Kerr_MEI_Specifications_3-20-19_Solicitation_Revisied.pdf
PDF 3 MB Posted
- Solicitation number
- W912BV18R0059
About this file
Solicitation Amendment to replace in its entirety "Kerr MEI Specifications 3-20-19 Solicitation RFP Final". This is the corrected, revised RFP.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W912BV19R0059
US Army Corps of Engineers Tulsa District Arkansas River Watershed Robert S. Kerr Lock & Dam 15, Oklahoma
Modernization of Electrical Infrastructure
Specifications
March 20, 2019
TABLE OF CONTENTS
SOLICITATION NO. W912BV19R0059
MODERNIZATION OF ELECTRICAL INFRASTRUCTURE
ROBERT S. KERR LOCK & DAM 15, OKLAHOMA
MARCH 20, 2019
TOC-1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 SF 1442 AND CLIN SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,
BASIS OF AWARD
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 CONTRACTOR'S SITE OPERATIONS
01 11 00.00 26 SUMMARY OF WORK
01 22 00.00 26 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 46 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 42 00.00 26 REMOVAL OF EXISTING OCB INSULATING OIL SYSTEM PIPING
02 82 13 ASBESTOS REMEDIATION
02 83 13 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 15 13.00 26 CONTAINMENT SEALING AND WATERSTOPS
03 30 53.00 26 CAST-IN-PLACE CONCRETE AND FOUNDATIONS
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND MINOR
EQUIPMENT FOUNDATIONS
DIVISION 05 - METALS
05 05 23.16 26 STRUCTURAL STEEL WELDING
05 05 23.20 26 PRESSURE TANK WELDING
05 50 04.01 26 METALS: MISCELLANEOUS, STANDARD ARTICLES, SHOP FABRICATED
ITEMS
TABLE OF CONTENTS
SOLICITATION NO. W912BV19R0059
MODERNIZATION OF ELECTRICAL INFRASTRUCTURE
ROBERT S. KERR LOCK & DAM 15, OKLAHOMA
MARCH 20, 2019
TOC-2
DIVISION 09 - FINISHES
09 90 00.00 26 PAINTING
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
21 13 19.00 20 DELUGE FIRE SPRINKLER SYSTEMS
21 30 00 FIRE PUMP
DIVISION 22 - PLUMBING
22 00 00.00 26 MECHANICAL EQUIPMENT AND PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 HVAC DUCT MODIFICATIONS
DIVISION 26 - ELECTRICAL
26 05 00.00 26 GENERAL ELECTRICAL
26 05 13.00 26 MEDIUM-VOLTAGE CABLE
26 05 19.00 26 INSULATED WIRE AND CABLE 2000V and Below
26 05 36.00 26 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 08 01.00 26 SYSTEMS TESTING AND COMMISSIONING
26 13 13.00 26 METAL-CLAD SWITCHGEAR
26 15 00.00 26 BUS STRUCTURES
26 23 10.10 26 480 VOLT SWITCHGEAR AND TRANSFORMERS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23.01 26 QUENCH ROCK
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 23.19 MONORAIL HOISTS
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 21 39 UNWATERING PUMPS, STATION SUMP PUMPS AND SUMP UNWATERING
PUMP REPLACEMENT
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT
44 42 52.00 26 OIL-STORM WATER PROCESSING
-- End of Table of Contents --
Kerr Modernization of Electrical Infrastructure - FY19 KERRMEIFY19
PRICING SCHEDULE
ITEM DESCRIPTION ESTIMATED UNIT
QUANTITY UNIT PRICE AMOUNT
BASE BID
0001 General Conditions 1 Job XXXX $_______
0002 Remove Transformer T1 1 Job XXXX $_______
0003 Remove Transformer T2 1 Job XXXX $_______
0004 Remove Existing Unit 1 1 Job XXXX $_______ 15 kV Switchgear
0005 Remove Existing Unit 2 1 Job XXXX $_______ 15 kV Switchgear
0006 Remove Existing Unit 3 1 Job XXXX $_______ 15 kV Switchgear
0007 Remove Existing Unit 4 1 Job XXXX $_______ 15 kV Switchgear
0008 Furnish New 15 KV 1 Job XXXX $_______ Unit 1 Switchgear (SJ1)
0009 Furnish New 15 KV 1 Job XXXX $_______ Unit 2 Switchgear(SJ2)
0010 Furnish New 15 KV 1 Job XXXX $_______ Unit 3 Switchgear(SJ3)
0011 Furnish New 15 KV 1 Job XXXX $_______ Unit 4 Switchgear(SJ4)
0012 Install New 15 kV Main 1 Job XXXX $_______ Unit 1 Switchgear(SJ1)
0013 Install New 15 kV Main 1 Job XXXX $_______ Unit 2 Switchgear(SJ2)
0014 Install New 15 kV Main 1 Job XXXX $_______ Unit 3 Switchgear(SJ3)
0015 Install New 15 kV Main 1 Job XXXX $_______ Unit 4 Switchgear(SJ4)
0016 Remove Existing Unit 1 1 Job XXXX $_______ Metal Enclosed Bus
0017 Remove Existing Unit 2 1 Job XXXX $_______ Metal Enclosed Bus
DOCUMENT 00 41 10 Page 1
0018 Remove Existing Unit 3 1 Job XXXX $_______ Metal Enclosed Bus
0019 Remove Existing Unit 4 1 Job XXXX $_______ Metal Enclosed Bus
0020 Furnish and Install New 1 Job XXXX $_______ Unit 1 Metal Enclosed Bus
0021 Furnish and Install New 1 Job XXXX $_______ Unit 2 Metal Enclosed Bus
0022 Furnish and Install New 1 Job XXXX $_______ Unit 3 Metal Enclosed Bus
0023 Furnish and Install New 1 Job XXXX $_______ Unit 4 Metal Enclosed Bus
0024 Remove existing 480 volt 1 Job XXXX $_______ Switchgear
0025 Furnish New 480 volt 1 Job XXXX $_______ Switchgear
0026 Install New 480 volt 1 Job XXXX $_______ Switchgear
0027 Transformer T1 and T2 1 Job XXXX $_______ Foundations
0028 Make external Connections 1 Job XXXX $_______ to Transformers T1 and T2
0029 Transformer Deluge Piping 1 Job XXXX $_______
0030 New Transformer oil 1 Job XXXX $_______ containment system
0031 Replace Sump Pumps and Motors 1 Job XXXX $_______
0032 Replace Draft Tube Drain Valves 1 Job XXXX $_______
0033 Replace Kidney Loop Filters 1 Job XXXX $_______ Systems
0034 Replace Hatch Monorail Hoist 1 Job XXXX $_______
0035 Replace Discharge Piping Gate and Check Valves 1 Job XXXX $_______
0036 Replace Spiral Case Gate Valves 1 Job XXXX $_______
0037 Furnish and Install New Insulating Oil Storage Tanks 1 Job XXXX $_______
0038 Asbestos Remediation to Include Sampling, Disposal, and
DOCUMENT 00 41 10 Page 2
Record Keeping 1 Job XXXX $_______
0039 Lead Remediation to Include Sampling, Disposal, and Record Keeping 1 Job XXXX $_______
TOTAL BASE $___________
-- End of Document --
DOCUMENT 00 41 10 Page 3
Contractor to replace the four main unit 15kV sw itchgear line-ups, replace the 480V station service sw itchgear, replace the unw atering/sump pumps and motors, transformer deluge containment, rehab of transformer f ire protection system, replace the governor kidney loop system, and install new Generator Step Up transformers (to be supplied by others), in accordance w ith the Statement of Work, located at Robert S.
Kerr Pow erhouse, Robert S. Kerr Reservoir, 29759 Pow erhouse Road, Keota, Oklahoma 74941.
Construction Cost Magnitude: $5,000,000.00 and $11,000,000.00 w hich includes all design, non-design, and construction cost for the total contract aw ard. Offerors are under no obligation to approach the maximum cost magnitude given above.
This is a full and open solicitation under NAICS 335313 (Sw itchgear and Sw itchboard Apparatus Manufacturing) w ith a size standard of 1,250 employees
The Request for Proposal Due Date is June 3rd, 2019 @ 2:00PM CST
BRUCE E HAYES 918.669.7277
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
18-Apr-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________570 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Jun 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
918-669-7436FAX:TEL: TEL: FAX:
W912BV18R0059 85
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
SECTION 00 21 00
Instruction to Offerors
00 21 00 - 3
Section 00 10 00 - Solicitation
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
00 21 00 - 4
Section 00 21 00 - Instructions
00 21 00 - 5
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT SECURITY REQUIREMENTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 NAICS CODE/SET ASIDE STATUS
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 SITE VISIT
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS
1.10 PROPOSAL FORMAT
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 DEVIATIONS AND EXCEPTIONS
1.13 PLACE OF PERFORMANCE
1.14 DISCLOSURE OF MAGNITUDE OF CONSTRUCTION PROJECTS
1.15 SYSTEM FOR AWARD MANAGEMENT REGISTRATION:
1.16 CONTRACTING OFFER AUTHORITY
1.17 ADDITIONAL INFORMATION
W912BV18R0059
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
The scope of this project is to replace the four main unit 15kV switchgear line-ups, replace the 480V station service switchgear, replace the unwatering/sump pumps and motors, transformer deluge containment, rehab of transformer fire protection system, replace the governor kidney loop system, and install new Generator Step Up transformers (to be supplied by others), at the Robert S. Kerr Lock and Dam powerhouse. The non-segregated 15kV bus from the generator to the switchgear and from the GSU transformers to the switchgear, draft tube valves, and spiral case valves will also be replaced under this project. The GSU transformer installation will require new transformer deluge containment including transformer pedestal structure modification.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.
ANY MAIL addressed to the U.S. Army Corps of Engineers WILL BE REJECTED by the U.S. Army Corps of Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is Mr. Bruce Hayes:
Phone: 918-669-7277 Email: Bruce.E.Hayes@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the Army’s Single Face to Industry (AFSI) to the Federal Business Opportunities (FBO) website at:
http://www.fbo.gov
Solicitation number: W912BV18R0059
It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall, submit in the proposal, all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic no later than 14 calendar days prior to the proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers..
The Bidder Inquiry Key for this project is 2K2BYC-365FX5
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.
1.5. NAICS CODE / SET ASIDE STATUS
North American Industry Classification System (NAICS) code 335313 (Switchgear and Switchboard Apparatus Manufacturing) with a size standard of 1,250 employees, also see FAR 52.204-8.
This requirement is being solicited as full and open, without exclusion of sources.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This request for proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. SITE VISIT
All vendors are highly encouraged to attend a site visit which is scheduled as stated below.
POC: Isaac Stephens “Steve” E-mail: Isaac.j.Stephens@usace.army.mil Telephone: 918-669-7288 Date of Site Visit: 1 May 2019 at 09:30AM CST Location: Robert S. Kerr Powerhouse 29759 Power House Road Keota, OK. 74941-6569
NOTES:
All participants must RSVP no later than April 19, 2019 1600 hours.
All participants must be US Citizens with a valid State Issued Driver's License.
For questions concerning this site visit, offerors are to contact Mr. Stephens.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTALS
1.9.1 The submittal method for proposals is electronic via FBO or email ONLY (no mailed proposals). The following email addresses are provided for email purposes. Ensure BOTH address are on your submission “TO” line.
Bruce.E.Hayes@usace.army,mil Brian.C.Hutchison@usace.army.mil
1.9.2 Proposals will be received until the time and date shown on Standard Form SF1442 or as amended on SF30. Mail bid bonds to:
U.S. Army Corps of Engineers, Tulsa District
ATTN: CESWT-CT-E
2488 E. 81st Street Tulsa, OK 74137-4290
1.9.3 The packaging shall be marked: “Solicitation Number: W912BV18R0059”
1.9.4 Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on
SF30.
1.10. PROPOSAL FORMAT
See Sections 00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA
1.11. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.12. DEVIATIONS AND EXCEPTIONS
Deviations and exceptions to the terms and conditions of the solicitation in either the technical or price proposal are neither encouraged nor desired. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. Notwithstanding the above, if deviations and exceptions are included with the offer, the Offeror shall list and describe in detail the deviations and/or exceptions as required by Sections 00 22 00 and/or 00 22 20 of this RFP. All deviations and exceptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. This information will not be evaluated separately but may impact the evaluation of other factors.
1.13. Place of Performance
The preponderance of the work to be placed under this contract is expected to be performed at Robert S. Kerr Lock and Dam powerhouse, 29759 Powerhouse Road, Keota, OK 74941.
1.14. DISCLOSURE OF MAGNITUDE OF CONSTRUCTION PROJECTS
In Accordance with FAR 36-204 and DFARS 236.204, the Construction Cost magnitude for this project is between $5,000,000.00 and $11,000,000.00 which includes all design, non-design, and construction cost for the total contract award. Offerors are under no obligation to approach the maximum cost magnitude given above.
1.15. SYSTEM FOR AWARD MANAGEMENT REGISTRATION
All contractors are required to register in the System for Award Management (SAM) database before an award can be made. Contractors can obtain information on registration and annual confirmation requirements by calling 866- 606-8220 or via the Internet at https://www.sam.gov.
1.16. CONTRACTING OFFICER AUTHORITY
"Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer."
1.17 ADDITIONAL INFORMATION
1.17.1 This is a competitive acquisition. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
1.17 .2 Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
1.17.3 Debriefings. The Contracting Officer will promptly notify Offerors of any decision to exclude them from competition if a competitive range is determined, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The Contracting Officer will notify unsuccessful Offerors of the source selection decision in accordance with FAR 15.506. Upon such notification, unsuccessful Offerors may request and receive a debriefing. Offerors desiring debriefing must make their request in accordance with the requirements of FAR
15.505 or 15.506, as applicable. All debriefings will be provided officially in writing.
CLAUSES INCORPORATED BY REFERENCE
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-22 Limitations on Pass-Through Charges--Identification of
Subcontract Effort
OCT 2009
52.217-4 Evaluation Of Options Exercised At The Time Of Contract Award
JUN 1988
52.217-5 Evaluation Of Options JUL 1990 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.228-1 Bid Guarantee SEP 1996 52.232-14 Notice Of Availability Of Progress Payments Exclusively For
Small Business Concerns
APR 1984
52.236-28 Preparation of Proposals--Construction OCT 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.236-7013 Requirement for Competition Opportunity for American Steel
Producers, Fabricators, and Manufacturers
JUN 2013
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Mr. Brian C. Hutchison or other warranted Contracting Officer authorized to acknowledge the receipt at 2488 E.
81st Street, Tulsa, OK. 74137-4290.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ http://www.acquisition.gov/far/
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ http://www.acquisition.gov/far/
(End of clause)
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulations Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
Section 00 22 00 - Supplementary Instructions
SECTION 00 22 11
SECTION 00 22 11
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD
1.0 OVERVIEW
1.1 This is an unrestricted competitive solicitation for a firm, fixed-price Design-Bid-Build construction contract to be awarded using the Trade-Off, Best Value selection process. This Request for Proposal (RFP) is to remove and replace the four main unit 15kV switchgear line-ups, remove and replace metal enclosed bus on the four units, remove and replace the 480V station service switchgear, replace the unwatering/sump pumps and motors, transformer deluge containment, new transformer fire protection system, replace the governor kidney loop system, install two new Generator Step Up transformers (to be supplied by others), replace discharge piping and gate valves, and replace the spiral case gate valves at the Robert S. Kerr Lock and Dam powerhouse. The solicitation criteria shall rely upon industry standards, as much as possible and firms must meet all project requirements.
1.2 Offerors will submit proposals with performance capability including identification of key subcontractors, the proposed contract duration, a preliminary schedule, and a price proposal. The Government will evaluate initial proposals in accordance with the criteria described in this Section.
Award of a firm fixed-price contract will be made to the responsible offeror whose proposal conforms to all the terms and conditions of the solicitation and represents the overall best value to the Government, considering the evaluation factors, below. The final evaluation rating used for comparison, selection, and award will reflect the ratings received during proposal evaluation. Cost and price information will not be rated but will be evaluated in accordance with FAR Part 15.4.
When combined, all non-price factors are considered significantly more important than price.
1.2.1 The proposal must describe the capability of the offeror to perform the work and understanding of the requirements contained in the Statement of Work, and set forth full, accurate, and complete information required by the RFP. The proposal should be prepared simply and economically and be legible, clear and coherent.
1.2.2 This is not a sealed bid procurement process. Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government. Contract award is subject to funds availability.
1.2.3 Proposal Submissions and the Trade-Off Process. This process permits tradeoffs among price and non-price factors and allows the Government to accept other than the lowest priced proposal.
Proposals must demonstrate performance and capability information for review and consideration by the Government. Relative weights among past performance and technical factors are provided, below. The Source Selection Evaluation Board (SSEB) reviews, evaluates, and rates the proposals against the source selection criteria in the RFP. If discussions are held, a competitive range consisting of the most highly qualified firms will be established, first.
Concurrently, the Government analyzes price proposals. Price will not be rated, but will be a factor in making the final best value determination for award. The Source Selection Authority (SSA) compares proposals to one another and determines the best value for the government.
The perceived benefits of the higher priced proposal must merit the additional cost, and the rationale for tradeoffs must be documented.
2.1 GENERAL INSTRUCTIONS
2.2 Who May Submit: Any legally organized business firm formally organized as entities, construction contractors that have associated specifically for this project, consortia of small business firms or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors.
2.3 Specific instructions for Joint Ventures (JV) and Partnerships.
2.3.1 JV or Partnerships shall be registered in the System for Acquisition Management (www.SAM.gov) as a JV or Partnership.
2.3.2 JV or Partnerships shall provide a copy of the Joint Venture or Partnership Agreement.
2.3.3 JV or Partnerships shall provide a detailed statement outlining the following in terms of percentages, where appropriate:
A. The relationship of the JV or Partnership parties in terms of business ownership, capital contribution, and profit sharing.
B. The management approach of the JV or Partnership in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the JV or Partnership and perform the duties necessary to complete the work.
C. The structure of the JV or Partnership and decision-making responsibilities of the JV or Partnership parties in terms of who will control the manner and method of performance of the work.
D. The bonding responsibilities of the JV or Partnership parties.
E. Identification of key personnel having authority to legally bind the JV or Partnership to subcontracts and state who will provide or contract for the labor and materials for the JV or Partnership.
F. Identification of party maintaining the JV or Partnership bank accounts for the payment of all expenses and deposits of all receipts, keep the books and records, and pay applicable taxes for the JV or Partnership.
G. Identification of party furnishing the facilities, such as office supplies and telephone service.
H. Identification of party having overall control of the JV or Partnership.
2.3.4 JV or Partnerships shall identify in other sections of the proposal, where appropriate, whether key personnel are employees of the individual JV or Partnership parties (and identify the party) or hired as employees of the JV or Partnership.
2.3.5 If one of the JV or Partnership parties possesses experience and/or past performance as a Federal Government contractor or as a Corps of Engineers contractor, that experience and/or past performance will be included as the experience and/or past performance of the JV or Partnership.
2.4 Where to Submit: Submit proposals to USACE Tulsa District as instructed in Section 00 21 00
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS.
2.5 Submission Deadline. Proposals shall be received by the Tulsa District no later than the time and date specified in Block 10 of Standard Form 1442 or as amended in an Standard Form 30.
2.6 GENERAL SUBMISSION REQUIREMENTS
2.7 Page Limitations. Proposals are limited to the number of pages shown below, not including the Table of Contents, tab dividers, OSHA forms, Drawings, Data Sheets, Installation Details, Construction Schedules and Past Performance Questionnaires (PPQ-0) forms.
2.8 In order to effectively and equitably evaluate all proposals, proposals must include sufficient detail to allow review by the Government. Proposal clarity, organization, and cross-referencing are mandatory.
Failures to submit and organize proposals as requested may adversely affect a proposal's evaluation.
Provide sufficient detail and clearly define all items required in this section.
2.9 The Contracting Officer may remove any proposal from further consideration during any phase of the procurement if the proposal fails to meet the submittal requirements of the RFP, or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).
2.9.1 Proposals shall be organized as shown in paragraph 3.0, “Proposal and Related Evaluation
Factors.”
2.10 Proposal Submissions.
2.10.1 Proposals shall be submitted in electronic format and contain the information in original PDF files that are accurately bookmarked. Electronic proposals shall be posted on FBO or sent to the Contracting Specialist and the Contracting Officer via email, see Section 00 21 00. Proposals shall be labeled in a manner to afford easy identification from a Table of Contents. Font size shall not be less than 10 point. Do not use condensed font. Each page shall be sequentially and
Factor 1 PAST PERFORMANCE CPARS Evaluations
Past Performance Questionnaires
Limit PPQ-0’s to five
Factor 2 PERFORMANCE CAPABILITY
Switchgear and Bus Company
Experience Narrative
Experience Forms 3 pages
No Limit
Organization/Management Narrative 10 pages
Key Personnel Resumes 2 pages each
Safety Record – OSHA Forms 300 or 300a OSHA Forms 300 & 300a
Narrative No Limit 3 Pages
Manufacturer Quality Control Narrative 3 Pages
Factor 3
TECHNICAL APPROACH:
TRANSFORMER, SWITCHGEAR
AND BUS REPLACEMENT
15 KV and 480Volt Switchgear Nameplate, Drawings and Data
Narrative Chart(s)
3 Pages No Limit
15 KV Bus Nameplate, Drawings, Data and Installation Details Narrative Chart(s)
3 Pages No Limit
Drawings &
Descriptive Information Narrative, Drawings/Chart(s) 3 Pages
No Limit
Schedule Narrative Chart(s)
3 Pages No Limit
Factor 4
SMALL BUSINESS
UTILIZATION
Narrative 3 Pages consecutively identified with the appropriate page number centered at the bottom of each page.
The Government will not review any information submitted in an appendix or attachment to the proposal. Do not submit verbatim sections of this solicitation as part of the proposal. Proposals that do not meet these requirements may be subject to rejection.
2.10.2 The proposal shall contain a detailed table of contents for each volume. A cover sheet identifying the firm(s) (name, address, point of contact), project description, and solicitation number shall be provided with each volume, followed by a Table of Contents. Improper proposal formats will unnecessarily delay the evaluation process and may be rejected after the initial evaluation without receiving any further consideration. The Government will not evaluate any information beyond the page limitations noted.
2.10.3 Electronic Format: The Offeror shall provide the complete proposal via AMRDEC Safe Download.
The electronic files for each volume shall contain the respective portion of the proposal in PDF format using Adobe Acrobat software; do not scan the documents into a PDF file except the bid bond may be scanned. The text portion of each volume of the proposal shall be contained as a single PDF file. Sections of the proposal shall be linked to the index in logical order through use of bookmarks.
2.10.4 Number of Copies: Submit one copy of all electronic files via FBO or send to the Contracting
Specialist and the Contracting Officer via email, see Section 00 21 00.
2.10.5 Proposal revisions, if requested, shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, Clarification, or amendment shall be included and be annotated for each revision.
Proposal replacement pages shall be numbered, shall be clearly marked “REVISED” show the date of revision.
3.0 PROPOSAL AND RELATED EVALUATION FACTORS
Location Factor Number Description Relative Importance
Front Matter
SF 1442 and Proposal Data Sheet Not Rated
Volume 1 Factor 1 Past Performance Most Important Factor
Volume 2 Factor 2 Performance Capability 2nd Most Important Factor
Factor 3 Technical Approach:, Switchgear and Bus Replacement
3rd Most Important Factor
Factor 4 Small Business Utilization Plan 4th Most Important Factor
Volume 3 Factor 5 Price and Pro Forma Documents Not Rated
4.0 STANDARD FORM 1442 AND PROPOSAL DATA SHEET
4.1 Submit the SF-1442, completed and signed by the firm’s authorized representative. Include the completed proposal data sheet (See Attachment 1, provided at the end of this Section).
5.0 FACTOR 1 – PAST PERFORMANCE
5.1 SUBMISSION REQUIREMENTS
5.2 Past Performance Information (PPI) is to be provided for the projects listed under Factor 2 –
Performance Capability.
1) For Department of Defense (DoD) projects Offeror need not submit a copy of the Contractor Performance Assessment Reporting System (CPARS) Evaluations (ACASS & CCASS) for each DoD project: instead, provide written notification that current ratings are available for the Government to evaluate.
2) For Non DoD projects or projects that do not have a CPARS Evaluation:
Offeror shall include copies of Past Performance Questionnaires (PPQ, see Attachment
3) in the proposal.
Offerors shall not incorporate PPQs previously submitted by reference in their proposal for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors shall not request PPQs on projects that have final ACASS, CCASS, or CPARS evaluations. If a past performance questionnaire is received on a project where a final ACASS, CCASS, or CPARS evaluation exists, the ACASS, CCASS, or CPARS evaluation will serve as the official rating of record for evaluation purposes.
If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal if the Offeror has not had an opportunity to previously address the evaluation.
Entities that have no past performance shall notify Contract Specialist Bruce Hayes bruce.e.hayes@usace.army.mil prior to the date and time established for receipt of proposals, that they have had no previous clients and that PPQs cannot be provided. The proposal must contain a written statement that no past performance evaluations are available.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
The Government reserves the right to verify the experience record of cited projects or other recent projects not submitted by reviewing the Past Performance Information Retrieval System (PPIRS) or other Government appraisal systems, or to interview owner or references. The Government may check any or all cited references to verify supplied information.
5.3 EVALUATION CRITERIA:
5.3.1 The Government will evaluate the extent of recent, related experience of the prime contractor as relevant to their role on this project. Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.
5.3.2 The proposal must demonstrate a record of recent, related experience in construction, for the types of work required by this project. Recent experience includes projects well underway (50% or more complete) or those completed and turned over within seven (7) years of the proposal issue date for this RFP. Joint Ventures and Partnerships should separately demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.
5.3.3 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), other DOD or Government appraisal systems, or to interview owners or references. The Government may check any or all cited references to verify supplied information.
5.3.4 To receive credit for extent (amount) of experience, the prime shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor based merely upon the relevant experience of key personnel proposed for this project.
5.3.5 The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions.
Some examples of relevancy to this project may include, but not be limited to:
Number, size, type work, complexity, location Dates (well under way 50% or more completed, no more than 7 years preceding date of
Solicitation) Firm's role and extent of work self-performed (brokering out all work and simply managing a cited project are examples of less relevant experience)
5.3.6 Previous experience is not mandatory for an acceptable rating. The Government will consider previous experience a strength, even if the experience is on different type projects than this project.
Similarly, the Government may consider previous recent teaming experience among the team members as value added, even if on different type design and/or construction projects than this project. The more relevant the experience, the more credit given.
5.3.7 Past Performance evaluation includes two aspects to assess the offeror’s probability of performing the requirements stated in the RFP, based on the offeror’s demonstrated performance on recent, relevant contracts.
First, the offeror’s past performance will be evaluated to determine how relevant a recent effort accomplished by the offeror is to the requirements of the RFP.
Second, the offeror’s past performance shall be given a Performance Confidence Assessment based on how well the contractor performed on past contracts.
5.3.8 The Government will assign a performance confidence assessment based on the probability of successfully meeting the contract requirements, considering the degree of success of the contractor’s recent, relevant experience. The Government will assess the past performance on projects submitted and reserves the right to conduct telephone interviews with points of contact identified in the proposal and/or to review other recent projects rated in CCASS/ACASS or other agency performance databases, review and/or contact furnished references, or to consider first-hand personal knowledge of Government employees.
5.3.9 The Government will first assess and rate the relevancy of recent projects accomplished compared to the scope of this contract for overall application to the performance confidence assessment ratings described, below. The projects will include those submitted as well as from other sources described, above. This rating is not a separate proposal rating but is only used in developing an overall past performance confidence assessment rating assigned to the Past Performance Factor.
The past performance relevancy ratings are described below.
Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
5.3.10 The Government will next consider how well the offeror performed on the contracts. The
Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy, past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer or by the team member. Owners/references may be asked to comment on items such as quality of design or construction, timeliness, management of the work, subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and designer or contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting design or construction errors, warranty work, etc. The Government will target areas covered in the requirements of this proposal including records of meeting quality, schedule, cost control, customer satisfaction, level of support for work product such as as-built documentation, O&M Manuals, training, problem resolution for design or construction errors, warranty work, and safety. The Government will not release the Interview Forms to the Offeror at any time, in order for the Government to solicit candid, unbiased interview comments. The Government also places a higher value on projects which document successful outcomes and are supported by outside source confirmation, such as furnished references, customer evaluations, or personal knowledge. The Government also places a higher value on projects involving particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully.
5.3.11 A degree of confidence in the offeror’s ability to successfully accomplish the contract requirements will be assigned. The rating system used for the performance confidence assessment is described below.
Performance Confidence Assessment Ratings Description
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Past Performance Relevancy Rating Adjectival Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
5.3.12 Each entity (firm) will be rated on its own performance. If the Government does not obtain past performance information for the projects identified in the proposal, and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance confidence assessment will be considered “Unknown Confidence.”
For Technical Factors (meaning all non-cost factors excluding Past Performance) the rating methodology (DoD Source Selection Procedure 3.1.2.2) is Combined Technical/Risk Rating. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in determining technical ratings. This methodology provides the most flexibility and least complexity in the rating process, conduct of the comparative analysis, and best value trade-off analysis process and will be used for this acquisition.
Combined Technical/Risk Ratings
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
5.4 FACTOR 2 – PERFORMANCE CAPABILITY
5.5 SUBMISSION REQUIREMENTS:
The contractor shall demonstrate recent, relevant experience on similar projects, using Construction
– Specialized Experience form – (Attachment 2). Proposals may identify state and local government and private contracts that are similar to the Government’s requirements.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.