15R0019-02_amendment.pdf

PDF 21 KB Posted

Attached to
Bluestone Barge Replacement
Solicitation number
W912BU-15-R-0019
Issued by

About this file

This is amendment 02 for RFP W912BU-15-R-0019.

View the file

Other files

File Type Posted
15R0019-04_amendment.pdf PDF
15R0019-03.pdf PDF
15R0019-01_amendment.pdf PDF
Bluestone_Drifter_As-Builts.zip ZIP file
15R0019_draftRFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W25PHS50167350

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Answ ers to Questions

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-15-R-0019

X 9B. DATED (SEE ITEM 11)

02-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jul-2015

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: JUSTIN CHUNG

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU-15-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 02

The purpose of this amendment is to answer questions that were asked by interested vendors of this solicitation. The answers to the questions are below.

Questions that may be of general interest of all Offerors/Government. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s).

Questions and answers are issued to the Offerors for information purposes only.

Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by signing block 15 below, by acknowledging receipt of this amendment on each copy of the offer submitted or by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE TO

ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION

OF YOUR QUOTE.

Q-1: My understanding is the “Drifter” drawings are provided as guidance drawings [for a modular version of the contract vessel] With certain features excluded as listed in C0006 that will not be part of the “contract vessel.”

Correct?

A-1: Correct.

Q-2: Would All other design arrangements shown on the “drifter” barge drawings be incorporated in the “contract vessel” design. Other than what contractor would provide for the modular version?

A-2: Correct.

Q-3: In reviewing the guidance drawings ,on the deck fitting drawing [D420010] it lists/depicts 2 -10inch double bitts on the bow facing foreaft and 8 kevels, Whereas on the “doors, windows, manhole” drawing [D4150110] , although not part of the material take off schedule that particular drawing shows 4-double bitts facing athwart ship on bow and stern and 6 kevels.

Please advise which deck fitting layout is preferred.

A-3: D420-01 Drawing is correct. Two 10” double bitts on the bow as shown facing foreaft and Eight 24” kevels.

Q-4: With respect to page 46 of the solicitation the “minimum requirements” for sub-factor 1A: Will the Corps consider past performance of construction projects of small barges and vessels that may be very similar and or comparable in size and scope whether modular or not?

A-4: As stated in the solicitation on page 46, minimum requirements for sub-factor 1A- Experience are “Direct and/or subcontractor experience building at least 2 modular steel barges, with rakes, similar in size to 50’x20’x5’ or larger, built in the past five years.”

All other terms and conditions remain the same.

W912BU-15-R-0019

(End of Summary of Changes)