SEE SCHEDULE AMC-20007-7J

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Revised Section B to add the Bid Sheet. Use of the bid sheet is mandatory.

Revised Statement of Work and Construct Wage Determination.

Add CLIN 0006 and CLIN 0007 for w all tie and spall repair patches.

Add FAR 52.211-18, Variation in Estimated Quantity.

Add requirement for submitting a tentative construction schedule w ith bid.

See summary changes and applicable attachments for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912D018B0002

X 9B. DATED (SEE ITEM 11)

25-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Aug-2018

CODE

REGIONAL CONTRACTING OFFICE - ALASKA

P O BOX 35510 1064 APPLE ST

FORT WAINWRIGHT AK 99703-0510

W912D0 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912D018B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

BID PREPARATION CHECKLIST

Before sending your bid to us, review it for the following documents--without these, your bid could be rejected. If you have questions, confusion, or doubts, contact the POC identified in the solicitation.

This checklist is designed for your convenience to assist you in completing your bid. Its completion does not guarantee that your bid will be acceptable. A complete and acceptable bid is solely the responsibility of the Contractor.

1. Your attention is directed to the following clause:

FAR 52.204-7, System for Award Management

LACK OF REGISTRATION IN THE CCR DATABASE WILL RENDER BIDDER INELIGIBLE FOR

AWARD. Information on how to register and the time it takes is detailed in the clause.

2. Standard Form 1442 Titled “SOLICITATION, OFFER AND AWARD”

a. Is it signed in Block 20B? Yes (Y)___Not Applicable(NA) ___

b. Have you verified with the Contracting Office that you have received all Amendments? Have you acknowledged all Amendments using block 19? Y__ NA__

c. Is the complete, correct address of the company printed in Block 14? (ALSO INCLUDE YOUR TIN, DUNS, AND CAGE NUMBERS IN THIS BLOCK) Y__ NA__

d. Are the correct phone numbers, and fax numbers including country codes, included in Block 15? Y__ NA__

e. Is the mailing address of the company is different from the address in Block 14, is the mailing address written in Block 16? (ALSO INCLUDE YOUR EMAIL ADDRESS IN THIS BLOCK) Y__ NA__ f.. Is the time you are allowing for acceptance of the offer, the same or longer than the time set out in block

13?. Y__ NA__

3. Representations, Certifications, and Other Statements of the Offeror Are all of the clauses in this section completed and signed in the appropriate places and returned attached to the bid?

Y__ NA__

4. The Bidding Schedule

a. Is it Section B completely filled out? Y__ NA__

b. It may not be altered either as to quantities or as to items offered. Y__ NA__

c. There can be no language of limitation either as to quantities or as to items offered. Y__ NA__

d. If you corrected your numbers, have you initialed these corrections? Y__ NA__

e. If the bidding schedule has been changed by Amendment, is the bidding schedule that you are submitting from the most recent amendment ? Y__ NA__

f. Do prices for each bid item include all costs, mark-ups and taxes (if any taxes are imposed)? Y__ NA__

g. Is the cost of obtaining your bid and performance guarantee included in the total bid price specified on the bid schedule? Y__ NA__

h. In preparing your bid, remember the U.S. Army does not make advanced payments on its contracts Y__ NA__

5. Bid Guarantees Did you attach a Bid Guarantee Credit Y__ NA_ If you are using a Bid Guarantee, does the Guarantee comply with the requirements set out in FAR 52.228-1? Y__

NA__

Remember insurance policies are not acceptable Y_ Is the amount of the Bid Guarantee equal to the amount required in FAR 52.228-1? Y__ NA__?

Is the time period of the Bid Guarantee equal to or greater than the period set out in block 13 of the 1442? Y__

NA__

Is there a Power of Attorney or other document attached that establishes the authority of the surety to sign the Bid Guarantee? Y__ NA__

6. Construction Schedule Did you attach a tentative construction schedule stated in number of days? Y__ NA_ Does the schedule show, in sufficient detail, the order in which you plan to perform the work? Y__ NA_ Does the schedule comply with the performance period as required by the solicitation? Y__ NA_ Remember, failure to provide a tentative construction schedule that conforms to all the solicitation requirements will render a bid NONRESPONSIVE.

Bid Sheet AMC-2007-7J Repair Earth-Covered Magazines (ECM)

Item No. Description Estimated Quantity

Unit Unit Price Amount

Contract Line Items

0001 Repair ECM B1919-1920

FFP

Provide all work plans, labor, material, equipment, supervision, work and facilities necessary to complete this requirement in accordance with the attached Statement of Work and Specifications. 1 Job $__________ $____________

0002 Repair ECM B1921-1922

FFP

Provide all work plans, labor, material, equipment, supervision, work and facilities necessary to complete this requirement in accordance with the attached Statement of Work and Specifications. 1 Job $__________ $____________

0003 Repair ECM B1923

FFP

Provide all work plans, labor, material, equipment, supervision, work and facilities necessary to complete this requirement in accordance with the attached Statement of Work and Specifications. 1 Job $__________ $____________

0004 ECM B1925-1926

FFP

Provide all work plans, labor, material, equipment, supervision, work and facilities necessary to complete this requirement in accordance with the attached Statement of Work and Specifications. 1 Job $__________ $____________

0005 Repair ECM B1927-1928

FFP

Provide all work plans, labor, material, equipment, supervision, work and facilities necessary to complete this requirement in accordance with the attached Statement of Work and Specifications. 1 Job $__________ $____________

0006 Wall tie patch repair

FFP

Repair an estimated quantity of 18 square feet of wall tie patches in accordance with the Statement of Work. Bid shall have a unit price based on 1/10 (tenth) of a square foot. 180

1/10 (tenth) of a square foot $__________ $____________ 0007 Spall patch repair

FFP

Repair an estimated quantity of 90 square feet of spall patches in accordance with the Statement of Work. Bid shall have a unit price based on 1 (one) square foot. 90

1 (one) square foot $__________ $____________

Total Contract Line Items $____________

W912D018B0002

SECTION B - SUPPLIES OR SERVICES AND PRICES

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0006:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

The following Acceptance/Inspection Schedule was added for CLIN 0007:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)

If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

Attachment 1-AMC-20007-7J Statement of Work, 15 August 2018, 87 pages Attachment 1-AMC-20007-7J Statement of Work, 12 June 2018, 86 pages Attachment 2-Construction Wage Determination, 3 August 2018, 14 pages Attachment 2-Construction Wage Determination, 1 June 2018, 14 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

CONSTRUCTION SCHEDULE

Bidders shall submit a preliminary construction schedule with bid. The bidder shall prepare and submit a schedule that shows the order in which the Contractor plans to perform the work. The schedule shall be prepared in sufficient detail to indicate appropriately the percentage of work scheduled during the performance period. The preliminary construction schedule shall conform to all the requirements of the solicitation and applicable attachments.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been added by full text:

CONSTRUCTION SCHEDULE

The Government will reject a bid as nonresponsive if the bid fails to include a preliminary construction schedule that conforms to all the requirements of the solicitation and applicable attachments. The schedule must be prepared in sufficient detail to indicate appropriately the percentage of work scheduled during the performance period.

(End of Summary of Changes)