15T0058-0001_Amendment_Final.pdf
PDF 27 KB Posted
- Attached to
- Boat Davit Crane for Benyaurd Vessel
- Solicitation number
- W912BU-15-T-0058
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15T0058-0002_Amendment_Final.pdf | ||
| PIC_2.jpg | JPG image | |
| PIC_6.jpg | JPG image | |
| Drawings.pdf | ||
| 15T0058_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Changes to the Statement of Work, Section M, answ er to questions, incorporating draw ings, and extending the offer due date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-15-T-0058
X 9B. DATED (SEE ITEM 11)
09-Nov-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Nov-2015
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: JUSTIN CHUNG
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU-15-T-0058
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
This amendment hereby modifies the following:
1. On page 7, paragraph C008 is hereby changed.
2. On page 53, paragraph Factor 1 – Technical Features is hereby changed.
3. On page 55, FAR 52.212-2 is hereby changed.
4. The Government has received questions concerning the solicitation and hereby provides answers to these questions.
Questions may be of general interest of all Offerors/Government. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Offerors for information purposes only.
5. Drawings are hereby included.
6. Offer due date is hereby extended to 15 December 2015 at 2:00PM EST.
Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15 below, by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE TO
ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION
OF YOUR QUOTE.
All other terms and conditions remain the same.
(End of Summary of Changes)
Question and Answers The Government has received the following questions concerning the solicitation and provides the following answers to these questions:
Question #1: Please confirm the boom length required. The solicitation synopsis mentions a 30ft boom while the statement of work mentions a 40ft fixed boom.
Answer #1: The boom shall be a 40 foot fixed boom.
Question #2: What is the service temperature? For API and ABS the service temperature is required for developing the design.
Answer #2: The Drybulb temps for January in Jackson, Mississippi is 21F heating and 95F Cooling.
Question #3 – In section C104 Crane Testing, the next to the last sentence states “The contractor shall supply all test weights.” Am I understand that the crane contractor is to provide these test weights or will the installing contractor provide the test weight?
Answer #3 – The installer s the Government. The crane supplier is responsible for providing the test weights.
Revised Paragraph C008
C008 CRANE DRUM
The crane shall be provided with a single main hoist drum. The drum shall have a line speed of 50 fpm with two wraps on the drum.
The main hoist drum shall be sized to hold sufficient wire rope to allow the load block to reach the water, 25 feet below the rotating works of the crane at a 10’ radius. The operator shall be able to select the lowering mode (power down or free fall) of operation on the hoist drum. The lowering mode for the hoist drum shall be power down only.
Revised Paragraph Factor 1 – Technical Features
Factor 1 – Technical/Risk is divided into the following fourteen (14) fifteen (15) different sub-factors. Each sub-factor will be rated acceptable or unacceptable in accordance with the below chart.
Revised FAR 52.212-2
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be the lowest price technically acceptable offer. The following factors shall be used to evaluate offers:
1. Technical Features
a. fourteen (14) fifteen (15) subfactors
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 30-Nov-2015 02:00 PM to 15-Dec-2015 02:00 PM.
File details come from the government source that posted it. Updated .