Formal Abstract 20B0003 IWW C-D Canal Maintenance Dredging.pdf
PDF 500 KB Posted
- Attached to
- Inland Waterway C & D Maintenance Dredging
- Solicitation number
- W912BU20B0003
About this file
This document provides details for a federal solicitation for maintenance dredging services along the Inland Waterway Chesapeake and Delaware Canal. The U.S. Army Corps of Engineers, Philadelphia District is seeking a firm-fixed price contract for dredging at various locations along the canal from Station 00+000 to Station 250+440 and within 25 feet of the channel from Station 101+000 to Station 250+440 where shoaling regularly occurs. The contractor will be required to commence dredging within ten days of the notice to proceed and complete all work within 120 calendar days between October 1, 2020 and March 31, 2021. The solicitation will be publicly posted on May 15, 2020 and bids will be opened on June 22, 2020. The estimated cost range for this project is $5,000,000 to $10,000,000 and the selected contractor must provide performance and payment bonds for 100% of the contract award. The NAICS code for this project is 237990 and the small business size standard is $39.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 13Jan20_AS11_12_AD_MLLW_3x3avg.txt | TXT text file | |
| Amendment 0002.pdf | ||
| 70_500to75_000_30Mar20_MLLW_3x3avg.txt | TXT text file | |
| 29Jan20_AS17_18_AD_MLLW_3x3avg.txt | TXT text file | |
| 3Feb20_AS19_AD_MLLW_3x3avg.txt | TXT text file | |
| 88_000to93_665_31Mar20_MLLW_3x3avg.txt | TXT text file | |
| 63_500to67_500_25Mar20_MLLW_3x3avg.txt | TXT text file | |
| 27Mar20_213_000to218_000_MLLW_3x3avg.txt | TXT text file | |
| 13Jan20_AS9_10_AD_MLLW_3x3avg.txt | TXT text file | |
| 23Jan20_AS16_AD_MLLW_3x3avg.txt | TXT text file | |
| 4Feb20_AS20_21_AD_MLLW_3x3avg.txt | TXT text file | |
| 14Jan20_AS13_AD_MLLW_3x3avg.txt | TXT text file | |
| 20B0003-0001_Specs-AM1.pdf | ||
| W912BU20B0003-Specs.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendments|Bid Bond Item
Number Description Qty Unit Price/CY Price Price/CY Price Price/CY Price
BASE BID Mobization & Demobilization
1 JOB 2,692,268.00$ 4,038,000.00$ 4,250,000.00$
Removal & Satisfactory Disposal of Material (AS- 11 thru AS-17) 315,377 CY 16.90$ 5,329,871.30$ 13.00$ 4,099,901.00$ 15.00$ 4,730,655.00$
Total estimated Base Bid Amount 8,022,139.30$ 8,137,901.00$ 8,980,655.00$
OPTION 1 REMOVAL & SATISFACTORY Disposal of Material (AS-1 thru AS-5) 20,780 CY 23.26$ 483,342.80$ 58.00$ 1,205,240.00$ 25.00$ 519,500.00$
OPTION 2 REMOVAL & SATISFACTORY Disposal of Material (AS-6 thru AS-10) 50,246 CY 14.09$ 707,966.14$ 14.00$ 703,444.00$ 15.00$ 753,690.00$
Totals Total ESTIMATED BASE BID and OPTIONS
AMOUNT 9,213,448.24$ 10,046,585.00$ 10,253,845.00$
Certified by:
Robert W. Hutcheon, Jr.
Contracting Officer
C & D Maintenance Dredging - IFB W912BUB0003 - Date Issued: 5/21/2020 Date Opened 6/22/2020 Gov't Estimate Great Lakes Dredging Weeks Marine