECTION 09 30 10 Page 1
Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Porcelain Tile; G
Recycled Content for Porcelain Tile
Setting-Bed; G
Mortar, Grout, and Adhesive; G
SD-04 Samples
Tile; G
SD-07 Certificates
Indoor Air Quality for Adhesives
Indoor Air Quality for Sealants
SD-08 Manufacturer's Instructions
Maintenance Instructions
SD-10 Operation and Maintenance Data
Installation; G
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Adhesives and Sealants
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body.When product does not have certification, provide validation that product meets the indoor air
SECTION 09 30 10 Page 2 quality product requirments cited in this Section.
1.4 QUALITY ASSURANCE
Provide installers having a minimum of two years experience with a company specializing in performing the type of work described. Each type and color of tile to be provided from a single source. Each type and color of mortar, adhesive, and grout to be provided from the same source.
1.5 DELIVERY, STORAGE, AND HANDLING
Ship tiles in sealed packages and clearly marked with the grade, type of tile, producer identification, and country of origin. Deliver materials to the project site in manufacturer's original unopened containers with seals unbroken and labels and hallmarks intact. Protect materials from weather, and store them under cover in accordance with manufacturer's printed instructions.
1.6 ENVIRONMENTAL REQUIREMENTS
Do not perform ceramic tile work unless the substrate and ambient temperature is at least 50 degrees F and rising. Maintain temperature above 50 degrees F while the work is being performed and for at least 7 days after completion of the work. When temporary heaters are used, ventilate the area to the outside to avoid carbon dioxide damage to new tilework.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a 1-year period.
1.8 EXTRA MATERIALS
Supply an extra 2 percent of each type tile used in clean and marked cartons.
PART 2 PRODUCTS
2.1 TILE
Provide tiles that comply with ANSI A137.1 and are standard grade tiles.
Provide a minimum breaking strength of 125 lbs. for wall tile and 250 lbs.
for floor tile in accordance with ASTM C648. Provide floor tiles with a wet dynamic coefficient of friction (DCOF) value of 0.42 or greater when tested in accordance with ANSI A137.1 requirements. Provide glazed floor tile with a Class IV-Commercial V-Heavy Commercial classification as rated by the manufacturer when tested in accordance with ASTM C1027 for visible abrasion resistance as related to foot traffic. For materials like tile, submit samples of sufficient size to show color range, pattern. Submit manufacturer's catalog data.
2.1.1 Porcelain Tile
Provide unglazed, rectified porcelain tile, cove base and trim pieces with color extending uniformly through the body of the tile. Blend tiles in factory and in a packages to have same color range and continuous blend for installation. Provide tile size(s) of as indicated on drawings. Provide a
0.50 percent maximum water absorption in accordance with ASTM C373.
SECTION 09 30 10 Page 3
Provide Porcelain Tiling Materials that contain a minimum of 10 percent recycled content. Provide data identifying percentage of recycled content for porcelain tile.
2.2 SETTING-BED
Submit manufacturer's catalog data. Compose the setting-bed manufacturer's instructions.
2.3 WATER
Provide potable water.
2.4 MORTAR, GROUT, AND ADHESIVE
Provide certification or validation of indoor air quality for adhesives.
2.4.1 Latex-Portland Cement Mortar
TCNA Hdbk.
2.4.2 Ceramic Tile Grout
TCNA Hdbk; petroleum-free and plastic-free sand portland cement grout latex-portland cement grout.
2.4.3 Sealants
Comply with applicable regulations regarding toxic and hazardous materials and as specified. Grout sealant must not change the color or alter the appearance of the grout. Refer to Section 07 92 00 JOINT SEALANTS.
Provide certification or validation of indoor air quality for sealants.
2.5 SUBSTRATES
2.6 TRANSITION STRIPS
Provide transitions as required. Provide types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified.
Provide transition strips that comply with 36 CFR 1191requirements.
2.7 MEMBRANE MATERIALS
Conform to ASTM D226/D226M, Type 1 for 15 pound waterproofing membrane, asphalt-saturated building felt. Conform to ASTM D2103 or ASTM D4068 4 mil for polyethylene film.
2.8 COLOR, TEXTURE, AND PATTERN
Provide color and pattern as inidcated on drawings. Color listed is not intended to limit the selection of equal colors from other manufacturers.
Provide floor patterns as specified on the drawings.
PART 3 EXECUTION
3.1 GENERAL INSTALLATION REQUIREMENTS
Do not start tile work until roughing in for mechanical and electrical work
SECTION 09 30 10 Page 4 has been completed and tested, and built-in items requiring membrane waterproofing have been installed and tested. Close space, in which tile is being set, to traffic and other work. Keep closed until tile is firmly set. Do not start floor tile installation in spaces requiring wall tile until after wall tile has been installed. Apply tile in colors and patterns indicated in the area shown on the drawings. Install tile with the respective surfaces in true even planes to the elevations and grades shown. Provide special shapes as required for sills, jambs, recesses, offsets, external corners, and other conditions to provide a complete and neatly finished installation. Solidly back tile bases and coves with mortar. Do not walk or work on newly tiled floors without using kneeling boards or equivalent protection of the tiled surface. Submit manufacturer's preprinted installation instructions.
Do not install building construction materials that show visual evidence of biological growth.
3.2 INSTALLATION OF FLOOR TILE
Install floor tile in accordance with TCNA Hdbk method F122 and with grout joints as recommended by the manufacturer for the type of tile.
3.2.1 Dry-Set and Latex-Portland Cement
Use Latex-Portland cement mortar to install tile directly over properly cured, plane, clean concrete slabs in accordance with TCNA Hdbk.
3.2.2 Ceramic Tile Grout
Prepare and install ceramic tile grout in accordance with TCNA Hdbk.
3.2.3 Waterproofing
Shower pans are specified in Section 22 00 00 PLUMBING, GENERAL PURPOSE.
3.3 INSTALLATION OF TRANSITION STRIPS
Install transition strips where indicated, in a manner similar to that of the ceramic tile floor and as recommended by the manufacturer.
3.4 CLEANING AND PROTECTING
Upon completion, thoroughly clean tile surfaces in accordance with manufacturer's approved cleaning instructions. Do not use acid for cleaning glazed tile. Clean floor tile with resinous grout or with factory mixed grout in accordance with printed instructions of the grout manufacturer. After the grout has set, provide a protective coat of a noncorrosive soap or other approved method of protection for tile wall surfaces. Cover tiled floor areas with building paper before foot traffic is permitted over the finished tile floors. Provide board walkways on tiled floors that are to be continuously used as passageways by workmen.
Replace damaged or defective tiles. Submit copy of manufacturer's printed maintenance instructions.
-- End of Section --
SECTION 09 30 10 Page 5
SECTION 09 65 00
RESILIENT FLOORING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D4078 (2002; R 2015) Water Emulsion Floor Polish
ASTM F1861 (2016) Standard Specification for Resilient Wall Base
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Accessories; G
Adhesives
Wall Base
SD-04 Samples
Wall Base; G
SD-06 Test Reports
Moisture, Alkalinity and Bond Tests; G
SECTION 09 65 00 Page 1
SD-07 Certificates
Indoor Air Quality for Adhesives
SD-08 Manufacturer's Instructions
Surface Preparation
Installation
SD-10 Operation and Maintenance Data
Accessories; G
1.3 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, production run, project identification, and handling instructions. Store materials in a clean, dry, secure, and well-ventilated area free from strong contaminant sources and residues with ambient air temperature maintained above 68 degrees F and below 85 degrees F, stacked according to manufacturer's recommendations. Remove resilient products from packaging to allow ventilation prior to installation. Protect materials from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances. Observe ventilation and safety procedures specified in the MSDS. Do not store rubber surface products with materials that have a high capacity to adsorb volatile organic compound (VOC) emissions. Do not store exposed rubber surface materials in occupied spaces.
1.4 ENVIRONMENTAL REQUIREMENTS
Maintain areas to receive resilient flooring at a temperature above 68 degrees F and below 85 degrees F for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature of 55 degrees F thereafter. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
1.5 SCHEDULING
Schedule resilient application after the completion of other work which would damage the finished surface.
1.6 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a one year period.
1.7 EXTRA MATERIALS
Provide extra wall base material composed of 20 linear feet of each type, color and pattern. Package all extra materials in original properly marked containers bearing the manufacturer's name, brand name, pattern color name and number, production run, and handling instructions. Provide extra materials from the same lot as those installed. Leave extra stock at the
SECTION 09 65 00 Page 2 site in location assigned by Contracting Officer.
PART 2 PRODUCTS
2.1 WALL BASE
Conform to ASTM F1861, Type TP (thermoplastic rubber) Style B (coved -installed with resilient flooring). Provide 4 inch high and a minimum 1/8 inch thick wall base. Provide job formed corners in matching height, shape, and color.
2.2 ADHESIVES
Provide adhesives for base and accessories as recommended by the manufacturer and comply with local indoor air quality standards. Submit manufacturer's descriptive data, documentation stating physical characteristics, and mildew and germicidal characteristics.
Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for office spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168. Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives.
2.3 SURFACE PREPARATION MATERIALS
Provide surface preparation materials, such as floor crack fillers as recommended by the flooring manufacturer for the subfloor conditions.
2.4 FINISH
Provide finish as recommended by the manufacturer and conform to ASTM D4078 for polish.
2.5 CAULKING AND SEALANTS
Provide caulking and sealants in accordance with Section 07 92 00 JOINT
SEALANTS.
2.6 MANUFACTURER'S COLOR, PATTERN AND TEXTURE
Provide color, pattern and texture for accessories as indicated on the drawings selected from manufacturer's standard colors. Color listed is not intended to limit the selection of equal colors from other manufacturers.
Submit Data Package 1 in accordance with Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
PART 3 EXECUTION
3.1 EXAMINATION
Examine and verify that site conditions are in agreement with the design package. Report all conditions that will prevent a proper installation.
Do not take any corrective action without written permission from the Government. Work will proceed only when conditions have been corrected and
SECTION 09 65 00 Page 3 accepted by the installer. Submit manufacturer's printed installation instructions for all flooring materials and accessories, including preparation of substrate, seaming techniques, and recommended adhesives.
3.2 GENERAL INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
3.3 CLEANING
Immediately upon completion of installation of wall base in a room or an area, dry and clean the adjacent surfaces to remove all surplus adhesive.
Clean as recommended in accordance with manufacturer's printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and finish in accordance with manufacturer's written instructions.
3.4 PROTECTION
From the time of installation until acceptance, protect from damage as recommended by the manufacturer. Remove and replace wall base which is not tight to wall or securely adhered.
SECTION 09 65 00 Page 4
SECTION 09 51 00
ACOUSTICAL CEILINGS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A489 (2018; E 2018) Standard Specification for Carbon Steel Eyebolts
ASTM A641/A641M (2009a; R 2014) Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire
ASTM C635/C635M (2017) Standard Specification for Manufacture, Performance, and Testing of Metal Suspension Systems for Acoustical Tile and Lay-In Panel Ceilings
ASTM C636/C636M (2013) Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels
ASTM C834 (2017) Standard Specification for Latex Sealants
ASTM E580/E580M (2017) Standard Practice for Installation of Ceiling Suspension Systems for Acoustical Tile and Lay-in Panels in Areas Subject to Earthquake Ground Motions
ASTM E795 (2016) Standard Practices for Mounting Test Specimens During Sound Absorption Tests
ASTM E1264 (2014) Acoustical Ceiling Products
ASTM E1414/E1414M (2011a; E 2014) Airborne Sound Attenuation Between Rooms Sharing a Common Ceiling Plenum
ASTM E1477 (1998a; R 2017; E 2018) Standard Test Method for Luminous Reflectance Factor of Acoustical Materials by Use of Integrating-Sphere Reflectometers
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile
SECTION 09 51 00 Page 1
Organic Chemical Emissions from Indoor Sources using Environmental Chambers
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
U.S. DEPARTMENT OF DEFENSE (DOD)
UFC 3-310-04 (2013; with Change 1, 2016) Seismic Design of Buildings
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Approved Detail Drawings; G
SD-03 Product Data
Acoustical Ceiling Systems; G
SD-04 Samples
Acoustical Ceiling Tiles; G
SD-06 Test Reports
Ceiling Attenuation Class and Test; G
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality Certifications
1.3.1.1 Ceiling Tiles
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs. Provide current product certification documentation from certification body.
1.4 DELIVERY, STORAGE. AND HANDLING
Deliver materials to the site in the manufacturer's original unopened
SECTION 09 51 00 Page 2 containers with brand name and type clearly marked. Carefully handle and store materials in dry, watertight enclosures. Immediately before installation, store acoustical units for not less than 24 hours at the same temperature and relative humidity as the space where they will be installed in order to assure proper temperature and moisture acclimation.
1.5 ENVIRONMENTAL REQUIREMENTS
Maintain a uniform temperature of not less than 60 degrees F nor more than 85 degrees F and a relative humidity of not more than 70 percent for 24 hours before, during, and 24 hours after installation of acoustical units.
1.6 SCHEDULING
Complete and dry interior finish work such as plastering, concrete and terrazzo work before ceiling installation. Complete mechanical, electrical, and other work above the ceiling line; install and start operating heating, ventilating, and air conditioning systems in order to maintain temperature and humidity requirements.
1.7 WARRANTY
Provide manufacturer's standard performance guarantees or warranties that extend beyond a one…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .