15B0015_IFB.pdf

PDF 316 KB Posted

Attached to
Procurement of Linear Density Polyethylene Liner
Solicitation number
W912BU-15-B-0015
Issued by

About this file

Invitation for bid (IFB) W912BU-15-B-0015.

View the file

Other files

File Type Posted
SF_1410_Completed.pdf PDF
SF_1409_Completed.pdf PDF
15B0015-0002.pdf PDF
15B0015-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BU-15-B-0015 04-Aug-2015

b. TELEPHONE NUMBER

215-656-6773

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 22 Sep 2015

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BU9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JUSTIN CHUNG

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W25PHS51730805

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: JUSTIN CHUNG

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

PEARCE CREEK

PEARCE CREEK CONFINED DISPOSAL FACILITY

CECIL COUNTY MD 21919

TEL: FAX:

215-656-6780FAX:

TEL: 215-656-6773 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

500 employees

NAICS:

314999

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF80

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BU-15-B-0015

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 2,448,931 Square

Yard

Geotextile

FFP

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

FOB: Destination

MILSTRIP: W25PHS51730805

PURCHASE REQUEST NUMBER: W25PHS51730805

NET AMT

0002 7,500 Square

Geotextile Cap Strips

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

FOB: Destination

0003 2,500,000 Linear

Foot

Geotextile Sewing Thread

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

0004 1,110,933 Square

Geomembrane (Smooth)

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

0005 98,229 Square

Geomembrane (Textured)

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

0006 116,000 Linear

Foot

Polyethylene Extrusion Welding Rod

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

0007 2,593 Square

Geogrid

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

0008 11,368 Square

Geocomposite

The contractor shall procure the required supplies listed in the Statement of Work.

The contractor shall deliver the supplies to Pearce Creek Confined Disposal Facility at Cecil County, Maryland.

Section C - Descriptions and Specifications

STATEMENT OF WORK

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.

Contractor's Quality Control (CQC) System Manager to check and approve all items prior to submittal and stamp, sign, and date indicating action taken.

Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as: manufacturer's drawings; descriptive literature including (but not limited to) catalog cuts or diagrams; test reports; samples; O&M manuals (including parts list);

certifications; warranties; and other such required submittals.

Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.

1.2 DEFINITIONS

1.2.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections. Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Pre-Submittals

Submittals which are required prior to or the start of the next major phase of the supply contract, includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

Certificates of insurance

Surety bonds

List of proposed Subcontractors

List of proposed products

Manufacturing progress schedule

Network Analysis Schedule (NAS)

Submittal register

Schedule of prices

Accident Prevention Plan (APP)

Work plan

Quality Control(QC) plan

Environmental protection plan

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

Confined space entry permits.

Text of posted operating instructions.

1.2.2 Approving Authority

Office or designated person authorized to approve submittal.

1.2.3 Work

As used in this section, on- and off-site manufacturing required by contract documents, including labor necessary to produce submittals, except those SD- 01 Pre-Submittals noted above, materials, products, equipment, and systems incorporated or to be incorporated in such.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.

SD-01 Pre Submittals

Submittal Register; G,COR

1.4 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.4.1 Government Approved (G)

Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.

Within the terms of the Contract Clause entitled, "Specifications and Drawings for Manufacturing," they are considered to be "shop drawings."

1.4.2 For Information Only

Submittals not requiring Government approval will be for information only.They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.

1.5 PREPARATION

1.5.1 Transmittal Form

Use the attached sample transmittal form (ENG Form 4025-R) for submitting both Government approved and information only submittals in accordance with the instructions on the reverse side of the form. These forms are included in the QCS software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.

1.6 QUANTITY OF SUBMITTALS

The Contractor shall be responsible for all costs incurred in transmitting the required information for review in the submittal process. Submit all submittals (except SD-04 Samples) to the COR electronically by email in PDF format. If files are too large for email, utilize a file transfer site provided by the Government. In addition, submit hard copies of all submittals in the quantities as specified in the paragraphs below. Maintain hard copies of approved submittals at the field locations (field office, site facilities, dredge, etc.) for use by Contractor and Government personnel. Email addresses, maximum email file size and file transfer site addresses will be provided at the premanufacturing conference. Submittal tracking and transmittal documents (Eng Form 4025) will continue to utilize RMS/QCS as specified in Section 01 45 05 QUALITY CONTROL SYSTEM (QCS).

1.6.1 Number of Copies of SD-02 Shop Drawings

Submit two copies to the Contracting Officer Representative of shop drawings requiring review and approval.

1.6.2 Number of Copies of SD-03 Product Data and SD-08 Manufacturer's Instructions

Submit in compliance with quantity requirements specified for shop drawings.

1.6.3 Number of Samples SD-04 Samples

a. Submit two samples, or two sets of samples showing range of variation, of each required item. One approved sample or set of samples will be retained by approving authority and one will be returned to Contractor.

b. Submit one sample panel or provide one sample installation where directed. Include components listed in technical section or as directed.

c. Submit one sample installation, where directed.

d. Submit one sample of non-solid materials.

1.6.4 Number of Copies SD-05 Design Data and SD-07 Certificates

1.6.5 Number of Copies SD-06 Test Reports and SD-09 Manufacturer's Field Reports

Submit in compliance with quantity and quality requirements specified for shop drawings other than field test results that will be submitted with QC reports.

1.6.6 Number of Copies of SD-10 Operation and Maintenance Data

Submit five copies of O&M Data to the Contracting Officer for review and approval.

1.6.7 Number of Copies of SD-01 Premanufacturing Submittals and SD-11 Closeout Submittals

1.7 FOR INFORMATION ONLY SUBMITTALS

Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;

and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.

1.8 VARIATIONS

Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.243-1 and will be considered where advantageous to Government.

1.8.1 Considering Variations

Discussion with Contracting Officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal

(VECP).

Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.

1.8.2 Proposing Variations

When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.

Check the column "variation" of ENG Form 4025-R for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.

The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.

1.8.3 Warranting That Variations Are Compatible

When delivering a variation for approval, Contractor, warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.

1.8.4 Review Schedule Is Modified

In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.

1.9 SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and (i) as approved. A submittal register showing items of equipment and materials for which submittals are required by the specifications is provided as an attachment. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project as specified herein and in accordance with Section 01 45 05 QUALITY CONTROL SYSTEM (QCS).

The Government will provide the initial submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.

Column (c): Lists specification section in which submittal is required.

Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.

Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.

Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.

1.9.1 Use of Submittal Register

Submit submittal register. Submit with QC plan and project schedule.

Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:

Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.

Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.

1.9.2 Contractor Use of Submittal Register

Update the following fields with each submittal throughout contract.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.

Column (l) List date of submittal transmission.

Column (q) List date approval received.

1.9.3 Approving Authority Use of Submittal Register

Update the following fields.

Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.

Column (l) List date of submittal receipt.

Column (m) through (p) List Date related to review actions.

Column (q) List date returned to Contractor.

1.9.4 Copies Delivered to the Government

Deliver one copy of submittal register updated by Contractor to Government with each invoice request.

1.10 SCHEDULING

Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.

a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.

b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."

c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.

d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."

e. Period of review for each resubmittal is the same as for initial submittal.

1.11 GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note date on which submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. Electronic email will be sent from the Government to the Contractor with the Review Notation, as specified below.

Hard copies of submittals will not be returned. If the Government performs a conformance review of other Designer of Record approved submittals, the submittals will be so identified and returned, as described above.

1.11.1 Review Notations

Government review will be completed within 14 calendar days after date of receipt of submission by the Government. Submittals will be returned to the Contractor with the following notations:

a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.

b. Submittals marked "approved as noted" "or approved except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.

c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.

d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.

1.12 DISAPPROVED SUBMITTALS

Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and manufacturing of work.

Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

The Contractor shall pay an administrative fee to the Government in the amount of $500 for each Contractor resubmittal required in excess of the initial submittal and one resubmittal for required corrections. The Contracting Officer will deduct any assessed administrative fees from the progress payments due the Contractor.

1.13 APPROVED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of manufacturing, materials, detailing and other information are satisfactory.

Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory manufacture of all work.

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.14 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor shall assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.

Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

1.15 WITHHOLDING OF PAYMENT

Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

1.16 STAMPS

Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:

| CONTRACTOR |

| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |

| SIGNATURE: __________________________________________________________ |

| TITLE: ______________________________________________________________ |

| DATE: _______________________________________________________________ |

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 42 00

SOURCES FOR REFERENCE PUBLICATIONS

1.1 REFERENCES

Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.

1.2 ORDERING INFORMATION

The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.

ASTM INTERNATIONAL (ASTM)

100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org

Not used

Not used

SECTION 31 05 19

GEOTEXTILE

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM D4354 (2012) Sampling of Geosynthetics for Testing

ASTM D4355 (2007) Deterioration of Geotextiles from

Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus

ASTM D4491 (1999a; R 2009) Water Permeability of

Geotextiles by Permittivity

ASTM D4533 (2011) Trapezoid Tearing Strength of

Geotextiles

ASTM D4632/D4632M (2008; E 2013; R 2013) Grab Breaking Load and

Elongation of Geotextiles

ASTM D4751 (2012) Determining Apparent Opening Size of a

Geotextile

ASTM D4759 (2011) Determining the Specification

Conformance of Geosynthetics

ASTM D4873 (2002; R 2009) Identification, Storage, and

Handling of Geosynthetic Rolls and Samples

ASTM D6241 (2004; R 2009; E 2014) Standard Test Method for the Static Puncture Strength of Geotextiles and Geotextile-Related Products Using a 50-mm Probe

1.2 SUBMITTALS

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Thread; G,DO

Proposed thread type for sewn seams along with data sheets showing the physical properties of the thread.

Manufacturing Quality Control Sampling and Testing; G,DO

Manufacturer's quality control manual.

SD-04 Samples

Quality Assurance Samples and Tests; G,DO

Samples for quality assurance testing.

Geotextile; G,DO

Manufacturer's certificate of compliance stating that the geotextile meets the requirements of this section. For needle punched geotextiles, the manufacturer shall also certify that the geotextile has been continuously inspected using permanent on-line full-width metal detectors and does not contain any needles which could damage other geosynthetic layers. The certificate of compliance shall be attested to by a person having legal authority to bind the geotextile manufacturer.

Qualifications; G,DO

Qualifications of the manufacturer shall be submitted for

1.3 QUALIFICATIONS

1.3.1 Manufacturer

Manufacturer shall have produced the proposed geotextile sheets for at least 5 completed projects having a total minimum area of 10 million square feet.

1.4 STORAGE AND DELIVERY

Store and deliver geotextile in accordance with ASTM D4873.

1.4.1 Storage

Protect rolls of geotextile, cap strip material, and sewing thread from construction equipment, chemicals, sparks and flames, temperatures in excess of 160 degrees F, or any other environmental condition that may damage the physical properties of the geotextile. To protect geotextile from becoming saturated, either elevate rolls off the ground or place them on a sacrificial sheet of plastic in an area where water will not accumulate.

1.4.2 Delivery

Pack geotextile rolls in an opaque, waterproof, protective plastic wrapping.

The plastic wrapping shall not be removed until deployment. If quality assurance samples are collected, immediately rewrap rolls with the plastic wrapping. Label each roll with the manufacturer's name, geotextile type, roll number, roll dimensions (length, width, gross weight), and date manufactured.

1.4.3 Handling

Handle and unload geotextile rolls with load carrying straps, a fork lift with a stinger bar, or an axial bar assembly. Rolls shall not be dragged along the ground, lifted by one end, or dropped to the ground.

2.1 RAW MATERIALS

2.1.1 Geotextile

Provide geotextile that is a nonwoven pervious sheet of polymeric material consisting of long-chain synthetic polymers composed of at least 95 percent by weight polypropylene. The use of woven slit film geotextiles (i.e.

geotextiles made from yarns of a flat, tape-like character) shall not be used. Stabilizers and/or inhibitors may be added to the base polymer, as needed, to make the filaments resistant to deterioration by ultraviolet light, oxidation, and heat exposure. Regrind material, which consists of edge trimmings and other scraps that have never reached the consumer, may be used to produce the geotextile. Post-consumer recycled material may also be used. Geotextile shall be formed into a network such that the filaments or yarns retain dimensional stability relative to each other, including the edges. Geotextiles shall meet the requirements specified in Table 1. Where applicable, Table 1 property values represent minimum average roll values (MARV) in the weakest principal direction. Values for AOS represent maximum average roll values.

TABLE 1

MINIMUM PHYSICAL REQUIREMENTS FOR DRAINAGE GEOTEXTILE

PROPERTY UNITS ACCEPTABLE VALUES TEST METHOD

GRAB STRENGTH LBS 250 ASTM D4632/D4632M

SEAM STRENGTH LBS 200 ASTM D4632/D4632M

PUNCTURE LBS 700 ASTM D6241

TRAPEZOID TEAR LBS 100 ASTM D4533

APPARENT OPENING

SIZE U.S. SIEVE 70-100 ASTM D4751

PERMITTIVITY SEC -1 0.7 ASTM D4491

ULTRAVIOLET

DEGRADATION PERCENT 50 AT 500 HRS ASTM D4355

2.1.2 Thread

Thread for sewn seams shall be high-strength polyester, nylon, or other approved thread type. Thread shall have ultraviolet light stability equivalent to the geotextile and the color shall contrast with the geotextile.

2.1.3 Geotextile Cap Strips

Geotextile cap strips shall be the same geotextile material as specified in Paragraph "Geotextile" and shall be provided in rolls having approximate dimensions of 5 feet x 300 feet. If the Contractor provides DRAINTUBE in lieu of geocomposite gas venting panel as specified in Section 31 05 25, geotextile cap strips are not required and shall not be included in the Contractor's bid.

2.2 MANUFACTURING QUALITY CONTROL SAMPLING AND TESTING

The Manufacturer is responsible for establishing and maintaining a quality control program to assure compliance with the requirements of the specification. Documentation describing the quality control program shall be made available upon request. Perform manufacturing quality control sampling and testing in accordance with the manufacturer's approved quality control manual. As a minimum, geotextiles shall be randomly sampled for testing in accordance with ASTM D4354, Procedure A. Acceptance of geotextile shall be in accordance with ASTM D4759. Tests not meeting the specified requirements will result in the rejection of applicable rolls.

3.1 DELIVERY

Geotextile material shall be manufactured and delivered at a maximum rate of 90 acres per month. All of the geotextile cap strip material and geotextile sewing thread shall be manufactured and delivered as 1 shipment and with the first shipment of geotextile. The Contractor shall coordinate deliveries of geotextile, cap strip, and sewing thread with the Contracting Officer Representative (COR).

3.2 MEASUREMENT AND PAYMENT

The work specified in this section for geotextile and geotextile cap strips will be measured for payment by the square yard of geotextile and geotextile cap strips provided and delivered to the site. Payment for this work will be made at the contract price per square yard for the Bid Items titled "Geotextile" and "Geotextile Cap Strips". The work specified in this section for geotextile sewing thread will be measured for payment by the linear foot of geotextile sewing thread provided and delivered to the site.

Payment for this work will be made at the contract price per linear foot for the Bid Item titled "Geotextile Sewing Thread".

SECTION 31 05 20

GEOMEMBRANE

1.1 REFERENCES

The publications listed below form a part of this specification to the

ASTM D1004 (2013) Initial Tear Resistance of Plastic

Film and Sheeting

ASTM D1505 (2010) Density of Plastics by the Density-

Gradient Technique

ASTM D1603 (2012) Carbon Black Content in Olefin

Plastics

ASTM D3895 (2007) Oxidative-Induction Time of

Polyolefins by Differential Scanning Calorimetry

ASTM D4218 (1996; R 2008) Determination of Carbon Black

Content in Polyethylene Compounds by the Muffle-Furnace Technique

ASTM D4833/D4833M (2007; E 2013; R 2013) Index Puncture

Resistance of Geotextiles, Geomembranes, and Related Products

ASTM D5199 (2012) Measuring Nominal Thickness of

Geosynthetics

ASTM D5323 (1992; R 2011) Standard Practice for

Determination of 2% Secant Modulus for Polyethylene Geomembranes

ASTM D5397 (2007; R 2012) Evaluation of Stress Crack

Resistance of Polyolefin Geomembranes Using Notched Constant Tensile Load Test

ASTM D5596 (2003; R 2009) Microscopic Evaluation of the

Dispersion of Carbon Black in Polyolefin Geosynthetics

ASTM D5617 (2004); R 2010) Standard Test Method for

Multi-Axial Tension Test for Geosynthetics

ASTM D5721 (2008; R 2013) Air-Oven Aging of Polyolefin Geomembranes

ASTM D5885 (2006; R 2012) Oxidative Induction Time of

Polyolefin Geosynthetics by High-Pressure Differential Scanning Calorimetry

ASTM D5994 (2010) Measuring Core Thickness of Textured

Geomembrane

ASTM D6693 (2012) Determining Tensile Properties of

Nonreinforced Polyethylene and Nonreinforced Flexible Polypropylene Geomembranes

ASTM D7238 (2006; R 2012) Standard Test Method for

Effect of Exposure of Unreinforced Polyolefin Geomembrane Using Fluorescent UV Condensation Apparatus

ASTM D7466 (2010) Standard Test Method for Measuring

Asperity Height of Textured Geomembranes

1.2 SUBMITTAL REQUIREMENTS

Submit manufacturer' qualification statements, including resumes of key personnel involved in the project, a minimum of 14 days prior to the first geomembrane shipment. The following shall also be submitted:

a. Manufacturer's QC manuals, a minimum of 14 days prior to the first geomembrane shipment.

b. Geomembrane samples.

c. Manufacturer's certified raw and sheet material test reports and a copy of the QC certificates, a minimum of 14 days prior to the first shipment of geomembrane to the site.

1.3 SUBMITTALS

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Materials; G,DO

Manufacturer's Quality Control Manual; G,DO

Samples; G,DO

Samples of smooth and textured geomembrane at least 30 days prior to delivery to the project site. Samples shall be 8 inches x 8 inches.

SD-06 Test Reports

Samples; G,DO

1.4 QUALIFICATIONS

1.4.1 Manufacturer

In their bids the Contractor shall provide supporting information that proves that they have experience or the manufacturer that they are procuring the material from has completed 5 projects with a total minimum area of 10 million square feet.

1.4.2 QC Inspector

The QC inspector is the qualified person or corporation hired by the installation Contractor, who is responsible for monitoring and documenting activities related to the QC of the geomembrane through delivery.

Inspection and acceptance prior to unloading of material shall be performed by the installer's QC inspector.

1.5 STORAGE AND DELIVERY

1.5.1 Storage

Temporary storage at the project site shall be on a level surface, free of sharp objects where water cannot accumulate. The geomembrane shall be protected from puncture, abrasion, excessive heat or cold, material degradation, or other damaging circumstances. Storage shall not result in crushing the core of roll goods or flattening of the rolls. Rolls shall not be stored more than two high. Palleted materials shall be stored on level surfaces and shall not be stacked on top of one another. Ultraviolet sensitive materials (i.e., PVC) shall be covered with a sacrificial opaque and waterproof covering or placed in a temporary shelter. Damaged geomembrane shall be removed from the site and replaced with geomembrane that meets the specified requirements.

1.5.2 Delivery

The QC inspector shall be present during delivery and unloading of the geomembrane. Each geomembrane roll/panel shall be labeled with the manufacturer's name, product identification number, roll/panel number, and roll dimensions.

2.1 MATERIALS

2.1.1 Raw Materials

Resin used in manufacturing geomembrane sheets shall be made of virgin uncontaminated ingredients. No more than 10 percent regrind, reworked, or trim material in the form of chips or edge strips shall be used to manufacture the geomembrane sheets. All regrind, reworked, or trim materials shall be from the same manufacturer and exactly the same formulation as the geomembrane sheet being produced. No post consumer materials or water-soluble ingredients shall be used to produce the geomembrane. Submit a copy of the test reports and QC certificates for materials used in the manufacturing of the geomembrane shipped to the site.

2.1.2 Sheet Materials

Geomembrane sheets shall be unreinforced linear low density polyethylene (LLDPE) and manufactured as wide as possible to minimize factory and field seams. Minimum roll width shall be at least 22.5 feet. Geomembrane sheets shall be uniform in color, thickness, and surface texture. For slopes greater than or equal to 1V on 8H, sheets shall be textured on both faces.

The textured surface features shall consist of raw materials identical to that of the parent sheet material and shall be uniform over the entire face of the geomembrane. The sheets shall be free of and resistant to fungal or bacterial attack and free of cuts, abrasions, holes, blisters, contaminants and other imperfections. Geomembrane sheets shall conform to the requirements listed in Table 1 and 2 for Manufacturing Quality Control

(MQC).

TABLE 1 - SMOOTH LLDPE GEOMEMBRANE PROPERTIES

PROPERTY TEST VALUE MQC TESTING

FREQUENCY

(MIN.)

TEST METHOD

Thickness (min ave) 40 mils per roll ASTM D5199

Lowest individual of 10 values

-10 percent per roll ASTM D5199

Density (max) 0.939 g/cc per 200,000 lb ASTM D1505

Tensile Properties(1)(min ave) per 20,000 lb ASTM D6693 yield stress N/A break stress 152 lb/in yield elong N/A break elong 800 percent

TABLE 1 - SMOOTH LLDPE GEOMEMBRANE PROPERTIES

FREQUENCY

(MIN.)

TEST METHOD

2% Modulus (max) 2400 lb/in per year and change in formulation

ASTM D5323

Tear Resistance (min ave) 22 lb per 45,000 lb ASTM D1004

Puncture Resistance(min ave) 56 lb per 45,000 lb ASTM D4833/D4833M

Axi-Symmetric Break Resistance Strain (min)

30% per year and change in formulation

ASTM D5617

Stress Crack Resistance (2) N/A per 200,000 lb ASTM D5397 (Appendix)

Carbon Black Content 2.0-3.0 percent per 20,000 lb ASTM D1603 (3)

Carbon Black Dispersion Note (4) per 45,000 lb ASTM D5596

Oxidative Induction Time (OIT)(min ave)(5) per 200,000 lb

-Std OIT 100 min ASTM D3895

-High Pres OIT 400 min ASTM D5885

Oven Aging at 185 deg F (min ave) (5), (6) per year and change in formulation

ASTM D5721

Std OIT 35 percent at 90 days

ASTM D3895

or High Pres OIT 60 percent at 90 days

ASTM D5885

UV Resistance (min ave) (7) per year and change in formulation

ASTM D7238

High Pres OIT(8)(9) 35 percent at 1600 hours

ASTM D5885

TABLE 2 - TEXTURED LLDPE GEOMEMBRANE PROPERTIES

FREQUENCY

(MIN.)

TEST METHOD

Nominal Thickness 40 mils

Thickness (min ave) -5 percent of nominal per roll ASTM D5994

Lowest individual for 8 out of 10 values

-10 percent of nominal per roll ASTM D5994

Lowest individual of 10 values

-15 percent of nominal per roll ASTM D5994

Asperity Height (min ave) (10)

10 mils every second roll

ASTM D7466 (11)

Density (max) 0.939 g/cc per 200,000 lb ASTM D1505

Tensile Properties(1)(min ave) per 20,000 lb ASTM D6693 Type IV yield stress N/A break stress 60 lb/in yield elongation N/A break elongation 250 percent

2% Modulus (max) 2400 lb/in per year and change in formulation

ASTM D5323

Tear Resistance (min ave) 22 lb per 45,000 lb ASTM D1004

Puncture Resistance(min ave)

44 lb per 45,000 lb ASTM D4833/D4833M

Axi-Symmetric Break Resistance Strain (min)

30% per year and change in formulation

ASTM D5617

Stress Crack Resistance (2) N/A per 200,000 lb ASTM D5397 (Appendix)

Carbon Black Content 2.0-3.0 percent per 20,000 lb ASTM D1603 (3)

Carbon Black Dispersion Note (4) per 45,000 lb ASTM D5596

TABLE 2 - TEXTURED LLDPE GEOMEMBRANE PROPERTIES

FREQUENCY

(MIN.)

TEST METHOD

Oxidative Induction Time (OIT)(min ave)(5) per 200,000 lb

Std OIT 100 min ASTM D3895 or High Pres OIT 400 min ASTM D5885

Oven Aging at 185 deg F (min ave) (5), (6) per year and change in formulation

ASTM D5721

Std OIT 35 percent at 90 days

ASTM D3895

or High Pres OIT 60 percent at 90 days

ASTM D5885

UV Resistance (min ave) (7) per year and change in formulation

ASTM D7238

High Pres OIT(8)(9) 35 percent at 1600 hours

ASTM D5885

TABLE 1 AND TABLE 2 NOTES

MQC Manufacturing Quality Control

Note (1) Minimum average machine direction and minimum average cross machine direction values shall be based on 5 test specimens in each direction. For HDPE geomembrane, yield elongation is calculated using a gauge length of 1.3 inches. For HDPE geomembrane, break elongation is calculated using a gauge length of 2.0 inches. For LLDPE geomembrane, break elongation is calculated using a gage length of 2.0 inches at 2 inches/min.

Note (2) For HDPE geomembrane, the yield stress used to calculate the applied load for test method ASTM D5397 (Appendix), shall be the manufacturer's mean value. ASTM D5397 does not need to be run on LLDPE geomembrane.

Note (3) Other methods such as ASTM D4218 or microwave methods are acceptable if an appropriate correlation to ASTM D1603 can be established.

Note (4) Carbon black dispersion for 10 different views:

- minimum 9 of 10 in Categories 1 or 2

- 1 in Category 3

TABLE 1 AND TABLE 2 NOTES

Note (5) The manufacturer has the option to select either one of the OIT methods to evaluate the antioxidant content.

Note (6) Evaluate samples at 30 and 60 days and compare with the 90 day response.

Note (7) The condition of the test shall be a 20 hour UV cycle at 167 degrees F followed by a 4 hour condensation cycle at 140 degrees F.

Note (8) The standard OIT test (ASTM D3895) shall not be used in determining UV resistance.

Note (9) UV resistance is based on percent retained value regardless of the original HP-OIT value.

Note (10) Textured Geomembrane Only: Of 10 readings; 8 out of 10 must be 7 mil, and lowest individual reading must be 5 mil.

Note (11) Textured Geomembrane Only: Alternate the measurement side for double sided textured sheet.

2.2 MANUFACTURING, SAMPLING, AND TESTING

2.2.1 Raw Materials

Raw materials shall be tested in accordance with the approved MQC manual.

Any raw material which fails to meet the geomembrane manufacturer's specified physical properties shall not be used in manufacturing the sheet.

Polyethylene extrusion welding rod shall be manufactured of materials which are essentially identical to that used in the geomembrane sheet.

Polyethylene extrusion welding rod shall be tested for density, melt index and carbon black content in accordance with the approved MQC manual.

Polyethylene extrusion welding rod which fail to meet the corresponding property values required for the sheet material, shall not be used for seaming.

2.2.2 Sheet Material

Geomembrane sheets shall be tested in accordance with the approved MQC manual. As a minimum, MQC testing shall be conducted at the frequencies shown in Table 1 or Table 2, as applicable. Sheets not meeting the minimum requirements specified in Table 1 or Table 2 shall not be sent to the site.

Geomembrane (smooth) material shall be manufactured and delivered at a maximum rate of 40 acres per month. Geomembrane (textured) material shall be manufactured and delivered at a maximum rate of 5 acres per month. All of the polyethylene extrusion welding rod shall be manufactured and delivered as 1 shipment with the first shipment of geomembrane. The Contractor shall coordinate deliveries of geomembrane and polyethylene extrusion welding rod with the COR.

The work specified in this section for geomembrane will be measured for payment by the square yard of geomembrane provided and delivered to the site. Payment for this work will be made at the contract price per square yard for the Bid Item titled "Geomembrane". The work specified in this section for polyethylene extrusion welding rod will be measured for payment by the linear foot of polyethylene extrusion welding rod provided and delivered to the site. Payment for this work will be made at the contract price per square yard for the Bid Item titled "polyethylene Extrusion Welding Rod".

GEOGRID SOIL REINFORCEMENT

The publications listed below form a part of this specification to the

ASTM D6637 (2011) Standard Test Method for Determining

Tensile Properties of Geogrids by the Single or Multi-Rib Tensile Method

ASTM D7748/D7748M (2014) Flexural Rigidity of Geogrids, Geotextiles, and Related Products submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that

Manufacturer; G,DO

Geogrid Reinforcement; G,DO

Certificates of Compliance; G,DO

In their bids the Contractor shall provide supporting information that proves that they or the manufacturer has experience procuring the material from 5 projects with a total minimum area of 10 million square feet.

1.4 LABELING

Label each roll with…