A.07.24_Amendment_0003_W912DQ-16-R-4000.pdf
PDF 51 KB Posted
- Attached to
- KC-46A De-Icing Pads
- Solicitation number
- W912DQ-16-R-4000
About this file
Amendment 0003 is attached.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
406844
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
KC-46A DEICING PADS ACE PRQE165114
***See SF 30 Block 14 Continuation Page for a summary of changes.***
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-16-R-4000
X 9B. DATED (SEE ITEM 11)
07-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Feb-2016
CODE
USACE, KANSAS CITY +
FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ-16-R-4000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0003
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
1. Section 00 21 00 – Instructions, Conditions and Notices to Offeror
PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
13.0 PRICE FACTOR
VOLUME 2 - TAB A, FACTOR 4 – PRICE
Submission Requirements
Offerors shall submit the Price Proposal Schedule from Section 00 11 00. Proposed prices must be entered for all items of the Price Proposal Schedule.
Evaluation Criteria
Price will not be rated or scored, but will be evaluated for fairness and reasonableness through the use of price analysis. The Price Evaluation Team (PET) will evaluate the reasonableness of the price proposal using their expert judgment.
ADDITIONAL INFORMATION TO BE PROVIDED IN VOLUME 2
Pro Forma Requirements. This information should be submitted with Volume 2 and labeled “Pro Forma Requirements”. Provide Original & 1 copy; 1 CD original and 2 copies. This information consists of the following:
- The Offeror will submit a cover letter containing:
1) Name, address, email, and telephone and fax numbers of the Offeror.
2) Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this RFP.
3) Name, title and signature of the person authorized to sign the proposal.
4) A statement specifying agreement with all terms, conditions and provisions included in the RFP.
- The Offeror (Solicitation and CLIN Schedule) duly executed with an original signature by an official authorized to bind the company. Include the Offeror’s DUNS & CAGE number.
- Acknowledgement of all amendments to the RFP in accordance with the instructions.
- Proposal Bond.
- Financial statement and bank letter that verify that sufficient funds will be available to finance the work.
W912DQ-16-R-4000
- The completed Field Office Overhead (FOOH) certification found in section 00 11 00, clause SCR_CT_002.
2. SPECIFICATIONS:
a. SECTION 33 56 10 FACTORY-FABRICATED SADF STORAGE TANKS, paragraph 1.1 “Summary” is changed to read as follows:
This section defines the requirements for factory-fabricated 50,000 gallon SADF storage tanks.
b. SECTION 33 56 10 FACTORY-FABRICATED SADF STORAGE TANKS, paragraph 2.4 “Underground Storage Tank” is changed to read as follows:
Provide a factory-fabricated, single-walled type 50,000 gallon storage tank tanks. TankTanks shall be designed and manufactured for an underground, horizontal installation. Provide hold down straps and accessories as recommended by the tank manufacturer. Use filler strips between the tank shell and any metal hold down straps that conform to the tank manufacturer's requirements.
c. SECTION 33 56 10 FACTORY-FABRICATED SADF STORAGE TANKS, paragraph 3.2.1 “Underground Storage Tank Tightness Tests” is changed to read as follows:
Perform a tightness test on each underground storage tank on-site just prior to their placement into the ground. Pneumatically pressurize each storage tank's primary chamber to 5 psig and monitor for a drop in pressure over a 2-hour period during which there shall be no drop in pressure in the tank greater than that allowed for thermal expansion and contraction. Following the successful completion of the primary chamber test, bleed the pressure from the primary chamber into the interstitial space.
Maintain this pressure while applying soapsuds or equivalent material over the exterior of the tank.
While applying the soapsuds, visually inspect the entire tank, including the bottom surfaces, for leaks (bubble formations). Inspection of the bottom surfaces of a tank may be performed by rotating the tank; however a tank shall only be rotated in strict accordance with the manufacturer's recommendations. Do not rotate a tank more than 90 degrees from the upright position. During testing, install a pressure relief device that relieves at the tank manufacturer's suggested pneumatic pressure limit. Gauges used in pneumatic tests shall have a scale with a maximum limit of 10 psig.
d. SECTION 33 56 10 FACTORY-FABRICATED SADF STORAGE TANKS, delete paragraph 3.2.1.1 “Brine Level Test” from the specification in its entirety.
e. SECTION 33 56 10 FACTORY-FABRICATED SADF STORAGE TANKS, paragraph 3.2.1.2 “Repairs” is changed to read as follows:
3.2.1.1 Repairs
Repair leaks discovered in either the primary chamber or the interstitial space in accordance with the tank manufacturer's instructions. Following any tank repairs, re-test the tank until the tank successfully passes the testing requirements defined herein.
3. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided.
Failure to acknowledge all amendments may cause rejection of the bid.
4. All other terms and conditions remain unchanged and in full force.
PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
File details come from the government source that posted it. Updated .