SECTION 21 22 00.00 40
CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
05/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM B88 (2016) Standard Specification for Seamless Copper Water Tube
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-58 (1993; Reaffirmed 2010) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)
NASA-STD-5008 (2011b; R 2016; E 2016; Change 1) Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment
RCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance Guide
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 (2015; ERTA 2015) Life Safety Code
NFPA 2001 (2015; ERTA 1-2 2015) Standard on Clean Agent Fire Extinguishing Systems
NFPA 70 (2017) National Electrical Code
NFPA 72 (2016) National Fire Alarm and Signaling Code
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-595 (Rev C; Notice 1) Colors Used in
Government Procurement
UNDERWRITERS LABORATORIES (UL)
UL 2127 (2012; Reprint Aug 2016) UL Standard for Safety Inert Gas Clean Agent Extinguishing System Units
UL 2166 (2012; Reprint Aug 2016) UL Standard for Safety Halocarbon Clean Agent Extinguishing System Units
UL 536 (2014) Flexible Metallic Hose
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Previous Product Installation; G, DO
SD-02 Shop Drawings
High-Pressure Cylinders; G, DO
Piping Materials; G, DO
Pipe Hangers and Supports; G, DO
Pressure Alarm Switch; G, DO
Nozzle; G, DO
Manual Actuation Stations; G
Installation Drawings; G, DO
SD-03 Product Data
Escutcheons; G
Storage Batteries; G, DO
Battery Charger; G, DO
Smoke Detectors; G, DO
Audible Alarms; G, DO
Visual Alarms; G, DO
Annunciator Panels; G, DO
Pressure-Relief Device; G, DO
SD-05 Design Data
Design Analysis; G, DO
Discharge Calculations; G, DO
SD-06 Test Reports
Test Procedure; G, DO
Preliminary Tests; G, DO
Formal Tests; G, DO
SD-07 Certificates
Certificates of Compliance
SD-10 Operation and Maintenance Data
Operating Instructions; G
Operation and Maintenance Manuals
SD-11 Closeout Submittals
Record Drawings
1.3 QUALITY CONTROL
Use State certified contractors to supervise installation and perform acceptance testing of the system in accordance with NFPA 2001.
Perform all work by, or under the direct supervision of the certified contractor.
1.3.1 Special Hazards Suppression Systems
Provide the services of a Certified Special Hazards Design Specialist (CSHDS) thoroughly experienced in Clean Agent Suppression System installations on site, to perform or directly supervise the installation, make all necessary adjustments, and perform all tests.
A CSHDS is considered certified when the specialist holds a valid System Layout Certification, Level IV Certification from the National Institute for Certification in Engineering Technologies (NICET) and an individual professional engineering license who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES).
Certification of other recognized agencies with equivalent requirements may be considered. Provide evidence of the Contractor's State Certification and the basis of certification to the Contracting Officer for approval prior to any work being performed.
1.3.2 Previous Product Installation
Submit the names, locations, and client contact information of five successful previous projects of similar size and scope that the installer has constructed using the manufacturer's submitted products for this project.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Design clean agent extinguishing system as per NFPA 2001. Submit plans and calculations for approval before installation. Submit certificates of compliance for the following items showing conformance with the referenced standards contained in this section:
a. Piping Materials and Supports
b. High-Pressure Cylinders
c. Escutcheons
d. Pipe Hangers and Supports
e. Pressure Alarm Switch
f. Internal Cleaning and Swabbing of Pipe
2.1.1 Installation Drawings
Submit installation drawings for Clean Agent Fire Protection Systems.
Annotate clean agent extinguishing system piping layout with reference points for design. In field wiring diagrams, show locations of devices and points of the system. Prepare working drawings in accordance with the requirements for "Specifications, Plans and Approvals" as specified in NFPA 2001. Include data essential to the proper installation of each system. Integrate with the alarm and detection system specified.
Include details of equipment layout and design. Indicate the general physical layout of all controls, manual actuation stations, and internal tubing and wiring details.
Give full consideration to built-in spaces, piping, electrical equipment, ductwork, and all other construction and equipment for the layout of the system.
Provide electronic drawings in Microstation.dgn format or AutoCAD.dwg format. If the electronic files are AutoCAD format, only use standard AutoCAD fonts and line styles and furnish the pcp file.
2.1.2 Design Requirements
Submit design analysis and calculations for Fire-Protection Systems including spray areas, hazard by class, and pressure calculations.
Submit clean agent discharge calculations verifying total storage requirements, flooding concentrations, discharge times, flow through the piping network, pipe sizes, and nozzle orifice sizes, in accordance with the manufacturer's listed design manual and NFPA 2001.
Design the total flooding system to a concentration of 6.5 percent for 15 minutes.
2.1.3 Equipment Approval
Provide devices and equipment of make and type listed by the Underwriters Laboratories, Inc. (UL), UL 2166, or Factory Mutual (FM) approved. In the UL and FM publications, consider the advisory provisions as mandatory.
Reference to the "authority having jurisdiction", AHJ is interpreted as the US Army Corps of Engineers.
Provide an approved high-pressure total flooding type Fire-Extinguishing system conforming to NFPA 2001. Acceptable product trade name is Novec-1230 (Sapphire) or approved equal.
2.1.4 Performance Requirements
Provide construction type, test, and mark of high-pressure cylinders in accordance with U.S. Department of Transportation specifications for seamless steel cylinders.
Provide each cylinder with a safety device to relieve excess pressure safely, in advance of the rated cylinder test pressure. Devices are to be Interstate Commerce Commission approved frangible safety disks.
Provide cylinder support racks that anchor to walls and floors.
Main System: Arrange system for fully automatic and manually operated electric control operation, with operating controls of the enclosed release type to prevent accidental operation. Also provide for manual actuation stations and keyed override operations.
2.2 EQUIPMENT
Design and construct the system as a total-flood system to include a fixed supply of extinguishing agent connected to properly sized, fixed piping with fittings and nozzles to direct this agent into the protected area.
2.3 COMPONENTS
2.3.1 Piping
Provide only galvanized, ferrous piping, Schedule 40 manifolds and distribution piping materials conforming to ASTM A53/A53M, nonferrous drawn seamless copper tubing conforming to ASTM B88, and flexible metallic hose conforming to UL 536.
Provide fittings for changes in direction of piping and for all connections. Reduce pipe sizes in the fitting. Do not use flush bushings. Fuse brazed joints, when used, with an alloy with a melting point above 1,000 degrees F.
Provide pipe and fittings having a minimum bursting pressure of 5,000 psi.
For 1/2 inch and 3/4 inch iron pipe size (ips), provide Schedule 40. For 1 inch or greater, use only Schedule 80 pipe. Standard malleable iron banded fittings or ductile iron fittings are to be used up through 3/4 inch ips.
Use extra heavy malleable iron or ductile iron fittings through 2 inch ips. Use forged steel fittings in all sizes over 2 inches.
Permanently mark discharge nozzles to identify the nozzle and to show the equivalent single orifice diameter regardless of shape and number of orifices. Design discharge nozzles to uniformly distribute the clean agent throughout the hazard area.
2.3.1.1 Pipe Hangers And Supports
Provide pipe hangers and supports conforming to MSS SP-58, adjustable type, zinc-coated.
2.3.1.2 Pipe Sleeves
Provide sleeves where piping passes through masonry or concrete walls, floors, roofs and partitions. Use standard weight zinc coating for steel pipe sleeves in outside walls, below and above grade, in floor, and roof slabs. Zinc coat steel sleeves in partitions having a nominal weight of not less than 0.90 pounds per square foot. Ensure space between piping and the sleeve, is not less than 0.5-inch. Use sleeves of sufficient length to pass through the entire thickness of walls, partitions and slabs. Extend sleeves in floor slabs 2-inches above the finished floor. Pack space between the pipe and sleeve with asbestos free insulation and caulk at both ends of the sleeve with plastic waterproof cement.
2.3.2 Escutcheons
Provide approved-type escutcheons for piping passing through floors, walls, and ceilings, consisting of one-piece or split-type. Provide chrome plated escutcheons where pipe passes through finished ceilings. Other escutcheons may be steel or cast iron, with aluminum paint finish. Securely fasten escutcheons in place with setscrews or other positive means.
2.3.3 Supervisory Switch
2.3.3.1 Low Pressure Alarm Switch
Provide the clean agent tanks with a low pressure alarm switch to warn of clean agent tank depressurization.
2.3.4 Control Panel
Provide a separate control panel for the clean agent system.2.3.4.1 Secondary Power Supply
Provide batteries, charger, and power transfer equipment which supplies the means of automatically supplying the entire preaction system with battery backup power in event of a primary power system failure, and switches to battery power in the event of AC power failure, and switches back to AC power upon return of primary power. Provide a control panel which operates when the backup batteries are disconnected for any reason, and controls charging currents and floating voltage levels to maintain batteries in optimum condition. Provide capability to recharge batteries in event of discharge. Fuse wiring to protect against battery over-current and polarity reversal. Primary power, battery, or charging equipment failure is to activate a preaction control panel trouble signal and visual indication.
2.3.4.1.1 Storage Batteries
Provide sealed and spill-proof battery modules (no corrosive fumes).
Utilize only batteries which are listed for preaction service and suitable for high discharge currents required under alarm conditions, sized to operate the suppression and detection system (including voice evacuation systems and UV/IR flame detectors) in normal supervisory condition for 48 hours minimum, then operate the system in the alarm mode for 15 minutes, minimum.
Provide calculations substantiating the battery capacity. Provide reliable separation between cells to prevent contact between terminals of adjacent cells and between battery terminals and other metal parts.
2.3.4.1.2 Battery Charger
Provide completely automatic high/low charging rate type charger capable of battery recovery from full discharge to full charge in 24 hours or less.
Provide an ammeter for recording rate of charge and a voltmeter to indicate the state of battery charge. Provide a red pilot light to indicate when batteries are manually placed on a high rate of charge as part of the unit assembly if a high-rate switch is provided.
2.3.5 Manual Actuation Stations
Provide actuation stations for systems at the exits from the protected areas. Ensure manual station operation causes the control panel to go into full alarm condition and discharge Clean Agent into the protected area following the adjustable time delay. Install stations of a type not subject to operation by jarring or vibration. Ensure stations have a dual action release configuration to prevent accidental system discharge.
Break-glass-front stations are not permitted; however a pull lever break-glass-rod type is acceptable. Station color is yellow or orange.
Place warning signs, "Agent Trade Name" manual release, at each station indicating that operation of the station initiates immediate Fire Suppression Agent discharge. Where building fire alarm pull stations are also mounted at the exits from the protected areas, separate them from Fire Suppression Agent actuation stations by at least 3-feet horizontally.
Provide labels to clearly distinguish building fire alarm stations from Fire Suppression Agent stations. Ensure Fire Suppression Agent stations are a different color from building fire alarm pull stations.
2.3.6 Smoke Detectors
Design for detection of abnormal smoke densities by the photoelectric principle. Necessary control and power modules required for operation of the device is integral with the main control panel. Ensure detectors are compatible with the main control panel provided and are suitable for use in a supervised circuit. Ensure detectors do not draw power from the initiating circuit. Take operating power from a separate supervised power supply circuit. Ensure that malfunction of the electrical circuitry to the detector or its control or power units results in the operation of the system trouble devices. Ensure detectors are not susceptible to operation by changes in relative humidity. Each detector contains a visible indicator lamp to show when the unit is activated. Use plug-in type detectors in which the detector base contains screw terminals for making all wiring connections. Provide remote indicator lamps for each detector that is located above suspended ceilings, beneath raised floors or otherwise concealed from view.
2.3.6.1 Photoelectric Detectors
Operate on a multiple cell concept using a light-emitting diode (LED) light source. Failure of the LED does not cause an alarm condition but operates the detector trouble indicating lamp.
2.3.6.2 Detector Spacing and Location
Ensure detector spacing and location is in accordance with the requirements of NFPA 72, the manufacturer's recommendations and the requirements stated herein. Spacing and location of detectors takes into account the airflow into the room and supply diffusers. Do not place detectors closer than 5 feet from any discharge grille. Spacing of detectors on room ceilings is not to exceed 450 square feet per detector. Spacing of detectors under raised floors is not to exceed250 square feet per detector. Mount detectors installed beneath raised floors with the detector base within 2 inches of the underside of the raised floor framing, with the detector facing downward. Where the space under the raised floor is less than 12 inches in height, mount detectors with their bases either horizontal or vertical, with the detection chambers mounted in the upper half of the underfloor space. Under no circumstances, mount detectors facing upward.
2.3.7 Inhibit Switch
Provide one switch where activation of switch is to delay only equipment shutdown and agent discharge. Switch is guarded, spring-loaded type which operates only when pressure is manually applied to the switch. Upon release of manual pressure, switch de-activates allowing delayed functions to resume. After start of agent discharge, switch has no effect.
Activation of switch during normal (non-alarm) conditions causes activation of system trouble signals.
2.3.8 Alarm Signaling Devices
Provide each protected area with audible and visual alarms located where shown. Electrically supervise all alarm circuits. Provide separate and distinct audible and visual pre-discharge and discharge signals. Where the building is equipped with a separate fire evacuation alarm system, ensure the discharge signals is distinct from those used by the building fire evacuation system. Provide each signal device with a rigid plastic or metal identification sign with lettering a minimum of 1.5-inches high.
Label the pre-discharge alarm "FIRE" and the discharge alarm "Fire Suppression Agent DISCHARGE." Locate post-discharge visual alarms outside all entrances to the protected areas, and provided with signs reading "Fire Suppression Agent DISCHARGED WHEN FLASHING - DO NOT ENTER.
2.3.8.1 Audible Alarms
a. Alarm bells
Provide 10 inch surface mounted alarm bells with matching mounting back box. Install bells of the vibrating type suitable for use in an electrically supervised circuit. Install bells of the underdome type that have a sound output rating of at least 90 decibels at 10 feet.
b. Alarm horns
Provide surface mounted, vibrating type alarm horns suitable for use in an electrically supervised circuit that have a sound output rating of at least 90 decibels at 10 feet.
2.3.8.2 Visual Alarms
Surface mounted lamp assembly suitable for use in an electrically supervised circuit. Provide flashing rotary beacon type lamps, powered from the control panel alarm circuit. Provide lamps with a minimum of 50 candle power with a flash rate is between 60 and 120 flashes per minute.
Protect lamps by a thermo-plastic lens, red for pre-discharge alarms and blue for discharge and post-discharge alarms. Visual alarms may be part of an audio-visual alarm assembly.
2.3.9 Main Annunciator
Annunciator is integral with the main control panel. Provide separate alarm and trouble lamps for each zone alarm initiating circuit located on the exterior of the cabinet door or visible through the cabinet door.
Supervision is not required provided that a fault in the annunciator circuits results only in loss of annunciation and does not affect the normal functional operation of the remainder of the system. Ensure each lamp provides specific identification of the device by means of a permanent label. Do not use generic nondescript wording such as "Zone 1," or "Zone 2," for the label identifications.
2.3.9.1 Annunciator Panels
a. Remote Annunciator Panels
Locate as shown. Ensure panel duplicates all requirements specified for the main control panel annunciator, except that in lieu of individual zone trouble lamps a single common system trouble lamp may be provided. Provide a panel lamp test switch. Provide zone identification by means of permanently attached rigid plastic or metal plate(s). Provide interior type, surface panel.
2.4 ACCESSORIES
2.4.1 Electrical Work
2.4.1.1 Wiring
Provide control and fire alarm wiring, including connections to fire alarm systems, under this section and conform to NFPA 70. Use No. 12 AWG minimum wiring for 120 volt circuits. Use No. 16 AWG minimum wiring for low voltage DC circuits. Color code all wiring. Use rigid metal conduit or intermediate metal conduit, except electrical metallic tubing may be used in dry locations not enclosed in concrete and where not subject to mechanical damage.
2.4.1.2 Operating Power
Use 120 Vac power, transformed through a two winding isolation type transformer and rectified to 24 volts DC for operation of all signal initiating, signal sounding, trouble signal and transmitter tripping circuits. Provide secondary DC power supply for operation of system in the event of failure of the AC supply. Ensure transfer from normal to emergency power or restoration from emergency to normal power is fully automatic and does not cause transmission of a false alarm. Obtain AC operating power to control panel and battery charger from the line side of the incoming building power source ahead of all building services. Provide independent properly fused safety switch, with provisions for locking the cover and operating handle in the "POWER ON" position for these connections and locate adjacent to the main distribution panel. Paint switch box red and suitably identify by a lettered designation.
2.4.1.3 Conductor Identification
Identify all circuit conductors within each enclosure where a tap, splice or termination is made. Use plastic coated self sticking printed markers or by heat-shrink type sleeves for conductor identification. Attach the markers in a manner that does not permit accidental detachment. Properly identify control circuit terminations.
PART 3 EXECUTION
3.1 INSTALLATION
Install materials and equipment in accordance with NFPA 2001. Ensure each system is complete and ready for operation.
Conceal piping to the maximum extent possible. Inspect and test pipe;
receive Contracting Officer approval before pipe is concealed.
Provide each system with an approved pressure-relief device designed to operate between 2,000 and 3,300 psi and located between the storage cylinder manifolds and any normally closed valve.
3.1.1 Warning Signs
Provide signs manufactured of 3-layer red-white-red micarta, engraved to show white uppercase letters on a red background, warning signs. Warning sign thickness is 1/8-inch thick with beveled edges.
3.1.1.1 Inside Control Room
Permanently affix a sign adjacent to every audible/visual system alarm reading:
WARNING
WHEN THIS STROBE IS LIT,
RELEASE OF FIRE SUPPRESSION AGENT WILL OCCUR WITHIN 60 SECONDS
Make letters for "WARNING" 1-1/2-inch tall, and all other lettering 1-inch tall.
3.1.1.2 Protected Space
Permanently affix a sign adjacent to every audible/visual system alarm reading:
WARNING
THIS SPACE IS PROTECTED BY A CLEAN AGENT
EXTINGUISHING SYSTEM. DO NOT ENTER
WITHOUT AUTHORIZATION DURING OR
AFTER DISCHARGE. THIS STROBE
INDICATES DISCHARGE.
Make letters for "WARNING" 1-1/2-inch tall, and all other lettering 1-inch tall.
3.1.1.3 Manual Activation or Release Station
Place a sign at every location where manual operation of the system may occur, reading:
WARNING
ACTUATION OF THIS DEVICE WILL CAUSE
FIRE SUPPRESSION GAS TO DISCHARGE. BEFORE
ACTUATING, ENSURE THAT PERSONNEL ARE
CLEAR OF THE AREA.
Make letters for "WARNING" 3/4-inch tall, and all other lettering 3/8-inch tall.
3.1.2 System Control
3.1.2.1 Controls
Provide an electrical and mechanical actuating control system contained in a fire alarm panel specified in Section 28 31 00.00 10 FIRE DETECTION AND ALARM SYSTEM, DIRECT CURRENT LOOP as modified below.
3.1.2.2 Suppression System Safing/Disconnect Switch
Connect the positive and negative conductors of the Class B solenoid/actuator/electric release head circuitry in series to a lock switch. Provide and install the switch in an enclosure inside the facility. A clearly visible sign on the enclosure, or immediately adjacent, is to explicitly indicate its purpose as "FIRE SUPPRESSION SYSTEM
SAFING SWITCH".
3.1.3 Electrical Work
Electrical work is specified in Section 28 31 00.00 10 FIRE DETECTION AND
ALARM SYSTEM, DIRECT CURRENT LOOP.
3.1.4 Operating Instructions
Submit operating instructions for Clean Agent Fire Protection Systems consisting of raised or embossed white letter on red rigid plastic or enameled steel background and of a size to permit them to be easily read.
Provide operating instructions at each remote control station.
Instructions are to clearly indicate necessary steps for the operation of the system.
Submit six copies of the operation and maintenance manuals 30 days prior to testing the Clean Agent Fire Protection Systems. Update and resubmit data for final approval no later than 30 days prior to contract completion.
3.1.5 Field Painting
Touch-up painting is to match equipment manufacturer's original paint.
3.2 FIELD QUALITY CONTROL
Conduct testing to determine conformance with the requirements in the presence of the Contracting Officer.
3.2.1 Manufacturer's Field Service
Provide an experienced manufacturer's field engineer to supervise installation and testing of the system.
3.2.2 Test Procedure
Prepare and submit the clean agent system test procedure to the Contracting Officer for approval 30 days prior to the planned preliminary tests.
3.2.3 Preliminary Tests
Pneumatically test each piping system at 150 psi gage to ensure no leakage or reduction in gage pressure after 2 hours. Use the discharge of breathing air from each system discharge nozzle to test discharge nozzles.
Test remote control stations, and all other components and accessories individually to demonstrate proper functioning. At the completion of tests and corrections, submit a signed and dated certificate to the Contracting Officer attesting to the satisfactory completion of all testing and that the system is in operating condition.
3.2.4 Formal Tests
Provide the suppression agent, instruments, personnel, appliances, and equipment necessary for testing are furnished by the Contractor at his expense.
At a time agreed upon by the Government, the Government Fire Protection Engineer will witness formal tests and approve systems before they are accepted. Ensure the presence of an experienced technician regularly employed by the system installer during the testing. During the testing, repeat any of the required tests, as directed by the Contracting Officer.
Perform a fan test witnessed by the Government wherein the enclosure integrity is required to perform in accordance with NFPA 2001, Annex C.
Provide the formal test results to the Contracting Officer.
3.3 CLOSEOUT ACTIVITIES
3.3.1 Record Drawings
Upon completion, and before final acceptance of the work, submit a complete set of as-built (record) working drawings, including complete as-built circuit diagrams, of each clean agent system for record purposes. Provide record working drawings in dwg.electronic format.
-- End of Section --