AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

-- Make some changes to the Draw ings -- Revise certain sections in the Specifications -- Provde the Government's answ ers to Bidders' questions (For Informational Purposes Only)

The Bid Opening Date of 22 September 2017 at 3:00pm (Denmark Time) is NOT extended.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing Block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS17B0008

X 9B. DATED (SEE ITEM 11)

22-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Sep-2017

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS17B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

FY17 Install Fire Suppression at M-Plant Thule Air Base, Greenland

W912DS-17-B-0008

Amendment 0001

AMENDMENT 0001 to DRAWINGS and SPECIFICATIONS for FY17 Install Fire Suppression at M-Plant, Thule Air Base, Greenland.

TO OFFERORS

The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED but NOT REISSUED:

None

2. The following DRAWINGS have been REVISED and REISSUED:

Drawing FX 001 Drawing FX 101 Drawing FX 401 Drawing FX 501

3. The following DRAWINGS have been ADDED:

Drawing FA 101

SPECIFICATIONS

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

- None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

- None

3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:

- Section 21 22 00.00 40 – Clean Agent Fire Extinguishing System – replace the specification section in its entirety.

- Appendix B – M-Plant As-Build Drawings – is hereby replaced in its entirety.

4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:

- Section 00 73 00 – Special Contract Requirements – add paragraph 1 l as follows: “l. The contractor shall coordinate the sprinkler pipe routing such that the existing overhead crane and jib cranes can operate unhindered.”

- Section 21 13 13.00 10 – Wet Pipe Sprinkler System, Fire Protection - revise the edition year for NFPA 13 and NFPA 24 in paragraph 1.1 from 2013 to 2016.

- Section 21 13 13.00 10 – Wet Pipe Sprinkler System, Fire Protection - revise the second sentence in paragraph 2.4.1 to read as follows: “Carrier piping shall be schedule 40 Black Steel.”

W912DS17B0008

- Section 21 13 13.00 10 – Wet Pipe Sprinkler System, Fire Protection - revise reference in paragraph 2.7 from “AUTO SPKR” to “STANDPIPE/AUTO SPKR.”

- Section 21 13 13.00 10 – Wet Pipe Sprinkler System, Fire Protection - replace paragraph 3.5 with “NOT USED”

- Section 21 13 13.00 10 – Wet Pipe Sprinkler System, Fire Protection - replace paragraph 3.6 in its entirety with the following: “Except as modified herein, electric equipment and wiring shall be in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Alarm signal wiring connected to the building fire alarm control system shall be in accordance with the notes on the plans. Wiring color code shall remain uniform throughout the system.”

BIDDERS’ QUESTIONS AND GOVERNMENT REPLY

(Questions that may be of general interest to all bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors/Bidders for information only.)

1. Specification section 211313.0010, page 8, Item 2.4.1. Pipes: The external pipes are specified as pre-insulated stainless steel type 316. What schedule pipe will be required? Response: The required pipe shall be black steel schedule 40, as noted in this amendment #1.

2. Drawings number FX 101 and FX 102. Please issue drawings that show sections in the various areas. Area cover gridline 1-9 / A-B are important. Response: Please refer to the reissued appendix B with all available section for the facility.

3. Drawing number FX 101. Shall Control room, Shop area, Part store, clean bench, Water lab Chemical store and Stairs be sprinkled? Response: The buildings is to be fully sprinklered as noted in section 21 13 13.00 10 paragraph 1.2.

4. Drawing number FX 102. Shall Mech. Room, Battery room, Office, Day room, Locker rooms and Mezz. Storage be sprinkled? Response: The buildings is to be fully sprinklered as noted in section 21 13 13.00 10 paragraph 1.2.

5. Can the date for submittal of the offer be extended one week to the 29. September 2017.

Response: Unfortunately, due to the expiring funds and proximity to fiscal year end, we are unable to grant any bid due date extension.