W912DR-14-R-0030-0001.pdf
PDF 72 KB Posted
- Attached to
- East Campus Parking Structure Federal contract opportunity
- Solicitation number
- W912DR-14-R-0030
About this file
For the PDF documents referenced in the Amendment please email Melissa Svetich at Melissa.A.Svetich2 usace.army.mil. As a reminder the site visit will be held tomorrow at 10 am on Fort Meade
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR-14-R-0030-0005.pdf | ||
| W912DR-14-R-0030-0004.pdf | ||
| W912DR-14-R-0030_Amd_3.pdf | ||
| W912DR-14-R-0030-0002.pdf | ||
| Fort_Meade_Access.pdf | ||
| Map_to_ECPS1_Site_Visit.pdf | ||
| RFI_Template.xlsx | XLSX spreadsheet | |
| W912DR-14-R-0030.pdf | ||
| STATEMENT_OF_AFFILIATION.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendmnet is to incorporate the follow ing changes:
1) PDF 01 updates the existing conditions on the draw ings
2) PDF 04 updates the phasing plan for the project in Spec section 01 05 00
3) PDF 05 deletes 2 sheets from the Site Construction Security Plan in Spec section 01 35 53
4) PDF 07,08,09 are updates to Division 1 Specifications. The updates are underlined. The 3 update include changes to w eather, contractor coordination, and schedule specifications.
5) CADD Requirements have been updated
6) Update to Spec Change regarding Soil at the end of the solicitation shall read .6 miles instead of .2 miles
7) IGNORE the price schedule in the specifications. The price schedule is the first 3 pages in the specifications manual. Instead, USE the price schedule found in the solicitation.
8) SITE VISIT REMINDER
8) Proposal due date time has been corrected to read 11am, 4 June 2014.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-May-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR-14-R-0030
X 9B. DATED (SEE ITEM 11)
05-May-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-May-2014
CODE
USACE, BALTIMORE
10 S. HOWARD STREET, ROOM 7000
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR-14-R-0030
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 04-Jun-2014 12:00 AM to 04-Jun-
2014 11:00 AM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
AS A REMINDER THE SITE VIST IS 15 May 2014 at 10am
EVEN IF YOU ARE NOT PRE-APPROVED TO ATTEND THE SITE VISIT YOU MAY COME TO THE
MEETING LOCATION TO HEAR THE BRIEFING PRIOR TO THE ACTUAL SITE VISIT.
PLEASE SEE MAP AND SITE VISIT ATTACHMENTS ON FBO
The site visit will be limited to 3 people per contractor.
(c) Participants will meet at--
Directions will be provided via email.
(End of provision)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
SPEC CHANGE REGARDING SOIL
The Government will provide up to 40,000 cubic yards of suitable soil in accordance with specifications of Division 31. This soil is located in a stabilized borrow stockpile within the overall East Campus site and is approximately .6 miles from the parking structure project site. The Offeror shall be required to load, haul and place suitable soil from this borrow stockpile to the ECPS1 project site in accordance with specifications in Division 31. The Offeror shall be required to manage the borrow stockpile in accordance with MDE regulations. The Government will provide the MDE permit for the stockpile to Contractor along with applicable soil proctors.
SPECIAL CONTRACT REQUIREMENTS
EVIDENCE OF AUTHORITY TO SIGN BIDS/PROPOSALS
Evidence of the authority of individuals signing bids/proposals to submit firm bids/proposals on behalf of the bidder/offeror is required except where the bid/offer is signed, and shows that it is so signed, by: The President, Vice-President, or Secretary of Incorporated bidders; a partner in case of partnership; the owner in the case of sole proprietorships. Failure to submit with the bid satisfactory evidence of authority of all other persons may be cause for rejection of bid as an invalid or non-responsive bid.
ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the bidding schedule as submitted by bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends his bid to be evaluated on the basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
AVAILABILITY OF CORPS OF ENGINEERS PUBLICATIONS DESCRIPTION
(a) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(1) ASSIST (http://assist.daps.dla.mil);
(2) Quick Search (http://assist.daps.dla.mil/quicksearch);
(3) ASSISTdocs.com (http://assistdocs.com).
(b) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point
(DoDSSP) by-
(1) Using the ASSIST Shopping Wizard (http://assist.daps.dla.mil/wizard);
(2) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(3) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
SUBMISSION OF INVOICES
(a) Original invoices for services performed under the contract will be submitted to and payment will be made by:
USACE FINANCE CENTER
ATTN: DISBURSING
5722 INTEGRITY DRIVE
MILLINGTON, TN 38054-5005
(b) A copy of all invoices shall be forwarded to the following for review and certification:
East Campus Area Office Attn: TBD 9499 Rockenbach Rd.
Fort Meade, Maryland 20755
SUMMARY FOR THE PAYMENT OFFICE
All modifications will provide sufficient information to permit the paying office to readily identify the changes for each Contract Line Item (CLIN) and SubCLIN item as follows:
(a) The amount of funds obligated by prior contract actions, to include the total cost and fee if a cost-type contract; the target fee at time of contract award if a cost-plus-incentive-fee contract; the base fee if a cost-plus-award-fee contract; or the target price and target profit if a fixed-price incentive contract;
(b) The amount of funds obligated or deobligated by the instant modification, categorized by the types of contracts specified in paragraph (a) of this section; and
(c) The total cumulative amount of obligated or deobligated funds, categorized by the types of contracts specified in paragraph (a) of this section.
WARRANTY OF CONSTRUCTION WORK
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (1) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of I year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractors expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of--
(1) The Contractor's failure to conform to contract requirements; or
(2) Any defect of equipment, material, or workmanship.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractors warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall--
(1) Obtain all warranties that would be given in normal commercial practice:
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and-
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or suppliers warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
REQUIRED INSURANCE FOR GOVERNMENT INSTALLATION
Pursuant to the contract clause entitled, 52.228-5, Insurance – Work on a Government Installation or on Dredging projects (which ever applies), the contractor shall procure and maintain during the entire period of this performance under the contract the following minimum insurance:
COVERAGE FOR GOVERNMENT INSTALLATION
Type Amount
Comprehensive General Liability $500,000 per occurrence
Bodily injury or death
Motor Vehicle Liability (for each motor vehicle):
Bodily injury or death $200,000 per person $500,000 per occurrence
Property Damage: $ 20,000 per occurrence
Workers' Compensation and Employer's Liability: $100,000 per person
Workers' Compensation and Employer's Liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statues, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
Prior to the commencement of work hereunder, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in policies adversely affecting the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.
The Contractor agrees to insert the substance of this clause, including this paragraph, in all subcontracts hereunder.
TRAINING
The Contractor shall provide operational and maintenance training for all systems furnished under this contract for the operating and maintenance personnel. The system manufacturer shall conduct the training, where feasible. All operation and maintenance manuals shall be submitted and approved prior to conducting the training and shall be used during training. The Contractor shall videotape the training session on DVD or CD and provide copies to the Government.
SUBMITTAL OF WORK TO BE PERFORMED BY THE CONTRACTOR
The Contractor shall furnish the Contracting Officer within 10 days after the award the items of work he will perform with his own forces and the estimated cost of those items. The percentage of work that must be performed by the Contractor is stated in Contract Clause 52.236-1, "PERFORMANCE OF WORK BY THE CONTRACTOR"
DRAWINGS AND OTHER DATA TO BECOME PROPERTY OF THE GOVERNMENT
All designs, drawings, specifications, notes, and other works developed in the performance of this contract shall become the sole property of the Government and may be used on any other design or construction without additional compensation to the Contractor. The Government shall be considered the "person for whom the work was prepared" for the purpose of authorship in any copyrightable work under 17 U.S.C. 201 (b). With respect thereto, the Contractor agrees not to assert or authorize others to assert any rights nor establish any claim under the design patent or copyright laws. The Contractor for a period of three (3) years after completion of the project agrees to furnish all retained works on the request of the Contracting Officer. Unless otherwise provided in this contract, the Contractor shall have the right to retain copies of all works beyond such period.
EVALUATION OF CONTRACTOR PERFORMANCE
As a minimum, the contractor's performance will be evaluated upon final acceptance of the work. However, interim evaluation may be prepared at any time during the contract performance when determined to be in the best interest of the Government.
The format for the evaluation will be DD 2626, and the contractor will be rated either outstanding, satisfactory, or unsatisfactory in the areas of Contractor Quality Control, Timely Performance, Effectiveness of Management, Compliance with Labor Standards, and Compliance with Safety Standards. The contractor will be advised of any unsatisfactory rating either in an individual element or in the overall rating prior to completing the evaluation, and all contractor comments will be made a part of the official record. Performance Evaluation Reports will be available to all DOD Contracting Offices for their future use in determining contractor responsibility.
SAFETY ASSURANCE
Preconstruction Safety Meeting: Representatives of the Contractor shall meet with the Contracting Officer or his/her representative(s) prior to the start of repair, alteration or construction activities for the purpose of reviewing the Contractor's safety and health programs and discussing implementation of all safety and health provisions pertinent to the work to be performed under the contract. The Contractor shall be prepared to discuss, in detail, the measures he/she intends to take in order to control any unsafe or unhealthy conditions associated with the work to be performed under the contract. This meeting may be held in conjunction with the preconstruction conference, if so directed by the Contacting Officer. The conduct of this meeting is not contingent upon a general preconstruction meeting. The level of detail for the safety meeting is dependent upon the nature of the work and the potential inherent hazards. The Contractor's principal on-site representative(s) shall attend this meeting.
Compliance with Regulations: All work, including the handling of hazardous materials or the disturbance or dismantling of hazardous materials or the disturbance or dismantling of structures containing hazardous materials shall comply with the applicable requirements of 20 CFR 1926/1910. Work involving the disturbance or dismantling of asbestos or asbestos containing materials, the demolition of structures containing asbestos, and/or the disposal and removal of asbestos, shall also comply with the requirements of 40 CFR, Part 61, Subparts A and B, ETL 1110-1-118 and DA Circular 40-83-4. All work shall comply with applicable state and municipal safety and health requirements. Where there is a conflict between applicable regulations, the most stringent shall apply.
Contractor Responsibility:
(a) The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his part or that of his employees or subcontractors, which results in illness, injury, or death. Contractors are required to report any accidents and injuries to the Contracting Officer's Representative within 24 hours of the accident. A written report (ENG 3394) shall be submitted within 72 hours of the accident to the Contracting Officer's Representative.
(b) The Contractor is subject to the safety and health standards of both the Occupational Safety and
Health Act (OSHA) and the Corps of Engineers General Safety Requirements, EM 385-1-1.
Implementation of OSHA provisions rests in the statutory requirement while compliance with EM 385-1-1 is a contractual matter.
(c) The Contractor should review the accident-prevention clauses of the contract, the Corps of Engineers
General Safety Requirements, EM 385-1-1, latest revision, referred to therein, and the special and technical provisions applicable to safety. The Contractor should assure himself that he has full knowledge of the personal protective equipment (including respiratory equipment) that must be provided workmen, and that he is familiar with medical surveillance and recordkeeping requirements and with the safety standards applicable to machinery and mechanized equipment, ladders and scaffolds, fire prevention and protection, stripping of concrete forms, cleanup and housekeeping and other safety measures for the prevention of accidents during construction.
Inspections, Tests, and Reports: The required inspections, tests, and reports made by the contractor, subcontractors, specially trained technicians, equipment manufacturers, and others as required, shall be at the contractor's expense. These reports shall be furnished in accordance with the terms contained herein.
(a) MATERIALS AND EQUIPMENT: Special facilities, devices, equipment, clothing, and similar items used by the Contractor in the execution of work shall comply with the applicable regulations.
(b) HAZARDOUS MATERIALS: The Contractor shall bring to the attention of the Contracting Officer any material suspected of being hazardous which he encounters during execution of the work. A determination will be made by the Contracting Officer as to whether the Contractor shall perform tests to determine if the material is hazardous. If the Contracting Officer directs the contractor to perform tests, and/or if the material is found hazardous and additional protective measures are needed, a contract change may be required, subject to equitable adjustment under the terms of the contract.
HEAD PROTECTION (HARD HATS)
The entire work area under this contract is designated as a hard hat area. The contractor shall post the area as per paragraph 05.D.01, EM 385-1-1, and shall insure that all contractor personnel, vendors, and visitors utilize hard hats within the project area.
COMPUTER AIDED DESIGN AND DRAFTING (CADD) REQUIREMENTS
1.0 General: All contract drawings to be provided under this contract shall be accomplished and developed using computer-aided design and drafting (CADD) software & procedures conforming to the criteria in the contract.
2.0 Graphic Format: Unless a specific file format is specified in the Scope of Work (SOW) for the specific task order, all CADD data shall be supplied in AutoCAD v.2012 native electronic digital format (i.e., DWG) and readable on the MS- XL operating system.
The contractor shall ensure that all digital files and data (e.g., base files, reference files, block libraries) are compatible with the Government's target CADD system (i.e., basic and advanced CADD software, platform), and adhere to the standards and requirements specified in the SOW for each task. The term “compatible” means that data can be accessed directly by the target CADD system without translation, preprocessing, or post processing of the electronic digital data files. It is the responsibility of the contractor to ensure this level of compatibility.
3.0 CADD Standards: CADD drawings shall be prepared in accordance with the Enterprise CADD Standard as specified in the SOW for each task. CADD drawings, details, and data shall be prepared in accordance with the above graphic format, with any additional job-specific CADD standards included with this document and utilizing any electronic standards (block libraries, line type libraries, font libraries, etc.) that may be supplied by the government. The Contractor shall submit a written request for approval of any deviations from the Government's established CADD standards. No deviations from the Government's established CADD standards shall be permitted unless prior written approval of such deviation has been received from the Government.
4.0 Ownership: The Government, for itself and such others as it deems appropriate, will have unlimited rights under this contract to all information and materials developed under this contract and furnished to the Government and documentation thereof, reports, and listings, and all other items pertaining to the work and services pursuant to this agreement, including any copyright. Unlimited rights under this contract are rights to use, duplicate, or disclose text, data, drawings, and information, in whole or in part in any manner and for any purpose whatsoever without compensation to or approval from the Contractor. The Government will at all reasonable times have the right to inspect the work and will have access to and the right to make copies of the above-mentioned items. All text, electronic digital files, data, and other products generated under this contract shall become the property of the Government. By reference, the following DFAR clauses are included in this contract as a part of the requirements herein:
a. 252.227-7013, “Rights in Technical Data – Non-Commercial Items.”
b. 252.227-7016, “Rights in Bid or Proposal Information”
c. 252.227-7017, “Identification and Assertion of Use, Release, or Disclosure Restrictions”
d. 252.227-7022, “Government Rights (Unlimited)”
e. 252.227-7023, “Drawings and Other Data to Become Property of Government”
f. 252.227-7028, “Technical Data or Computer Software Previously Delivered to the Government.”
g. 252.227-7037, “Validation of Restrictive Markings on Technical Data.”
5.0 Government-Furnished Materials: One electronic copy of Enterprise CADD Standard on CD will be provided with Notice to Proceed. Standard forms and drawing templates are included on the standards disk.
EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(a) This information does not apply to terminations. See 52.249-5000, Basis for settlement of proposals and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable conditions owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual costs data for each piece of equipment or groups of similar serial and services for which the government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs can not be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP1110-1-8 Construction Equipment Ownership and Operating Expenses Schedule, Region East . Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply for retroactive pricing and the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established proactive of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
WAGE DETERMINATIONS
Wage Determination MD140053, dated 11 April 2014 is included in this solicitation.
(End of Summary of Changes)