W912DS19B0019_0002.pdf
PDF 213 KB Posted
- Attached to
- Fire Suppression System, Various Buildings, Watervliet, NY Federal contract opportunity
- Solicitation number
- W912DS19B0019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| FPS001.pdf | ||
| W912DS19B0019_0003.pdf | ||
| 01_45_00_00_10.pdf | ||
| 21_13_13_00_10.pdf | ||
| 28_31_64_00_10.pdf | ||
| 21_13_17.00_10.pdf | ||
| W912DS19B0019_0001.pdf | ||
| RTA_WVA_FIRE_SUPPRESSION_Spec.pdf | ||
| W912DS19B0019.pdf | ||
| WVA_FIRE_SUPPRESSION_100_pct_Submission_Combined_(compress).pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
Update changes to Draw ings Update changes to Specif ications Provide RFI responses
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied or as amended in the bid by one of the follow ing methods:
In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS19B0019
X 9B. DATED (SEE ITEM 11)
14-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Sep-2019
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS19B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been added by full text:
RFIS AND CHANGES
Fire Suppression Various Buildings, Watervliet, NY
W912DS-19-B-0019
Amendment No. 1
• To Bidders The purpose of this amendment is to make the following changes to the solicitation.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED:
None
2. The following DRAWINGS have been ADDED:
3. The following DRAWINGS have been DELETED:
4. The following DRAWINGS have been REVISED but NOT REISSUED:
a. (ADD) the following note to sheet FP-104 dated 31JUL2019, “Power shall be provided for air compressors.”
b. (ADD) the following note to sheet FP-105 dated 31JUL2019, “Power shall be provided for air compressors.”
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
a. (ADD) specification section 01 45 00.00 10, dated 09 SEPT 2019
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
a. (DELETE) specification section 01 45 00.15 10, dated 31 JUL 2019
b. (DELETE) specification section 26 51 00, dated 31 JUL 2019
c. (DELETE) specification section 21 30 00, dated 31 JUL 2019
3. The following SPECIFICATION SECTIONS have been REVISED but REISSUED (revisions are shown in red text):
a. (DELETE) specification section 21 13 13.00 10, dated 31 JUL 2019, and (SUBSTITUTE THEREFORE) specification section 21 13 13.00 10, dated 09 SEP
b. (DELETE) specification section 21 13 17.00 10, dated 31 JUL 2019, and (SUBSTITUTE THEREFORE) specification section 21 13 17.00 10, dated 09 SEP
c. (DELETE) specification section 28 31 64.00 10, dated 31 JUL 2019, and (SUBSTITUTE THEREFORE) specification section 28 31 64.00 10, dated 09 SEP
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
a. (DELETE) the following language in specification table of contents, “26 51
00 INTERIOR LIGHTING.”
ANSWERS TO QUESTIONS:
Q1: Please provide the name of the existing Fire Alarm company.
A1: Information on existing fire alarm company is not available at this time.
Q2: Does the scope of Bldg. 40-5 and 40-6 include removal of existing sprinkler piping? We have not seen any reference to removal of existing piping in the drawings, yet the description on FBO.gov states the removal is part of the scope for these 2 buildings. If removal is part of the scope, does the piping contain lead paint? And is a fire watch required during removal phase.
A2: Removal of existing sprinkler piping is part of the scope. There are no existing sprinkler system in 40- 5 and 40-6. Bid shall assume the existence of lead paint. A fire watch is required during the removal and installation of the sprinkler system.
Q3: The specifications include sections for Asbestos Abatement along with an Asbestos survey. The survey contains information on buildings that are not even part of this contract. The survey also contains information within the buildings in this contract that are not affected by the installation of new sprinkler systems.
A) Is abatement in the buildings that we are not installing Fire Suppression systems part of this contract?
B) Is abatement of all the material listed as positive in the Asbestos Survey in the buildings in which we are installing Fire Suppression systems part of this contract? Or are we only to abate material that is affected/disturbed by the installation of the Fire Suppression System (ie do we include abatement of floor tile, pipe insulation, etc)?
C) Please provide a more distinct scope of work for the abatement other than just providing the contractors with an Asbestos Survey report. It is not clear to us what is the Abatement Scope of Work.
A3: The asbestos survey was provided by Watervliet Arsenal, was infeasible to edit and therefore included in totality to provide contract information for the facilities within this scope of work.
A). There is no abatement required in buildings not part of the fire suppression scope of work.
B)Refer to C4, A-001: "IT IS NOT INTENDED THAT ANY POSITIVELY SAMPLED AREA BE
TOTALLY REMEDIATED - ONLY AREAS IMPACTED BY ATTACHMENT OR PENETRATIONS
ARE TO BE MITIGATED."
C)Refer to above A) and B).
Q4: Are there any known contaminated material or water in the ground?
A4: There is potential for contaminated soil. Refer to section 31 00 00 "EARTHWORK" paragraph 1.2.6.
Q5: There is no scale provided for FPS-001 or details for concrete/asphalt/landscape restoration.
A5: FPS-001 site map is an excerpt of the attached Malcolm Pirnie 2010 site plan (see attached) with a 1"=100' scale also provided on A-002. It is provided for reference relative to the recently completed water main replacement project. Drawing A-002 indicates typical details for pavement repair. Degree of repair will depend on Contractor's method of trenching and/or boring and selected water main tie-in locations.
Building 40's site restoration is atypical and addressed on A-103
Q6: Are any permits required for this project?
A6: Dig permit, Hot Work permit (if hot work is necessary), Open Flame (if open flame work is necessary) permit from Watervliet Arsenal Directorate of Public Works.
Q7: Specification provides a Lighting specification. We are not able to find any drawings which refer to lighting installation. Is Lighting part of this project?
A7: Delete Table of Contents reference to "INTERIOR LIGHTING", SECTION 26 51 00 and delete SECTION 26 51 00 in entirety
Q8: Fire pump specification 21 30 00 is included in the specifications, yet not in the TOC. There is no reference to fire pump on the drawings. Is fire pump required for this project?
A8: There are no fire pumps required. Delete SECTION 21 30 00 "FIRE PUMPS" in entirety.
Q9: For Bldg. 126, the Asbestos Survey indicates transite panels as being positive for asbestos. Are these wall panels or ceiling/roof panels?
A9: Wall panels.
Q10: The specifications include a section for lead paint. There has been no indication as to where the lead paint is located. Where is the lead paint, and what part of the work is affected by the existence of lead paint?
A10: Contractor is advised that lead paint surveying has not been done and that lead containing paint has been found on painted surfaces. Contractor is to assume that the removal and/or disturbance of painted materials is likely to include lead painted materials and to take necessary precautions.
Q11: The survey 30 April 2018 states that negative results on ceiling tiles and vinyl floor tiles must not be relied upon for planning decisions. Is it the Contractors responsibility now to test all of the tiles in the affected buildings and come up with a new survey report for these areas?
A11: Refer to note C4, A-001: "CONTRACTOR WILL ASSUME ALL FLOOR TILE AND CEILING
TILES ARE ASBESTOS UNTIL THEY ARE SAMPLED. CONTRACTOR SHOULD INCLUDE
TESTING IN THEIR EFFORTS TO CONFIRM ASBESTOS PRESENCE/ABSENCE BEFORE
CONDUCTING CONSTRUCTION ACTIVITIES. TO THE BEST OF OUR KNOWLEDGE, ALL
SAMPLE RESULTS FOR MATERIALS IDENTIFIED AS VERTICAL WALL SURFACES ARE
ACCURATE (THE ATTACHED REPORTS IN 02 82 13.10) ANY OTHER CONSTRUCTION
RELATED ACTIVITY THAT MAY INADVERTENTLY CAUSE AS ASBESTOS DISTURBANCE,
BUT IS NOT IDENTIFIED THROUGH PROVIDED SAMPLING RESULTS (NO TESTING RESULTS
PROVIDED FOR A SPECIFIC AREA), WILL BE TESTED FOR THE PRESENCE OF ASBESTOS
PRIOR TO CONSTRUCTION ON THAT SURFACE. IT IS NOT INTENDED THAT ANY
POSITIVELY SAMPLED AREA BE TOTALLY REMEDIATED - ONLY AREAS IMPACTED BY
ATTACHMENT OR PENETRATIONS ARE TO BE MITIGATED. ALL HAZARDOUS MATERIAL
REMEDATION SHALL OCCUR DURING 2ND SHIFT."
Q12: Note 1 states to provide circuit for air compressor and run from nearest 208/120V Panel. Please provide location of nearest 208/120V panel.
A12: Location is in the basement, adjacent to the stairs.
Q13: For Bldg. 22 Fire Station, the Asbestos Summary Table lists Tin Ceiling Insulation as being positive. This exists in Rooms 123(Women's B/R), 124(Fire Truck Bay), and 125(Men's B/R). Is this insulation above the ceiling, or an integral part of the ceiling. We are trying to determine if the fire suppression work affects this area, and the entire ceiling needs to be abated. Is this the case? Or can the insulation be removed above the ceiling prior to the work. Removing the ceiling in the fire truck bay due to all of the equipment attached to it and replacing would be a fairly large ordeal. Please advise how to address this Tin Ceiling Insulation.
A13: Refer to C4 A-001 "CONTRACTOR WILL ASSUME ALL FLOOR TILE AND CEILING TILES
ARE ASBESTOS UNTIL THEY ARE SAMPLED. CONTRACTOR SHOULD INCLUDE TESTING IN
THEIR EFFORTS TO CONFIRM ASBESTOS PRESENCE/ABSENCE BEFORE CONDUCTING
CONSTRUCTION ACTIVITIES. TO THE BEST OF OUR KNOWLEDGE, ALL SAMPLE RESULTS
FOR MATERIALS IDENTIFIED AS VERTICAL WALL SURFACES ARE ACCURATE (THE
ATTACHED REPORTS IN 02 82 13.10) ANY OTHER CONSTRUCTION RELATED ACTIVITY
THAT MAY INADVERTENTLY CAUSE AS ASBESTOS DISTURBANCE, BUT IS NOT IDENTIFIED
THROUGH PROVIDED SAMPLING RESULTS (NO TESTING RESULTS PROVIDED FOR A
SPECIFIC AREA), WILL BE TESTED FOR THE PRESENCE OF ASBESTOS PRIOR TO
CONSTRUCTION ON THAT SURFACE. IT IS NOT INTENDED THAT ANY POSITIVELY
SAMPLED AREA BE TOTALLY REMEDIATED - ONLY AREAS IMPACTED BY ATTACHMENT
OR PENETRATIONS ARE TO BE MITIGATED. ALL HAZARDOUS MATERIAL REMEDATION
SHALL OCCUR DURING 2ND SHIFT."
The "tin ceiling" itself is not asbestos containing. The insulation above the ceiling tested positive as non-friable according to the testing entity.
Q14: As shown on Drawing FP-100, there is a note 1 for power to the Air Compressor for the dry system.
There is no note for power on Drawings FP-104(Bldg. 41), and FP-105(Bldg. 108). Should there be? And if so, please designate location where power should be taken from, and run to the air compressor location.
A14: Power shall be provided for air compressors in B41 & B108 the same as stated on bid drawing FP-
100. Exact locations of panels are unknown, bid based on worst-case.
Q15: Is replacing the existing fire alarm panel w/ 4100ES F/A panel as noted on Drawings FP-104/105 a part of this contract for Bldgs. 41 and 108?
A15: yes
Q16: Are there working shutoff valves within the water system that we will be able to isolate the water main to install new sprinkler service lines, or will we be required to wet-tap for these new lines?
A16: There are existing valves shown on Drawing FPS-001. Water main shall only be isolated if it can be done without stopping supply to another building, otherwise wet-tap.
(End of Summary of Changes)
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
File details come from the government source that posted it.