W912BU-10-R-0034-0001.pdf
PDF 24 KB Posted
- Attached to
- Stop Logs for Nashville District
- Solicitation number
- W912BU-10-R-0034
About this file
Amendment 01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BU-10-R-0034.pdf | ||
| Drawings.zip | ZIP file | |
| TNSLOGS TSpecs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: ADRIANA A. DUNAWAY
100 PENN SQUARE EAST
CENAP-CT
PHILADELPHIA PA 19107-3390
W25PHS00990144
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Amend Clause F03 Place of Delivery
2. Extend the date set for receipt of proposals from 03 August 2010 to 06 August 2010. Time remains the same.
3. Answ er questions from Bidders
All other terms and conditions remains the same.
Offeror must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: in the space provided on the SF 33, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE
AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jul-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-10-R-0034
X 9B. DATED (SEE ITEM 11)
01-Jul-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jul-2010
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE E5CTSAAD
FACILITY CODECODE
EMAIL:TEL:
W912BU-10-R-0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Aug-2010 02:00 PM to 06-Aug-2010 02:00 PM.
Solicitation Clause F03, in Section F, shall be amended as follows:
F03 PLACE OF DELIVERY
The Contractor shall deliver the stop logs and chain assemblies ready for service at the following location:
U.S. Army Corps of Engineers U.S. Army Engineer District, NASHVILLE
Tennessee River Operations Center At Wilson Lock
Tennessee River, Mile Mark 259.4R (Florence, Alabama)
The total stop log order shall be delivered to this final location by barge. It is not possible to truck the stop logs into the Operations Center. The Government shall be responsible for off loading the stop logs from the contractor’s delivery barge or barges.
Please note that in Section L of the solicitation, under paragraph B(4) Management, subparagraph 4 – the offeror’s approach to delivery of the stop logs shall be identified and discussed.
Answers to the offerors’ questions are as follows:
(These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s).
Questions and answers are issued to the Offerors for information only.
Question #1 – Specification 09 97 02 lists the requirements for a paint system. Are the second and third coats intended to be non-immersion coatings?
Answer – The Corps would like the coating system as outlined in Specification 09 97 02.
Question #2 – The solicitation states in several locations (Specification 35 20 14, page 6 and Section F, Clause F03) that the stop logs are to be delivered to Wilson Lock on the Tennessee River. Can the logs be delivered by truck to this location or does the total order need to be delivered by barge? Will the Government be responsible for offloading trucks or a barge?
Answer - The stops logs are required to be delivered fully assembled to Wilson Lock on the Tennessee River. The stop logs cannot be trucked into the Tennessee River Operations Center at that location due to physical constraints.
The total stop log order shall be by barge or barges. The Government will be responsible for off loading the stop logs from the delivery barge or barges, once they arrive at the Tennessee River Operations Center.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .