Bldg_102_Amdt_0002_Attachments.pdf
PDF 2 MB Posted
- Attached to
- Renovate Historical Building 102
- Solicitation number
- W912DQ-16-B-4001
About this file
Amendment 0002 Attachment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_0002.pdf | ||
| A.07.20_Site_Visit_Attendence_Sheet.pdf | ||
| A.07.24_Solicitation_Amendment_0001.pdf | ||
| INSTRUCTIONS_TO_BIDDERS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 53 PAGES
W912DQ-16-B-4001
Fort Leavenworth Building 102
01 11 00 SD-01 Preconstruction Submittals 1.6Salvage Plan
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals 1.5.3.1Preliminary Sustainability
Notebook 1.5.3.1Preliminary High Performance and Sustainable Building Checklist SD-07 Certificates
1.4.5Third Party Certification (TPC) SD-11 Closeout Submittals
1.5.3.1Final Sustainability Notebook 1.5.3.1Final High Performance and
Sustainable Building Checklist 1.5.3.1Amended Final Sustainability
Notebook 3.2.1Third Party Certification Plaque and Certificates 01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 53 PAGES
Fort Leavenworth Building 102
01 35 26 SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.5Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
1.14.1 G RORadiography Operation Planning
Work Sheet 01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 G ROConstruction Site Plan
01 51 00.00 23 SD-01 Preconstruction Submittals
2.1.3.1 G AEExisting Conditions
SD-02 Shop Drawings
2.1.2 G AETemporary Modular Office Layout
2.1.2 G AETemporary Modular Office Layout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 53 PAGES
Fort Leavenworth Building 102
01 51 00.00 23 2.1.3 G AETemporary Modular Office Layout
2.1.3 G AETemporary Modular Office Layout
2.1.2 G AEFurniture Layouts
SD-03 Product Data
2.1.2.2 G AEFurniture
SD-11 Closeout Submittals
2.1.3.4 G AEFinal Site Conditions
01 57 19 SD-01 Preconstruction Submittals 1.6.1Preconstruction Survey 1.10Solid Waste Management Permit 1.6.2Regulatory Notifications 1.7Environmental Protection Plan 3.2.1.2Stormwater Notice of Intent 1.7.9.1Dirt and Dust Control Plan 1.6.4Employee Training Records
SD-06 Test Reports 3.2.1.3Inspection Reports 3.7.2.1Solid Waste Management Report
SD-07 Certificates 1.6.4Employee Training Records 1.6.4Erosion and Sediment Control
Inspector SD-11 Closeout Submittals
3.2.1.4Stormwater Pollution Prevention Plan Compliance Notebook
3.2.1.5Stormwater Notice of Termination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 53 PAGES
Fort Leavenworth Building 102
01 57 19 3.7.1Waste Determination Documentation
3.7.3.6Disposal Documentation for Hazardous and Regulated Waste
1.6.4Assembled Employee Training Records
1.10Solid Waste Management Permit 3.7.2.1Solid Waste Management Report 3.7.3.1Hazardous Waste/Debris
Management 1.6.2Regulatory Notifications 3.7.2.1Sales Documentation
01 74 19 SD-01 Preconstruction Submittals 1.6Waste Management Plan
SD-11 Closeout Submittals 1.7Records
01 78 00 SD-03 Product Data 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.5Spare Parts Data
SD-08 Manufacturer’s Instructions 1.7.1Instructions
SD-10 Operation and Maintenance Data
3.7 G ROOperation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 53 PAGES
Fort Leavenworth Building 102
01 78 00 SD-11 Closeout Submittals
3.1 G ROAs-Built Drawings
3.3 G RORecord Drawings
3.6As-Built Record of Equipment and Materials 3.4Final Approved Shop Drawings 3.5Construction Contract
Specifications
2.3 G ROCertification of EPA Designated
Items
3.9 G ROInterim DD FORM 1354
3.9 G ROChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance Data
1.4 G AEO&M Database
3.1.1 G AETraining Plan
3.1.3 G AETraining Outline
3.1.2 G AETraining Content
SD-11 Closeout Submittals
3.1.4 G AETraining Video Recording
3.1.6 G AEValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.1 G AEDemolition Plan
1.2.1 G AEDeconstruction Plan
1.10Existing Conditions
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 53 PAGES
Fort Leavenworth Building 102
02 41 00 1.7 G AENotification SD-11 Closeout Submittals
3.3.4Receipts 02 42 51 SD-01 Preconstruction Submittals
1.4.2Proposed Dust-Control Measures 1.4.2Proposed Packing and
Transportation Measures 1.4.4Schedule of Carpet Reclamation
Activities 1.4.3Carpet Reclamation Agency
Records 02 42 91 SD-03 Product Data
1.1 G AEWork Plan
02 82 13.00 10 SD-02 Shop Drawings
1.4 G AEDetailed Drawings
SD-03 Product Data
3.9.3.1 G AEAsbestos Waste Shipment
Records
1.1Weight Bills and Delivery Tickets
1.9.1 G AERespiratory Protection Program
3.9 G AECleanup and Disposal
1.6.1 G AEQualifications
1.11Training Program 1.8.1Licenses, Permits and
Notifications
3.9.3.2 G AEAsbestos Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 53 PAGES
Fort Leavenworth Building 102
02 82 13.00 10 SD-06 Test Reports 3.7Exposure Assessment and Air
Monitoring 1.7.3Local Exhaust System 1.9Medical Surveillance
Requirements 02 82 33.13 20 SD-03 Product Data
1.6.4Vacuum Filters 1.6.1Respirators
SD-06 Test Reports
1.5.2.3 G AEsampling results
1.5.2.3 G AEOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.1 G AEQualifications of CP
1.5.1.3 G AETesting Laboratory
1.5.1.2 G AETraining Certification
1.5.1.4 G AEThird Party Consultant
Qualifications
1.5.3 G AElead-based paint/paint with lead
removal/control plan
1.6.3 G AERental equipment notification
1.5.2.6 G AERespiratory Protection Program
1.5.2.7 G AEHazard Communication Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 53 PAGES
Fort Leavenworth Building 102
02 82 33.13 20 3.5.2 G AEEPA or State approved hazardous waste treatment, storage, or disposal facility
1.5.2.8 G AELead Waste Management Plan
1.6.4 G AEVacuum filters
3.5.1.1 G AEClearance Certification
SD-11 Closeout Submittals
3.5.2.1 G AEhazardous waste manifest
1.5.2.4 G AEMedical Examinations
1.5.1.2 G AETraining Certification
3.5.2.1 G AEturn-in documents or weight
tickets 02 84 16 SD-07 Certificates
1.8.1Qualifications of CIH 1.8.1Training Certification 1.8.2PCB and Lamp Removal Work
Plan 1.8.3PCB and Lamp Disposal Plan
SD-11 Closeout Submittals 3.5.2Transporter certification 3.2.4Certification of Decontamination 3.5.2.1Certificate of Disposal and/or recycling 03 01 30 SD-02 Shop Drawings
1.4.2 G AEDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 53 PAGES
Fort Leavenworth Building 102
03 01 30 1.2.6 G AEProportions of Mixtures 1.4Qualifications
SD-04 Samples
2.1 G AEMaterials
SD-06 Test Reports 1.2.7Sampling and Laboratory Testing of Materials SD-07 Certificates
2.1Materials 03 15 00.00 10 SD-03 Product Data
2.2Preformed Expansion Joint Filler 2.3Sealant
SD-04 Samples 2.3.2Lubricant for Preformed
Compression Seals 2.3.3Field-Molded Type
03 20 00.00 10 SD-02 Shop Drawings 3.1Reinforcement
SD-06 Test Reports 2.6Tests, Inspections, and
Verifications SD-07 Certificates
2.3Reinforcing Steel 03 30 00.00 10 SD-01 Preconstruction Submittals
1.5.2 G AEQuality Control Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 53 PAGES
Fort Leavenworth Building 102
03 30 00.00 10 Part 2Recycled Content Products 2.2Cementitious Materials 2.9Vapor Retarder 2.4Chemical Admixtures
SD-05 Design Data
2.1.1 G AEMixture Proportions
SD-06 Test Reports
2.1.1 G AEMixture Proportions
3.8 G AETesting and Inspection for CQC
2.2.4Fly Ash 2.2.7Ground Granulated Blast-Furnace
(GGBF) Slag 2.3Aggregates 3.8.3.1Air Content 3.8.3.2Slump 3.8.3.4Compressive Strength 2.5Water
SD-07 Certificates 1.5Contractor Quality Control personnel 3.2.1Ready-Mix Plant
03 35 00.00 10 SD-03 Product Data Part 2Recycled Content Products
04 01 20.70 SD-01 Preconstruction Submittals
1.5.1 G AEQuality Control Plan
1.5.1 G AEProject Training Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 53 PAGES
Fort Leavenworth Building 102
04 01 20.70 1.5.2 G AEQualifications SD-02 Shop Drawings
1.5.5Photographic Documentation
3.5.1 G AEStructural Upgrades
SD-03 Product Data 1.5.2Qualifications
1.5.6 G AECleaning and Restoration
Methods
2.1 G AECleaning Materials
2.1.4Biocides
2.2.2.2 G AEReplacement Mortar And Stucco
2.4 G AEMortar Mix
SD-04 Samples
1.5.7 G AEMock-ups
SD-05 Design Data
3.5.1 G AEStructural Upgrades
SD-06 Test Reports 2.2.2.1Testing and Matching 3.5.2Existing Sealants for Asbestos and PCBs SD-07 Certificates
2.2Repair Materials 05 12 00 SD-03 Product Data
2.6.2Shop primer SD-07 Certificates
2.2Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 53 PAGES
Fort Leavenworth Building 102
05 12 00 2.3Bolts, nuts, and washers 2.5Galvanizing
05 40 00 SD-07 Certificates 1.4Load-Bearing Cold-Formed Metal
Framing SD-11 Closeout Submittals
2.1Recycled Content of Steel Products
05 50 13 SD-02 Shop Drawings
2.3 G AEAccess doors and panels
2.6 G AEMechanical Stand
SD-03 Product Data
2.3 G AEAccess doors and panels
06 10 00 SD-02 Shop Drawings
1.8.1 G AEFloor Joists
1.8.1 G AERoof Rafters
1.8.1 G AEPSL and LSL Members
1.8.1 G AEWooden Stairs
SD-03 Product Data 1.10.1Local/Regional Materials 2.4.1Underlayment 2.1.2Engineered wood products 1.4.4Structural-use and OSB panels 2.3.2.2Structural-use and OSB panels 2.3Oriented Strand Board 2.4.3Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 53 PAGES
Fort Leavenworth Building 102
06 10 00 SD-06 Test Reports 1.4.5Preservative-treated
SD-07 Certificates 1.10.3Forest Stewardship Council
(FSC) Certification 1.8.2Certificates of grade 1.7Preservative treatment
SD-10 Operation and Maintenance Data
3.5Take-back program SD-11 Closeout Submittals
1.10.1Local/Regional Materials 2.4.3Adhesives 2.3Oriented Strand Board 2.1.2Engineered Wood Products 1.4.4Structural-use and OSB Panels 2.3.2.2Structural-use and OSB Panels 1.10.2Certified Wood 1.10.3Certified Wood
06 20 00 SD-02 Shop Drawings
1.3 G AEDetail Drawings Indicating All
Wood Assemblies SD-03 Product Data
2.2 G AEWood Products
1.4 G AETreated Wood Products
2.3 G AETrim
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 53 PAGES
Fort Leavenworth Building 102
06 20 00 2.2.5 G AERailings SD-04 Samples
1.5 G AESamples
SD-07 Certificates
1.7.1 G AECertificates of Grade
2.1 G AECompliance
2.1 G AECertification of Sustainable Wood
SD-11 Closeout Submittals 2.1Certification of Sustainable Wood
06 40 24 SD-01 Preconstruction Submittals
1.6 G AEContractor Qualifications
1.6 G AESubcontractor Qualifications
SD-03 Product Data
1.5.1 G AEProduct Data
SD-04 Samples
1.5.2 G AESamples for verification
06 61 16 SD-02 Shop Drawings
3.1 G AEInstallation
SD-03 Product Data
2.1 G AESolid Polymer Material
1.5.1 G AEQualifications
2.3 G AEFabrications
1.5.2 G AECertification
1.5.2 G AEVOC Content
SD-04 Samples 2.1Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 53 PAGES
Fort Leavenworth Building 102
06 61 16 2.3.5 G AECounter and Vanity Tops SD-06 Test Reports
2.1Solid Polymer Material SD-07 Certificates
2.3Fabrications 1.5.1Qualifications
SD-10 Operation and Maintenance Data
3.2Clean-up SD-11 Closeout Submittals
1.3LEED Documentation 07 21 16 SD-03 Product Data
2.2 G AESound Attenuation Batts
2.3 G AEAccessories
SD-08 Manufacturer’s Instructions 3.2.1Insulation
SD-11 Closeout Submittals 2.1.1Recycled Content for Insulation
Materials 07 21 19 SD-03 Product Data
2.1.1 G AEOpen-cell spray polyurethane
foam
2.2 G AEThermal Barrier
SD-11 Closeout Submittals
1.3Sustainability Documentation 07 31 13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 53 PAGES
Fort Leavenworth Building 102
07 31 13 2.1.1Shingles 1.6.1Local/Regional Materials 1.6.2Recycled Materials
SD-04 Samples
2.1.1 G AEShingles
2.1.1 G AEColor charts
SD-08 Manufacturer’s Instructions 3.3Application
07 60 00 SD-02 Shop Drawings
3.1.13 G AEGutters
3.1.14 G AEDownspouts
3.1.11 G AEGravel stops and fascias
3.1.9 G AEBase flashing
3.1.10 G AECounterflashing
3.1.18 G AEFlashing at roof penetrations
3.1.15 G AEScuppers
3.1.12 G AEDrip edge
3.1.16 G AEConductor heads
3.1.17 G AEEave flashing
SD-11 Closeout Submittals 3.5Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 G AEFirestopping System
SD-03 Product Data
2.2 G AEFirestopping Materials
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 53 PAGES
Fort Leavenworth Building 102
07 84 00 3.3 G AEInspection SD-07 Certificates
1.5.2Inspector Qualifications 2.2Firestopping Materials 1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1 G AESealants
2.2 G AEPrimers
2.3 G AEBond breakers
2.4 G AEBackstops
SD-07 Certificates 3.3.6Sealant
08 01 52 SD-02 Shop Drawings
1.5 G AEShop Drawings
SD-03 Product Data
2.4 G AEHardware
3.1.10 G AEWeatherstripping
1.5 G AEQualifications
SD-04 Samples
2.4 G AEHardware
3.1.10 G AEMoldings
3.1.10 G AEWeatherstripping
SD-11 Closeout Submittals 1.3LEED Documentation
08 11 13 SD-02 Shop Drawings
2.1 G AEDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 53 PAGES
Fort Leavenworth Building 102
08 11 13 2.1 G AEDoors
2.4 G AEFrames
2.4 G AEFrames
2.2 G AEAccessories
2.6 G AEInsulated Metal Transom Panel
2.7 G AEInsulated Metal Transom Panel
Applied Muntin System SD-03 Product Data
2.1 G AEDoors
2.4 G AEFrames
2.2 G AEAccessories
2.6.1.2 G AEPanel Performance
Characteristics SD-08 Manufacturer’s Instructions
3.1.4 G AEInsulated Metal Transom Panels
SD-11 Closeout Submittals
1.3Sustainability Documentation
2.6.2 G AEWarranty
08 14 00 SD-02 Shop Drawings
2.1 G AEDoors
SD-03 Product Data
2.1 G AEDoors
2.2 G AEAccessories
2.3.7 G AEWater-resistant sealer
1.6 G AEwarranty
2.1.2 G AEFire resistance rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 53 PAGES
Fort Leavenworth Building 102
08 14 00 1.3Certification 1.4Local/Regional Materials
SD-04 Samples
2.1 G AEDoors
2.3.6.2 G AEDoor finish colors
SD-06 Test Reports 2.4Cycle-slam 2.4Hinge loading resistance
08 51 69.10 SD-02 Shop Drawings 2.1.2Storm windows
SD-03 Product Data 2.1.2Storm windows
SD-10 Operation and Maintenance Data
2.1.2 G AEStorm windows
08 71 00 SD-02 Shop Drawings
1.3 G AEHardware schedule
2.3.5 G AEKeying system
SD-03 Product Data
2.3 G AEHardware items
SD-10 Operation and Maintenance Data
1.3Hardware Schedule SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 53 PAGES
Fort Leavenworth Building 102
08 81 00 1.6.1 G AEInsulating Glass
2.3 G AEWindow Films
SD-04 Samples
1.6.1 G AEInsulating Glass
SD-07 Certificates 1.6.1Insulating Glass
SD-08 Manufacturer’s Instructions 2.2Setting and Sealing Materials 3.2Glass Setting
SD-11 Closeout Submittals 1.3Sustainability Documentation
09 03 20 SD-08 Manufacturer’s Instructions
1.5.1 G AEReady-mix plaster
09 03 53 SD-02 Shop Drawings
2.2 G AEMetal Ceiling Panels
SD-03 Product Data
2.2 G AEMetal Ceiling Panels
SD-04 Samples
2.3 G AEArchitectural Metal Items
SD-07 Certificates
1.5.1 G AEHistoric Treatment Specialist
09 22 00 SD-03 Product Data 2.1Metal support systems
09 29 00 SD-03 Product Data
2.1.4 G AECementitious backer units
2.1.2 G AEInterior Glass Mat Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 53 PAGES
Fort Leavenworth Building 102
09 29 00 2.1.3 G AEGlass Mat Covered or Reinforced Gypsum Sheathing
2.1.3.1 G AEGlass Mat Covered or Reinforced
Gypsum Sheathing Sealant
2.1.7 G AEAccessories
SD-07 Certificates
2.1Asbestos Free Materials SD-10 Operation and Maintenance Data
3.8Waste Management SD-11 Closeout Submittals
1.5.1Local/Regional Materials 2.1.1Gypsum Board
09 30 10 SD-02 Shop Drawings
3.2 G AEDetail Drawings
SD-03 Product Data
1.4.1 G AELocal/Regional Materials
2.1 G AETile
2.1 G AETile
2.2Setting-Bed
2.4 G AEMortar, Grout, and Adhesive
SD-04 Samples
2.1 G AETile
2.1 G AETransition Strips
2.5 G AETransition Strips
2.4 G AEGrout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 53 PAGES
Fort Leavenworth Building 102
09 30 10 SD-07 Certificates 2.1Tile 2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions 3.7Maintenance Instructions
SD-10 Operation and Maintenance Data
3.2Installation SD-11 Closeout Submittals
1.4.1Local/Regional Materials 1.2LEED Documentation 2.1Tile 2.4Adhesives
09 62 38 SD-03 Product Data
2.1 G AEStatic-Control Flooring
2.1 G AEAccessories
2.1.1.2 G AEAdhesives
2.4 G AEAdhesives
1.10 G AEWarranty
SD-04 Samples
2.1 G AEStatic-Control Flooring
SD-06 Test Reports 1.5Fire Resistance 3.2Moisture, Alkalinity and Bond 3.6Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 53 PAGES
Fort Leavenworth Building 102
09 62 38 2.1Static-Control Flooring 2.1Accessories 2.1.1.2Adhesives 2.4Adhesives 1.7Qualifications of Applicator
SD-08 Manufacturer’s Instructions 2.1Static-Control Flooring 2.1Accessories
SD-10 Operation and Maintenance Data
2.1Static-Control Flooring 2.1Accessories
SD-11 Closeout Submittals 1.3LEED Documentation
09 65 00 SD-02 Shop Drawings
2.9 G AEResilient Flooring and
Accessories SD-03 Product Data
2.9Resilient Flooring and Accessories
2.5 G AEAdhesives
2.1 G AESolid Vinyl Tile
2.2 G AEWall Base
2.3 G AEStair Treads, Risers and
Stringers SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 53 PAGES
Fort Leavenworth Building 102
09 65 00 2.9 G AEResilient Flooring and Accessories
SD-06 Test Reports 3.3Moisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.9Resilient Flooring and Accessories
SD-11 Closeout Submittals 1.3LEED Documentation
09 68 00 SD-02 Shop Drawings
3.4 G AEInstallation Drawings
2.4 G AEMoldings
SD-03 Product Data
2.1 G AECarpet
2.4 G AEMoldings
2.1.1 G AEPhysical Characteristics
1.2.1 G AELocal/Regional Materials
1.2.2 G AEEnvironmental Data
SD-04 Samples
2.1 G AECarpet
2.4 G AEMoldings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 53 PAGES
Fort Leavenworth Building 102
09 68 00 SD-06 Test Reports 3.2Moisture and Alkalinity Tests
SD-07 Certificates 2.1Carpet 1.5Regulatory Requirements
SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.4Installation
SD-10 Operation and Maintenance Data
2.1Carpet 3.5Cleaning and Protection 3.7.2Maintenance Service
SD-11 Closeout Submittals 1.3LEED Documentation 1.2.1Local/Regional Materials
09 69 13 SD-02 Shop Drawings
1.5 G AEDetailed Installation Drawings
SD-03 Product Data
1.2 G AEAccess Flooring System
1.3.1LEED Documentation
09 90 00 SD-03 Product Data
2.1 G AECoating
2.1 G AEManufacturer's Technical Data
Sheets SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 53 PAGES
Fort Leavenworth Building 102
09 90 00 1.10Color SD-07 Certificates
1.3Applicator's qualifications SD-08 Manufacturer’s Instructions
3.2.1Application instructions 3.4.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1Coatings:
10 11 00 SD-03 Product Data
1.2 G AEVisual Display Board
2.2 G AEMarkerboard
2.3 G AETackboards
2.4 G AEGlass Magnetic Marker Boards
SD-04 Samples
2.1.3 G AEAluminum
2.1.1 G AEPorcelain Enamel
2.1 G AEMaterials
SD-07 Certificates 1.2Visual Display Board
10 14 02 SD-02 Shop Drawings
3.1 G AEDetail Drawings
SD-03 Product Data
3.1 G AEInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 53 PAGES
Fort Leavenworth Building 102
10 14 02 SD-04 Samples
1.2 G AEInterior Signage
1.5 G AESoftware
SD-10 Operation and Maintenance Data
3.1Approved Manufacturer's Instructions
3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings
2.1 G AEFabrication Drawings
3.2 G AEInstallation Drawings
SD-03 Product Data
2.1 G AECleaning and Maintenance
Instructions
2.7 G AEColors And Finishes
2.2.1 G AEAnchoring Devices and Fasteners
2.2.3 G AEHardware and Fittings
2.2.2 G AEBrackets
2.2.4 G AEDoor Hardware
2.5 G AEPilaster Shoes
SD-04 Samples 2.7Colors and Finishes
SD-07 Certificates 1.6Warranty
SD-11 Closeout Submittals 2.3.1Toilet Enclosures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 53 PAGES
Fort Leavenworth Building 102
10 21 13 2.3.2Urinal Screens 2.5Pilaster Shoes
10 22 19 SD-02 Shop Drawings
3.3 G AEInstallation
SD-03 Product Data
1.7 G AEWarranty
SD-04 Samples
2.2 G AEPartition System
SD-07 Certificates 2.1.1Fire-Resistance Rating and
Burning Characteristics 2.1.2Acoustical Performance 2.1.3Structural Performance
10 26 00 SD-02 Shop Drawings
2.2 G AECorner Guards
SD-03 Product Data
2.2 G AECorner Guards
SD-04 Samples
2.4 G AEFinish
SD-06 Test Reports 2.2Corner Guards
SD-07 Certificates 2.2Corner Guards
10 28 13 SD-03 Product Data
2.1.2 G AEFinishes
2.2 G AEAccessory Items
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 53 PAGES
Fort Leavenworth Building 102
10 28 13 SD-04 Samples
2.1.2 G AEFinishes
2.2Accessory Items
SD-07 Certificates 2.2Accessory Items
10 44 16 SD-01 Preconstruction Submittals
2.1.1 G AEManufacturer's Data
SD-02 Shop Drawings
2.1.1 G AEFire Extinguishers
2.1.4 G AEAccessories
Part 2 G AECabinets
2.2.2 G AEWall Brackets
SD-03 Product Data
2.1.1 G AEFire Extinguishers
2.1.4 G AEAccessories
Part 2 G AECabinets
2.2.2 G AEWall Brackets
3.2.1 G AEReplacement Parts List
SD-07 Certificates 2.1.1Fire Extinguishers 2.1.1Manufacturer's Warranty with
Inspection Tag 12 24 13 SD-02 Shop Drawings
3.3 G AEInstallation
SD-03 Product Data
2.1 G AEWindow Shades
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 53 PAGES
Fort Leavenworth Building 102
12 24 13 SD-04 Samples
2.1 G AEWindow Shades
SD-06 Test Reports 2.1Window Shades
SD-08 Manufacturer’s Instructions 2.1Window Shades
SD-10 Operation and Maintenance Data
2.1Window Shades 12 32 00 SD-02 Shop Drawings
2.2 G AEFabrication
3.1.2 G AEInstallation Drawings
SD-03 Product Data
2.2.1 G AECabinets
2.3 G AEPlywood
2.3 G AEHardwood
2.3 G AEHardwood Plywood
2.3 G AEGlass
2.3 G AEFiller Material
2.3 G AETurpentine
2.3 G AEVarnish
2.3 G AEFasteners
2.4 G AEAccessories and Hardware
SD-04 Samples
2.4 G AEAccessories and Hardware
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 53 PAGES
Fort Leavenworth Building 102
12 32 00 2.3Plywood 2.3Hardwood 2.3Glass 2.3Filler Material 2.3Turpentine 2.3Varnish 2.3Fasteners 2.4Accessories and Hardware
SD-08 Manufacturer’s Instructions 1.3Manufacturer's Instructions
12 51 00.00 23 SD-02 Shop Drawings
1.3.8 G AEInstallation Drawings
SD-03 Product Data Part 2 G AEProduct Data Specifications 1.3.7FF&E Quantity Spreadsheet Part 2 G AEColor Boards
3.1 G AEInstallation Instructions
1.4 G AEWarranty
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 G AEShop Drawings
3.9 G AEAs-built drawings
SD-03 Product Data
1.4.1 G AEFire Protection Related
Submittals
2.3 G AEMaterials and Equipment
1.6 G AESpare Parts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 53 PAGES
Fort Leavenworth Building 102
21 13 13.00 10 3.8 G AEPreliminary Tests
3.9 G AEFinal Acceptance Test
3.10 G AEOnsite Training
1.4.1 G AEFire Protection Specialist
1.4.2 G AESprinkler System Installer
SD-05 Design Data
1.4.3 G AESway Bracing
1.2.1.3 G AEHydraulic Calculations
SD-06 Test Reports
3.8 G AEPreliminary Test Report
3.9 G AEFinal Acceptance Test Report
SD-07 Certificates
3.3 G AEInspection by Fire Protection
Specialist SD-10 Operation and Maintenance Data
3.10 G AEOperating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
3.8.1 G AEPlumbing System
SD-03 Product Data 2.5Fixtures 2.5.3Flush Valve Water Closets 2.5.4Flush Valve Urinals 2.5.5Wall Hung Lavatories 2.5.6Countertop Lavatories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 53 PAGES
Fort Leavenworth Building 102
22 00 00 2.5.7 G AEDrinking-Water Coolers
2.9 G AEWater Heaters
2.11 G AEPumps
3.8.1.1 G AEBackflow Prevention Assemblies
1.5.1Welding 3.8.1Plumbing System
2.5.9 G AESolid Surface Shower Floors
SD-06 Test Reports 3.8Tests, Flushing and Disinfection 3.8.1.1Test of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment 2.2.1Bolts
SD-10 Operation and Maintenance Data
3.8.1Plumbing System SD-11 Closeout Submittals
2.1.1Water-Efficient Products 2.1.2Energy-Efficient Water Heaters
23 00 00 SD-02 Shop Drawings
1.4.5 G AEDetail Drawings
SD-03 Product Data
2.10.1.1 G AEMetallic Flexible Duct
2.10.1.2 G AEInsulated Nonmetallic Flexible
Duct Runouts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 53 PAGES
Fort Leavenworth Building 102
23 00 00 2.10.1.2 G AEDuct Connectors
2.10.2 G AEDuct Access Doors
2.10.3 G AEFire Dampers
2.10.4 G AEManual Balancing Dampers
2.10.5 G AEManual Balancing Dampers
2.10.8.1 G AEDiffusers
2.10.8.2 G AERegisters and Grilles
2.10.9 G AELouvers
2.10.10 G AEAir Vents, Penthouses, and
Goosenecks
2.11.1.1 G AECentrifugal Fans
2.11.1.2 G AEIn-Line Centrifugal Fans
2.11.1.3 G AECentrifugal Type Power Wall
Ventilators
2.11.1.4 G AECentrifugal Type Power Roof
Ventilators
2.11.1.5 G AECeiling Exhaust Fans
2.12Air Handling Units
2.13 G AEVariable Refrigerant Flow System
2.14 G AEEnergy Recovery Devices
1.4.6 G AETest Procedures
SD-06 Test Reports 3.13Performance Tests 3.11Damper Acceptance Test
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 53 PAGES
Fort Leavenworth Building 102
23 00 00 3.3Manufacturer's Installation Instructions
3.15.2Operation and Maintenance Training
SD-10 Operation and Maintenance Data
3.15.1Operation and Maintenance Manuals
2.11.1.1Centrifugal Fans 2.11.1.2In-Line Centrifugal Fans 2.14Energy Recovery Devices
SD-11 Closeout Submittals 2.1.1Energy Efficient Equipment 2.1.2Reduce Volatile Organic
Compounds (VOC) 3.1Indoor Air Quality During
Construction 2.1.3Ozone Depleting Substances for
Refrigerants 23 05 93 SD-02 Shop Drawings
3.3 G AETAB Schematic Drawings and
Report Forms
SD-03 Product Data 3.2TAB Related HVAC Submittals
3.4.1 G AETAB Procedures
1.4Calibration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 53 PAGES
Fort Leavenworth Building 102
23 05 93 3.4.2 G AESystems Readiness Check 3.4.1TAB Execution 3.4.4TAB Verification
SD-06 Test Reports
3.1 G AEDesign Review Report
3.4.2 G AESystems Readiness Check
3.4.3 G AETAB Report
3.4.4 G AETAB Verification Report
SD-07 Certificates 1.5.1TAB Firm 1.5.2TAB Specialist
23 07 00 SD-03 Product Data
2.3 G AEPipe Insulation Systems
3.3 G AEDuct Insulation Systems
3.4 G AEEquipment Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 G AECommissioning Plan
SD-03 Product Data
3.2.1 G AEPre-Functional Performance Test
Checklists
3.2.2 G AEFunctional Performance Tests
SD-06 Test Reports
3.3 G AECommissioning Report
SD-07 Certificates 1.5.1Commissioning Firm 1.5.2Commissioning Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 53 PAGES
Fort Leavenworth Building 102
23 09 00 SD-02 Shop Drawings 3.2DDC Contractor Design Drawings 3.2Draft As-Built Drawings 3.2Final As-Built Drawings
SD-03 Product Data
1.8.3 G ROProgramming Software
1.8.4 G ROController Application Programs
1.8.1 G ROConfiguration Software
1.8.2 G ROController Configuration Settings
2.2 G ROManufacturer's Product Data
SD-06 Test Reports
3.4.2 G ROStart-Up Testing Report
3.5.1 G ROPVT Procedures
3.5.3 G ROPVT Report
1.9.1 G ROPre-Construction Quality Control
(QC) Checklist
1.9.2 G ROPost-Construction Quality Control
(QC) Checklist SD-10 Operation and Maintenance Data
3.6 G ROOperation and Maintenance
(O&M) Instructions
3.8.1 G ROTraining Documentation
SD-11 Closeout Submittals
2.5 G ROEnclosure Keys
3.1.6.1 G ROPassword Summary Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 53 PAGES
Fort Leavenworth Building 102
23 09 00 1.9.3 G ROCloseout Quality Control (QC) Checklist
23 23 00 SD-02 Shop Drawings
2.3 G AERefrigerant Piping System
SD-03 Product Data
2.3 G AERefrigerant Piping System
1.5.2 G AESpare Parts
1.3.1 G AEQualifications
3.5 G AERefrigerant Piping Tests
3.1 G AEVerification of Dimensions
SD-06 Test Reports
3.5 G RORefrigerant Piping Tests
SD-07 Certificates
2.1 G ROService Organization
SD-10 Operation and Maintenance Data
1.5 G ROMaintenance
3.4 G ROOperation and Maintenance
Manuals
3.4 G RODemonstrations
26 20 00 SD-02 Shop Drawings
2.14 G AEPanelboards
2.27 G AEWireways
2.13 G AEReceptacles
2.4 G AECable Trays
2.4 G AECable Trays
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 53 PAGES
Fort Leavenworth Building 102
26 20 00 2.21.1CATV Outlets
2.14.3 G AECircuit breakers
2.11 G AESwitches
2.17 G AEMotor controllers
2.18 G AEManual motor starters
2.28 G AEMetering
2.29 G AESurge protective devices
SD-06 Test Reports
3.5.2 G AE600-volt wiring test
3.5.4 G AEGrounding system test
3.5.3 G AEGround-fault receptacle test
SD-07 Certificates
2.12 G AEFuses
SD-10 Operation and Maintenance Data
1.5.1 G AEElectrical Systems
2.28 G AEMetering
26 28 01.00 10 SD-03 Product Data 2.9Fault Current Analysis 2.9Protective Device Coordination
Study 2.1Equipment 1.4.1System Coordinator 3.2Installation
SD-07 Certificates 1.6Devices and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 53 PAGES
Fort Leavenworth Building 102
26 29 23 SD-02 Shop Drawings
1.5.1 G AESchematic diagrams
1.5.2 G AEInterconnecting diagrams
1.5.3 G AEInstallation drawings
SD-03 Product Data
2.1 G AEVariable frequency drives
2.3Wires and cables 1.5.4Equipment schedule
SD-06 Test Reports 3.2.1VFD Test 3.2.2Performance Verification Tests 3.2.3Endurance Test
SD-08 Manufacturer’s Instructions 1.5.5Installation instructions
SD-09 Manufacturer’s Field Reports
2.4.1 G AEVFD Factory Test Plan
1.5.6Factory test results
SD-10 Operation and Maintenance Data
2.1Variable frequency drives 26 41 00 SD-02 Shop Drawings
1.4.1.1 G AEOverall lightning protection
system
1.4.1.2 G AEEach major component
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 53 PAGES
Fort Leavenworth Building 102
26 41 00 1.4.3 G AELightning Protection and Grounding System Test Plan
3.5.1 G AELightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3 G AELightning Protection System
Installers Documentation
1.4.2 G AEComponent UL Listed and
Labeled
1.4.4 G AELightning protection system
inspection certificate
3.1.1 G AERoof manufacturer's warranty
26 42 14.00 10 SD-02 Shop Drawings
1.3.6 G AEDrawings
2.1.1 G AEContractor's Modifications
SD-03 Product Data
2.1 G AEEquipment
1.5Spare Parts
SD-06 Test Reports
3.5 G AETests and Measurements
2.1.1 G AEContractor's Modifications
SD-07 Certificates 2.1Cathodic Protection System
1.3.1 G AEServices of 'Corrosion Expert'
SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 53 PAGES
Fort Leavenworth Building 102
26 42 14.00 10 2.1 G AECathodic Protection System
3.6 G AETraining Course
26 51 00 SD-02 Shop Drawings
1.5.1 G AELuminaire Drawings
1.5.2 G AEOccupancy/Vacancy Sensor
Coverage Layout SD-03 Product Data
2.2 G AELuminaires
2.4 G AELight Sources
2.3 G AEDrivers, Ballasts and Generators
1.6.1 G AELED Luminaire Warranty
2.5.3.2 G AEVacancy Sensors
2.5.2 G…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .