RTA_WVA_FIRE_SUPPRESSION_Spec.pdf
PDF 4 MB Posted
- Attached to
- Fire Suppression System, Various Buildings, Watervliet, NY Federal contract opportunity
- Solicitation number
- W912DS19B0019
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| W912DS19B0019_0003.pdf | ||
| FPS001.pdf | ||
| W912DS19B0019_0002.pdf | ||
| 28_31_64_00_10.pdf | ||
| 01_45_00_00_10.pdf | ||
| 21_13_13_00_10.pdf | ||
| 21_13_17.00_10.pdf | ||
| W912DS19B0019_0001.pdf | ||
| WVA_FIRE_SUPPRESSION_100_pct_Submission_Combined_(compress).pdf | ||
| W912DS19B0019.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
FY15 FIRE SUPPRESSION SYSTEM VARIOUS
BUILDINGS
WATERVLIET ARSENAL, NEW YORK
W912DS-14-D-0002-0022
Prepared For:
United States Army Corps of Engineers New York District and
Watervliet Arsenal, NY
Prepared by:
QPK Design LLP 450 South Salina Street
Syracuse, NY 13201-0029 in association with:
GHD Engineers One Remington Park Drive, Cazenovia, NY 13035 USA and Crawford Consulting
239 Highland Avenue
East Pittsburgh, PA 15112
July 31, 2019
WVA MULTIPLE BUILDING FIRE PROTECTION
QPK NO. 216294.00
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 45.00 10 CHEMICAL DATA QUALITY CONTROL
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 82 13.00 ASBESTOS REMEDIATION
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
DIVISION 21 – FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM
21 13 17 DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 51 00 INTERIOR LIGHTING
DIVISION 28 - COMMUNICATIONS
28 31 64.00 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 – SITE UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
---END OF TABLE OF CONTENTS ---
WVA Multiple Building Fire Protection 216294
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes installation of fire suppression systems, and collateral work. Incidental related work includes but is not limited to new water entrances and alarm system integration and electrical wiring.
1.1.2 Location
The work is located at the Watervliet Arsenal, Watervliet NY, approximately as indicated. Refer to A3/A-001 for Arsenal site plan.
1.2 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
Building 22 is a fire station and is occupied 24/7. 2nd shift fire suppression work is required. Building 40-6 is partially occupied by a gym and used 1st shift. Remaining area is an industrial lab also occupied 1st shift. 2nd shift fire suppression work is required. Building 40-5 is occupied 1st shift and is an industrial lab. 1st shift work may be scheduled with user. Building 41 is an "officers club" and will have unoccupied periods during scheduled uses. 1st shift work can be scheduled with the user. Building 108 functions as a mail/post office. It is lightly occupied during 1st shift. 2nd shift work may be required. Building 126 is a steal stock storage building and is not typically occupied. Access to steel stock by the user during work hours is required.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
Section 01 11 00 Page 2
1.4 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation and comply with installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 72 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar
(GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.5 FAR 52.211-10, COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
a. The Contractor shall be required to (i) commence Work under this
Contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the Work diligently, and
(iii) complete the entire Work ready for use, not later than 275 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises. (FAR 52.212-3)
b. Location: The Site of Work is located at Watervliet Arsenal, Watervliet, New York. The Site of the Work is on a military reservation and all rules and regulations issued by the Commanding
Officer covering general safety, security, and sanitary requirements, etc., shall be observed by the Contractor.
c. The Contractor shall furnish all labor, materials, equipment, and services for the following work: Design and construction for infrastructure upgrades as described in the solicitation package.
d. All Work shall be in accordance with the Drawings and Specifications or instructions attached hereto and made a part thereof, or to be furnished hereafter by the Contracting Officer and subject, in every detail, to his supervision, direction, and instructions.
PART 2 PRODUCTS
Not used.
e3enmjpt Highlight
Section 01 11 00 Page 3
PART 3 EXECUTION
Not used.
-- End of Section --
01 14 00 - 1
SECTION 01 14 00 - WORK RESTRICTIONS
WATERVLIET ARSENAL (WVA) INFORMATION FOR
CONTRACTORS
23 Nov 2015
This Information is intended to provide general guidelines and instructions to contractors who will be providing various services on the Watervliet Arsenal Installation. These guidelines include general as well as specific information dealing with Security, Fire, Facilities, Environmental, Industrial Hygiene and
Safety issues. These should not be considered as all-inclusive but as a guide as to what is expected when performing work at the arsenal. Questions should be directed to the Contracting Officer, the Contracting
Officer’s Representative (COR), or the WVA Project Manager.
1. The Watervliet Arsenal personnel from Safety, Industrial Hygiene, Security, Fire Department, and
Facilities Engineering will perform periodic inspections at the work site. WATERVLIET ARSENAL
RESERVES THE RIGHT TO STOP WORK OR THE USE OF EQUIPMENT NOT IN
COMPLIANCE WITH APPLICABLE LAWS, STANDARDS, OR REGULATIONS.
2. EMERGENCIES: All emergencies must be reported. All fires must be reported regardless of size.
All spills (oils, chemicals, fuels, coolants, etc.) must be reported regardless of size. Discovery of all pre-existing spills must also be reported regardless of size. First aid is available at the Arsenal Fire
House 24 hours/day. Emergency phone numbers at the arsenal (prefix 266) are:
Fire - Ext 5222
Ambulance - Ext 5333
Security - Ext 5444 Safety Office- Ext- HOTLINE (4537)/Safety Manager (5677)
Industrial Hygiene - Ext 4517/4516
To Report a Spill - Ext 5888 / dial 911 from a mobile phone (Albany County)
3. WORK HOURS: Visitors and Contractors will only be allowed access to Watervliet Arsenal during normal duty hours, which are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on select Fridays (the arsenal is closed every other Friday). Work may be performed on shutdown Fridays, after normal duty hours, Saturdays, Sundays or holidays only after the contractor has submitted their request two working days in advance through the project COR or technical point of contact for request evaluation and approval by the Contracting Officer. (Note:
request approval is not guaranteed). If a federal holiday falls on a Saturday or Sunday, the preceding
Friday or following Monday is a work holiday. The COR or Arsenal Point of Contact will submit a request to the Security Office and arrange for a responsible arsenal POC to be on post at all times when the visitor is on post.
4. CONTRACTOR’S PROJECT WORK ATTENDANCE: The contractor is responsible to inform the
COR and/or Project Inspector of their presence on post at all times. At the beginning and end of each workday, the Contractor is required to notify the COR and/or Project Inspector of location(s) on post where work is being performed or has been completed for the day.
01 14 00 - 2
5. SUB-CONTRACTORS: It is the responsibility of the Contractor to inform all their sub-contractors of all the instructions contained in this information sheet. Subcontractors are responsible to report project work attendance through the prime contractor to the COR whenever they are on post.
6. OIL AND CHEMICALS: The contractor shall furnish and utilize secondary containment measures for all storage activities. The contractor shall protect oils and chemicals from rainwater at all times.
Containers shall be appropriately closed and labeled; the load shall be adequately secured during all transportation on post. The contractor shall not abandon any oil and/or chemicals on post at WVA.
7. ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON) AT
WATERVLIET ARSENAL: Impact on contractor performance during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
8. RAMDOM ANTITERRRORISM MEASURESS PROGRAM (RAMP) AT THE WATERVLIET
ARSENAL: In accordance with AR 525-13, contractor personnel working on an installation are subject to participation in installation RAMP security program (e.g. vehicles, wearing of ID badges, etc) and installation security program.
9. BADGES: All personnel will report to the Visitors Center daily to be issued a pass. They must return the pass when they leave for the day by dropping it off in the drop box by the Visitors Center attached to the barrier to the left prior to entering the exit lane of the south gate. All personnel must show a driver’s license or state identification card (picture ID) to the security guard in order to get the pass. If the personnel will be working on the arsenal for over 90 days, they may be authorized a WVA picture badge, which will allow them access during normal work hours without getting a daily pass.
PICTURE BADGES: The contractor may request through the Contracting Officer a picture badge if the term of the contract warrants. Requests must be made in writing on company letterhead to the
Contracting Officer listing the following:
a. Contract Number
b. Indicate that the individual(s) work for said company
c. Project name and location of worksite (i.e. Bldg. #)
d. Duration of performance (start and stop dates)
e. All personnel being issued a picture badge shall present a passport or original birth certificate
(with a raised seal) and driver’s license. (A social security card is not an acceptable form of identification).
f. During performance of the contract, the contractor is responsible for prompt return of badges for any employee who no longer requires access to the work site.
g. Upon completion or termination of the contract or expiration of badge(s), the contractor shall ensure that they are returned to the issuing office.
h. Final payment on the contract will be held until all badges are properly returned.
i. Possession of a picture badge does not relieve the badge holder from the responsibility to notify the COR of project work attendance.
01 14 00 - 3
10. ACCESS POLICY: a. All contractor personnel entering the installation and requiring unescorted access must have a valid purpose to enter and be sponsored by a US government organization or a contractor providing support on the installation. They must have their identity proofed and vetted through the National Crime Information Center (NCIC) database, and be issued, or in possession of an authorized and valid access credential from the Watervliet Arsenal installation.
b. At the discretion of the Commander, US Army Watervliet Arsenal, any individual known to have a criminal background involving violence or meets the disqualifying standards in the Final Credentialing
Standards for Issuing Personal Identity Verification Cards under HSPD-12 (31 JUL 2008) and local command guidance, may be denied access to the Watervliet Arsenal. Fingerprinting of employees and any other security procedures deemed necessary for the security of Watervliet Arsenal (vehicle searches or x-raying packages, bags, briefcases) may be required based on the Force Protection Condition level at the time of access and whether the installation or building location is identified as a restricted area or
Mission Essential Vulnerable Area (MEVA).
11. NON-CITIZENS: Non-citizens of the U.S. may not be approved for access.
12. CAMERAS:
a. The Security Office and Public Affairs Officer must approve all cameras use prior to any pictures being taken, to include using a photographic-capable cell phone as a photographic device. Requests must be submitted to the WVA COR then routed to Security and then to the Public Affairs Officer.
Violations may result in the camera and film being confiscated and a citation being issued for an appearance before the U.S. Magistrate in Albany, NY.
b. For any photos that have been approved by the Security Office and Public Affairs Officer be advised that the photos contain military imagery that is owned by the US Government: US Army Watervliet
Arsenal. It is not to be used for any purpose other than the purpose for which it is furnished nor distributed or reproduced for any purpose to persons other than the individuals specified to receive it, or their employees, without written consent of the US Army Watervliet Arsenal.
c. All photos must be reviewed by the security office before the photo capture system (i.e., camera, cell phone, etc.) has left the arsenal.
13. TRAFFIC CONTROL: Post Speed Limit is 15 mph. Parking is allowed in valid spaces only. All valid spaces are clearly marked with white lines on both sides of the space. Vehicles parked in other than valid spaces are subject to being issued traffic citations requiring a monetary fine and/or an appearance before the U.S. Magistrate in Albany, N.Y. Motorists within the confines of WVA are subject to all New York State Vehicle and Traffic Laws. Any moving or nonmoving violation may result in a traffic citation being issued. Loading and unloading of vehicles will be allowed only for the amount of time required to perform the function. Vehicles cannot be left unattended in other than valid parking spaces. If a patrol officer can approach a vehicle, write a traffic citation, affix that citation to the vehicle, and depart the area with no one present at the vehicle, that vehicle is considered to be unattended. Both the Fire Department and Security Department must be notified prior to blocking of streets. The contractor must coordinate through the COR for approval to block or close streets.
14. DELIVERIES: Deliveries to contractors shall enter the post through the South Gate. Contractors expecting deliveries should notify the South Gate (266-5821) prior to the arrival of the delivery. The contractor’s representative must accept deliveries. Materials, which are delivered to the site, are the responsibility of the contractor. Storage and special conditions must be coordinated with the COR.
15. EXPLOSIVE MATERIALS: The use of explosive materials is prohibited.
01 14 00 - 4
16. CONTRABAND: Alcohol, illegal drugs, and any firearms are prohibited. Violations may result in the items being confiscated and a citation being issued for an appearance before the U.S. Magistrate in
Albany, NY.
17. RESTRICTION OF WVA PROVIDED DOCUMENTS: Documents provided by WVA contain proprietary information and are to be used only in support of their current authorized release. Other requests for documents must be referred to the Contracting Officer, Army Contracting Command –
Warren (ACC-WRN) (WVA), 1 Buffington Street, Watervliet, NY 12189. Documents shall be destroyed to prevent disclosure and reconstruction of the contents upon completion of contracted work.
18. SECURITY OF EQUIPMENT: Contractors are responsible for securing all of their equipment.
WVA is not responsible for stolen or lost items.
19. VEHICLES IN BUILDINGS: Contractors' vehicles and equipment using fuel shall receive clearance from the Fire Chief before entering the building. Refueling of vehicles in a building requires Fire
Department standby.
20. STORAGE SHED/TRAILERS/TEMPORARY OFFICES: The placement of all storage shed/trailers/temporary offices are subject to the approval of the Public Works Division, the Watervliet
Arsenal Fire department, and the Watervliet Arsenal Security Department. The contractor shall submit their placement request in writing 10 business days in advance to the project COR or technical POC for request evaluation and approval. (Note: request approval is not guaranteed.)
All temporary sheds, trailers or offices within thirty feet of any Arsenal structure must be equipped with a temporary sprinkler system as required by NFPA 13. The Fire Inspection Staff will assist contractors in determining sprinkler requirements on site, upon request. Call extension 5990 for fire inspector assistance.
21. EQUIPMENT, DUMPSTER, STORAGE CONTAINER/SHED, TRAILER, and OFFICE
IDENTIFICATION: Contractor shall prominently display the following information on all contractor and subcontractor, owned, leased or rented motorized and wheeled equipment, dumpsters, storage containers/sheds, trailers, and offices:
a. Contractor Company Name
b. Project Number/Contract Number or Equivalent (information will be provided to contractor by the Watervliet Arsenal, the Arsenal Partnership (AP), or the AP’s Construction Manager)
c. Contractor Project Point of Contact (POC) with phone number or Arsenal/AP Project POC with phone number (information will be provided to contractor by the Watervliet Arsenal, the AP, or the AP’s Construction Manager)
22. FLAME PERMITS: A flame permit is required daily for the use of any open flame device
(blowtorches, portable furnaces, tar kettles, welding, cutting devices, etc.). Call extension 5990 for request of a flame permit to be issued; give exact location of the job site, and the name of the contractor that will use the permit.
23. FIRE EXTINGUISHERS: Whenever open flame devices are used, the contractor will provide an approved fire extinguisher. Minimum size will be a 10-pound chemical (A-B-C) powder or CO2.
01 14 00 - 5
24. FIRE WATCH PERSONNEL (OVERHEAD WELDING OR CUTTING): The contractor will retain a worker at floor level at all times during cutting/welding operations with proper extinguishers to assure that sparks are properly controlled. Fire Watch personnel must also be provided for hot tar kettles while in operation, with approved fire extinguisher and sandbag (dike) around tar kettle.
Contractor must have a fire blanket to cover flammable material that cannot be moved.
25. GASOLINE CONTAINERS AND FLAMMABLES: Gasoline will be stored in safety containers equipped with self closing lids and other features as certified by the Underwriters' Laboratories.
Flammable liquids will be kept in National Fire Protection Association or UL approved containers;
Fire Department (extension 5990) will be called in event of a question. If gasoline or any other type fuel is kept in a portable tank it must have secondary containment or the tank be double walled and the product labeled on the side of the tank (i.e. flammable).
26. FIRE HYDRANTS: Fire hydrants shall not be used without the permission of Facilities
Engineering and notification of the Fire Department (extension 5990). If permission is granted to use hydrants, the contractor will provide adapters, valves and hoses. A backflow preventer will also be required of the contractor. It is the responsibility of the contractor to insure the hydrants are shut off and have drained properly. The Fire Department must be notified when finished.
27. WATER: Backflow prevention is required for any connections to the arsenal water system throughout construction work.
28. DISCHARGES: Unless granted prior written approval, there shall be no discharge to the sanitary sewer, the storm sewer, the industrial sewer system, or the Industrial Waste Treatment Plant (IWTP).
Except when WVA has established with the contractor a prior written agreement regarding discharge of "purge water" originating from groundwater monitoring wells and/or "decontamination water" originating from activities associated with groundwater monitoring wells, there shall be no dumping of oil or chemicals or fluids to the ground.
29. DOCUMENTATION OF DISPOSITION OF MATERIALS AND ITEMS REMOVED FROM
WATERVLIET ARSENAL: The contractor shall furnish documentation of the final disposition of all materials and items leaving Watervliet Arsenal. If an item is resold intact, indicate such action for the item and the name and address of purchaser. If oil is drained from an item, provide documentation for both the oil and the item by identifying final disposition location and management method for each
(e.g., recycled, incinerated, land filled). All materials and items leaving Watervliet Arsenal shall be managed strictly in accordance with all applicable environmental regulations. The contractor shall indicate intentions for all such materials and items at the pre-construction meeting, for approval by
Watervliet Arsenal.
30. WASTE DISPOSAL: All hazardous waste shall be relinquished to WVA at a location on post as designated by the COR, thereafter WVA will be responsible for management of such hazardous waste. Hazardous waste shall be relinquished to WVA in accordance with the RCRA "three day" rule.
Drums of hazardous waste shall not remain outdoors overnight. Other wastes include any spent material such as garbage, packaging, residues, construction and demolition debris, excavated soils and earthen materials not designated for immediate reuse, etc., which is known by WVA and/or demonstrated by the contractor via appropriate sampling and analysis to not be hazardous waste (such demonstration shall be to the satisfaction of WVA). The contractor is responsible for disposal of other wastes. Disposal of wastes at private sites such as sites advertising clean fill wanted, etc. is prohibited. The contractor shall comply with 6 NYCRR Part 364 for all waste hauling activities.
The contractor shall furnish copies of documents for each waste shipment, such as Bills of Lading, etc. (Including "light weight" upon entering WVA, and "heavy weight" upon exiting WVA), through
01 14 00 - 6 the COR to Facilities Engineering. Contractor shall furnish and properly label new, unused, appropriate drums and/or containers (including, but not limited to, compliance with DOT's
Performance Oriented Packaging Standards [POPS]) for containerizing waste. Contractor supplied dumpsters shall be covered with water proof covers to prevent precipitation from entering the dumpster. Covers shall be secured in place whenever the contractor leaves the job site, and whenever precipitation is possible or occurring.
31. INDUSTRIAL WASTE TREATMENT: Remediation work and/or hazardous waste work shall be performed in accordance with the requirements of the Resource Conservation and Recovery Act
(RCRA) and OSHA's Hazardous Waste Operations and Emergency Response (HAZWOPER), including, but not limited to:
a. Documentation of appropriate training.
b. Submittal for approval of a Site Specific Work Plan.
c. Submittal for approval of a Health & Safety Plan.
d. Except when WVA has established with the contractor a prior written agreement whereby WVA agrees to furnish drums and/or containers, contractor shall furnish and properly label new, unused, appropriate drums and/or containers (including, but not limited to, compliance with
DOT's Performance Oriented Packaging Standards (POPS) for containerizing hazardous waste.
e. Contractor shall appropriately containerize all hazardous waste, consolidating the waste to minimize the number of containers as appropriate. Contractor shall not overload containers.
Each container which has some hazardous waste shall be appropriately labeled, and shall be closed at all times except when waste is actually being added to the container ("closed" means sealed in a manner appropriate for shipment).
f. All hazardous waste generated shall be relinquished to WVA.
32. INDUSTRIAL WASTE TREATMENT PLANT (IWTP): Due to OSHA Process Safety
Management rule requirements, the contractor shall coordinate with the IWTP Leader regarding
IWTP- specific requirements when work is to be performed in and/or around the IWTP.
Requirements will include:
-hazard awareness of chemicals used at the - to include sulfur dioxide (so2).
-hazmin system- access by IWTP leader for all chemicals/msds upon request.
-proper PPE to be used when working with chemicals.
-building evacuation procedures when so2 alarm activates.
-must sign in/out of IWTP roster as acknowledgment this procedure.
33. ASBESTOS: Both OSHA Regulation 29CFR1910 and NY State Industrial Code Rule 56, (12NYCRR56) will be followed with regard to asbestos removal. If asbestos material is unexpectedly encountered during work, the contractor must contact the COR immediately. The contractor shall sign and submit the "Contractor Asbestos Notification Record" prior to starting work on any facility project. All asbestos waste, except where WVA provides written authorization to do otherwise, shall be Properly containerized, labeled, manifested and disposed of by Contractor, at their expense, according to all Local, State and Federal laws. All manifests for such waste, including weights, shall be presented to WVA Environmental staff for signature at least 24 hours prior to removal from WVA for disposal. The Generator copy of each Manifest shall be left with Environmental at the time of signing, for WVA records. All asbestos personnel shall provide their training certificates to the safety office prior to beginning work on the job site. Also all personnel shall have their training credentials with them at all times on the job site 34.
01 14 00 - 7
34. UTILITIES: Active utility services to the area of work, which are to remain, or services through the area feeding other areas, shall be rerouted, redirected or otherwise maintained. Required utility shutdowns shall be performed at such times as coordinated with Arsenal personnel and shall provide a minimum of shutdown time. Requests for shutdown shall be made at least 7 days prior to desired shutdown and be approved by the Contracting Officer prior to Contractor’s work. Arsenal personnel shall perform actual shutdown of utilities. The contractor’s work schedule shall be well planned and accomplished as expeditiously as possible. Service no longer required shall be removed.
35. ENVIRONMENTAL MANAGEMENT SYSTEM (EMS) - Watervliet Arsenal (WVA) has implemented an Environmental Management System (EMS) to proactively deal the environmental impacts of its processes, activities and services. Watervliet Arsenal uses the ISO 14001:2004 as the standard for its Environmental Management System (EMS). All personnel performing work for or on behalf of Watervliet Arsenal must be aware and understand Watervliet Arsenal’s Environmental
Policy. The contractor, to include any subcontract that a contractor uses, is responsible to ensure that all goods and services do not deviate from installation environmental policy. Watervliet Arsenal’s
Environmental Policy can be viewed by going to http://www.wva.army.mil/
36. UTILITY CLEARANCE PERMIT (UCP): All contracted work is subject to the WVA Regulation on utility clearance permits, WVAR 420-02. The contractor will assist the COR in preparing the UCP.
The contractor shall review the project site, project documents and utility record plans to determine the presence of concealed utilities within the area(s) of the project work. The contractor is required to sign the UCP and concur / non-concur with the project UCP.
37. MARKING UNDER GROUND UTILITIES: All contract work, which involves the installation or unearthing of underground utilities, shall include the marking of these utilities as part of the required project work. The tape shall be detectable by a metal detector when buried up to 3 feet deep. The tape shall be of a type specifically manufactured for marking and locating underground utilities. The metallic core of the tape shall be encased in a protective jacket or provided with other means to protect it from corrosion. Tape color shall be as specified below and shall bear a continuous printed inscription describing the specific utility.
RED: ELECTRIC
BLUE: WATER SYSTEM
GREEN: SEWER SYSTEM
YELLOW: GAS LINE OR PIPELINE (FOR NATURAL GAS, OIL,
STEAM/CONDENSATE OR OTHER DANGEROUS MATERIALS)
ORANGE: FIBER OPTIC (TELEPHONE, TELEVISION, SECURITY OR FIRE ALARM)
38. HISTORICAL ITEMS: The Contracting Officer or the COR reserves the right to declare any item or items resulting from removals, excavation, demolition, cleanup, or any other contract operation, as historically significant items. Included in this category are items of weaponry, ammunition, uniforms, equipment, relics, architectural features, archeological features or any other item that represents a part of the past history of the Arsenal. It is incumbent upon the contractor to report the finding of any item that may have historical significance. If the contractor discovers any item, which could be from the above category, all work will cease and the Contracting Officer or the COR will be contacted. These items shall remain in the property of the Arsenal and be delivered by the contractor to an area designated by the Contracting Officer or the COR. Historical items shall be carefully removed and carefully handled to prevent damage.
39. ASBESTOS AND MERCURY FREE: All materials utilized in the contract work shall be asbestos and mercury free. An asbestos material is any material containing more than one percent by weight of asbestos.
http://www.wva.army.mil/ http://www.wva.army.mil/
01 14 00 - 8
40. LEAD-FREE/CHROMIUM-FREE PAINT: All paints applied shall be lead-free and chromium free. Lead based paint is paint that contains more than six one hundredths of one percent, 0.06%, lead in weight.
41. PCB’s: To the extent that the project introduces fluids or equipment, such fluids and equipment shall not contain any polychlorinated biphenyls (PCBs). PCB-Free is a level of contamination less than 2
PPM using EPA approved methodologies.
42. CONFINED SPACE ENTRY: All contracted work is subject to WVA Regulation 385-1 Confined space entry procedure. Contractors shall provide proof of training in confined space entry procedures.
Contractor shall provide the COR a completed WVA Form 385-17-E, confined space entry permit or equivalent company form prior to starting any work within a confined space. Contractors shall provide their own calibrated confined space Monitors when entering all confined spaces. Contractors will have their own retrieval tripods and harnesses. Contractor will notify COR and Fire Dept contact prior to entering confined space each day.
43. ACCIDENT PREVENTION PLAN: Prior to commencement of contract work, the Contractor shall submit for approval to the COR, an Accident Prevention Plan if required per Federal
Acquisition Regulation construction clause 52.236-13(f).
44. MATERIAL SAFETY DATA SHEETS (MSDS): When material safety data sheets (MSDS’s) or labels are required, failure to submit them prior to award, or when requested to do so, may result in the contractor being considered non-responsive. When providing MSDS’s at any time, provide 7 copies to the Contracting Officer. Material Safety Data Sheets for all chemicals/paints are to be made available at the work site and all containers of chemicals will be labeled for identification.
45. LASER OPERATIONS: All laser operations must be in accordance with ANSI Z13.6.1. The
Radiation Safety Officer must be notified when a laser will be used on a worksite.
46. SOUND LEVELS: Sound levels in the vicinity of equipment installed under any project shall not exceed 85 BA following construction when the equipment is in use (measured by a sound level meter set for A scale, slow response). The vicinity of installed equipment is defined as a distance not to exceed 1 meter from the equipment. Techniques such as sound level averaging or exposure time weighting shall not be used to meet this requirement. If an 85-dBA limit is beyond the state of art for the equipment, documentation verifying the minimum level achievable shall be submitted to WVA for review and acceptance at time of equipment submittals. This documentation shall be provided and reviewed/approved prior to ordering any materials.
47. SAFETY REGULATIONS: The contractor shall comply with all provisions of U.S. Department of
Labor and Occupational Safety and Health (OSHA) standards.
48. PROJECT DESIGN AND DOCUMENTATION: The Contractor shall be responsible to maintain a current copy of the project Statement of Work (SOW), or Performance Work Statement (PWS), or Statement of Objectives (SOO), whichever is applicable to the project and appears in the Contract, at the worksite(s) available to all Contractor and Subcontractor employees for reference. The Contractor shall promote the distribution of the SOW, PWS, or SOO to all Contractor and Subcontractor foremen, site supervisors, and employees providing construction services at the Watervliet Arsenal. Where the SOW, PWS, or SOO call out specific drawings and/or specifications for the proper performance and execution of project work, the
Contractor shall also be responsible to provide copies of the drawings and specifications to the Contractor and Subcontractor employees, foremen, site supervisors, and workers.
01 14 00 - 9
49. SAFETY PRECAUTIONS: The contractor shall be responsible for instructing his workers and sub-contractors in appropriate safety measures and shall not permit them to place tools, machines and other equipment in traffic lanes or other locations in such a manner as to create safety hazards.
50. SAFETY RULES: Contractors must adhere to the following:
a. Work area will be barricaded and appropriately marked.
b. The work area will be kept clean and orderly. Waste materials are to be located so as not to create a hazard.
c. Dust and noise are to be kept to a minimum and within allowable limits (OSHA AND ACGIH
TLV’s and PEL’s). (To be determined by the contracting representatives with the assistance of
Industrial Hygiene and Safety).
d. Existing means of egress will be adequately maintained during construction.
e. Compressed gas cylinders shall be secured in an upright position.
f. Flashback protection is required for oxygen and acetylene welding.
g. Hand and portable power tools shall be maintained and used in a safe manner.
h. Ground fault circuit interrupters are to be used with portable electric powered tools.
i. Proper protective clothing & equipment (PPE) must be provided and worn where necessary.
j. Safety glasses must be worn in designated areas in the arsenal and within any designated construction work area.
k. Hard hats must be worn when overhead work is being performed.
l. Ladders are to be free of defects and secured from movement.
m. Scaffolds or elevated work platforms are to be properly erected and adequately guarded.
(Guardrails, toe boards, etc.).
n. Fall protection will be used whenever work is elevated above 6 feet.
o. Sides of all excavations in which employees are exposed to danger from moving ground shall be guarded by sloping, shoring, or other equivalent means.
p. Wheeled equipment (trailers, carts, etc.) must be free of defects and secured from movements.
q. Internal combustion engine exhausts are to be vented to the outside.
r. Bi-directional vehicles (fork trucks, dump trucks, shop carts, etc.) will be equipped with backup alarms.
s. Vehicular traffic flow in and out of building (work site) will be such so as to not endanger safety of personnel.
t. Material Safety Data Sheets for all chemicals/paints are to be made available at the work site and all containers of chemicals will be labeled for identification.
u. Lock-out/tag-out procedures per OSHA will be used as required.
51. SULFUR DIOXIDE (SO2) AWARENESS: Due to the presence of highly hazardous chemicals located in the Industrial Waste Treatment Plant, always follow the instructions of WVA officials quickly and completely in the event of any emergency. This is especially important when working in or near the Industrial Waste Treatment Plant (IWTP).
Because of the requirements of OSHA's Process Safety Management (PSM) standard (For specific requirements see Title 29 of the Code of Federal Regulations, Part 1910.119 on the OSHA website) safe work practices have been developed that provide for the control of hazards during operations such as lockout/tag out; confined space entry; line breaking of process associated piping; control over IWTP facility entry. These safe work practices apply to all employees and contractors equally. Contractors must follow all safe work practices while working on the installation and provide training to employees on PSM before working within the IWTP.
For contractors performing maintenance or repair, turnaround, major renovation, or specialty work on or adjacent to a covered process, contact the Contracting Officer's Representative (COR) for more instructions on special provisions of the PSM standard that applies to this work.
01 14 00 - 10
52. SUBMISSION OF RECORDABLE INJURIES AND ILLNESS CASES: Watervliet Arsenal is pursuing OSHA Voluntary Protection Program (VPP) recognition. In VPP, management, labor, and
OSHA work cooperatively and proactively to prevent fatalities, injuries, and illnesses through a system focused on: hazard prevention and control; worksite analysis; training; and management commitment and worker involvement.
The VPP impacts all contractors whose employees cumulatively work more than 1000 hours per quarter within a calendar year at Watervliet Arsenal (herein referred to as “applicable contractors”). It is the contractor’s responsibility to ensure its employees and managers are in full compliance with
OSHA requirements and have a general understanding of VPP. Detailed information on VPP is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html . All contractors, whether regularly involved in routine site operations or engaged in temporary projects such as construction or repair, must follow the safety and health rules of Watervliet Arsenal.
Applicable contractors are required to annually submit to Watervliet Arsenal, ATTN: TAWV-XO
S/Safety Office, 1 Buffington Street, Watervliet, NY 12189-4000 or email:
usarmy.watervliet.tacom.list.wate-safety@mail.mil the following documents (covering the previous calendar year quarters) by 15 January:
- Total Case Incidence Rate (TCIR) - the number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
- Days Away, Restricted, and/or Transfer Case Incident Rate (DART) - Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
- OSHA Form 300A
Applicable contractors may submit the above immediately following the completion of a quarter, if desired.
53. RADIOACTIVE SOURCES: Contractor must comply with U.S. Army requirements for Radioactive
Sources well as Nuclear Regulatory Commission and local WVA requirements Watervliet Arsenal's
Radiation Safety Officer (RSO), in the Safety Office phone: 518-266-5635, must be notified when any radioactive sources are to be brought into WVA and must be given a copy of required licenses. The
Watervliet Arsenal RSO must also be provided a POC before materials are to be brought on post for any potential follow-up questions or required information. No one will be allowed to bring any radioactive source on post until an Army Radiation Permit is issued by the Commanding Officer through the WVA RSO.
54. MEDIA: The Arsenal public affairs officer must approve any media announcement or press release that mentions the Watervliet Arsenal in either the headline or in the text of the release. Additionally, no media activity may occur on the Arsenal without prior coordination with the public affairs officer.
Coordination or requests for approval must be submitted to the public affairs officer at least two working days prior to the event.
55. EMERGENCY EVACUATION PLAN: All contractor personnel working on the site will be responsible to be familiar with the building’s existing emergency evacuation plan, if available and applicable to the project’s worksite. The contractor shall provide the COR with the contractor’s emergency evacuation plan from the worksite if different from the existing emergency evacuation plan.
mailto:usarmy.watervliet.tacom.list.wate-safety@mail.mil http://www.osha.gov/dcsp/vpp/index.html http://www.osha.gov/dcsp/vpp/index.html mailto:usarmy.watervliet.tacom.list.wate-safety@mail.mil
01 14 00 - 11
56. HOT WORK PERMITS: All contractors are advised to avoid working on live/hot electrical systems on the installation. If it is deemed necessary to do any hot work on the installation a hot work permit must be authorized by the fire department before starting any work(X5990).
END OF SECTION 01 14 00
Section 01 22 00.00 10 Page 1
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
1.1 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Mobilization and Demobilization
1.1.1.1 Payment
Payment will be made for costs associated with mobilization and demobilization, as defined in Special Clause PAYMENT FOR MOBILIZATION AND
DEMOBILIZATION.
1.1.1.2 Unit of Measure
Unit of measure: job.
1.1.2 Structure No. 22
1.1.2.1 Payment
Payment will be made for costs associated with operations necessary for construction of the structure.
1.1.2.2 Unit of Measure
1.1.3 Structure No. 40-5
1.1.3.1 Payment
1.1.3.2 Unit of Measure
Section 01 22 00.00 10 Page 2
1.1.4 Structure No. 40-6
1.1.4.1 Payment
1.1.4.2 Unit of Measure
Unit of Measure: job.
1.1.4.3 Structure No. 41
1.1.4.3.1 Payment
1.1.4.3.2 Unit of Measure
1.1.5 Stucture No. 108
1.1.5.1 Payment
1.1.5.2 Unit of Measure
1.1.6 Structure No. 126
1.1.6.1 Payment
1.1.6.2 Unit of Measure
Unit of Measure: job.
PART 2 PRODUCTS
Not Used
3.1 CONTRACT COST BREAKDOWN
The Contractor must furnish within 30 days after the date of Notice to
Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late
Section 01 22 00.00 10 Page 3 payment items or other discrepancies will be revised by the Contracting
Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.
-- End of Section --
Section 01 30 00 Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
View Location Map; G, RO
Progress and Completion Pictures; G, RO
1.3 VIEW LOCATION MAP
Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.
1.4 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer.
Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government.
Section 01 30 00 Page 2
1.5 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 LIABILITY, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.
a. The Contractor shall, at its own expense, provide and maintain during the entire performance of this Contract, at least the kinds and minimum amounts of insurance as follows in accordance with FAR 28.307-2
LIABILITY:
(1) General Liability Insurance (comprehensive form of policy) Bodily
Injury Liability - $500,000 per occurrence Property Damage Liability - $20,000 per accident.
(2) Automobile Liability Insurance Bodily Injury Liability - $200,000 per person and $500,000 per accident Property Damage Liability - $20,000 per accident.
(3) Workmen's Compensation and Employer's Liability Insurance Compliance with all applicable workmen's compensation and occupational diseases statutes is required. Employer's liability coverage in the minimum amount of $100,000 is required.
b. Before commencing Work under this Contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective for such a period as may be prescribed by the laws of the State in which this Contract is to be performed and in no event less than thirty
(30) days after written notice thereof to the Contracting Officer.
c. The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this Contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the Contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance, and shall make copies available to the Contracting Officer upon request
1.5.1 Warranty of Construction: (APR 1984)
a. In addition to any other warranties in this Contract, the Contractor warrants, except as provided in paragraph (j) of this clause, that Work performed under this Contract conforms to the Contract Requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
b. This Warranty shall continue…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.