*Section 35 20 20, paragraph 2.4.2.1 calls for an SPD. The drawing E-601, control schematic does not indicate where this is located in the circuit. Will the SPD need to be in 480VAC load side of the breakers or will be on the 120VAC off the transformer?

Answer: The SPD's shall be on the load side of the 480VAC breakers.