A.07.24_Solicitation_Amendment_0002.pdf
PDF 47 KB Posted
- Attached to
- Renovate Historical Building 102
- Solicitation number
- W912DQ-16-B-4001
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg_102_Amdt_0002_Attachments.pdf | ||
| A.07.20_Site_Visit_Attendence_Sheet.pdf | ||
| A.07.24_Solicitation_Amendment_0001.pdf | ||
| INSTRUCTIONS_TO_BIDDERS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
" Historical Renovation of Building 102 located at Ft. Leavenw orth Kansas."
Bid due date remains the same Sept 6, 2016 @ 2:00 p.m. Local Time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Aug-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DQ-16-B-4001
X 9B. DATED (SEE ITEM 11)
04-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Aug-2016
CODE
USACE, KANSAS CITY +
FEDERAL BUILDING CT-M, RM 647 601 EAST 12TH S
KANSAS CITY MO 64106-2896
W912DQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DQ-16-B-4001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0002
The Solicitation is amended as follows:
Deleted text is shown with a strikethrough. Added text is shown with underline.
1. CONTRACT CHANGES
a. Standard Form 1442, Item 10. Correct the magnitude of the project to read as follows:
The magnitude of this project is between $1,000,000 and $5,000,000 $5,000,000 and $10,000,000
2. SPECIFICATION CHANGES
b. DELETE the Submittal Register in its entirety and replace with the revised Submittal Register that accompanies this amendment.
c. SECTION 01 33 29 “Sustainability Reporting”. Delete Attachment 2 LEED Scorecard in its entirety and replace with the revised scorecard that accompanies this amendment.
d. DELETE Section 01 51 00.00 23 “Swing Space” in its entirety and replace with the revised section that accompanies this amendment.
e. Section 06 10 00 “Rough Carpentry”, Paragraph 1.2 “Submittals” - Add the following submittal requirements after first paragraph.
SD-02 Shop Drawings
Floor Joists; G, AE Roof Rafters; G, AE PSL and LSL Members; G, AE Wooden Stairs; G, AE
f. Section 06 10 00 “Rough Carpentry”, Paragraph 1.8.1 “Drawing Requirements” is changed to read as follows:
1.8.1 Drawing Requirements
For fabricated structural members, floor joists, roof rafters, PSL and LSL members, wooden stairs, trusses, qlu-lam members, indicate materials, details of construction, methods of fastening, and erection details. Include reference to design criteria used and manufacturers design calculations. Submit drawings for all proposed modifications of structural members. Do not proceed with modifications until the submittal has been approved.
g. Section 23 09 00 “Instrumentation and Control for HVAC”, Paragraph 1.1 “SUMMARY” is changed to read as follows:
1.1 SUMMARY
Provide a complete Direct Digital Control (DDC) system, except for the Front End which is specified elsewhere, suitable for the control of the heating, ventilating and air conditioning (HVAC) and other building-level systems as indicated and shown and in accordance with Section 23 09 23.02 BACNET
DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL SYSTEMS.
Control system needs to be 100% native compatible with base existing Automated Logic Corporation control system. As such, the control systems shall be registered and certified to operate on the NEC system. No gateways or integration should be necessary to communicate with base wide Energy Business Management System is compatibility requirements are met.
h. Section 23 09 23.02 “BACNET Direct Digital Control for HVAC and Other Building Control Systems”, Paragraph 1.1. “SUMMARY” is changed to read as follows:
1.1 SUMMARY
Provide a complete Direct Digital Control (DDC) system, except for the front end, suitable for the control of the heating, ventilating and air conditioning (HVAC) and other building-level systems as specified and shown and in accordance with Section 23 09 00 INTRUMENTATION AND CONTROL FOR HVAC.
Control system needs to be 100% native compatible with base existing Automated Logic Corporation control system. As such, the control systems shall be registered and certified to operate on the NEC system. No gateways or integration should be necessary to communicate with base wide Energy Business Management System is compatibility requirements are met.
i. Section 23 23 00 “Refrigerant Piping”, Add the following new Paragraph 2.4.6 “Pre-Insulated Refrigerant Line Sets after paragraph 2.4.5
2.4.6 Pre-Insulated Refrigerant Line Sets
At the contractors’ option, pre-insulated refrigerant line sets may be used in lieu of hard drawn pipe.
3. REVISED DRAWING SHEETS
a. DELETE the following drawing sheets in their entirety and replace with the revised drawing sheets that accompany this amendment.
G-002 Drawing Sheet Index A-011 Building 100 Plans M-102 Mechanical Plan – Second Floor M-103 Mechanical Piping Plan – First Floor M-104 Mechanical Piping Plan – Second Floor M-602 Mechanical Schedules MI102 Temperature Controls T-503 Telecommunication Details
4. To incorporate the following CLAUSES
52.215-11 11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR
PRICING DATA MODIFICATION (AUG 2011)
52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA-MODIFICATIONS (OCT 2010)
5 To incorpoate Updated Wage Determination Rates: KS160058 dated 08/26/2016 (Building)
6. Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided.
Failure to acknowledge all amendments may cause rejection of the bid.
7. Bid due date remain the same Sept 6, 2016 @ 2:00 p.m.
8. All other terms and conditions remain unchanged and in full force.
00 73 46 WAGE DETERMINATION
APPLICATION OF WAGE RATES
The inclusion of the Davis-Bacon Act General Wage Decision or the Service Contract Act Wage Determination in the solicitation is a statutory requirement. It is not a representation by the U.S. Army Corps of Engineers that any specific work task can be performed by any specific trade. Which work tasks can be performed by what trades depends on and is determined by the prevailing area practice for the local area where the contract is being performed. It is the sole responsibility of the contractor to determine and comply with the prevailing area practice. Inquiries regarding a prevailing area practice should be directed to the Corps of Engineers, Contractor Industrial Relations Specialist (telephone number 816-389-3723) or to the U. S. Department of Labor Regional Wage and Hour Division.
Application of wage rates and fringe benefits: For the application of the wage rates and fringe benefits contained in the Decisions of the U. S. Secretary of Labor, attached to and a part of this contract, all work required within 5 feet outside building lines shall be considered Building Construction.
General Decision Number: KS160058 08/26/2016 KS58 Superseded General Decision Number: KS20150058 State: Kansas Construction Type: Building County: Leavenworth County in Kansas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 02/26/2016 2 03/04/2016 3 03/11/2016 4 04/01/2016 5 04/15/2016 6 04/29/2016 7 06/17/2016 8 07/01/2016
9 08/26/2016
ASBE0027-005 10/01/2015
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (MECHANICAL (Duct, Pipe & Mechanical System Insulation)).....................$ 33.97 24.58
BRKS0015-011 06/01/2014
Rates Fringes
TILE SETTER......................$ 33.76 13.16
BRKS0015-012 04/01/2015
Rates Fringes
BRICKLAYER.......................$ 34.06 17.50
BRKS0015-014 06/01/2015
Rates Fringes
TILE FINISHER....................$ 16.70 7.55
CARP0315-003 05/01/2014
Rates Fringes
CARPENTER (Acoustical Ceiling Installation Only)...............$ 36.05 15.05
CARP0315-004 05/01/2014
Rates Fringes
CARPENTER (Excludes Acoustical Ceiling Installation, Drywall Hanging and Floor Laying Carpet).........$ 36.05 15.05
CARP1181-001 05/01/2015
Rates Fringes
CARPENTER (Floor Laying-Carpet Only)..............$ 34.32 15.75
ELEC0124-011 08/31/2015
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 36.69 20.62
ELEV0012-004 01/01/2013
Rates Fringes
ELEVATOR MECHANIC................$ 42.34 25.185+a+b
a. VACATION PAY: 6% for 6 months to 5 years service; 8% with 5 or more years of service.
b. PAID HOLIDAYS: Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Friday after, and Christmas Day.
ENGI0101-043 04/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR:
Crane.......................$ 38.44 15.97 Forklift....................$ 36.29 15.97 Grader/Blade................$ 37.63 15.97 Oiler.......................$ 32.08 15.97 Paver (Asphalt, Aggregate, and Concrete)...............$ 38.44 15.97
* IRON0010-032 04/01/2016
Rates Fringes
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.00 28.15
LABO1290-011 04/01/2016
Rates Fringes
Laborers: (Asphalt, Includes Raker, Shoveler, Spreader and Distributor).....................$ 30.35 14.77
LABO1290-013 04/01/2016
Rates Fringes
LABORER
Mason Tender - Brick........$ 27.55 15.40
PAIN0558-006 05/01/2011
GLAZIER..........................$ 26.47 19.98
PAIN2012-009 05/01/2012
Rates Fringes
PAINTER (Spray)..................$ 22.93 11.51
PAIN2012-010 04/01/2013
Rates Fringes
PAINTER (Drywall Finishing/Taping)................$ 28.58 15.07
PLAS0518-017 04/01/2016
Rates Fringes
PLASTERER........................$ 31.24 18.49
PLUM0008-020 06/01/2016
Rates Fringes
PLUMBER..........................$ 42.64 21.04
PLUM0533-013 06/01/2016
Rates Fringes
PIPEFITTER (Including HVAC Pipe, Unit, and Installation of HVAC Electricial/Temperature Controls)........................$ 45.33 19.32
ROOF0020-021 06/01/2016
Rates Fringes
ROOFER...........................$ 32.55 17.09
SFKS0314-002 01/01/2016
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 35.74 19.37
SHEE0002-011 07/01/2015
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 39.85 20.11
TEAM0541-010 04/01/2016
Rates Fringes
TRUCK DRIVER (Lowboy Truck)......$ 32.04 13.45
TEAM0541-011 04/01/2016
Rates Fringes
TRUCK DRIVER (Semi-Trailer Truck)...........................$ 32.04 13.45
SUKS2015-022 07/08/2015
Rates Fringes
CARPENTER (Drywall Hanging Only)............................$ 30.00 1.62
CEMENT MASON/CONCRETE FINISHER...$ 25.93 11.62
ELECTRICIAN (Low Voltage Wiring Only).....................$ 32.91 18.15
LABORER: Common or General......$ 25.49 12.95
LABORER: Concrete Saw (Hand Held/Walk Behind)................$ 28.44 11.60
LABORER: Landscape..............$ 12.48 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 17.86 1.01
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 33.85 13.87
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 33.53 13.66
OPERATOR: Bulldozer.............$ 33.12 13.96
OPERATOR: Loader................$ 30.35 12.04
OPERATOR: Roller................$ 32.18 13.49
PAINTER (Brush and Roller).......$ 23.69 9.39
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 38.39 17.73
TRUCK DRIVER: Dump (All Types)...$ 28.58 11.22
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .