G24__Bid_Abstract_.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Chemical Building Roadway Improvements Federal contract opportunity
- Solicitation number
- W912DR-16-B-0015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR-16-B-0015-04.pdf | ||
| W912DR-16-B-0015-03.pdf | ||
| NEW_Amendment_3_Drawings_-_ChemBldgRoadwayImps.pdf | ||
| W912DR-16-B-0015-0002.pdf | ||
| W912DR-16-B-0015-01.pdf | ||
| 10May2016SiteVisit.pdf | ||
| W912DR-16-B-0015-01.pdf | ||
| Contract_Drawings_-_ChemBldgRoadwayImps.pdf | ||
| Specifications_-_ChemBldgRoadwayImps.pdf | ||
| W912DR-16-B-0015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chart1
SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 0 525980 269180 211166 67784 80911 29218 1184239 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 0 1277451 315833 232287 121673 147382 257438 2352064 -0.98613962215397399 1167825 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 0 1572000 275000 177000 28000 28000 130000 2210000 -5.9952038369304558E-2 -125000 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).
All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).
All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).
| All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). |
| All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 Sheet1 BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair
| LOCATION: Washington Aqueduct - Washington, DC | |||||||
| LINE | SERVICE | IGE | MZM Construction Co | ADC Coporation | Milani Contruction | NorAir Engineering | Banneker Venture Tech |
CLIN 0001 All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.
| $525,980.00 | $1,277,451.00 | $1,889,065.69 | $919,000.00 | $911,000.00 | $287,000.00 |
| CLIN 0002 | All costs in connection with DPS Loading Area and Adjacent |
Pavement as shown on drawings and specified (OPTION 1).
| $269,180.00 | $315,833.00 | $432,980.17 | $187,000.00 | $150,000.00 | $333,000.00 |
| CLIN 0003 | All costs in connection with West Filter Building Pavement |
Area as shown on drawings and specified (OPTION 2).
| $211,166.00 | $232,287.00 | $281,224.80 | $161,000.00 | $143,000.00 | $289,000.00 |
| CLIN 0004 | All costs in connection with Maintenance Building Parking |
Lot as shown on drawings and Specified (OPTION 3).
| $67,784.00 | $121,673.00 | $217,461.00 | $87,000.00 | $72,000.00 | $157,000.00 |
| CLIN 0005 | All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4). | ||||
| $80,911.00 | $147,382.00 | $247,977.00 | $86,000.00 | $123,000.00 | $151,000.00 |
| CLIN 0006 | All costs in connection with the Interior Load Dock Concrete |
Slab as shown on drawings
| $29,218.00 | $257,438.00 | $251,008.50 | $32,000.00 | $70,000.00 | $48,000.00 | ||||
| TOTAL = | $1,184,239.00 | $2,352,064.00 | $3,319,717.16 | $1,472,000.00 | $1,469,000.00 | $1,265,000.00 | |||
| PERCENT ABOVE/BELOW IGE = | -98.61% | -180.32% | -24.30% | -24.05% | -6.82% | ||||
| AMOUNT OVER IGE = | $1,167,825.00 | $2,135,478.16 | $287,761.00 | $284,761.00 | $80,761.00 |
Sheet2