Amendment 03 for solicitation W912BU-15-R-0019.

View the file

Other files

File Type Posted
15R0019-04_amendment.pdf PDF
15R0019-02_amendment.pdf PDF
15R0019-01_amendment.pdf PDF
Bluestone_Drifter_As-Builts.zip ZIP file
15R0019_draftRFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W25PHS50167350

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Question and Answ ers and Changes to the Solicitation

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-15-R-0019

X 9B. DATED (SEE ITEM 11)

02-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2015

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: JUSTIN CHUNG

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU-15-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 03

The purpose of this amendment is listed below:

1. Paragraph 4.0.3 on page 48 of the solicitation is hereby changed.

2. The Government has received questions concerning the solicitation and hereby provides answers to these questions.

Questions that may be of general interest of all Offerors/Government and that are not readily answered by the preceding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Offerors for information purposes only.

Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15 below, by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE TO

ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION

OF YOUR QUOTE.

All other terms and conditions remain the same.

Questions and Answers Q-1: Page 48 of 54 ask to execute form SR 1442, should be form 33? Also is Price Proposal Schedule page 2 of 54 same as Section B – Supplies or Services and Prices?

A-1: Yes, should be SF33. Yes, price proposal schedule is same as Section B on page 2.

Q-2: Page 4 of 54 Section C006 stated features not provided on the contract vessel: electrical systems. Page 22 of 54 Section C701 – no electrical System. Page 5 requires the following standards “U. S. Coast Guard, Navigation Rules and Regulations – International and Inland”. Are navigation lights required and if so how do we power?

A-2: No electrical system is required. Navigation lights are not required. The Government will handle outfitting the vessel with portable navigation lights after contract.

Q-3: How will the contractor be evaluated if other than experience of having built modular barges is presented in the submittal?

A-3: If a submittal does not meet the minimum requirements of any factor or sub-factor the submittal will not be technically acceptable.

Q-4: Can you please clarify if the ACOE expects the modular barge to be in three sections? [three modules]

A-4: The Government does not have a specific requirement for the number of modular sections as long as all other requirements in the specification are met. Three modules is an acceptable approach.

Revised Paragraph 4.0.3

W912BU-15-R-0019

4.0.3 FACTOR 3 – PRICE

The Government will evaluate price information for completeness, reasonableness, and for material unbalancing.

PRICE (STANDARD FORM 33 AND CONTRACT LINE ITEM SCHEDULE).

SUBMITTAL REQUIREMENTS:

Submit the properly filled out and executed SF 33 and Price Proposal Schedule.

EVALUATION CRITERIA:

The contract resulting from this solicitation will be awarded to the responsive Offeror submitting the lowest price.

Pricing must be materially and mathematically balanced. A proposal is unbalanced when it is based on prices significantly less than the cost for some work and prices which are significantly overstated for other work.

(End of Summary of Changes)