Bldg_102_Amdt_0002_Attachments.pdf

PDF 2 MB Posted

Attached to
Renovate Historical Building 102
Solicitation number
W912DQ-16-B-4001
Issued by

About this file

Amendment 0002 Attachment

View the file

Other files

File Type Posted
A.07.24_Solicitation_Amendment_0002.pdf PDF
A.07.20_Site_Visit_Attendence_Sheet.pdf PDF
A.07.24_Solicitation_Amendment_0001.pdf PDF
INSTRUCTIONS_TO_BIDDERS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 53 PAGES

W912DQ-16-B-4001

Fort Leavenworth Building 102

01 11 00 SD-01 Preconstruction Submittals 1.6Salvage Plan

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals 1.5.3.1Preliminary Sustainability

Notebook 1.5.3.1Preliminary High Performance and Sustainable Building Checklist SD-07 Certificates

1.4.5Third Party Certification (TPC) SD-11 Closeout Submittals

1.5.3.1Final Sustainability Notebook 1.5.3.1Final High Performance and

Sustainable Building Checklist 1.5.3.1Amended Final Sustainability

Notebook 3.2.1Third Party Certification Plaque and Certificates 01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 53 PAGES

Fort Leavenworth Building 102

01 35 26 SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.5Crane Operators/Riggers

1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

1.14.1 G RORadiography Operation Planning

Work Sheet 01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 G ROConstruction Site Plan

01 51 00.00 23 SD-01 Preconstruction Submittals

2.1.3.1 G AEExisting Conditions

SD-02 Shop Drawings

2.1.2 G AETemporary Modular Office Layout

2.1.2 G AETemporary Modular Office Layout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 53 PAGES

Fort Leavenworth Building 102

01 51 00.00 23 2.1.3 G AETemporary Modular Office Layout

2.1.3 G AETemporary Modular Office Layout

2.1.2 G AEFurniture Layouts

SD-03 Product Data

2.1.2.2 G AEFurniture

SD-11 Closeout Submittals

2.1.3.4 G AEFinal Site Conditions

01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey 1.10Solid Waste Management Permit 1.6.2Regulatory Notifications 1.7Environmental Protection Plan 3.2.1.2Stormwater Notice of Intent 1.7.9.1Dirt and Dust Control Plan 1.6.4Employee Training Records

SD-06 Test Reports 3.2.1.3Inspection Reports 3.7.2.1Solid Waste Management Report

SD-07 Certificates 1.6.4Employee Training Records 1.6.4Erosion and Sediment Control

Inspector SD-11 Closeout Submittals

3.2.1.4Stormwater Pollution Prevention Plan Compliance Notebook

3.2.1.5Stormwater Notice of Termination

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 53 PAGES

Fort Leavenworth Building 102

01 57 19 3.7.1Waste Determination Documentation

3.7.3.6Disposal Documentation for Hazardous and Regulated Waste

1.6.4Assembled Employee Training Records

1.10Solid Waste Management Permit 3.7.2.1Solid Waste Management Report 3.7.3.1Hazardous Waste/Debris

Management 1.6.2Regulatory Notifications 3.7.2.1Sales Documentation

01 74 19 SD-01 Preconstruction Submittals 1.6Waste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data

SD-08 Manufacturer’s Instructions 1.7.1Instructions

SD-10 Operation and Maintenance Data

3.7 G ROOperation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 53 PAGES

Fort Leavenworth Building 102

01 78 00 SD-11 Closeout Submittals

3.1 G ROAs-Built Drawings

3.3 G RORecord Drawings

3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract

Specifications

2.3 G ROCertification of EPA Designated

Items

3.9 G ROInterim DD FORM 1354

3.9 G ROChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance Data

1.4 G AEO&M Database

3.1.1 G AETraining Plan

3.1.3 G AETraining Outline

3.1.2 G AETraining Content

SD-11 Closeout Submittals

3.1.4 G AETraining Video Recording

3.1.6 G AEValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G AEDemolition Plan

1.2.1 G AEDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 53 PAGES

Fort Leavenworth Building 102

02 41 00 1.7 G AENotification SD-11 Closeout Submittals

3.3.4Receipts 02 42 51 SD-01 Preconstruction Submittals

1.4.2Proposed Dust-Control Measures 1.4.2Proposed Packing and

Transportation Measures 1.4.4Schedule of Carpet Reclamation

Activities 1.4.3Carpet Reclamation Agency

Records 02 42 91 SD-03 Product Data

1.1 G AEWork Plan

02 82 13.00 10 SD-02 Shop Drawings

1.4 G AEDetailed Drawings

SD-03 Product Data

3.9.3.1 G AEAsbestos Waste Shipment

Records

1.1Weight Bills and Delivery Tickets

1.9.1 G AERespiratory Protection Program

3.9 G AECleanup and Disposal

1.6.1 G AEQualifications

1.11Training Program 1.8.1Licenses, Permits and

Notifications

3.9.3.2 G AEAsbestos Management Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 53 PAGES

Fort Leavenworth Building 102

02 82 13.00 10 SD-06 Test Reports 3.7Exposure Assessment and Air

Monitoring 1.7.3Local Exhaust System 1.9Medical Surveillance

Requirements 02 82 33.13 20 SD-03 Product Data

1.6.4Vacuum Filters 1.6.1Respirators

SD-06 Test Reports

1.5.2.3 G AEsampling results

1.5.2.3 G AEOccupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.1 G AEQualifications of CP

1.5.1.3 G AETesting Laboratory

1.5.1.2 G AETraining Certification

1.5.1.4 G AEThird Party Consultant

Qualifications

1.5.3 G AElead-based paint/paint with lead

removal/control plan

1.6.3 G AERental equipment notification

1.5.2.6 G AERespiratory Protection Program

1.5.2.7 G AEHazard Communication Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 53 PAGES

Fort Leavenworth Building 102

02 82 33.13 20 3.5.2 G AEEPA or State approved hazardous waste treatment, storage, or disposal facility

1.5.2.8 G AELead Waste Management Plan

1.6.4 G AEVacuum filters

3.5.1.1 G AEClearance Certification

SD-11 Closeout Submittals

3.5.2.1 G AEhazardous waste manifest

1.5.2.4 G AEMedical Examinations

1.5.1.2 G AETraining Certification

3.5.2.1 G AEturn-in documents or weight

tickets 02 84 16 SD-07 Certificates

1.8.1Qualifications of CIH 1.8.1Training Certification 1.8.2PCB and Lamp Removal Work

Plan 1.8.3PCB and Lamp Disposal Plan

SD-11 Closeout Submittals 3.5.2Transporter certification 3.2.4Certification of Decontamination 3.5.2.1Certificate of Disposal and/or recycling 03 01 30 SD-02 Shop Drawings

1.4.2 G AEDetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 53 PAGES

Fort Leavenworth Building 102

03 01 30 1.2.6 G AEProportions of Mixtures 1.4Qualifications

SD-04 Samples

2.1 G AEMaterials

SD-06 Test Reports 1.2.7Sampling and Laboratory Testing of Materials SD-07 Certificates

2.1Materials 03 15 00.00 10 SD-03 Product Data

2.2Preformed Expansion Joint Filler 2.3Sealant

SD-04 Samples 2.3.2Lubricant for Preformed

Compression Seals 2.3.3Field-Molded Type

03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement

SD-06 Test Reports 2.6Tests, Inspections, and

Verifications SD-07 Certificates

2.3Reinforcing Steel 03 30 00.00 10 SD-01 Preconstruction Submittals

1.5.2 G AEQuality Control Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 53 PAGES

Fort Leavenworth Building 102

03 30 00.00 10 Part 2Recycled Content Products 2.2Cementitious Materials 2.9Vapor Retarder 2.4Chemical Admixtures

SD-05 Design Data

2.1.1 G AEMixture Proportions

SD-06 Test Reports

2.1.1 G AEMixture Proportions

3.8 G AETesting and Inspection for CQC

2.2.4Fly Ash 2.2.7Ground Granulated Blast-Furnace

(GGBF) Slag 2.3Aggregates 3.8.3.1Air Content 3.8.3.2Slump 3.8.3.4Compressive Strength 2.5Water

SD-07 Certificates 1.5Contractor Quality Control personnel 3.2.1Ready-Mix Plant

03 35 00.00 10 SD-03 Product Data Part 2Recycled Content Products

04 01 20.70 SD-01 Preconstruction Submittals

1.5.1 G AEQuality Control Plan

1.5.1 G AEProject Training Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 53 PAGES

Fort Leavenworth Building 102

04 01 20.70 1.5.2 G AEQualifications SD-02 Shop Drawings

1.5.5Photographic Documentation

3.5.1 G AEStructural Upgrades

SD-03 Product Data 1.5.2Qualifications

1.5.6 G AECleaning and Restoration

Methods

2.1 G AECleaning Materials

2.1.4Biocides

2.2.2.2 G AEReplacement Mortar And Stucco

2.4 G AEMortar Mix

SD-04 Samples

1.5.7 G AEMock-ups

SD-05 Design Data

3.5.1 G AEStructural Upgrades

SD-06 Test Reports 2.2.2.1Testing and Matching 3.5.2Existing Sealants for Asbestos and PCBs SD-07 Certificates

2.2Repair Materials 05 12 00 SD-03 Product Data

2.6.2Shop primer SD-07 Certificates

2.2Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 53 PAGES

Fort Leavenworth Building 102

05 12 00 2.3Bolts, nuts, and washers 2.5Galvanizing

05 40 00 SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal

Framing SD-11 Closeout Submittals

2.1Recycled Content of Steel Products

05 50 13 SD-02 Shop Drawings

2.3 G AEAccess doors and panels

2.6 G AEMechanical Stand

SD-03 Product Data

2.3 G AEAccess doors and panels

06 10 00 SD-02 Shop Drawings

1.8.1 G AEFloor Joists

1.8.1 G AERoof Rafters

1.8.1 G AEPSL and LSL Members

1.8.1 G AEWooden Stairs

SD-03 Product Data 1.10.1Local/Regional Materials 2.4.1Underlayment 2.1.2Engineered wood products 1.4.4Structural-use and OSB panels 2.3.2.2Structural-use and OSB panels 2.3Oriented Strand Board 2.4.3Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 53 PAGES

Fort Leavenworth Building 102

06 10 00 SD-06 Test Reports 1.4.5Preservative-treated

SD-07 Certificates 1.10.3Forest Stewardship Council

(FSC) Certification 1.8.2Certificates of grade 1.7Preservative treatment

SD-10 Operation and Maintenance Data

3.5Take-back program SD-11 Closeout Submittals

1.10.1Local/Regional Materials 2.4.3Adhesives 2.3Oriented Strand Board 2.1.2Engineered Wood Products 1.4.4Structural-use and OSB Panels 2.3.2.2Structural-use and OSB Panels 1.10.2Certified Wood 1.10.3Certified Wood

06 20 00 SD-02 Shop Drawings

1.3 G AEDetail Drawings Indicating All

Wood Assemblies SD-03 Product Data

2.2 G AEWood Products

1.4 G AETreated Wood Products

2.3 G AETrim

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 53 PAGES

Fort Leavenworth Building 102

06 20 00 2.2.5 G AERailings SD-04 Samples

1.5 G AESamples

SD-07 Certificates

1.7.1 G AECertificates of Grade

2.1 G AECompliance

2.1 G AECertification of Sustainable Wood

SD-11 Closeout Submittals 2.1Certification of Sustainable Wood

06 40 24 SD-01 Preconstruction Submittals

1.6 G AEContractor Qualifications

1.6 G AESubcontractor Qualifications

SD-03 Product Data

1.5.1 G AEProduct Data

SD-04 Samples

1.5.2 G AESamples for verification

06 61 16 SD-02 Shop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G AESolid Polymer Material

1.5.1 G AEQualifications

2.3 G AEFabrications

1.5.2 G AECertification

1.5.2 G AEVOC Content

SD-04 Samples 2.1Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 53 PAGES

Fort Leavenworth Building 102

06 61 16 2.3.5 G AECounter and Vanity Tops SD-06 Test Reports

2.1Solid Polymer Material SD-07 Certificates

2.3Fabrications 1.5.1Qualifications

SD-10 Operation and Maintenance Data

3.2Clean-up SD-11 Closeout Submittals

1.3LEED Documentation 07 21 16 SD-03 Product Data

2.2 G AESound Attenuation Batts

2.3 G AEAccessories

SD-08 Manufacturer’s Instructions 3.2.1Insulation

SD-11 Closeout Submittals 2.1.1Recycled Content for Insulation

Materials 07 21 19 SD-03 Product Data

2.1.1 G AEOpen-cell spray polyurethane

foam

2.2 G AEThermal Barrier

SD-11 Closeout Submittals

1.3Sustainability Documentation 07 31 13 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 53 PAGES

Fort Leavenworth Building 102

07 31 13 2.1.1Shingles 1.6.1Local/Regional Materials 1.6.2Recycled Materials

SD-04 Samples

2.1.1 G AEShingles

2.1.1 G AEColor charts

SD-08 Manufacturer’s Instructions 3.3Application

07 60 00 SD-02 Shop Drawings

3.1.13 G AEGutters

3.1.14 G AEDownspouts

3.1.11 G AEGravel stops and fascias

3.1.9 G AEBase flashing

3.1.10 G AECounterflashing

3.1.18 G AEFlashing at roof penetrations

3.1.15 G AEScuppers

3.1.12 G AEDrip edge

3.1.16 G AEConductor heads

3.1.17 G AEEave flashing

SD-11 Closeout Submittals 3.5Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 G AEFirestopping System

SD-03 Product Data

2.2 G AEFirestopping Materials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 53 PAGES

Fort Leavenworth Building 102

07 84 00 3.3 G AEInspection SD-07 Certificates

1.5.2Inspector Qualifications 2.2Firestopping Materials 1.5.1Installer Qualifications

07 92 00 SD-03 Product Data

2.1 G AESealants

2.2 G AEPrimers

2.3 G AEBond breakers

2.4 G AEBackstops

SD-07 Certificates 3.3.6Sealant

08 01 52 SD-02 Shop Drawings

1.5 G AEShop Drawings

SD-03 Product Data

2.4 G AEHardware

3.1.10 G AEWeatherstripping

1.5 G AEQualifications

SD-04 Samples

2.4 G AEHardware

3.1.10 G AEMoldings

3.1.10 G AEWeatherstripping

SD-11 Closeout Submittals 1.3LEED Documentation

08 11 13 SD-02 Shop Drawings

2.1 G AEDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 53 PAGES

Fort Leavenworth Building 102

08 11 13 2.1 G AEDoors

2.4 G AEFrames

2.4 G AEFrames

2.2 G AEAccessories

2.6 G AEInsulated Metal Transom Panel

2.7 G AEInsulated Metal Transom Panel

Applied Muntin System SD-03 Product Data

2.1 G AEDoors

2.4 G AEFrames

2.2 G AEAccessories

2.6.1.2 G AEPanel Performance

Characteristics SD-08 Manufacturer’s Instructions

3.1.4 G AEInsulated Metal Transom Panels

SD-11 Closeout Submittals

1.3Sustainability Documentation

2.6.2 G AEWarranty

08 14 00 SD-02 Shop Drawings

2.1 G AEDoors

SD-03 Product Data

2.1 G AEDoors

2.2 G AEAccessories

2.3.7 G AEWater-resistant sealer

1.6 G AEwarranty

2.1.2 G AEFire resistance rating

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 53 PAGES

Fort Leavenworth Building 102

08 14 00 1.3Certification 1.4Local/Regional Materials

SD-04 Samples

2.1 G AEDoors

2.3.6.2 G AEDoor finish colors

SD-06 Test Reports 2.4Cycle-slam 2.4Hinge loading resistance

08 51 69.10 SD-02 Shop Drawings 2.1.2Storm windows

SD-03 Product Data 2.1.2Storm windows

SD-10 Operation and Maintenance Data

2.1.2 G AEStorm windows

08 71 00 SD-02 Shop Drawings

1.3 G AEHardware schedule

2.3.5 G AEKeying system

SD-03 Product Data

2.3 G AEHardware items

SD-10 Operation and Maintenance Data

1.3Hardware Schedule SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 53 PAGES

Fort Leavenworth Building 102

08 81 00 1.6.1 G AEInsulating Glass

2.3 G AEWindow Films

SD-04 Samples

1.6.1 G AEInsulating Glass

SD-07 Certificates 1.6.1Insulating Glass

SD-08 Manufacturer’s Instructions 2.2Setting and Sealing Materials 3.2Glass Setting

SD-11 Closeout Submittals 1.3Sustainability Documentation

09 03 20 SD-08 Manufacturer’s Instructions

1.5.1 G AEReady-mix plaster

09 03 53 SD-02 Shop Drawings

2.2 G AEMetal Ceiling Panels

SD-03 Product Data

2.2 G AEMetal Ceiling Panels

SD-04 Samples

2.3 G AEArchitectural Metal Items

SD-07 Certificates

1.5.1 G AEHistoric Treatment Specialist

09 22 00 SD-03 Product Data 2.1Metal support systems

09 29 00 SD-03 Product Data

2.1.4 G AECementitious backer units

2.1.2 G AEInterior Glass Mat Gypsum Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 53 PAGES

Fort Leavenworth Building 102

09 29 00 2.1.3 G AEGlass Mat Covered or Reinforced Gypsum Sheathing

2.1.3.1 G AEGlass Mat Covered or Reinforced

Gypsum Sheathing Sealant

2.1.7 G AEAccessories

SD-07 Certificates

2.1Asbestos Free Materials SD-10 Operation and Maintenance Data

3.8Waste Management SD-11 Closeout Submittals

1.5.1Local/Regional Materials 2.1.1Gypsum Board

09 30 10 SD-02 Shop Drawings

3.2 G AEDetail Drawings

SD-03 Product Data

1.4.1 G AELocal/Regional Materials

2.1 G AETile

2.1 G AETile

2.2Setting-Bed

2.4 G AEMortar, Grout, and Adhesive

SD-04 Samples

2.1 G AETile

2.1 G AETransition Strips

2.5 G AETransition Strips

2.4 G AEGrout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 53 PAGES

Fort Leavenworth Building 102

09 30 10 SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions

SD-10 Operation and Maintenance Data

3.2Installation SD-11 Closeout Submittals

1.4.1Local/Regional Materials 1.2LEED Documentation 2.1Tile 2.4Adhesives

09 62 38 SD-03 Product Data

2.1 G AEStatic-Control Flooring

2.1 G AEAccessories

2.1.1.2 G AEAdhesives

2.4 G AEAdhesives

1.10 G AEWarranty

SD-04 Samples

2.1 G AEStatic-Control Flooring

SD-06 Test Reports 1.5Fire Resistance 3.2Moisture, Alkalinity and Bond 3.6Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 53 PAGES

Fort Leavenworth Building 102

09 62 38 2.1Static-Control Flooring 2.1Accessories 2.1.1.2Adhesives 2.4Adhesives 1.7Qualifications of Applicator

SD-08 Manufacturer’s Instructions 2.1Static-Control Flooring 2.1Accessories

SD-10 Operation and Maintenance Data

2.1Static-Control Flooring 2.1Accessories

SD-11 Closeout Submittals 1.3LEED Documentation

09 65 00 SD-02 Shop Drawings

2.9 G AEResilient Flooring and

Accessories SD-03 Product Data

2.9Resilient Flooring and Accessories

2.5 G AEAdhesives

2.1 G AESolid Vinyl Tile

2.2 G AEWall Base

2.3 G AEStair Treads, Risers and

Stringers SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 53 PAGES

Fort Leavenworth Building 102

09 65 00 2.9 G AEResilient Flooring and Accessories

SD-06 Test Reports 3.3Moisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.9Resilient Flooring and Accessories

SD-11 Closeout Submittals 1.3LEED Documentation

09 68 00 SD-02 Shop Drawings

3.4 G AEInstallation Drawings

2.4 G AEMoldings

SD-03 Product Data

2.1 G AECarpet

2.4 G AEMoldings

2.1.1 G AEPhysical Characteristics

1.2.1 G AELocal/Regional Materials

1.2.2 G AEEnvironmental Data

SD-04 Samples

2.1 G AECarpet

2.4 G AEMoldings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 53 PAGES

Fort Leavenworth Building 102

09 68 00 SD-06 Test Reports 3.2Moisture and Alkalinity Tests

SD-07 Certificates 2.1Carpet 1.5Regulatory Requirements

SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.4Installation

SD-10 Operation and Maintenance Data

2.1Carpet 3.5Cleaning and Protection 3.7.2Maintenance Service

SD-11 Closeout Submittals 1.3LEED Documentation 1.2.1Local/Regional Materials

09 69 13 SD-02 Shop Drawings

1.5 G AEDetailed Installation Drawings

SD-03 Product Data

1.2 G AEAccess Flooring System

1.3.1LEED Documentation

09 90 00 SD-03 Product Data

2.1 G AECoating

2.1 G AEManufacturer's Technical Data

Sheets SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 53 PAGES

Fort Leavenworth Building 102

09 90 00 1.10Color SD-07 Certificates

1.3Applicator's qualifications SD-08 Manufacturer’s Instructions

3.2.1Application instructions 3.4.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

10 11 00 SD-03 Product Data

1.2 G AEVisual Display Board

2.2 G AEMarkerboard

2.3 G AETackboards

2.4 G AEGlass Magnetic Marker Boards

SD-04 Samples

2.1.3 G AEAluminum

2.1.1 G AEPorcelain Enamel

2.1 G AEMaterials

SD-07 Certificates 1.2Visual Display Board

10 14 02 SD-02 Shop Drawings

3.1 G AEDetail Drawings

SD-03 Product Data

3.1 G AEInstallation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 53 PAGES

Fort Leavenworth Building 102

10 14 02 SD-04 Samples

1.2 G AEInterior Signage

1.5 G AESoftware

SD-10 Operation and Maintenance Data

3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings

2.1 G AEFabrication Drawings

3.2 G AEInstallation Drawings

SD-03 Product Data

2.1 G AECleaning and Maintenance

Instructions

2.7 G AEColors And Finishes

2.2.1 G AEAnchoring Devices and Fasteners

2.2.3 G AEHardware and Fittings

2.2.2 G AEBrackets

2.2.4 G AEDoor Hardware

2.5 G AEPilaster Shoes

SD-04 Samples 2.7Colors and Finishes

SD-07 Certificates 1.6Warranty

SD-11 Closeout Submittals 2.3.1Toilet Enclosures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 53 PAGES

Fort Leavenworth Building 102

10 21 13 2.3.2Urinal Screens 2.5Pilaster Shoes

10 22 19 SD-02 Shop Drawings

3.3 G AEInstallation

SD-03 Product Data

1.7 G AEWarranty

SD-04 Samples

2.2 G AEPartition System

SD-07 Certificates 2.1.1Fire-Resistance Rating and

Burning Characteristics 2.1.2Acoustical Performance 2.1.3Structural Performance

10 26 00 SD-02 Shop Drawings

2.2 G AECorner Guards

SD-03 Product Data

2.2 G AECorner Guards

SD-04 Samples

2.4 G AEFinish

SD-06 Test Reports 2.2Corner Guards

SD-07 Certificates 2.2Corner Guards

10 28 13 SD-03 Product Data

2.1.2 G AEFinishes

2.2 G AEAccessory Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 53 PAGES

Fort Leavenworth Building 102

10 28 13 SD-04 Samples

2.1.2 G AEFinishes

2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-01 Preconstruction Submittals

2.1.1 G AEManufacturer's Data

SD-02 Shop Drawings

2.1.1 G AEFire Extinguishers

2.1.4 G AEAccessories

Part 2 G AECabinets

2.2.2 G AEWall Brackets

SD-03 Product Data

2.1.1 G AEFire Extinguishers

2.1.4 G AEAccessories

Part 2 G AECabinets

2.2.2 G AEWall Brackets

3.2.1 G AEReplacement Parts List

SD-07 Certificates 2.1.1Fire Extinguishers 2.1.1Manufacturer's Warranty with

Inspection Tag 12 24 13 SD-02 Shop Drawings

3.3 G AEInstallation

SD-03 Product Data

2.1 G AEWindow Shades

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 53 PAGES

Fort Leavenworth Building 102

12 24 13 SD-04 Samples

2.1 G AEWindow Shades

SD-06 Test Reports 2.1Window Shades

SD-08 Manufacturer’s Instructions 2.1Window Shades

SD-10 Operation and Maintenance Data

2.1Window Shades 12 32 00 SD-02 Shop Drawings

2.2 G AEFabrication

3.1.2 G AEInstallation Drawings

SD-03 Product Data

2.2.1 G AECabinets

2.3 G AEPlywood

2.3 G AEHardwood

2.3 G AEHardwood Plywood

2.3 G AEGlass

2.3 G AEFiller Material

2.3 G AETurpentine

2.3 G AEVarnish

2.3 G AEFasteners

2.4 G AEAccessories and Hardware

SD-04 Samples

2.4 G AEAccessories and Hardware

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 53 PAGES

Fort Leavenworth Building 102

12 32 00 2.3Plywood 2.3Hardwood 2.3Glass 2.3Filler Material 2.3Turpentine 2.3Varnish 2.3Fasteners 2.4Accessories and Hardware

SD-08 Manufacturer’s Instructions 1.3Manufacturer's Instructions

12 51 00.00 23 SD-02 Shop Drawings

1.3.8 G AEInstallation Drawings

SD-03 Product Data Part 2 G AEProduct Data Specifications 1.3.7FF&E Quantity Spreadsheet Part 2 G AEColor Boards

3.1 G AEInstallation Instructions

1.4 G AEWarranty

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 G AEShop Drawings

3.9 G AEAs-built drawings

SD-03 Product Data

1.4.1 G AEFire Protection Related

Submittals

2.3 G AEMaterials and Equipment

1.6 G AESpare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 53 PAGES

Fort Leavenworth Building 102

21 13 13.00 10 3.8 G AEPreliminary Tests

3.9 G AEFinal Acceptance Test

3.10 G AEOnsite Training

1.4.1 G AEFire Protection Specialist

1.4.2 G AESprinkler System Installer

SD-05 Design Data

1.4.3 G AESway Bracing

1.2.1.3 G AEHydraulic Calculations

SD-06 Test Reports

3.8 G AEPreliminary Test Report

3.9 G AEFinal Acceptance Test Report

SD-07 Certificates

3.3 G AEInspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.10 G AEOperating and Maintenance

Manuals

22 00 00 SD-02 Shop Drawings

3.8.1 G AEPlumbing System

SD-03 Product Data 2.5Fixtures 2.5.3Flush Valve Water Closets 2.5.4Flush Valve Urinals 2.5.5Wall Hung Lavatories 2.5.6Countertop Lavatories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 53 PAGES

Fort Leavenworth Building 102

22 00 00 2.5.7 G AEDrinking-Water Coolers

2.9 G AEWater Heaters

2.11 G AEPumps

3.8.1.1 G AEBackflow Prevention Assemblies

1.5.1Welding 3.8.1Plumbing System

2.5.9 G AESolid Surface Shower Floors

SD-06 Test Reports 3.8Tests, Flushing and Disinfection 3.8.1.1Test of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.2.1Bolts

SD-10 Operation and Maintenance Data

3.8.1Plumbing System SD-11 Closeout Submittals

2.1.1Water-Efficient Products 2.1.2Energy-Efficient Water Heaters

23 00 00 SD-02 Shop Drawings

1.4.5 G AEDetail Drawings

SD-03 Product Data

2.10.1.1 G AEMetallic Flexible Duct

2.10.1.2 G AEInsulated Nonmetallic Flexible

Duct Runouts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 53 PAGES

Fort Leavenworth Building 102

23 00 00 2.10.1.2 G AEDuct Connectors

2.10.2 G AEDuct Access Doors

2.10.3 G AEFire Dampers

2.10.4 G AEManual Balancing Dampers

2.10.5 G AEManual Balancing Dampers

2.10.8.1 G AEDiffusers

2.10.8.2 G AERegisters and Grilles

2.10.9 G AELouvers

2.10.10 G AEAir Vents, Penthouses, and

Goosenecks

2.11.1.1 G AECentrifugal Fans

2.11.1.2 G AEIn-Line Centrifugal Fans

2.11.1.3 G AECentrifugal Type Power Wall

Ventilators

2.11.1.4 G AECentrifugal Type Power Roof

Ventilators

2.11.1.5 G AECeiling Exhaust Fans

2.12Air Handling Units

2.13 G AEVariable Refrigerant Flow System

2.14 G AEEnergy Recovery Devices

1.4.6 G AETest Procedures

SD-06 Test Reports 3.13Performance Tests 3.11Damper Acceptance Test

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 53 PAGES

Fort Leavenworth Building 102

23 00 00 3.3Manufacturer's Installation Instructions

3.15.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.15.1Operation and Maintenance Manuals

2.11.1.1Centrifugal Fans 2.11.1.2In-Line Centrifugal Fans 2.14Energy Recovery Devices

SD-11 Closeout Submittals 2.1.1Energy Efficient Equipment 2.1.2Reduce Volatile Organic

Compounds (VOC) 3.1Indoor Air Quality During

Construction 2.1.3Ozone Depleting Substances for

Refrigerants 23 05 93 SD-02 Shop Drawings

3.3 G AETAB Schematic Drawings and

Report Forms

SD-03 Product Data 3.2TAB Related HVAC Submittals

3.4.1 G AETAB Procedures

1.4Calibration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 53 PAGES

Fort Leavenworth Building 102

23 05 93 3.4.2 G AESystems Readiness Check 3.4.1TAB Execution 3.4.4TAB Verification

SD-06 Test Reports

3.1 G AEDesign Review Report

3.4.2 G AESystems Readiness Check

3.4.3 G AETAB Report

3.4.4 G AETAB Verification Report

SD-07 Certificates 1.5.1TAB Firm 1.5.2TAB Specialist

23 07 00 SD-03 Product Data

2.3 G AEPipe Insulation Systems

3.3 G AEDuct Insulation Systems

3.4 G AEEquipment Insulation Systems

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2 G AECommissioning Plan

SD-03 Product Data

3.2.1 G AEPre-Functional Performance Test

Checklists

3.2.2 G AEFunctional Performance Tests

SD-06 Test Reports

3.3 G AECommissioning Report

SD-07 Certificates 1.5.1Commissioning Firm 1.5.2Commissioning Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 53 PAGES

Fort Leavenworth Building 102

23 09 00 SD-02 Shop Drawings 3.2DDC Contractor Design Drawings 3.2Draft As-Built Drawings 3.2Final As-Built Drawings

SD-03 Product Data

1.8.3 G ROProgramming Software

1.8.4 G ROController Application Programs

1.8.1 G ROConfiguration Software

1.8.2 G ROController Configuration Settings

2.2 G ROManufacturer's Product Data

SD-06 Test Reports

3.4.2 G ROStart-Up Testing Report

3.5.1 G ROPVT Procedures

3.5.3 G ROPVT Report

1.9.1 G ROPre-Construction Quality Control

(QC) Checklist

1.9.2 G ROPost-Construction Quality Control

(QC) Checklist SD-10 Operation and Maintenance Data

3.6 G ROOperation and Maintenance

(O&M) Instructions

3.8.1 G ROTraining Documentation

SD-11 Closeout Submittals

2.5 G ROEnclosure Keys

3.1.6.1 G ROPassword Summary Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 53 PAGES

Fort Leavenworth Building 102

23 09 00 1.9.3 G ROCloseout Quality Control (QC) Checklist

23 23 00 SD-02 Shop Drawings

2.3 G AERefrigerant Piping System

SD-03 Product Data

2.3 G AERefrigerant Piping System

1.5.2 G AESpare Parts

1.3.1 G AEQualifications

3.5 G AERefrigerant Piping Tests

3.1 G AEVerification of Dimensions

SD-06 Test Reports

3.5 G RORefrigerant Piping Tests

SD-07 Certificates

2.1 G ROService Organization

SD-10 Operation and Maintenance Data

1.5 G ROMaintenance

3.4 G ROOperation and Maintenance

Manuals

3.4 G RODemonstrations

26 20 00 SD-02 Shop Drawings

2.14 G AEPanelboards

2.27 G AEWireways

2.13 G AEReceptacles

2.4 G AECable Trays

2.4 G AECable Trays

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 53 PAGES

Fort Leavenworth Building 102

26 20 00 2.21.1CATV Outlets

2.14.3 G AECircuit breakers

2.11 G AESwitches

2.17 G AEMotor controllers

2.18 G AEManual motor starters

2.28 G AEMetering

2.29 G AESurge protective devices

SD-06 Test Reports

3.5.2 G AE600-volt wiring test

3.5.4 G AEGrounding system test

3.5.3 G AEGround-fault receptacle test

SD-07 Certificates

2.12 G AEFuses

SD-10 Operation and Maintenance Data

1.5.1 G AEElectrical Systems

2.28 G AEMetering

26 28 01.00 10 SD-03 Product Data 2.9Fault Current Analysis 2.9Protective Device Coordination

Study 2.1Equipment 1.4.1System Coordinator 3.2Installation

SD-07 Certificates 1.6Devices and Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 53 PAGES

Fort Leavenworth Building 102

26 29 23 SD-02 Shop Drawings

1.5.1 G AESchematic diagrams

1.5.2 G AEInterconnecting diagrams

1.5.3 G AEInstallation drawings

SD-03 Product Data

2.1 G AEVariable frequency drives

2.3Wires and cables 1.5.4Equipment schedule

SD-06 Test Reports 3.2.1VFD Test 3.2.2Performance Verification Tests 3.2.3Endurance Test

SD-08 Manufacturer’s Instructions 1.5.5Installation instructions

SD-09 Manufacturer’s Field Reports

2.4.1 G AEVFD Factory Test Plan

1.5.6Factory test results

SD-10 Operation and Maintenance Data

2.1Variable frequency drives 26 41 00 SD-02 Shop Drawings

1.4.1.1 G AEOverall lightning protection

system

1.4.1.2 G AEEach major component

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 53 PAGES

Fort Leavenworth Building 102

26 41 00 1.4.3 G AELightning Protection and Grounding System Test Plan

3.5.1 G AELightning Protection and

Grounding System Test

SD-07 Certificates

1.2.3 G AELightning Protection System

Installers Documentation

1.4.2 G AEComponent UL Listed and

Labeled

1.4.4 G AELightning protection system

inspection certificate

3.1.1 G AERoof manufacturer's warranty

26 42 14.00 10 SD-02 Shop Drawings

1.3.6 G AEDrawings

2.1.1 G AEContractor's Modifications

SD-03 Product Data

2.1 G AEEquipment

1.5Spare Parts

SD-06 Test Reports

3.5 G AETests and Measurements

2.1.1 G AEContractor's Modifications

SD-07 Certificates 2.1Cathodic Protection System

1.3.1 G AEServices of 'Corrosion Expert'

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 53 PAGES

Fort Leavenworth Building 102

26 42 14.00 10 2.1 G AECathodic Protection System

3.6 G AETraining Course

26 51 00 SD-02 Shop Drawings

1.5.1 G AELuminaire Drawings

1.5.2 G AEOccupancy/Vacancy Sensor

Coverage Layout SD-03 Product Data

2.2 G AELuminaires

2.4 G AELight Sources

2.3 G AEDrivers, Ballasts and Generators

1.6.1 G AELED Luminaire Warranty

2.5.3.2 G AEVacancy Sensors

2.5.2 G…