10-R-0012-JOC-TECH-SPEC.pdf

PDF 3 MB Posted

Attached to
8(a) Job Order Contract (JOC) for Joint Base M-D-L, Wrightstown, NJ
Solicitation number
W912BU-10-R-0012
Issued by

About this file

10-R-0012 JOC Technical Specifications

View the file

Other files

File Type Posted
10-R-0012-Amend6.pdf PDF
10-R-0012 AmndNo0005.pdf PDF
10-R-0012-Amend4.pdf PDF
JocTool_1.6.exe EXE file
10-R-0012-Amend3.pdf PDF
10-R-00012-Amend1.pdf PDF
10-R-0012-Amend2.pdf PDF
10-R-0012-Spec.pdf PDF
10-R-0012-UPB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOB ORDER CONTRACT

TECHNICAL SPECIFICATIONS

FORT DIX

DECEMBER 2008

PREPARED BY:

U.S. COST INCORPORATED

WWW.USCOST.COM

Job Order Contract Specifications

U.S. COST Page 1

TABLE OF CONTENTS

Table of Contents

DIVISION 01 GENERAL CONDITIONS

Section 01200 Warranty Of Construction Zero Accidents Index

DIVISION 02 SITE WORK

Section 02012 Standard Penetration Tests Section 02075 Concrete Core Drilling Section 02080 Asbestos Removal And Disposal Section 02110 Clearing And Grubbing Section 02114 Lead-Based Paint (Lbp) Removal And Disposal Section 02210 Site Grading Section 02211 Rock Removal Section 02215 Finish Grading For Structures And Slabs Section 02220 Site Excavation And Fill Section 02221 Excavation, Trenching, And Backfilling For Utilities Systems Section 02222 Structural Excavation Section 02224 Pipe Sleeves For Utility Lines Section 02227 Field Tests Section 02240 Soil Stabilization - Crushed Rock Subgrade Section 02243 Soil Stabilization - Hydrated Lime Section 02250 Soil Stabilization - Vibroflotation Section 02251 Soil Sterilization Section 02270 Sediment Control Section 02272 Gabions Section 02274 Riprap Section 02275 Soil - Cement Surfacing Section 02450 Railroads Section 02511 Portland Cement Concrete Overlays Section 02512 Steel Reinforced Portland Cement Concrete Overlays Section 02513 Fibrous Reinforced Portland Cement Concrete Overlays Section 02514 Asphaltic Concrete Overlays Section 02515 Crushed Stone Paving Section 02520 Portland Cement Concrete Sidewalks Section 02521 Asphalt Concrete Sidewalks Section 02522 Miscellaneous Sidewalks Section 02523 Precast Sidewalks And Pavers Section 02525 Concrete Curbs And Gutters Section 02570 Portland Cement Concrete Section 02575 Bridge Deck Asphalt Concrete Wearing Surfaces Section 02576 Crack Sealing Of Asphalt Concrete Pavements Section 02577 Patching Of Asphalt Concrete Pavements Section 02578 Spray Applications, Seal Coats And Surface Treatments Section 02579 Slurry Seals Section 02580 Asphalt Curbs Section 02581 Cold Milling Of Bituminous Pavements Section 02582 Bituminous Rejuvenation Section 02583 Cold Mix Recycling Section 02584 Central Plant Hot-Mix Recycling Section 02661 Water Lines Section 02665 Water Reservoirs And Tanks Section 02666 Chilled Water Lines

2 Page U.S. COST

Section 02670 Well Repair Section 02672 Water Wells Section 02685 Gas Distribution Lines Section 02710 Foundation Drainage Systems Section 02712 Underslab Drainage Section 02720 Storm Drains Section 02724 Force Mains And Inverted Siphons Section 02725 Sand Drains Section 02726 Wastewater Collection Section 02727 Erosion Control Section 02730 Sewer Line Manholes Section 02735 Sewer Line Grouting Section 02737 Sewer Line Cleaning Section 02740 Septic Tanks And Grease Traps Section 02742 Siphon Tank And Siphons Section 02744 Grease Interceptors Section 02745 Imhoff Tanks Section 02766 Sewer Line Pipe Lining Section 02774 Sewage Treatment Lagoons Section 02830 Fences And Gates Section 02831 Steel Chain-Link Fencing Section 02832 Steel Rod And Bar Fencing Section 02833 Wrought Iron Rod And Bar Fencing Section 02834 Pre-Cast Concrete And Masonry Fencing Section 02835 Permanent Wood Fencing Section 02836 Snow And Other Temporary Fencing Section 02837 Farm-Type Wire Fencing Section 02840 Electrical Traffic Control Signals Section 02850 Traffic Signs Section 02860 Playing Fields Section 02861 Recreational Facilities Section 02921 Topsoil Section 02933 Sodding And Seeding Section 02940 Landscape Irrigation System Section 02950 Pavement Markings

DIVISION 03 CONCRETE

Section 03105 Concrete Formwork Section 03130 Concrete Accessories Section 03205 Concrete Reinforcement Section 03227 Steel Stressing Tendons For Prestressed Concrete Section 03305 Cast-In-Place Concrete Section 03334 Concrete Curing Section 03351 Exposed Aggregate Concrete Section 03352 Rusticated Concrete Finishes Section 03353 Solid Board Concrete Finishes Section 03354 Flexural Concrete Section 03356 Grout Section 03362 Shotcrete Section 03372 Specially Placed Concrete Section 03399 Roller-Compacted Concrete Section 03405 Precast Architectural Concrete Section 03415 Precast-Prestressed Concrete

U.S. COST Page 3

Section 03425 Miscellaneous Precast Items Section 03505 Precast Lightweight Roof Slabs Section 03510 Gypsum Concrete Decks Section 03520 Insulating Concrete Roof Decks Section 03530 Cementitious Wood Fiber Roof Deck Systems Section 03705 Concrete Restoration And Cleaning Section 03730 Concrete Topping

DIVISION 04 MASONRY

Section 04190 Scaffolding - Tubular Steel Section 04202 Unit Masonry Section 04210 Brickwork Section 04250 Terra Cotta Section 04405 Stonework Section 04510 Masonry Restoration

DIVISION 05 METALS

Section 05020 Anchor Bolts And Expansion Anchors Section 05120 Structural Steel Section 05130 Steel Deck Section 05155 Steel Joists Section 05180 Miscellaneous Standard Metal Articles Section 05210 Steel Trusses Section 05518 Pipe And Tube Railings Section 05520 Metal Stairs Section 05528 Ornamental Handrail And Railings Section 05530 Grating Section 05540 Castings Section 05556 Ornamental Sheet Metal Section 05814 Expansion Joint Covers Section 05910 Water Treatment Plant Debris Racks

DIVISION 06 WOOD & PLASTIC

Section 06056 Timber Bridge Components Section 06116 Light Wooden Structures Framing Section 06140 Sheathing, Siding, And Subflooring Section 06181 Wood Trusses Section 06220 Millwork Section 06240 Cabinets Section 06250 Wood Paneling

DIVISION 07 THERMAL & MOISTURE PROTECTION

Section 07110 Bituminous Waterproofing Section 07111 Bituminous Membrane Waterproofing Section 07115 Plastic Sheet Waterproofing Section 07120 Fluid-Applied Waterproofing Section 07125 Metal Waterproofing Section 07130 Bentonite Clay Waterproofing Section 07160 Bituminous Dampproofing Section 07170 Silicone Dampproofing Section 07175 Water-Repellent Coating Dampproofing Section 07180 Cementitious Dampproofing Section 07192 Bituminous Vapor Barrier For Roofs Section 07193 Laminated Sheet Vapor Barrier For Roofs Section 07194 Polyvinyl Sheet Vapor Barrier For Roofs Section 07196 Bituminous Vapor Barriers

4 Page U.S. COST

Section 07197 Laminated Sheet Vapor Barriers Section 07198 Plastic Sheet Vapor Barriers Section 07210 Batt And Blanket Building Insulation Section 07211 Loose Or Granular Fill Insulation Section 07212 Rigid Insulation Section 07213 Perimeter Insulation Section 07215 Sprayed-On Insulation Section 07223 Roof Insulation And Underlayment Cellular Glass Section 07224 Roof Insulation And Underlayment - Mineral Fiber Section 07225 Roof Insulation And Underlayment - Composite Board Section 07226 Roof Insulation And Underlayment Expanded Perlite Board Section 07227 Roof Insulation And Underlayment Fiberboard Section 07256 Sprayed-On Fireproofing Section 07310 Steel Shingles Section 07311 Asphalt Shingles Section 07314 Slate Shingles Section 07321 Clay Roofing Tiles Section 07322 Concrete Roofing Tiles Section 07410 Preformed Roofing And Siding Section 07463 Asbestos Cement Roofing And Siding Section 07510 Built-Up Roofing Section 07530 Single Ply Roofing Section 07550 Inverted Roof Systems Section 07572 Wood Traffic Topping Section 07573 Composition Traffic Topping Section 07574 Precast Concrete Or Tile Traffic Topping Section 07605 Sheet Metal Section 07705 Roof Accessories Section 07811 Plastic Skylights Section 07812 Metal-Framed Skylights Section 07920 Sealants

DIVISION 08 DOORS & WINDOWS

Section 08110 Hollow Metal Doors And Frames Section 08115 Aluminum Doors And Frames Section 08220 Wood Doors And Frames Section 08312 Aluminum And Wood Sliding Glass Doors Section 08316 Sliding Fire Doors Section 08317 Security Vault Doors Section 08330 Coiling (Rolling) Doors Section 08356 Flexible Doors Section 08360 Overhead Doors Section 08375 Hangar Doors Section 08379 Wood Safety Glass Doors Section 08385 Sound Retardant Doors Section 08386 Aluminum Safety Glass Doors Section 08390 Screen And Storm Doors Section 08410 Entrances Section 08471 Revolving Doors Section 08512 Metal Windows Section 08520 Aluminum Windows Section 08610 Wood Windows Section 08710 Finish Hardware

U.S. COST Page 5

Section 08810 Glass And Glazing Section 08915 Aluminum Window Walls/Curtain Walls

DIVISION 09 FINISHES

Section 09210 Plaster Repairs Section 09260 Gypsum Drywall And Metal Studs Section 09310 Ceramic Tile Section 09315 Tile Flooring Section 09320 Ceramic Wall Tile Section 09405 Terrazzo Section 09510 Acoustical Ceilings Section 09530 Acoustical Insulation And Barriers Section 09535 Sound Absorbing Panels Section 09560 Wood Strip Flooring Section 09566 Wood Block Industrial Flooring Section 09570 Wood Parquet Flooring Section 09596 Gymnasium Flooring Section 09598 Softwood Flooring Section 09651 Resilient Flooring - Cementitious Underlayment Section 09660 Resilient Flooring Section 09670 Fluid-Applied Resilient Flooring Section 09675 Conductive Vinyl Tile Flooring Section 09680 Colors Section 09685 Carpeting Section 09710 Magnesium Oxychloride Flooring Section 09720 Epoxy Flooring Section 09731 Conductive Elastomeric Liquid Flooring Section 09740 Heavy-Duty Concrete Floor Topping Section 09741 Armored Flooring Section 09750 Brick Flooring Section 09751 Light-Duty Brick Flooring Section 09791 Standard Floor Treatment Section 09792 Floor Treatment Non-Slip Coatings On Concrete Floors Section 09793 Floor Treatment - Refinishing Wood Floors Section 09910 Exterior Painting Section 09915 Color Schedule Section 09920 Interior Painting Section 09941 Painting Of Water Storage Tank Interior Surfaces Section 09942 Painting Of Water Storage Tank Exterior Surfaces Section 09970 Wall Coverings

DIVISION 10 SPECIALTIES

Section 10160 Compartments And Cubicles For Shower And Toilet Rooms Section 10260 Wall And Corner Protection Section 10275 Access And Pedestal Floors Section 10351 Flagpoles Section 10410 Directory And Bulletin Boards Section 10430 Signs Section 10440 Interior Signage Section 10452 Security Screens Section 10505 Metal Lockers Section 10520 Fire Extinguishers, Cabinets, And Accessories Section 10550 Postal Specialties Section 10605 Wire Mesh Partitions

6 Page U.S. COST

Section 10615 Demountable Partitions Section 10630 Movable Metal Partitions Section 10677 Metal Storage Shelving Section 10820 Toilet Accessories Section 10911 Wardrobes

DIVISION 11 EQUIPMENT

Section 11024 Vault Door Units Section 11061 Theater, Auditorium Seating Section 11106 Refrigerators Section 11132 Projection Screens Section 11150 Parking Control Equipment Section 11160 Platform And Dock Lifts Section 11161 Platform And Dock Levelers Section 11164 Platform And Dock Enclosures Section 11165 Platform And Dock Bumpers Section 11166 Platform And Dock Warning Devices Section 11167 Platform And Dock Guardrails And Posts Section 11402 Food Service Equipment Section 11415 Unit Kitchens Section 11420 Ranges And Ovens Section 11484 Gymnasium Equipment Section 11486 Demountable Bleachers (Exterior) Section 11498 Fixed Wood Bleachers (Exterior) Section 11501 Paint Spray Booth Section 11600 Metal Medical Casework Section 11700 Laboratory And Medical Equipment Section 11910 Dishwashers Section 11912 Garbage Disposers Section 11920 Clothes Dryers Section 11922 Clothes Washers Section 11980 Target Firing Ranges (Exterior)

DIVISION 12 FURNISHINGS

Section 12500 Window Treatment Section 12531 Window Treatment Hardware

DIVISION 13 SPECIAL CONSTRUCTION

Section 13090 Radiation Protection Section 13112 Pre-Engineered Structures Section 13152 Swimming Pool Accessories Section 13182 Sludge Incinerators Section 13204 Concrete/Steel, Above Ground Storage Tank Section 13205 Settling Chamber Section 13221 Water Treatment Plant Filters Section 13222 Pressure Filters Section 13227 Backwash Tanks Section 13320 Sewage Treatment Plant Electrical Controls And Instrumentation Section 13321 Water Treatment Plant Electrical Controls And Instrumentation Section 13322 Flow Measurement Device Section 13800 Floor Safes Section 13955 Vehicle Barriers

DIVISION 14 CONVEYING SYSTEMS

Section 14210 Passenger Elevators – Electric Section 14211 Passenger Elevators - Hydraulic

U.S. COST Page 7

Section 14212 Freight Elevators Section 14401 Personnel Lifts Section 14402 Wheel Chair Lifts Section 14416 Vehicular Lifts Section 14611 Material Handling Hoists Section 14650 Ash Hoists Section 14660 Cranes And Hoists

DIVISION 15 MECHANICAL

Section 15060 Mechanical Piping Section 15100 Valves Section 15120 Piping Accessories Section 15160 Pumps Section 15261 Insulation For Aboveground Pipe Section 15262 Insulation For Underground Pipe Section 15281 Boiler Firebox Insulation Section 15290 Ductwork Insulation Section 15301 Fire Protection Systems Section 15401 Interior Plumbing Section 15451 Steel Tanks Section 15452 Plastic Tanks Section 15475 Pool Equipment Section 15481 Compressed Air Equipment Section 15556 Fire Tube Boilers Section 15557 Water Tube Boilers Section 15558 High Temperature Water Boilers Section 15559 Cast-Iron Boilers And Fireboxes Section 15560 Cleaning Of Boilers Section 15565 Firebrick Fireboxes For Boilers Section 15566 Firebrick For Insulation Of Boiler Fireboxes Section 15571 Oil-Fired And Gas-Fired Burners For Boilers Section 15572 Coal-Firing Systems For Boilers Section 15573 Draft Control Equipment Section 15576 Breeching Section 15577 Stacks Section 15580 Boiler Feedwater Equipment Section 15581 Gas Meters And Regulators Section 15590 Fuel Handling Systems Section 15610 Warm Air Furnaces Section 15621 Gas Unit Heaters Section 15622 Oil Unit Heaters Section 15661 Air-Cooled Condensing Units Section 15670 Condensers Section 15680 Refrigerant Equipment Section 15683 Refrigeration Specialties Section 15711 Natural Draft Cooling Towers Section 15712 Forced Draft And Induced Draft Cooling Towers Section 15751 Coils Section 15760 Steam And Hot Water Unit Heaters Section 15765 Cleaning Of Heat Exchangers Section 15780 Air Dehydration Equipment (ADhE) Section 15781 Packaged Heating And Cooling Units Section 15782 Packaged Heat Pumps

8 Page U.S. COST

Section 15800 Humidity Control Equipment Section 15830 Radiators Section 15834 Air Curtains Section 15840 Induction Units Section 15855 Air Handling Units Section 15860 Centrifugal Fans Section 15865 Axial Flow Fans Section 15871 Power Roof Ventilators Section 15881 Diffusers, Registers, Grilles, And Louvers Section 15886 Air Cleaning Devices Section 15887 Tailpipe Exhaust Equipment Section 15890 Ductwork And Accessories Section 15915 Control And Fire Dampers Section 15920 Sound Attenuators Section 15951 Control Devices For Mechanical Equipment Section 15990 Testing And Balancing Of Hvac Systems

DIVISION 16 ELECTRICAL

Section 16032 Wiring Systems Equipment Section 16110 Overhead Electrical Distribution Systems Section 16111 Fiber Optic Data Transmission System Section 16115 Underground Electrical Distribution Systems Section 16121 Institutional Electric Heating Equipment Section 16123 Electrical Distribution System Grounding Section 16233 Clock And Program Systems Section 16300 Motor Control Centers, Panelboards And Load Centers Section 16313 Electric Motors Section 16415 Electrical Distribution System Voltage Regulators Section 16416 Transformers Section 16439 Uninterruptible Power System (Ups) Section 16440 Interior Low-Voltage Disconnecting Devices Section 16511 Automatic Transfer And By-Pass/Isolation Switches Section 16513 Motor Generator Sets Section 16600 Luminaire Ballasts And Transformers Section 16610 Luminaires Section 16616 Street And Area Lighting Controls Section 16660 Central Monitoring, Control, And Instrumentation Section 16680 Airfield And Heliport Lighting And Visual Navigation Aids Section 16814 Telephone System, Outside Plant Section 16820 Cathodic Protection System For Underground Utilities Section 16821 Cathodic Protection Of Steel Water Tanks Section 16825 Fire Alarm And Detection Equipment Section 16830 Electric Unit Heaters Section 16840 Lightning Arresters Section 16845 Nurse Call System Section 16850 Public Address Equipment Section 16860 Master Antenna Television System Section 16900 Poles For Street And Area Lighting Systems Section 16916 Electrical Distribution System Substation Equipment Section 16917 Electrical Distribution System Capacitor Banks Section 16925 High-Voltage Disconnecting Devices

DIVISION 19 DEMOLITION

Section 19120 Demolition

U.S. COST Page 9

SPECIFICATION CROSS REFERENCE

Cross Reference Ordered by Unit Price Book Section Cross Reference Ordered by Specification Section

10 Page U.S. COST

DIVISION 01 GENERAL CONDITIONS

U.S. COST Page 11

SECTION 01200 WARRANTY OF CONSTRUCTION ZERO ACCIDENTS INDEX

1.0 WARRANTY OF CONSTRUCTION (APR 1984):

1.1 In Addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph 1.10 below, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workman-ship performed by the Contractor or any subcontractor or supplier at any tier.

1.2 This Warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

1.3 The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-

1.3.1 The Contractor's failure to conform to contract requirements; or

1.3.2 Any defect of equipment, material, workmanship, or design furnished.

1.4 The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

1.5 The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

1.6 If the Contractor fails to remedy any failure, defect, or damage within a time as specified in paragraph: WARRANTY SERVICE CALLS after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.

1.7 With Respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall--

1.7.1 Obtain all warranties that would be given in normal commercial practice;

1.7.2 Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer, and

1.7.3 Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.

1.8 In the Event the Contractor's warranty under paragraph 1.2 above has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.

1.9 Unless a Defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design

12 Page U.S. COST furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

1.10 This Warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

1.11 Defects in Design or manufacture of equipment specified by the Government on a "brand name and model" basis, shall not be included in this warranty. In this event, the Contractor shall require any subcontractors, manufacturers, or suppliers thereof to execute their warranties, in writing, directly to the Government. (Based on FAR 52.246-21)

2.0 WARRANTY SERVICE CALLS: The Contractor shall furnish to the Contracting Officer the names of local service representatives and/or Contractors that are available for warranty service calls and who will respond to a call within the time periods as follows: 4 hours for heating, air-conditioning, refrigeration, air supply and distribution, and critical electrical service systems and food service equipment, and 24 hours for all other systems. The names, addresses, and telephone numbers for day, night, weekend, and holiday service responses shall be furnished to the Contracting Officer and also posted at a conspicuous location in each mechanical and electrical room or close to the unit.

U.S. COST Page 13

14 Page U.S. COST

DIVISION 02 SITE WORK

U.S. COST Page 15

SECTION 02012 STANDARD PENETRATION TESTS

1.0 DESCRIPTION OF WORK: This specification covers core drilling and borings for subsurface investigation of soils.

2.0 PRODUCTS: (Section not used.)

3.0 EXECUTION:

3.1 Auger Borings: ASTM D 1452.

3.2 Soil Samples: ASTM D 1586, ASTM D 1587.

3.3 Rock Cores: ASTM D 2113, Size BX and NX.

3.4 Bearing Capacity: ASTM D 1194.

3.5 Soils Classification: ASTM D 2487, D 2488, MIL-STD-619.

3.6 Boring Logs: Boring report shall include, but not be limited to, a boring location plan locating and numbering boring and boring logs. Log of borings shall have boring number; date of start and finish of boring; rig type, job number and name; sample number, depth, and type; depth of strata changes, soil description and classification, surface elevation, depth of boring, and depth of water table.

16 Page U.S. COST

SECTION 02075 CONCRETE CORE DRILLING

1.0 DESCRIPTION OF WORK: This specification covers the furnishing of equipment and labor for core drilling of existing concrete. Procedures shall be in accordance with the equipment manufacturer's recommendations. Demolition and removal of materials shall be as required to support the work.

2.0 PRODUCTS: (Section not used)

3.0 EXECUTION:

3.1 Preparation:

3.1.1 Equipment shall be of shot-drill or diamond-drill type and shall be acceptable to the Contracting Officer. Shot drilling shall be used on horizontal surfaces only.

3.1.2 Location and Size of Cores shall be as directed by the Contracting Officer.

3.2 Core Drilling:

3.2.1 Drilling shall be performed in a neat manner providing a smooth, clean hole perpendicular to the surface.

3.2.2 Equipment shall be rigidly affixed to the surface to prevent drifting or misalignment of the hole.

3.2.3 Work shall be planned and executed so that dust and rubble are held to a minimum.

3.2.4 Surrounding Surfaces, Material, and Equipment shall be protected from damage from dust, water, and flying debris.

3.3 Test Samples:

3.3.1 Where Cores from Drilling are to be used for testing of existing concrete, the resulting core shall meet the requirements of ASTM C 42.

3.3.2 Test Cores shall be taken at locations as directed by the Contracting Officer.

U.S. COST Page 17

SECTION 02080 ASBESTOS REMOVAL AND DISPOSAL

1.0 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. References to these publications in the text will be by basic designation only. State and Local laws and regulations shall also apply.

1.1 U.S. Government Code of Federal Regulations (CFR):

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

40 CFR 61 National Emission Standards for Hazardous Air Pollutants, Subpart A General Provisions

40 CFR 61 National Emission Standards for Hazardous Air Pollutants, Subpart M National Emission Standard for Asbestos

40 CFR 241 Guidelines for the Land Disposal of Solid Wastes

40 CFR 257 Criteria for Classification of Solid Waste Disposal Facilities and Practices

1.2 American National Standards Institute (ANSI) Publications:

Z9.2 Fundamentals Governing the Design and Operation of Local Exhaust Systems

Z88.2 Practices for Respiratory Protection

1.3 National Institute of Occupational Safety and Health (NIOSH):

Manual of Analytical Methods, 2nd Ed., Vol. 1, Physical and Chemical Analysis Methods

(P&CAM):

Method 239 Asbestos Fibers in Air

Method 7400 Fibers (N1, 3rd Ed., Vol. 1)

1.4 Underwriters' Laboratories, Inc., (UL):

586 Test Performance of High Efficiency, Particulate, Air Filter Units

2.0 GENERAL REQUIREMENTS: This specification covers the removal and disposal of asbestos materials performed under this contract.

2.1 Work Required: Asbestos containing materials (ACM) present within and upon the structures, materials, and equipment to be altered, demolished, or repaired shall be removed and

18 Page U.S. COST disposed of prior to demolition, alteration, or repair of the structures, materials, and equipment involved.

2.1.1 Locations: Asbestos containing materials shall be removed from the structures, materials, and equipment to be demolished, altered, or repaired, and from all other site locations where directed. Asbestos materials to be removed shall be as identified in the appropriate "Asbestos Sampling Report" provided by the Government or as shown on the drawings or written descriptions which form a part of the construction documents. This shall not relieve the Contractor from the responsibility of notifying the Contracting Officer or his representative of the discovery of suspected additional asbestos during the course of contract performance. Upon notification by the Contractor of suspected additional ACM, the Contracting Officer shall be responsible for the verification of existence and extent of additional work. Should the suspected material prove not to be ACM, the Contracting Officer shall so notify the Contractor.

2.1.2 Debris: All debris located within the project limits for asbestos removal and disposal work shall be considered as containing, or having been contaminated with asbestos, and shall be treated, handled, removed and disposed of in accordance with applicable regulations. Any miscellaneous debris located outside of the requested work area which is determined to contain asbestos shall also be disposed of in accordance with the applicable regulations.

2.1.3 Structures, Materials, and Equipment Surfaces: Interior building surfaces, including supporting structure surfaces or equipment shall be considered as contaminated with asbestos containing dust. Surfaces shall be cleaned in accordance with the regulations prior to demolition, alteration, or repair of the structures, materials, and equipment.

3.0 CONTRACTOR COMPLIANCE AND RESPONSIBILITY:

3.1 Compliance: The Contractor shall perform asbestos removal and disposal operations in compliance with all Federal, State, and Local laws, regulations, standards, codes and these specifications, governing asbestos removal and disposal. Any other work required in conjunction with such removal and disposal shall also comply with all Federal, State, and Local laws, regulations, codes, and these specifications. In the event of a conflict between the requirements of the regulations and the requirements contained in these specifications, the more stringent requirements shall govern.

3.2 Responsibility: It shall be the responsibility of the Contractor to visit and investigate the site; review all applicable drawings and specifications; to review all applicable and available "Asbestos Sampling Reports"; to assess the actual amount of asbestos present; and become thoroughly familiar with conditions, and the relative difficulty thereof, which are present and will affect a complete asbestos removal and disposal operation.

3.2.1 The Contractor is responsible for supplying all labor, material, equipment, services, insurances, and all incidentals which are necessary or required to perform the work in accordance with the applicable regulations and these specifications.

3.2.2 The Contractor shall have a Certified Industrial Hygienist (CIH) or his representative at the job site throughout all phases of the work.

4.0 GOVERNMENT RESPONSIBILITY:

4.1 Asbestos Sampling Report: When available, the Contracting Officer or his representative shall provide the Contractor with an Asbestos Sampling Report based on samples

U.S. COST Page 19 taken and analyzed at a testing laboratory. This report shall constitute a representation of what is believed to be a complete identification of the asbestos containing material associated with a facility or site, and be definitive to the degree that the Contractor may use the report to determine initial project requirements. While the report should identify all known asbestos at the facility or site, it is not a certification of total scope identification. The Contractor shall remain responsible for notification to the Contracting Officer of any additional suspected asbestos containing materials discovered during the execution of the Contract.

4.2 Monitoring: The Government may employ a Certified Industrial Hygienist (independent of that required to be employed by the Contractor) to monitor air quality, project procedures, and to help ensure the Contractor is in compliance with applicable Federal, State, and Local regulations.

5.0 CONTRACTOR QUALIFICATIONS AND CERTIFICATION: Unless otherwise stated, at least five (5) days prior to the start of any asbestos removal work, the Contractor shall provide the following submittals to the Contracting Officer or his representative:

5.1 Certifications: That the principals of the firm actually performing the work and all employees involved in asbestos removal and disposal operations are familiar with the following:

a. The U.S. Environmental Protection Agency's Regulations for Asbestos--40 CFR 61, Subpart M.

b. The U.S. Department of Labor OSHA Asbestos Regulations--29 CFR 1910 and 29

CFR 1926.

c. State and local regulations pertaining to asbestos removal, abatement, hauling, and disposal.

The Contractor shall also certify that all employees who are involved in asbestos work have received the information and training required by 29 CFR 1926.58(k) (3) and that the Contractor has complied with all other State and Local requirements.

5.2 Licenses: Evidence shall be submitted that the Contractor is licensed to perform asbestos removal projects in the jurisdiction in which the project is located.

5.3 Notifications: Prior to starting any asbestos removal work, the Contractor shall attend a pre-construction meeting. The time and place of the meeting shall be designated by the Contracting Officer. At that meeting the Contractor shall provide a detailed written account(s) of the following:

a. Proposed work schedule for all operations involving asbestos.

b. Overview of site preparation plans and the proposed project containment strategy. A complete detailed asbestos removal plan shall be submitted at least three (3) days prior to start of asbestos removal work.

c. Submit for approval of the Contracting Officer the name, address, and telephone number of laboratories which will perform the test analysis throughout the project. The laboratories shall have participated in at least six (6) rounds of the EPA asbestos bulk sample quality assurance program and currently be proficient in the AIHA Administrated PAT program for air samples.

20 Page U.S. COST

d. The name of the Certified Industrial Hygienist (CIH) to be assigned to the project by the Contractor. The CIH shall meet the qualification requirements of a "Competent Person" as stated in 29 CFR 1926.58(b).

5.4 Asbestos Inventory: Prior to any work at the site, the Contractor shall conduct a space-by-space inspection with the Contracting Officer or his designated representative and prepare a written inventory of all existing areas where asbestos has been identified as being present (using the installation supplied asbestos sampling report as a basis). This document will be signed and certified as to apparent accuracy by both parties. All areas and materials previously described as containing asbestos shall be treated as such, unless the Contractor provides analytical evidence satisfactory to the Contracting Officer that specific portions of the material are not asbestos, or asbestos contaminated.

5.5 Asbestos Removal Plan: At least 3 days prior to the start of asbestos removal work, the Contractor shall submit for approval a complete detailed asbestos removal plan in accordance with Paragraph 5.3(b) above. The plan shall contain the following elements:

5.5.1 Project Containment Strategy: The plan shall be prepared, signed and sealed, including certification number and date by the Contractor's CIH. The plan shall include a sketch and shop drawings showing the location, size, and details of asbestos control of work areas; the location and details, including layout, of the decontamination area as described further in Paragraph 10.0 "DECONTAMINATION ENCLOSURE SYSTEMS"; location of local exhaust equipment and methods and materials to be used to prevent asbestos fiber contamination of the work site and environment. The plan will address all phases of the work including, but not limited to:

a. Preparation of the work area.

b. Storage of materials and equipment at the site.

c. Temporary utilities.

d. Engineering controls and work practices used to achieve compliance with exposure levels, such as negative air systems, containment barriers, use of removal encapsulants, wet methods, or other methods or combination of methods allowable under 29 CFR 1926.58(g). DRY

REMOVAL METHODS WILL NOT BE ALLOWED.

e. Order of removal.

f. Decontamination procedures to be used for personnel, work area, and equipment.

g. Waste disposal.

h. Air monitoring procedures.

i. Final decontamination and cleanup.

j. Procedures for dealing with heat stress.

k. Emergency procedures.

l. Notification and permits required.

U.S. COST Page 21

Prior to starting work, the Contractor, the Contractor's CIH, and the Contracting Officer shall meet to discuss plan details, work procedures, and safety precautions.

5.5.2 Work Schedule: This schedule will include all operations involving asbestos.

5.5.3 Equipment List: Shall include the brand name, model, capacity, performance characteristics (as applicable), quantities, and any other pertinent information for all equipment and materials to be used in all asbestos removal operations performed on this project. Shall include, but not be limited to the following:

a. Respirators and cartridges.

b. Vacuums and vacuum equipment.

c. Protective clothing and other personnel protection equipment.

d. Trucks used to haul waste.

e. Containment and disposal of waste materials.

f. Air sampling pumps.

g. Wetting agents.

h. Pressure differential air monitoring devices.

Manufacturers' certificates shall be submitted that all respiratory protection devices and equipment utilized on the site are approved by NIOSH. Provide manufacturer's certificate of HEPA filtration capabilities for all cartridges and filters.

5.6 Asbestos Safety Plan: The Contractor shall submit for approval a detailed safety plan for all phases of the asbestos abatement operation at least three (3) days prior to the start of removal operations. This plan shall include an "Accident Prevention Plan" and shall include, but not be limited to the following elements:

5.6.1 General Safety Procedures:

5.6.2 Respirator Program: This program shall be in accordance with 29 CFR 1926.58(h) and 29 CFR 1910.134(b), (d), (e), and (f) and State and Local regulations.

5.6.3 Medical Surveillance Program: The program shall be in accordance with 29 CFR 1926.58(m), 1926.58(n), and 1910.20.

5.6.4 Emergency Procedures: Emergency procedures shall be in written form and prominently posted in the clean change area and equipment room of the personnel decontamination area. All persons entering the work area shall read and sign the procedures to acknowledge receipt and understanding of the work site layout, location of emergency exits and emergency procedures.

5.7 Asbestos Waste Disposal Plan: This plan will include, but not be limited to the following:

22 Page U.S. COST

a. Name, location, and telephone number of the landfill used. A copy of the landfill's issued license, and a signed agreement that the landfill will accept the asbestos waste, shall be provided to the Contracting Officer or his representative.

b. Name, address, and telephone number of any waste subcontractors used and the subcontractor's landfill. Provide copies of licenses and signed agreements as in paragraph 5.7(a) above.

c. Should rented equipment be used in removal areas, or to transport asbestos waste materials, a copy of the written notification provided to the rental company informing them of the nature of the use to which the rental equipment will be put shall be included along with the rental company's acknowledgement and agreement.

5.8 Notifications and Permits: It shall be the Contractor's responsibility to secure all permits required and pay any necessary fees to carry out this asbestos removal project.

5.8.1 Permits: The Contractor shall submit copies of the following:

a. All permits required by Federal, State, and Local Government Agencies for the type of asbestos removal undertaken.

b. All permits required by the Federal, State, and Local authorities for asbestos waste hauling and dumping.

5.8.2 Notifications: The Contractor shall make the following notifications:

5.8.2.1 In accordance with 40 CFR 61.146, at least ten (10) days prior to commencement of demolition work, written notices, with copies, of intent to demolish friable asbestos materials shall be sent to:

a. National Emissions Standard for Air Pollution (NESHAPS) Coordinator at the governing EPA Regional Office.

b. The State asbestos regulatory office.

c. Local regulatory office.

d. Other required notifications.

6.0 PUBLIC WARNINGS AND POSTED SAFETY INFORMATION: In addition to the warning signs required by 29 CFR 1926.58(k), the Contractor shall post the following at the work site:

a. "DANGER--ASBESTOS HAZARD, AUTHORIZED PERSONNEL ONLY", signs will be posted at all entrances to each building or area in which work will take place. Additional public notices required by State and/or Local governments will also be posted on the structures and at work areas as necessary.

b. U.S. Department of Labor - OSHA Poster Number 3038 will be hung in a place where it will be clearly visible to personnel each day.

U.S. COST Page 23

c. A copy of the U.S. Environmental Protection Agency Regulations for Asbestos, 40 CFR 61, Subpart M, and a copy of U.S. Department of Labor--OSHA Asbestos Regulations, 29

CFR 1926.58.

d. A list of all scheduled air sampling tests to be completed each day. This list will include the type of sample to be taken, the approximate time it will be taken, and the total amount of air which is to be taken through the filter cassette.

e. A list of telephone numbers of the local hospital and/or emergency squad, the local police department, the local fire department, a representative of the Contracting Officer who can be reached 24 hours a day, the Contractor's corporate headquarters, and any further professional consultants directly involved in the project.

7.0 PERSONNEL PROTECTION: To protect all personnel, authorized visitors, and others in or around the asbestos removal site during the course of this project, the Contractor shall comply with all of the requirements of 29 CFR 1926.58 and the following requirements:

7.1 Certified Industrial Hygienist (CIH): The Contractor's Certified Industrial Hygienist (CIH) or his representative shall be present on the job site throughout all phases of the removal project to supervise, monitor, and document all aspects of the project's health and safety provisions. The Contractor's CIH shall maintain a daily log showing the results of all air sampling tests done throughout each phase of the project; shall stop work inside the work area, or asbestos control area, if measured airborn fiber levels exceed the "action" level of 0.1 FCC outside the work area as defined by 29 CFR 1926.58(b); shall be responsible for maintaining the records required by the medical surveillance program, and collect all samples for the air monitoring program.

7.2 Medical Surveillance: Medical surveillance will be implemented in accordance with the Contractor's submitted Plan, and as a minimum shall comply with the requirements of 29 CFR 1926.58(m) and (n).

7.3 Respirators: The Contractor shall provide appropriate respirators as required for use in accordance with the Contractor's submitted plan and as a minimum shall conform to 29 CFR

1926.58. Fit testing shall be in accordance with 29 CFR 1926.58(h) (4) and Appendix C referenced therein.

7.4 Protective Equipment: The Contractor shall provide an adequate supply of respirators and protective clothing to all employees, authorized visitors, and personnel at the site in accordance with 29 CFR1926.58(i).

8.0 MATERIALS AND EQUIPMENT: Prior to the start of the asbestos removal and disposal work, the Contractor shall have at the site sufficient quantities of all the materials and equipment needed to complete the project in the proper manner, in accordance with 29 CFR 1926.58(g) and Appendices F and G to 29 CFR 1926.58.

9.0 AIR MONITORING AND ANALYSIS: Monitoring of airborne concentrations of asbestos fiber shall be done in accordance with 29 CFR 1926.58. The Contracting Officer shall retain the option to perform independent monitoring. One (1) day prior to beginning onsite demolition or construction work, the Contractor shall have the area monitored and establish the background concentrations for each work area. At least three general area air samples in each asbestos removal work area shall be taken.

24 Page U.S. COST

9.1 Sampling Equipment: The Contractor shall use the following sample collection equipment:

a. High-volume, oil-less, vane-driven pumps with a calibrated air flow of at least 10 liters per minute. The air flow shall be calibrated while the pump is attached to the sampling train.

b. Low-volume, battery powered, body-attachable, portable personnel pumps with a calibrated flow of at least 2 liters per minute and a self-contained power pack capable of sustaining this calibrated flow for at least two hours. This pump unit shall also be equipped with an automatic flow control unit which will maintain a 2-liter per minute flow even as filter resistance increases due to trapped debris.

c. Standard filter cassettes will be utilized in accordance with 29 CFR 1926.58 Appendices A and B.

d. A portable flow calibrator capable of calibration to within +2 percent over a temperature range of -20 degrees C to +60 degrees C and a flow range to 50 liters per minute.

9.2 Type of Air Sampling: Three types of air samples shall be collected by the Contractor.

9.2.1 Area Samples: These shall be collected with a high-volume pump and filter cassette.

They shall be collected at a single, specific spot, or station. A minimum of 2,000 liters of air shall be passed through the filter for each station sample outside the work area. Minimum collection amounts inside the work area shall be determined by filter loading conditions and consultation between the Contractor and the Government, but where possible, shall be sufficient to yield between 100 and 1,300 fibers per square millimeter on the membrane filter.

9.2.2 Personnel Samples: These shall be collected with a 2-liter per minute pump and a filter cassette. The cassette shall be attached to the pump with a length of plastic tubing. The cassette will be pinned, clamped, or otherwise securely attached on the forward part of the shoulder of a worker in an acceptable manner. The cassette's exposed filter surface shall be positioned so that it points downward. The pump shall remain attached to the body of the worker and shall run for ten minutes to two hours, adjusted for filter load and working conditions, to produce a filter fiber density of 100 to 1,300 fibers per square millimeter in accordance with 29 CFR 1926.58, Appendix B.

9.2.3 Dust Samples: Shall be collected with a 2-liter per minute portable pump equipped with a filter cassette and an extra length of tube extending from the filter end of the cassette. This tube from the forward end of the cassette shall be used in a manner similar to a small vacuum cleaner hose. The hose shall be placed on at least ten spots of visible dust or in areas such as room corners, locker tops, and similar locations where asbestos containing dust is most likely to accumulate. Filters from cassettes used for collecting dust samples shall be analyzed as bulk samples rather than air samples.

9.3 Sampling Procedures: The Contractor shall utilize a CIH or a person working under the direct supervision of a CIH to collect all samples. Sampling shall be done in accordance with 29 CFR 1926.58, Appendices A and B.

9.3.1 Final Air and Dust Samples: The final air and dust samples will be analyzed using Transmission Electron Microscopy (TEM) methods to determine if asbestos contamination has been reduced to 0.01 FCC or the adjoining environmental concentration, whichever is less.

U.S. COST Page 25

9.4 Sample Record Maintenance: The Contractor shall keep comprehensive records concerning the testing, monitoring, and analysis of air conditions in and around the work area throughout every phase of asbestos removal work.

9.4.1 Pumps: The Contractor shall keep records on all air pumps used on this project. "Air pumps" will include high-volume pumps and low-volume personnel pumps. The records shall show:

a. The manufacturer, model type, and serial number of each item.

b. The date on which the pump was flow calibrated.

c. The manufacturer, model type, and serial number of the flow calibrator used to calibrate the pump.

d. The rate of flow registered by the calibrating instrument for the pump.

e. The name of the person who performed the calibration.

9.4.2 Dust Sample Collection: A hand drawn map marked with X's to show the collection points for dust samples shall accompany each dust sample filter cassette. Each X shall also have a brief written description to further describe the collection point, for instance, "top of pipes".

9.5 Laboratory Analysis: The following analytical methods shall be employed where required.

9.5.1 TEM: The TEM laboratory shall provide written reports on the samples it processes using TEM analysis.

10.0 DECONTAMINATION ENCLOSURE SYSTEMS: Where required by the type of removal procedures utilized, the Contractor shall build suitable framing for the decontamination enclosures. Shop drawings shall be submitted for approval by the Contracting Officer or his representative. Shop drawings shall be submitted as part of the "Asbestos Removal Plan" required by Paragraph 5.5 above, and in accordance with any Contract Clause(s). Adequate descriptions of any portable pre-fab units, if utilized, must be submitted for review and approval by the Contracting Officer or his representative before start of construction. Submittals shall include, but not be limited to, a floor plan layout showing dimensions, materials, sizes, thicknesses, plumbing, and electrical outlets. In all cases access between contaminated and uncontaminated rooms or areas shall be through an airlock. In all cases access between any two rooms within the decontamination enclosure systems shall be through a curtained doorway. The Contractor shall perform maintenance of the enclosure system in accordance with the approved Asbestos Removal Plan.

11.0 DECONTAMINATION PROCEDURES:

11.1 Personnel Decontamination Procedures: The Contractor shall ensure that the personnel decontamination procedures are done in accordance with all Federal, State, and Local laws and regulations.

11.2 Equipment Decontamination Procedures: All tools, furnishings, apparatus, fixtures, pieces of equipment, containers of supplies, exterior surfaces of bags or containers containing

26 Page U.S. COST

ACM, and any other item moved out of the sealed work area, or glove-bag, shall be thoroughly decontaminated.

11.2.1 Items removed from the sealed work area shall be HEPA vacuumed, damp wiped, showered thoroughly, wrapped and sealed in multiple layers of polyethylene sheeting. The item shall then be passed into the washroom, where it shall be damp wiped and/or HEPA vacuumed and then placed in the shower and thoroughly scrubbed as necessary. Electrical items which can be damaged by water shall be wrapped and sealed in at least two layers of 6-mil polyethylene sheeting before they are passed into the holding area.

11.2.2 All the Contractor's tools shall be removed from the work site in 6-mil plastic bags or sealed wraps or appropriate containers. Brooms, long scrapers, shovels, and similar implements shall have their working ends bagged. Each bag shall be secured to the handle with tape. Tubs of scrapers, wire brushes, and similar implements shall be completely bagged and sealed prior to their removal from the work area. Coils of hose and electrical wire shall be bagged and sealed prior to removal from the work area. Scaffolding and ladders shall be wrapped in polyethylene.

The Contractor shall be responsible for ultimate disposition of contaminated tools and ensure they will be either disposed of or cleaned so as to meet State, Federal, and Local regulations.

12.0 ASBESTOS REMOVAL PROCEDURE OPTIONS: The Contractor shall determine the most efficient manner in which to carry out the asbestos removal from the work areas in conformance with this specification. The Contractor shall select from options available and in conformance with 29 CFR 1926.58. The selected options or combinations of options selected to comply with the regulations shall be detailed in the Contractor's Asbestos Removal Plan, including, but not limited to details of construction, materials used, equipment required, work practices to be used, etc. Wet engineering control methods or use of removal encapsulants shall be used to comply with the regulations in conjunction with the selected removal procedures.

12.1 Methods: The following methods shall be used for asbestos removal, as applicable, in accordance with 29 CFR 1926.58.

12.1.1 Removal intact using polyethylene sheeting, glove bags, or liquid encapsulating agents approved by the Contracting Officer.

12.1.2 A containment barrier with a negative air system shall be used when asbestos insulation…