Amendment 0007_33 40 00_revised.pdf
PDF 594 KB Posted
- Attached to
- MCRC Fire Protection System & Gates Upgrade Federal contract opportunity
- Solicitation number
- W912DS21B0009
About this file
This document provides details on an upcoming federal contract opportunity with the U.S. Army Corps of Engineers for fire protection system upgrades and gate replacements at the Marine Corps Reserve Center in Brooklyn, New York. The firm-fixed-price construction contract will include installing a new fire protection system to replace an aging system, with coordination with the National Park Service. Scope of work includes a new water storage tank, pump, pump house and associated piping, mechanical, electrical and communication work. It will also replace existing manual gates with new gates, install and repair fencing, reconfigure and repair the existing drive between two gates, remove an existing berm, and install a new driveway connecting to the taxiway. The pre-solicitation indicates the solicitation will be posted on or around April 15, 2021 on SAM.gov, with proposals due approximately 30 days later. The contract is a small business set-aside, with a period of performance of 365 calendar days. The project cost is estimated between $1-5 million.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Civil and Fire Suppression MAY 2021
MCRC BROOKLYN, NY 2018-117-10
SECTION TABLE OF CONTENTS
DIVISION 33 - UTILITIES
SECTION 33 40 00
STORM DRAINAGE UTILITIES
02/10
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery and Storage
1.3.2 Handling
PART 2 PRODUCTS
2.1 PIPE FOR CULVERTS AND STORM DRAINS
2.1.1 Concrete Pipe
2.1.2 Ductile Iron Culvert Pipe
2.1.3 Polyethylene (PE) Pipe
2.1.3.1 Corrugated PE Pipe
2.1.4 Polypropylene (PP) Pipe
2.2 DRAINAGE STRUCTURES
2.2.1 Flared End Sections
2.2.2 Precast Reinforced Concrete Box
2.3 MISCELLANEOUS MATERIALS
2.3.1 Concrete
2.3.2 Mortar
2.3.3 Precast Concrete Segmental Blocks
2.3.4 Brick
2.3.5 Precast Reinforced Concrete Manholes
2.3.6 Frame and Cover for Gratings
2.3.7 Joints
2.3.7.1 Flexible Watertight Joints
2.3.7.2 External Sealing Bands
2.3.7.3 Flexible Watertight, Gasketed Joints
2.3.7.4 Corrugated PE Plastic Pipe
2.3.7.5 Ductile Iron Pipe
2.4 RESILIENT CONNECTORS
2.5 EROSION CONTROL RIP RAP
PART 3 EXECUTION
3.1 INSTALLATION OF PIPE CULVERTS, STORM DRAINS, AND DRAINAGE
STRUCTURES
3.1.1 Trenching
3.1.2 Removal of Rock
3.1.3 Removal of Unstable Material
3.2 BEDDING
3.2.1 Concrete Pipe Requirements
3.2.2 Ductile Iron Pipe
3.2.3 Plastic Pipe
SECTION 33 40 00 Page 1
ADDENDUM 006: 06-15-2021
cjgray Text Box Revised Section Addendum 006: 06-15-2021
3.3 PLACING PIPE
3.3.1 Concrete, Ductile Iron and Cast-Iron Pipe
3.3.2 PE
3.4 JOINTING
3.4.1 Concrete
3.4.1.1 Flexible Watertight Joints
3.5 DRAINAGE STRUCTURES
3.5.1 Manholes and Inlets
3.5.2 Walls and Headwalls
3.6 BACKFILLING
3.6.1 Backfilling Pipe in Trenches
3.6.2 Backfilling Pipe in Fill Sections
3.6.3 Movement of Construction Machinery
3.6.4 Compaction
3.6.4.1 General Requirements
3.6.4.2 Minimum Density
3.7 FIELD PAINTING
3.7.1 Cast-Iron Covers, Frames, Gratings, And Steps
3.7.2 Steel Covers And Frames Or Concrete Frames
3.8 FIELD QUALITY CONTROL
3.8.1 Tests
3.8.1.1 Determination of Density
3.8.2 Inspection
3.8.2.1 Post-Installation Inspection
3.8.2.1.1 Concrete
3.8.2.1.2 Flexible Pipe
3.8.2.1.3 Post-Installation Inspection Report
3.8.3 Repair Of Defects
3.8.3.1 Inspection
3.8.3.1.1 Concrete
3.8.3.1.2 Flexible Pipe
3.9 PROTECTION
3.10 WARRANTY PERIOD
-- End of Section Table of Contents --
SECTION 33 40 00 Page 2
ADDENDUM 006: 06-15-2021
SECTION 33 40 00
STORM DRAINAGE UTILITIES
02/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 294 (2017) Standard Specification for Corrugated Polyethylene Pipe, 300- to 1500-mm (12- to 60-in.) Diameter
ASTM INTERNATIONAL (ASTM)
ASTM A48/A48M (2003; R 2012) Standard Specification for Gray Iron Castings
ASTM A536 (1984; R 2014) Standard Specification for Ductile Iron Castings
ASTM A716 (2008; R 2014) Standard Specification for Ductile Iron Culvert Pipe
ASTM A929/A929M (2018) Standard Specification for Steel Sheet, Metallic-Coated by the Hot-Dip Process for Corrugated Steel Pipe
ASTM B26/B26M (2014; E 2015) Standard Specification for Aluminum-Alloy Sand Castings
ASTM C139 (2017) Standard Specification for Concrete Masonry Units for Construction of Catch Basins and Manholes
ASTM C1433 (2016b) Standard Specification for Precast Reinforced Concrete Monolithic Box Sections for Culverts, Storm Drains, and Sewers
ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C270 (2014a) Standard Specification for Mortar for Unit Masonry
ASTM C32 (2013; R 2017) Standard Specification for Sewer and Manhole Brick (Made from Clay or
SECTION 33 40 00 Page 3
Shale)
ASTM C425 (2004; R 2013) Standard Specification for Compression Joints for Vitrified Clay Pipe and Fittings
ASTM C443 (2012; R 2017) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets
ASTM C478 (2018) Standard Specification for Circular Precast Reinforced Concrete Manhole Sections
ASTM C55 (2017) Standard Specification for Concrete Building Brick
ASTM C62 (2017) Standard Specification for Building Brick (Solid Masonry Units Made from Clay or Shale)
ASTM C76 (2018) Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe
ASTM C877 (2008) External Sealing Bands for Concrete Pipe, Manholes, and Precast Box Sections
ASTM C923 (2008; R 2013; E 2016) Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals
ASTM C990 (2009; R 2014) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants
ASTM D1056 (2014) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D1171 (2016; E 2016) Standard Test Method for Rubber Deterioration - Surface Ozone Cracking Outdoors (Triangular Specimens)
ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2004a; R 2013) Standard Specification for Preformed Sponge Rubber Cork and Recycled
SECTION 33 40 00 Page 4
PVC Expansion
ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the Rubber Balloon Method
ASTM D2321 (2018) Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM D3350 (2012) Polyethylene Plastics Pipe and Fittings Materials
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM F2736 (2013; E 2014) Standard Specification for 6 to 30 in. (152 To 762 mm) Polypropylene (PP) Corrugated Single Wall Pipe And Double Wall Pipe
ASTM F2764/F2764M (2017; E 2017) Standard Specification for 6 to 60 in. Polypropylene (PP) Corrugated Double and Triple Wall Pipe and Fittings for Non-Pressure Sanitary Sewer Applications
ASTM F2881 (2011) Standard Specification for 12 to 60
in. (300 to 1500 mm) Polypropylene (PP) Dual Wall Pipe and Fittings for Non-Pressure Storm Sewer Applications
ASTM F477 (2014) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-04 Samples
Pipe for Culverts and Storm Drains
SD-07 Certificates
Resin Certification
Oil Resistant Gasket
Determination of Density
SECTION 33 40 00 Page 5
Frame and Cover for Gratings
Post-Installation Inspection Report
SD-08 Manufacturer's Instructions
Placing Pipe
1.3 DELIVERY, STORAGE, AND HANDLING
1.3.1 Delivery and Storage
Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. Materials shall not be stored directly on the ground. The inside of pipes and fittings shall be kept free of dirt and debris. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install plastic pipe shall be stored in accordance with the manufacturer's recommendations and shall be discarded if the storage period exceeds the recommended shelf life.
Solvents in use shall be discarded when the recommended pot life is exceeded.
1.3.2 Handling
Materials shall be handled in a manner that ensures delivery to the trench in sound, undamaged condition. Pipe shall be carried to the trench, not dragged.
PART 2 PRODUCTS
2.1 PIPE FOR CULVERTS AND STORM DRAINS
Pipe for culverts and storm drains shall be of the sizes indicated and shall conform to the requirements specified.
2.1.1 Concrete Pipe
Manufactured in accordance with and conforming to ASTM C76, Class III.
2.1.2 Ductile Iron Culvert Pipe
ASTM A716.
2.1.3 Polyethylene (PE) Pipe
Submit the pipe manufacturer's resin certification , indicating the cell classification of PE used to manufacture the pipe, prior to installation of the pipe. The minimum cell classification for polyethylene plastic shall apply to each of the seven primary properties of the cell classification limits in accordance with ASTM D3350.
2.1.3.1 Corrugated PE Pipe
AASHTO M 294, Type S . For slow crack growth resistance, acceptance of
SECTION 33 40 00 Page 6 resins shall be determined by using the notched constant ligament-stress (NCLS) test meeting the requirements of AASHTO M 294. Pipe walls shall have the following properties:
Nominal Size (inch) ) Minimum Wall Area (square in/ft)
Minimum Moment of Inertia of Wall Section (in. to the
4th/in.)
18 2.34 0.062
2.1.4 Polypropylene (PP) Pipe
Double wall and triple wall pipe with a diameter of 12 to 60 inches shall meet the requirements of ASTM F2736, ASTM F2764/F2764M , or ASTM F2881.
2.2 DRAINAGE STRUCTURES
2.2.1 Flared End Sections
Sections shall be of a standard design fabricated from zinc coated steel sheets meeting requirements of ASTM A929/A929M .
2.2.2 Precast Reinforced Concrete Box
Manufactured in accordance with and conforming to ASTM C1433.
2.3 MISCELLANEOUS MATERIALS
2.3.1 Concrete
Unless otherwise specified, concrete and reinforced concrete shall conform to the requirements for 5,500 psi . The concrete mixture shall have air content by volume of concrete, based on measurements made immediately after discharge from the mixer, of 5 to 7 percent when maximum size of coarse aggregate exceeds 1-1/2 inches . Air content shall be determined in accordance with ASTM C231/C231M. The concrete covering over steel reinforcing shall not be less than 1 inch thick for covers and not less than 1-1/2 inches thick for walls and flooring. Concrete covering
SECTION 33 40 00 Page 7 deposited directly against the ground shall have a thickness of at least 3 inches between steel and ground. Expansion-joint filler material shall conform to ASTM D1751, or ASTM D1752, or shall be resin-impregnated fiberboard conforming to the physical requirements of ASTM D1752.
2.3.2 Mortar
Mortar for pipe joints, connections to other drainage structures, and brick or block construction shall conform to ASTM C270, Type M, except that the maximum placement time shall be 1 hour. The quantity of water in the mixture shall be sufficient to produce a stiff workable mortar but in no case shall exceed 5 gallons of water per sack of cement. Water shall be clean and free of harmful acids, alkalis, and organic impurities. The mortar shall be used within 30 minutes after the ingredients are mixed with water. The inside of the joint shall be wiped clean and finished smooth. The mortar head on the outside shall be protected from air and sun with a proper covering until satisfactorily cured.
2.3.3 Precast Concrete Segmental Blocks
Precast concrete segmental block shall conform to ASTM C139, not more than 8 inches thick, not less than 8 inches long, and of such shape that joints can be sealed effectively and bonded with cement mortar.
2.3.4 Brick
Brick shall conform to ASTM C62, Grade SW; ASTM C55, Grade S-I or S-II; or ASTM C32, Grade MS. Mortar for jointing and plastering shall consist of one part portland cement and two parts fine sand. Lime may be added to the mortar in a quantity not more than 25 percent of the volume of cement. The joints shall be filled completely and shall be smooth and free from surplus mortar on the inside of the structure. Brick structures shall be plastered with 1/2 inch of mortar over the entire outside surface of the walls. For square or rectangular structures, brick shall be laid in stretcher courses with a header course every sixth course. For round structures, brick shall be laid radially with every sixth course a stretcher course.
2.3.5 Precast Reinforced Concrete Manholes
Conform to ASTM C478. Joints between precast concrete risers and tops shall be made with flexible watertight, rubber-type gaskets meeting the requirements of paragraph JOINTS.
2.3.6 Frame and Cover for Gratings
Submit certification on the ability of frame and cover or gratings to carry the imposed live load. Frame and cover for gratings shall be cast gray iron, ASTM A48/A48M, Class 35B; cast ductile iron, ASTM A536, Grade 65-45-12; or cast aluminum, ASTM B26/B26M, Alloy 356.O-T6. Weight, shape, size, and waterway openings for grates and curb inlets shall be as indicated on the plans. The word "Storm Sewer" shall be stamped or cast into covers so that it is plainly visible.
2.3.7 Joints
2.3.7.1 Flexible Watertight Joints
a. Flexible watertight joints shall be made with plastic or rubber-type
SECTION 33 40 00 Page 8 gaskets for concrete pipe and with factory-fabricated resilient materials for clay pipe. The design of joints and the physical requirements for preformed flexible joint sealants shall conform to ASTM C990, and rubber-type gaskets shall conform to ASTM C443.
Factory-fabricated resilient joint materials shall conform to ASTM C425.
Gaskets shall have not more than one factory-fabricated splice, except that two factory-fabricated splices of the rubber-type gasket are permitted if the nominal diameter of the pipe being gasketed exceeds 54 inches .
b. Rubber gaskets shall comply with the oil resistant gasket requirements of ASTM C443. Certified copies of test results shall be delivered to the Contracting Officer before gaskets or jointing materials are installed. Alternate types of watertight joint may be furnished, if specifically approved.
2.3.7.2 External Sealing Bands
Requirements for external sealing bands shall conform to ASTM C877.
2.3.7.3 Flexible Watertight, Gasketed Joints
a. Gaskets: When infiltration or exfiltration is a concern for pipe lines, the couplings may be required to have gaskets. The closed-cell expanded rubber gaskets shall be a continuous band approximately 7 inches wide and approximately 3/8 inch thick, meeting the requirements of ASTM D1056, Type 2 A1, and shall have a quality retention rating of not less than 70 percent when tested for weather resistance by ozone chamber exposure, Method B of ASTM D1171. Rubber O-ring gaskets shall be 13/16 inch in diameter for pipe diameters of 36 inches or smaller and 7/8 inch in diameter for larger pipe having 1/2 inch deep end corrugation. Rubber O-ring gaskets shall be 1-3/8 inches in diameter for pipe having 1 inch deep end corrugations. O-rings shall meet the requirements of ASTM C990 or ASTM C443. Preformed flexible joint sealants shall conform to ASTM C990, Type B.
b. Connecting Bands: Connecting bands shall be of the type, size and sheet thickness of band, and the size of angles, bolts, rods and lugs as indicated or where not indicated as specified in the applicable standards or specifications for the pipe. Exterior rivet heads in the longitudinal seam under the connecting band shall be countersunk or the rivets shall be omitted and the seam welded. Watertight joints shall be tested and shall meet the test requirements of paragraph
HYDROSTATIC TEST ON WATERTIGHT JOINTS.
2.3.7.4 Corrugated PE Plastic Pipe
Pipe joints shall be water tight and shall conform to the requirements in AASHTO M 294. Water tight joints shall be made using a PE coupling and rubber gaskets as recommended by the pipe manufacturer. Rubber gaskets shall conform to ASTM F477.
2.3.7.5 Ductile Iron Pipe
Couplings and fittings shall be as recommended by the pipe manufacturer.
2.4 RESILIENT CONNECTORS
Flexible, watertight connectors used for connecting pipe to manholes and
SECTION 33 40 00 Page 9 inlets shall conform to ASTM C923.
2.5 EROSION CONTROL RIP RAP
Provide non-erodible rock not exceeding 15 inches in its greatest dimension and choked with sufficient small rocks to provide a dense mass with a minimum thickness of 8 inches .
PART 3 EXECUTION
3.1 INSTALLATION OF PIPE CULVERTS, STORM DRAINS, AND DRAINAGE STRUCTURES
Excavation of trenches, and for appurtenances and backfilling for culverts and storm drains, shall be in accordance with the applicable portions of Section 31 00 00 EARTHWORK, and the requirements specified below.
3.1.1 Trenching
The width of trenches at any point below the top of the pipe shall be not greater than the outside diameter of the pipe plus 12 inches to permit satisfactory jointing and thorough tamping of the bedding material under and around the pipe. Sheeting and bracing, where required, shall be placed within the trench width as specified, without any overexcavation.
Where trench widths are exceeded, redesign with a resultant increase in cost of stronger pipe or special installation procedures will be necessary. Cost of this redesign and increased cost of pipe or installation shall be borne by the Contractor without additional cost to the Government.
3.1.2 Removal of Rock
Rock in either ledge or boulder formation shall be replaced with suitable materials to provide a compacted earth cushion having a thickness between unremoved rock and the pipe of at least 8 inches or 1/2 inch for each foot of fill over the top of the pipe, whichever is greater, but not more than three-fourths the nominal diameter of the pipe. Where bell-and-spigot pipe is used, the cushion shall be maintained under the bell as well as under the straight portion of the pipe. Rock excavation shall be as specified and defined in Section 31 00 00 EARTHWORK .
3.1.3 Removal of Unstable Material
Where wet or otherwise unstable soil incapable of properly supporting the pipe, as determined by the Contracting Officer, is unexpectedly encountered in the bottom of a trench, such material shall be removed to the depth required and replaced to the proper grade with select granular material, compacted as provided in paragraph BACKFILLING. When removal of unstable material is due to the fault or neglect of the Contractor while performing shoring and sheeting, water removal, or other specified requirements, such removal and replacement shall be performed at no additional cost to the Government.
3.2 BEDDING
The bedding surface for the pipe shall provide a firm foundation of uniform density throughout the entire length of the pipe.
SECTION 33 40 00 Page 10
3.2.1 Concrete Pipe Requirements
When no bedding class is specified or detailed on the drawings, concrete pipe shall be bedded in granular material minimum 4 inch in depth in trenches with soil foundation. Depth of granular bedding in trenches with rock foundation shall be 1/2 inch in depth per foot of depth of fill, minimum depth of bedding shall be 8 inch up to maximum depth of 24 inches .
The middle third of the granular bedding shall be loosely placed. Bell holes and depressions for joints shall be removed and formed so entire barrel of pipe is uniformly supported. The bell hole and depressions for the joints shall be not more than the length, depth, and width required for properly making the particular type of joint.
3.2.2 Ductile Iron Pipe
Bedding for ductile iron pipe shall be as shown on the drawings.
3.2.3 Plastic Pipe
Bedding for PVC, PE, SRPE and PP pipe shall meet the requirements of ASTM D2321. Use Class IB or II granular material as defined in 31 00 00 EARTHWORK for bedding, haunching, and initial backfill. Use Class I, II, or III material for PP pipe bedding, haunching and initial backfill.
3.3 PLACING PIPE
Each pipe shall be thoroughly examined before being laid; defective or damaged pipe shall not be used. Plastic pipe, excluding SRPE pipe shall be protected from exposure to direct sunlight prior to laying, if necessary to maintain adequate pipe stiffness and meet installation deflection requirements. Pipelines shall be laid to the grades and alignment indicated. Proper facilities shall be provided for lowering sections of pipe into trenches. Lifting lugs in vertically elongated pipe shall be placed in the same vertical plane as the major axis of the pipe.
Pipe shall not be laid in water, and pipe shall not be laid when trench conditions or weather are unsuitable for such work. Diversion of drainage or dewatering of trenches during construction shall be provided as necessary. Deflection of installed flexible pipe shall not exceed the following limits:
TYPE OF PIPE MAXIMUM ALLOWABLE
DEFLECTION (percent)
Corrugated Steel and Aluminum 5
Concrete-Lined Corrugated Steel 3
Plastic (PVC, PE, SRPE, and PP) 5
Note post installation requirements of paragraph DEFLECTION TESTING in PART 3 of this specification for all pipe products including deflection testing requirements for flexible pipe.
3.3.1 Concrete, Ductile Iron and Cast-Iron Pipe
Laying shall proceed upgrade with spigot ends of bell-and-spigot pipe and tongue ends of tongue-and-groove pipe pointing in the direction of the
SECTION 33 40 00 Page 11
ADDENDUM 006: 06-15-2021
cjgray Cross-Out cjgray Cross-Out cjgray Underline cjgray Underline cjgray Underline cjgray Text Box flow.
3.3.2 PE
Laying shall be with the separate sections joined firmly on a bed shaped to line and grade and shall follow manufacturer's guidelines.
3.4 JOINTING
3.4.1 Concrete
3.4.1.1 Flexible Watertight Joints
Gaskets and jointing materials shall be as recommended by the particular manufacturer in regard to use of lubricants, cements, adhesives, and other special installation requirements. Surfaces to receive lubricants, cements, or adhesives shall be clean and dry. Gaskets and jointing materials shall be affixed to the pipe not more than 24 hours prior to the installation of the pipe, and shall be protected from the sun, blowing dust, and other deleterious agents at all times. Gaskets and jointing materials shall be inspected before installing the pipe; any loose or improperly affixed gaskets and jointing materials shall be removed and replaced. The pipe shall be aligned with the previously installed pipe, and the joint pushed home. If, while the joint is being made the gasket becomes visibly dislocated the pipe shall be removed and the joint remade.
3.5 DRAINAGE STRUCTURES
3.5.1 Manholes and Inlets
Construction shall be of reinforced concrete, brick, precast reinforced concrete; complete with frames and covers or gratings. Pipe connections to concrete manholes and inlets shall be made with flexible, watertight connectors.
3.5.2 Walls and Headwalls
Construction shall be as indicated.
3.6 BACKFILLING
3.6.1 Backfilling Pipe in Trenches
After the pipe has been properly bedded, selected material from excavation or borrow, at a moisture content that will facilitate compaction, shall be placed along both sides of pipe in layers not exceeding 6 inches in compacted depth. The backfill shall be brought up evenly on both sides of pipe for the full length of pipe. The fill shall be thoroughly compacted under the haunches of the pipe. Each layer shall be thoroughly compacted with mechanical tampers or rammers. This method of filling and compacting shall continue until the fill has reached an elevation equal to the midpoint (spring line) of concrete pipe or has reached an elevation of at least 12 inches above the top of the pipe for flexible pipe. The remainder of the trench shall be backfilled and compacted by spreading and rolling or compacted by mechanical rammers or tampers in layers not exceeding 6 inches . Tests for density shall be made as necessary to ensure conformance to the compaction requirements specified below. Where it is necessary, in the opinion of the Contracting Officer, that sheeting or portions of bracing used be left in place, the contract will be
SECTION 33 40 00 Page 12 adjusted accordingly. Untreated sheeting shall not be left in place beneath structures or pavements.
3.6.2 Backfilling Pipe in Fill Sections
For pipe placed in fill sections, backfill material and the placement and compaction procedures shall be as specified below. The fill material shall be uniformly spread in layers longitudinally on both sides of the pipe, not exceeding 6 inches in compacted depth, and shall be compacted by rolling parallel with pipe or by mechanical tamping or ramming. Prior to commencing normal filling operations, the crown width of the fill at a height of 12 inches above the top of the pipe shall extend a distance of not less than twice the outside pipe diameter on each side of the pipe or 12 feet , whichever is less. After the backfill has reached at least 12 inches above the top of the pipe, the remainder of the fill shall be placed and thoroughly compacted in layers not exceeding 6 inches . Use select granular material for this entire region of backfill for flexible pipe installations.
3.6.3 Movement of Construction Machinery
When compacting by rolling or operating heavy equipment parallel with the pipe, displacement of or injury to the pipe shall be avoided. Movement of construction machinery over a culvert or storm drain at any stage of construction shall be at the Contractor's risk. Any damaged pipe shall be repaired or replaced.
3.6.4 Compaction
3.6.4.1 General Requirements
Cohesionless materials include gravels, gravel-sand mixtures, sands, and gravelly sands. Cohesive materials include clayey and silty gravels, gravel-silt mixtures, clayey and silty sands, sand-clay mixtures, clays, silts, and very fine sands. When results of compaction tests for moisture-density relations are recorded on graphs, cohesionless soils will show straight lines or reverse-shaped moisture-density curves, and cohesive soils will show normal moisture-density curves.
3.6.4.2 Minimum Density
Backfill over and around the pipe and backfill around and adjacent to drainage structures shall be compacted at the approved moisture content to the following applicable minimum density, which will be determined as specified below.
a. See Drawings and Section 31 00 00 EARTHWORK for density requirements.
a. Under airfield and heliport pavements, paved roads, streets, parking areas, and similar-use pavements including adjacent shoulder areas, the density shall be not less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material, up to the elevation where requirements for pavement subgrade materials and compaction shall control.
b. Under unpaved or turfed traffic areas, density shall not be less than 90 percent of maximum density for cohesive material and 95 percent of maximum density for cohesionless material.
SECTION 33 40 00 Page 13
ADDENDUM 006: 06-15-2021
cjgray Underline cjgray Cross-Out cjgray Text Box
c. Under nontraffic areas, density shall be not less than that of the surrounding material.
3.7 FIELD PAINTING
3.7.1 Cast-Iron Covers, Frames, Gratings, And Steps
After installation, clean cast-iron, not buried in masonry or concrete, of mortar, rust, grease, dirt, and other deleterious materials to bare metal and apply a coat of bituminous paint.
3.7.2 Steel Covers And Frames Or Concrete Frames
After installation, clean steel or concrete, not buried in masonry or concrete, of mortar, dirt, grease, and other deleterious materials to bare metal. Apply a coat of primer and apply a top coat, color optional. Do not paint surfaces subject to abrasion.
3.8 FIELD QUALITY CONTROL
3.8.1 Tests
Testing is the responsibility of the Contractor. Perform all testing and retesting at no additional cost to the Government.
3.8.1.1 Determination of Density
Testing shall be performed by an approved commercial testing laboratory or by the Contractor subject to approval. Tests shall be performed in sufficient number to ensure that specified density is being obtained.
Laboratory tests for moisture-density relations shall be made in accordance with ASTM D1557 except that mechanical tampers may be used provided the results are correlated with those obtained with the specified hand tamper. Field density tests shall be determined in accordance with ASTM D2167 or ASTM D6938. When ASTM D6938 is used, the calibration curves shall be checked and adjusted, if necessary, using the sand cone method as described in paragraph Calibration of the referenced publications.
ASTM D6938 results in a wet unit weight of soil and ASTM D6938 shall be used to determine the moisture content of the soil. The calibration curves furnished with the moisture gauges shall be checked along with density calibration checks as described in ASTM D6938. Test results shall be furnished the Contracting Officer. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed.
3.8.2 Inspection
3.8.2.1 Post-Installation Inspection
Visually inspect each segment of concrete pipe for alignment, settlement, joint separations, soil migration through the joint, cracks, buckling, bulging and deflection. An engineer must evaluate all defects to determine if any remediation or repair is required.
3.8.2.1.1 Concrete
Cracks with a width greater than 0.01 inches . An engineer must evaluate all pipes with cracks with a width greater than 0.01 inches but less than
SECTION 33 40 00 Page 14
ADDENDUM 006: 06-15-2021
cjgray Cross-Out
0.10 inches to determine if any remediation or repair is required.
3.8.2.1.2 Flexible Pipe
Check each flexible pipe (PE, PP) for rips, tears, joint separations, soil migration through the joint, cracks, localized bucking, bulges, settlement and alignment.
3.8.2.1.3 Post-Installation Inspection Report
The deflection results and final post installation inspection report must include: pipe location identification, equipment used for inspection, inspector name, deviation from design, grade, deviation from line, deflection and deformation of flexible pipe, inspector notes, condition of joints, condition of pipe wall (e.g. distress, cracking, wall damage dents, bulges, creases, tears, holes, etc.).
3.8.3 Repair Of Defects
3.8.3.1 Inspection
Replace pipe or repair defects indicated in the Post-Installation Inspection Report.
3.8.3.1.1 Concrete
Replace pipes having cracks with a width greater than 0.1 inches .
3.8.3.1.2 Flexible Pipe
Replace pipes having cracks or splits.
3.9 PROTECTION
Protect storm drainage piping and adjacent areas from superimposed and external loads during construction.
3.10 WARRANTY PERIOD
Pipe segments found to have defects during the warranty period must be replaced with new pipe and retested.
-- End of Section --
SECTION 33 40 00 Page 15
File details come from the government source that posted it. Updated .