W912DR-16-B-0015-03.pdf

PDF 24 KB Posted

Attached to
Chemical Building Roadway Improvements Federal contract opportunity
Solicitation number
W912DR-16-B-0015
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

About this file

Amendment to extend bid due date update bid schedule and update drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Chemical Building Roadway Improvements, newest first.
File Type Posted
G24__Bid_Abstract_.xlsx XLSX spreadsheet
W912DR-16-B-0015-04.pdf PDF
NEW_Amendment_3_Drawings_-_ChemBldgRoadwayImps.pdf PDF
W912DR-16-B-0015-0002.pdf PDF
W912DR-16-B-0015-01.pdf PDF
10May2016SiteVisit.pdf PDF
W912DR-16-B-0015-01.pdf PDF
Contract_Drawings_-_ChemBldgRoadwayImps.pdf PDF
Specifications_-_ChemBldgRoadwayImps.pdf PDF
W912DR-16-B-0015.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment hereby incorporates the follow ing changes into the solicitation:

1. Extend the bid opening date from 06/14/2016 to 6/21/2016 at 11:00am EST 2.Update the Price Schedule

3. Delete Draw ings in its entity as originally issued and insert attached new Draw ings, dated JUN 2016.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-16-B-0015

X 9B. DATED (SEE ITEM 11)

29-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jun-2016

CODE

U.S.ARMY CORPS OF ENGINEERS, BALTIMORE

10 S. HOWARD STREET

ROOM 7000

BALTIMORE MD 21201

W912DR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DR-16-B-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 14-Jun-2016 10:00 AM to 21-Jun-2016 11:00 AM.

The following have been modified:

PRICE SCHEDULE

PART I - THE PRICE SCHEDULE

SECTION 00010 - SUPPLIES OR SERVICES AND PRICES

PRICE SCHEDULE – REVISED: JUN. 3, 2016

Item Estimated Unit No. Description Quantity Unit Price Amount

BASE BID

0001 All costs in connection with 1 LS _ __ $_________ construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

TOTAL BASE BID AMOUNT $___________

OPTIONAL ITEMS

0002 All costs in connection with 1 LS _ __ $_________

DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

0003 All costs in connection with 1 LS _ __ $_________

West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

0004 All costs in connection with 1 LS _ __ $_________

Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

0005 All costs in connection with 1 LS _ __ $_________

South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).

W912DR-16-B-0015

0006 All costs in connection with 1 LS _ __ $_________ the Interior Load Dock Concrete Slab as shown on drawings and specified (OPTION 5).

TOTAL BASE AND OPTION BID AMOUNT $___________

NOTES TO OFFERORS

Offerors must quote on all items including Optional Items. Failure to quote on all items may be cause for rejection of the proposal.

Optional Items may be exercised at any time within 90 calendar days after contract award. The Contracting Officer may exercise the Optional Bid Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Optional Bid Items in any order.

No additional time for contract completion will be allowed when an Optional Item is exercised.

(End of Summary of Changes)