Amendment_0001.pdf
PDF 608 KB Posted
- Attached to
- Tuttle Creek Tainter Gate Controls
- Solicitation number
- W912DQ18B1010
About this file
Change to CLIN and clarification for options updated specs and drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_sheet.pdf | ||
| Bid_opening_Sign_in_sheet.pdf | ||
| Site-Visit_Signin_sheet.pdf | ||
| contractor_question_and_answer.pdf | ||
| TC_TGC_E-102O.PDF | ||
| TC_TGC_E-102.pdf | ||
| A.07.23_TC_TGC_16_May_2018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Change to CLIN structure and update to specs
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DQ18B1010
X 9B. DATED (SEE ITEM 11)
16-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Jun-2018
CODE
USACE, KANSAS CITY +
FEDERAL BLDG, CT-C
601 E 12TH ST RM 647
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ18B1010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The below Table of Contents has been added
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 01-JUN-2018 Attachment 2
SECTION 00 10 00 - SOLICITATION
CLIN 0002
The CLIN description has changed from Install conduit, wiring & recalibrate to Install conduit, & wiring.
The following have been modified:
SUBMISSION REQUIREMENTS
All bids are due by: SEE BLOCK 13, on front page The public bid opening will begin: SEE BLOCK 13, on front page.
Location:
Bolling Federal Building US Army Corps of Engineers Civil Contracting Branch, 601 E. 12th Street Kansas City, MO 64106
This IFB will result in one Firm-Fixed-Price contract.
Submit one (1) original and one (1) copy of the following:
Bid schedule - complete with your bid amount.
Ensure Bid is signed by a Principal of your company with authority to do so.
Ensure all Amendments are acknowledged.
Bid Bonds - required with your submission. (See solicitation for details)
INQUIRIES/QUESTIONS/PLAN ROOM FOR DRAWINGS
Prospective Bidders shall submit contracting and technical inquiries and questions concerning this solicitation document via Bidder Inquiry in ProjNet at www.projnet.org/projnet.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on the next screen is correct and click continue.
From this page, you may view all bidder inquiries or add a new inquiry.
Bidders will receive an acknowledgement of their questions via email, followed by an answer to their questions after it has been processed by our technical team. ***Please Note: Bidders shall only submit one (1) question per inquiry. All inquiries containing multiple questions shall be rejected***
The Solicitation Number is: W912DQ18B1010 The Bidder Inquiry Key is: 2Z8ESV-MA5PWK The Plan Room Key is: VHSRCQ-6FJAH2
The Bidder Inquiry System will be unavailable for new inquiries after 4 June 2018, at 2PM local Kansas City time in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the solicitation if necessary.
Bidders are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to:
staff@rcesupport.com .
CLIN Structure: Additive bid items: CLIN 0004 and CLIN 0005 will be evaluated in accordance with DFARS 252.236-7007 Additive or Deductive Items.
Basis of Award: In accordance with DFARS 252.236-7007 Additive or Deductive Items, The basis of award is the lowest aggregate bid amount for base CLIN 0001, CLIN 0002, and CLIN 0003 plus any additive bid item (either CLIN 0004 or CLIN 0005) that provide the most features within the funds determined available. The order of precedence for including any additive bid item is:
1. CLIN 0004 (New limit switches)
2. CLIN 0005 (recalibrate existing limit switches )
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been added by reference:
252.236-7007
(End of Summary of Changes)
The following items are applicable to this modification:
SPECS
Highlighted section is added for clarification.
Section: 01 12 00.00 23
1.4.4 Migratory Bird Nest Removal
Reference Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS paragraph
MIGRATORY BIRDS AND THREATENED AND ENDANGERED SPECIES.
When earliest permitted under Federal Law, under the BASE and OPTION CLINs "Repair 3 Adjacent Tainter Gates", the Contractor shall remove all Swallow nests and other bird nests from concrete, steel, and other areas that could prevent, hinder, or pause construction operations awarded in the BASE and could be awarded in this contract (as identified by OPTIONS) throughout the dam's spillway. This work shall occur as required throughout the duration of the project, and should be anticipated to occur during each winter season. The removal of the migratory bird nests may begin after the swallows migrate from the area in the fall, and must be completed before the swallows arrive in the spring. A visual observation shall occur by the contractor to ensure all migratory birds have migrated from the area prior to nest removal. No active nests may be removed. An active nest is one in which eggs have been deposited and/or chicks are present.
Section: 35 20 20
2.8 SPLICES
All splices shall be in accordance with NFPA 70. Make all splices in AWG No. 8 and smaller with approved insulated electrical type indenter crimp-type connectors and compression tools. Splices shall be wrapped with an insulating tape that has an insulation and temperature rating equivalent to that of the conductor. For splices into existing wire, the Contractor shall properly clean the connection point of the existing conductor of any impurities prior to performing the splice. Make splices in conductors No. 8 AWG and larger diameter with solderless connector, and cover with insulation material equivalent to conductor insulation.
NOTE: THE LOCATION WHERE MIGRATORY BIRDS NEST IS TYPICALLY OUTSIDE THE
BOUNDARY FOR THIS SCOPE OF WORK. IF THE CONTRACTOR DOES ENCOUNTER A NEST
WITHIN THE WORK BOUNDARY THEN EXTRA PRECAUTION FOLLOWING THE GUIDELINES
BELOW MUST TAKE PLACE. The contractor may turn off the existing lasers and sound machines, at the beginning of the work shift, that are used within the work area to help deter birds. However, the contractor is responsible for and must turn back on the lasers and sound machines at the end of each work shift to help prevent migratory birds from nesting within the work area.