G24__Bid_Abstract_.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Chemical Building Roadway Improvements Federal contract opportunity
Solicitation number
W912DR-16-B-0015
Issued by
Department of the Army Corps of Engineers Engineering District Baltimore

View the file

Other files for this federal contract opportunity

Other files attached to Chemical Building Roadway Improvements, newest first.
File Type Posted
W912DR-16-B-0015-04.pdf PDF
W912DR-16-B-0015-03.pdf PDF
NEW_Amendment_3_Drawings_-_ChemBldgRoadwayImps.pdf PDF
W912DR-16-B-0015-0002.pdf PDF
W912DR-16-B-0015-01.pdf PDF
10May2016SiteVisit.pdf PDF
W912DR-16-B-0015-01.pdf PDF
Contract_Drawings_-_ChemBldgRoadwayImps.pdf PDF
Specifications_-_ChemBldgRoadwayImps.pdf PDF
W912DR-16-B-0015.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chart1

SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 0 525980 269180 211166 67784 80911 29218 1184239 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 0 1277451 315833 232287 121673 147382 257438 2352064 -0.98613962215397399 1167825 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 0 1572000 275000 177000 28000 28000 130000 2210000 -5.9952038369304558E-2 -125000 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 SERVICE All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

All costs in connection with DPS Loading Area and Adjacent Pavement as shown on drawings and specified (OPTION 1).

All costs in connection with West Filter Building Pavement Area as shown on drawings and specified (OPTION 2).

All costs in connection with Maintenance Building Parking Lot as shown on drawings and Specified (OPTION 3).

All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings TOTAL = PERCENT ABOVE/BELOW IGE = AMOUNT OVER IGE = BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair LOCATION: Washington Aqueduct - Washington, DC LINE CLIN 0001 CLIN 0002 CLIN 0003 CLIN 0004 CLIN 0005 CLIN 0006 Sheet1 BID ABSTRACT FOR W912DR-16-B-0015 Chemical Building Roadway Repair

LOCATION: Washington Aqueduct - Washington, DC
LINESERVICEIGEMZM Construction CoADC CoporationMilani ContructionNorAir EngineeringBanneker Venture Tech

CLIN 0001 All costs in connection with construction of the Chemical Building Road and Loading Dock Improvements as shown on the drawings and specified, but exclusive of work covered under Optional Items 0002 through 0005 below.

$525,980.00$1,277,451.00$1,889,065.69$919,000.00$911,000.00$287,000.00
CLIN 0002All costs in connection with DPS Loading Area and Adjacent

Pavement as shown on drawings and specified (OPTION 1).

$269,180.00$315,833.00$432,980.17$187,000.00$150,000.00$333,000.00
CLIN 0003All costs in connection with West Filter Building Pavement

Area as shown on drawings and specified (OPTION 2).

$211,166.00$232,287.00$281,224.80$161,000.00$143,000.00$289,000.00
CLIN 0004All costs in connection with Maintenance Building Parking

Lot as shown on drawings and Specified (OPTION 3).

$67,784.00$121,673.00$217,461.00$87,000.00$72,000.00$157,000.00
CLIN 0005All costs in connection with South Connection Building Parking Lot as shown on drawings and specified (OPTION 4).
$80,911.00$147,382.00$247,977.00$86,000.00$123,000.00$151,000.00
CLIN 0006All costs in connection with the Interior Load Dock Concrete

Slab as shown on drawings

$29,218.00$257,438.00$251,008.50$32,000.00$70,000.00$48,000.00
TOTAL =$1,184,239.00$2,352,064.00$3,319,717.16$1,472,000.00$1,469,000.00$1,265,000.00
PERCENT ABOVE/BELOW IGE =-98.61%-180.32%-24.30%-24.05%-6.82%
AMOUNT OVER IGE =$1,167,825.00$2,135,478.16$287,761.00$284,761.00$80,761.00

Sheet2

File details come from the government source that posted it. Updated .