Amendment 0004

View the file

Other files

File Type Posted
10-R-0012-Amend6.pdf PDF
10-R-0012 AmndNo0005.pdf PDF
JocTool_1.6.exe EXE file
10-R-0012-Amend3.pdf PDF
10-R-00012-Amend1.pdf PDF
10-R-0012-Amend2.pdf PDF
10-R-0012-JOC-TECH-SPEC.pdf PDF
10-R-0012-Spec.pdf PDF
10-R-0012-UPB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: RYAN ANNIBALI

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment does not extend the proposal due date of 30 March 2010 at 2:00 PM Local Time.

ALL QUESTIONS PERTAINING TO THIS SOLICITATION MUST BE RECEIVED BY 12:00 PM ON MARCH 22, 2010. RESPONSES MAY NOT BE

PROVIDED TO QUESTIONS RECEIVED AFTER THIS CUT OFF DATE.

Continued on next page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-10-R-0012

X 9B. DATED (SEE ITEM 11)

09-Feb-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) Job Order Contract (JOC) for Joint Base M-D-L, Wrightstown. New Jersey

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Mar-2010

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE E5CTCRRA

FACILITY CODECODE

EMAIL:TEL:

THIS PAGE IS INTENTIONALLY LEFT BLANK

Amendment No. 0004

W912BU-10-R-0012

14. DESCRIPTION OF AMENDMENT (continued)

a. Section 00 110 00—REQUEST FOR PROPOSAL SUBMITTAL REQUIREMENTS:

Please delete pages 11 and 12 in their entirety and substitute revised pages, annotated Amendment No.

0004, attached hereto

Please delete pages 23 and 24 in their entirety and substitute revised pages, annotated Amendment No.

0004, attached hereto.

Please delete pages 40 and 41 in their entirety and substitute revised pages, annotated Amendment No.

0004, attached hereto.

Please delete page 46 in its entirety and substitute revised page, annotated Amendment No. 0004, attached hereto.

b. Section 00800—SPECIAL CONTRACT CLAUSES:

Please make a pen and ink change to page 24, paragraph 1 under “Submittals” to delete the words “Page 45 of 98”.

c. Section 00815—WAGE RATES:

Please delete this section in its entirety and substitute revised pages, annotated Amendment No. 0004, attached hereto.

d. Job Order Contract Tool.

Please see the enclosed Job Order Contract Tool posted to www.fbo.gov . NOTE: The use of this tool is NOT mandatory, but may assist in the preparation of your proposal.

Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0004. Failure to acknowledge all amendments may be cause for rejection of proposal.

W912BU-10-R-0012 00 110 00 - 11

1.3.2. Weakness

A flaw in the proposal that increases the risk of unsuccessful contract performance but is easily correctable. Successful contract performance is defined by customer satisfaction.

1.3.3. Significant Weakness

As flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. Successful contract performance is defined by customer satisfaction.

1.3.4 Strength

An aspect of a proposal that appreciably decreases the risk of unsuccessful contract performance or that represents a significant benefit to the Government. A strength can only exist in area of the proposal that not covered by prescriptive RFP requirements.

Anything above a prescriptive RFP requirement will be considered a betterment.

1.3.5 Uncertainty

Any aspect of the proposal for which the intent of the Offeror is unclear because there may be more than one way to interpret the offer or because inconsistencies in the offer indicate that there may be an error, omission, or mistake.

1.3.6. Deviation

Proposal implies or specifically offers a deviation below the specified criteria. The Offeror may or may not have called the deviation to the Government’s attention. A deviation is a deficiency. The proposal must conform to the solicitation requirements for award.

1.4. RATING SYSTEM -

1.4.1. General: The Government will review the proposals and rate the quality of each evaluation factor. The TEC and PEC will rate each proposal against the specified evaluation criteria in the Solicitation requirements. They will not compare proposals.

1.4.2. Review Write-up: The Government will support each rating with a narrative, separately listing all strengths, weaknesses, deficiencies, and required clarifications.

1.4.3. Rating System: After listing proposal strengths, weaknesses and deficiencies, the TEC and PEC will assign an adjective rating of “Acceptable, Marginal or Unacceptable”, to each, which reflect the Government's confidence in each Offeror's ability, as demonstrated in its proposal, to perform the requirements stated in the RFP.

The adjectival ratings shall be assigned, using the following criteria, which incorporate a proposal risk assessment:

W912BU-10-R-0012 00 110 00 - 12

(i) Acceptable: Proposal demonstrates acceptable understanding of the requirements and approach that meets performance or capability standards.

The approach may include both strengths and weaknesses of substance, where strengths are not outweighed by weakness. Collectively, strengths and weaknesses are likely to result in acceptable performance. Has no deficiencies and is an acceptable solution. The risk or unsuccessful performance is low to moderate, as the proposal solutions are generally feasible and practical.

(ii) Marginal: Proposal demonstrates shallow understanding of requirements and approach that only marginally meets performance or capability standards necessary for minimal, but acceptable contract performance. The proposal demonstrates an approach which may not be capable of meeting all requirements and objectives. The Offeror may satisfactorily complete the proposed tasks, but there is a high risk that it will not be successful. The approach has weaknesses of substance and strengths, which if they exist, are outweighed by the weaknesses. Has no deficiencies. Collectively, the strengths, if any, and weaknesses are not likely to result in satisfactory performance. The risk of unsuccessful performance is high as the proposal may contain solutions which may not be feasible and practical.

(iii) Unacceptable: Proposal fails to meet performance capability standards and contains deficiencies. Requirements can only be met with major changes to the proposal. The risk or unsuccessful performance is very high as the proposal contains solutions which are not feasible and practical and/or do not meet the solicitation requirement.

G. RATING GUIDELINES.

Factor 1: Past Relevant Experience of Offeror’s Team:

W912BU-10-R-0012 00 110 00 - 23

2.2.2. Support the block foundations, back fill and compact the fill for a concrete floor.

2.2.3. The contractor will excavate trenches for the gas

supply, water supply, sewer and electrical and communication lines or conduit. After each line is installed the trench will be back filled, using six inch lifts, tamped in between. The appropriate marking tape will be installed half way between the line and the surface.

2.2.3.1. The water supply runs along the rear fire

line, forty (40) feet from the Mechanical Room.

2.2.3.2. The sewer line runs along Doughboy Loop, sixty

(60) feet from the Mechanical Room.

2.2.3.3. The gas line runs along Doughboy Loop, fifty

(50) feet from the Mechanical Room.

2.2.3.4. The electrical conduit runs from the power

pole on Doughboy loop sixty (60) feet to the Mechanical Room.

2.2.3.5. The communication conduit runs from the DOIM

closet of building 8810 forty (40) feet to the DIOM closet of building 8810.

2.2.4. The contractor will excavate for sidewalks. The

sidewalks will be graded to meet the entrance pads and not exceed ADA standards. Sidewalks will be four feet wide and three inches thick.

2.2.4.1. The sidewalk will be from the front doors, 12

feet, and then run perpendicular 64 feet to the drop off lane.

2.2.4.2. One sidewalk 20 feet from the side door to the

drop off area.

2.2.4.3. One sidewalk 29 feet from the side door to the

fire lane.

2.2.4.4. One drop off area, 37 feet long x 13 feet wide, 34 LF from Doughboy loop.

2.2.4.5. One equipment pad, 10 feet x 10 feet behind

Office 1.

2.2.4.6. Entrance pad, 10 feet x 10 feet at the front

entrance.

2.2.4.7. Two (2) entrance pads, one each at the side

doors, six feet x six feet.

W912BU-10-R-0012 00 110 00 - 24

2.2.5. FINAL GRADING: The area to be graded and seeded is

200 feet long, 75 feet wide. This area includes the building.

2.2.5.1. After completion of construction the area around

the building will be graded and raked level and cover with top soil.

2.2.5.2. The final grade will be covered with grass seed, a hydro seed type product.

3.0. CONCRETE

3.1. FOOTING

3.1.1. Install forms in the excavation in paragraph

2.2.1. The forms will be for a concrete footing, 12 inches thick and 16 inches wide.

3.1.2. Place a footing, 12 inches thick, 16 inches wide.

The footings will be 4000 PSI concrete with reinforcing bars.

3.2. FLOOR

3.2.1. Place a six inch concrete floor on the foundation

erected in paragraph 4.1. The floor will be 4000 PSI, reinforced with 4 inch x 4 inch welded wire. The floor will be screed and trowel finished. The floor will be eight inches above grade.

3.3. STEPS and SIDEWALKS: Pads and sidewalks will be boomed

finished; the sloop will not exceed ADA requirements.

3.3.1. Form and place 3000 PSI sidewalks and drop off

area six inches thick, 4000 PSI excavated in paragraph 2.2.4.1.

thru 2.2.4.4.

3.3.2. Form and place (1) 3000 PSI pad, 10 feet wide and

10 feet long behind office 1.

3.3.3. Form and place 3000 PSI pads excavated in

paragraphs 2.2.4.6. and 2.2.4.7.

4.0. MASONRY

4.1. FOUNDATION

4.1.1. Install a concrete block foundation on the

footings installed in paragraph 3.1.1 and 3.1.2. The foundation will have a ledge for the brick veneer.

4.1.2. Construct block walls to form a building 36 feet

wide x 116 feet long x 10 feet high. The walls will have headers

W912BU-10-R-0012 00 110 00 - 40

16.2.2. Install ten (10) duplex receptacles, six in the

Admin/Recept Office and four in the Records room. Each will be on a 20 amp dedicated circuit using 12.2 MC cable.

16.2.3. Install nine (9) duplex receptacles, six each

in Conference Room, and three in the break Room. Install one (1) GFI duplex receptacle near the sink in the break room. Each room will be on a 20 amp dedicated circuit using 12.2 MC cable.

16.2.4. Install seven (7) duplex receptacles in the

Waiting area/Entry. Six in the waiting area and one in the Entry.

The room will be on a 20 amp dedicated circuit using 12.2 MC cable.

16.2.5. Install four (4) GFI duplex receptacles, one

each in the Male Latrine, Female Latrine, Staff Latrine and Janitor’s Closet. These will be on a dedicated circuit using 12.2 MC cable.

16.2.6. Install four (4) duplex receptacles in the

DIOM Room. The DOIM Room will be on a 20 amp dedicated circuit using 12.2 MC cable.

16.2.7. Install three (3) duplex receptacles in the

Mechanical Room. The Mechanical Room will be on a 20 amp dedicated circuit using 12.2. MC cable.

16.2.9. Install six (6) duplex receptacles in the

corridor. The receptacles will be on the same 20 amp dedicated circuit using 12.2. MC cable.

16.3. COMMUNICATION: Install a NEMA 12 enclosure made by

Hoffman Engineering Part# A-242410LP box on the exterior wall of the DOIM Room. Install four inch schedule 40 PVC conduit 40 feet from building 5608 and 10 feet up the wall to the existing Hoffman.

16.3.1. Install thirty four (34) boxes, two each in

Offices 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, Provider, Exam, Conference Room, Records, Admin/Recept and Waiting. Each drop for communications will be four (4) green Cat 6 plenum rated cables.

The cable will be run from the drop to the DOIM Room and coiled (10 foot lengths) and tagged. Final connections will be made by others.

16.3.1.1. ASSUME installing 12,000 LF of Cat. 6

green plenum rated cable.

16.4. POWER:

W912BU-10-R-0012 00 110 00 - 41

16.4.1. Install a 225 amp 3 phase 4 wire 42 circuit

breaker panel with main and full panel in the Mechanical Room.

16.4.1.1. Install two (2) 30 amp 208 volt 3 phase

circuits to the condensing units with two 30 amp NEMA 3R disconnects.

16.4.1.2. Install two (2) 20 amp 120 volt circuits in

ceiling for air handler with two single pole switches.

16.5 SERVICE AND DISTRIBUTION

16.5.1. Install all main runs, and other circuits according

to set of plans. All electrical circuits above the suspended ceiling shall properly supported and hung independent of the ceiling.

16.5.2. Install one 4 inch conduit sixty feet from the

mechanical room of building 8810 to the utility pole on Doughboy Loop and ten feet up the pole. Install the service cable from the building to the utility pole and leave excess coiled.

16.6. ALARMS

16.6.1. Install wall mounted Manual Dual Action Pull

stations located at exits and corridors to ADA height. The pull stations connected to four alarm devices with lights, two on each station.

16.7. ACCEPTANCE

16.7.1. Upon completion of electrical work all contract

drawings and load list documents shall be verified during “Final Inspection” and documented “As-Built" before final acceptance tests. Before the final acceptance test the installation contractor shall fully test the system.

16.7.2. Acceptance Tests shall be performed on all detection

and alarm system components to verify operability and acceptance criteria. Testing shall be conducted by contractor certified test personnel and witnessed by local Fire Prevention and RDPW technical staff. The test method shall consist of demonstration of 100% smoke and heat detection with the appropriate zone response and function to provide indication, local and /or remote alarm. Acceptance criteria shall be as required by NFPA 72 and NFPA 101 for horns and flashers.

17.0. MATERIALS: All work and materials shall conform to all

applicable JOC specifications.

W912BU-10-R-0012 00 110 00 - 46

W912BU-10-R-0012 0815-1

Section 00815

WAGE RATES

The work to be performed is classified as:

BUILDING, HEAVY, and HIGHWAY

W912BU-10-R-0012 0815-2

THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK

W912BU-10-R-0012 0815-3

General Decision Number: NJ100032 03/12/2010 NJ32

Superseded General Decision Number: NJ20080032

State: New Jersey

Construction Type: Building

County: Burlington County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 03/12/2010

ASBE0014-003 05/01/2009

BURLINGTON COUNTY (City of Beverly; Townships of Cinnaminson, Delanco, Delron, Edgewater Park, Evesham, Hainesport and Lumberton; Borough of Maple Shade; Township of Medford; Borough of Medford Lakes; Townships of Moorestown and Mt. Laurel;

Borough of Palmyra; Township of Riverside; Borough of Riverton;

Townships of Shamong, Southampton, Tabernacle, Westhampton and Willingboro)

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 39.14 25.30

ASBE0089-003 07/01/2009

BURLINGTON COUNTY (Townships of Bordentown, Burlington, Chesterfield, Easthampton, Florence, Mansfield, Mt. Holly, New Hanover, North Hanover, Pemberton, Springfield and Woodland)

INSULATOR ((includes the

W912BU-10-R-0012 0815-4

application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 37.92 26.83

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

BRNJ0002-013 11/01/2009

Rates Fringes

Bricklayer.....................$ 36.70 23.47

Work on high stacks: 22% per hour additional.

BRNJ0007-012 01/01/2009

Rates Fringes

Marble setter...................$ 50.53 24.00

BRNJ0007-014 07/01/2005

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 39.68 23.25

BRNJ0007-017 06/01/2008

Rates Fringes

Tile finisher..................$ 32.77 18.15 Tile setter....................$ 37.11 20.40

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

CARP0006-009 05/01/2009

Rates Fringes

CARPENTER (Scaffold Builder).....$ 39.45 49.75%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0006-010 05/01/2009

W912BU-10-R-0012 0815-5

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging, Formwork, Batt and Blown Insulation...$ 39.45 49.75%

CARP0029-006 05/01/2009

Rates Fringes

Soft floor layer...............$ 39.45 49.75%

CARP0454-009 07/01/2009

Rates Fringes

PILEDRIVERMAN....................$ 37.55 26.63

PAID HOLIDAYS:

New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.

CARP0715-007 05/01/2009

Rates Fringes

Millwright.....................$ 40.27 49.75%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

ELEC0269-017 01/01/2010

BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road;

then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line)

Electrician and cable splicer (Includes Low Voltage Wiring)....$ 48.28 51.3% + .25

W912BU-10-R-0012 0815-6

ELEC0351-001 10/05/2009

ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington

- Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt.

Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line);

CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER AND SALEM COUNTIES:

Electricians:

Cable splicer on lead cable.$ 45.33 31.24 Electrician and cable splicer.....................$ 43.17 29.79

ELEV0005-004 01/01/2010

Rates Fringes

Elevator mechanic..............$ 46.90 20.04

PAID HOLIDAYS:

New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

PAID VACATION:

Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.

ENGI0825-020 07/01/2009

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 42.02 22.50

GROUP 2.....................$ 40.43 22.50

GROUP 3.....................$ 38.52 22.50

GROUP 4.....................$ 36.89 22.50

GROUP 5.....................$ 35.18 22.50

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.

PAID HOLIDAYS:

W912BU-10-R-0012 0815-7

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.

DEFINITION OF GROUPS:

GROUP 1:

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic

GROUP 5:

Oiler

IRON0068-011 07/01/2009

(Lumberton)

Rates Fringes

IRONWORKER

Reinforcing.................$ 32.35 34.85 Structural and Ornamental...$ 34.35 34.85

IRON0350-009 07/01/2009

BURLINGTON COUNTY (south and east of a line starting from the point on the Atlantic-Burlington county line where the Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the

W912BU-10-R-0012 0815-8

town of Chatsworth; then, continuing along the same line, to the Burlington-Ocean county line)

Ironworkers:

Reinforcing.................$ 32.97 31.75 Structural and Ornamental...$ 33.97 31.75

IRON0399-005 07/01/2009

BURLINGTON COUNTY (north and west of a line starting from the point on the Atlantic-Burlington county line where the Atlantic-Burlington county line crosses Route 206; then, following a line northeast through Wharton State Park to the

IRONWORKER (Structural, Reinforcing and Ornamental)......$ 31.46 29.70

LABO0222-006 05/01/2009

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 28.55 19.42

LABO0222-008 05/01/2009

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt Spreader, Landscape Laborer, Pipelayer, Power Toole Operator and Screedman...................$ 28.05 19.42

LABO1030-002 05/01/2009

Rates Fringes

Asbestos Removal Laborer.........$ 28.05 16.22

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment

W912BU-10-R-0012 0815-9

normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

PAIN0021-032 05/01/2009

BURLINGTON COUNTY (south of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Heights)

Glazier........................$ 36.64 23.40

Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional.

PAIN0711-011 05/01/2009

BURLINGTON COUNTY (north of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to

Glazier........................$ 37.53 17.85

Work welding or using a cutting torch: $1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PAIN0711-018 05/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 35.58 17.67

PAIN0711-019 05/01/2009

W912BU-10-R-0012 0815-10

PAINTER (Brush & Roller).........$ 27.72 14.28 PAINTER (Spray)..................$ 30.50 14.28

PLAS0592-036 11/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 36.75 24.63

* PLUM0009-015 01/01/2010

BURLINGTON COUNTY (north of a line drawn from the town of Burlington City, includes Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, includes the city of Mt. Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East;

then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530; then, along County Road Route 530 to Magnolia Road, includes Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Road to State Road Route 70 East; then, along State Road Route 70 East to the Ocean County line)

PIPEFITTER (Including HVAC Pipe Installation)...............$ 43.53 27.65 PLUMBER (Excluding HVAC Pipe Installation)....................$ 43.53 27.65

PLUM0322-008 05/01/2009

BURLINGTON COUNTY (south of a line drawn from the town of Burlington City, does not include Burlington City; then, along County Road Route 541 East, also known as High St., until it reaches the city of Mt. Holly, does not include the city of Mt.

Holly; then, along Madison Ave. in Mt. Holly to State Road Route 38 East; then, along State Road Route 38 East until it crosses over State Road Route 206 and becomes County Road Route 530, does not include Pemberton Borough; then, south on Magnolia Road in Pemberton Township to Magnolia New Lisbon Road (Route 545); then, south on Mt. Holly Misery Rd. to State Road Route 70 East; then, along State Road Route 70 East to the

Pipe Installation)...............$ 41.97 26.79 PLUMBER (Excluding HVAC Pipe Installation)....................$ 41.97 26.79

ROOF0030-027 05/01/2009

W912BU-10-R-0012 0815-11

Rates Fringes

Roofer

SHINGLES....................$ 23.25 13.77

SLATE AND TILE..............$ 26.25 13.77

ALL OTHER WORK..............$ 30.00 22.70

Mopper, and operator of felt-laying machine: $.50 per hour additional.

Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.

PAID HOLIDAY:

The last working day before Christmas, to be paid at the rate of four hours pay.

SFNJ0669-006 01/01/2010

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 45.25 18.85

SFNJ0692-002 05/01/2009

Within 15 miles beyond the city limits of Philadelphia.

Rates Fringes

Sprinkler fitter (Fire Sprinklers)......................$ 46.42 18.05

SHEE0027-009 06/01/2009

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 41.61 29.49

SUNJ2004-003 01/02/2009

Rates Fringes

LABORER: Common or General......$ 19.27 12.42

PLASTERER........................$ 42.33 0.00

TEAM0469-003 05/01/2009

BURLINGTON COUNTY (east of a line drawn from the New Jersey Turnpike to the Delaware River)

W912BU-10-R-0012 0815-12

Truck drivers:

Dump Truck..................$ 34.00 20.585 Off the Road Truck..........$ 33.90 20.585

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour additional.

New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day.

VACATION PAY CREDIT:

Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

TEAM0676-002 05/01/2008

BURLINGTON COUNTY (west of a line drawn from the New Jersey

Dump Truck Drivers..........$ 26.70 16.485 Off the Road Truck..........$ 27.05 16.485

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required:

$1.00 per hour additional.

W912BU-10-R-0012 0815-13

New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday occurs.

BEREAVEMENT PAY:

In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on

W912BU-10-R-0012 0815-14

a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor

W912BU-10-R-0012 0815-15

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

W912BU-10-R-0012 0815-16

General Decision Number: NJ100044 03/12/2010 NJ44

Superseded General Decision Number: NJ20080044

State: New Jersey

Construction Type: Building

County: Ocean County in New Jersey.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

0 03/12/2010

ASBE0089-004 07/01/2009

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 37.92 26.83

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

BRNJ0002-013 11/01/2009

Rates Fringes

Bricklayer.....................$ 36.70 23.47

Work on high stacks: 22% per hour additional.

BRNJ0007-017 06/01/2008

Rates Fringes

Tile finisher..................$ 32.77 18.15 Tile setter....................$ 37.11 20.40

Tile finisher:

Work grouting all epoxy: $10.00 additional per day.

W912BU-10-R-0012 0815-17

CARP0006-011 05/01/2009

Rates Fringes

CARPENTER

Including Acoustical Ceiling Installation, Drywall Hanging and Formwork....................$ 39.45 49.75%

ELEC0400-005 06/01/2009

Rates Fringes

Electrician & Cable Splicer (Including Low Voltage Wiring)...$ 43.90 61%

ELEV0005-004 01/01/2010

Rates Fringes

Elevator mechanic..............$ 46.90 20.04

PAID HOLIDAYS:

New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas Day.

PAID VACATION:

Employer contributes 2% of basic hourly rate as vacation pay credit for 6 months to 5 years of service, and 4% for 5 years or more of service.

ENGI0825-020 07/01/2009

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 42.02 22.50

GROUP 2.....................$ 40.43 22.50

GROUP 3.....................$ 38.52 22.50

GROUP 4.....................$ 36.89 22.50

GROUP 5.....................$ 35.18 22.50

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is

New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided

W912BU-10-R-0012 0815-18

1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that

Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);

Elevating Grader; Excavator; Front End Loader (5 cu. yd.

and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable); Trencher

GROUP 2:

Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);

Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom

GROUP 3:

Asphalt Spreader; Bulldozer;Compressor(2 or 3) (in Battery) (within 100 ft.); Forklift; Front End Loader (1 cu. yd.

and over but less than 2 cu. yd.); Lull; Mechanic; Paver, Asphalt; Roller, Blacktop; Tractor;

GROUP 4:

Bobcat/Skid Loader; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Hydroseeder; Roller, Grade;

Pump, Hydraulic

GROUP 5:

Oiler

IRON0011-008 07/01/2009

Northern Third of County

Rates Fringes

IRONWORKER

Reinforcing.................$ 34.34 35.60 Structural and Ornamental...$ 37.14 35.60

IRON0068-012 07/01/2009

Middle Third of County

Rates Fringes

IRONWORKER

Reinforcing.................$ 32.35 34.85 Structural and Ornamental...$ 34.35 34.85

W912BU-10-R-0012 0815-19

IRON0350-007 07/01/2009

Southern Third of County

Rates Fringes

Ironworkers:

Reinforcing.................$ 32.97 31.75 Structural and Ornamental...$ 33.97 31.75

LABO0222-006 05/01/2009

Rates Fringes

LABORER

MASON TENDER:

Brick/Cement/Concrete.......$ 28.55 19.42

LABO0222-009 05/01/2009

Rates Fringes

Laborers:

Asphalt Shoveler, Asphalt Spreader, Common or General Laborer, Landscape Laborer, Pipelayer, Power Tool Operator and Screedman...................$ 28.05 19.42

LABO1030-002 05/01/2009

Rates Fringes

Asbestos Removal Laborer.........$ 28.05 16.22

The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

PAIN0021-034 05/01/2009

W912BU-10-R-0012 0815-20

OCEAN COUNTY (south of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to

Glazier........................$ 36.64 23.40

Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional.

PAIN0711-016 05/01/2009

OCEAN COUNTY (north of a line drawn between these cities:

Florence to Bustleton to Columbus to Jobstown to Pemberton to

Seaside Heights):

Glazier........................$ 37.53 17.85

Work welding or using a cutting torch: $1.00 per hour additional.

Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet:

$1.00 per hour additional.

PAIN0711-018 05/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 35.58 17.67

PAIN0711-019 05/01/2009

Rates Fringes

PAINTER (Brush & Roller).........$ 27.72 14.28 PAINTER (Spray)..................$ 30.50 14.28

PLAS0008-007 05/01/2009

Rates Fringes

Plasterer......................$ 32.90 23.35

PLAS0592-036 11/01/2009

W912BU-10-R-0012 0815-21

CEMENT MASON/CONCRETE FINISHER...$ 36.75 24.63

* PLUM0009-018 01/01/2010

OCEAN COUNTY (north of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, continuing along State Highway Route 72 until it reaches the Burlington County line):

Pipe Installation)...............$ 43.53 27.65 PLUMBER (Excluding HVAC Pipe Installation)....................$ 43.53 27.65

PLUM0322-007 05/01/2009

OCEAN COUNTY (south of a line drawn from the Atlantic Ocean following a line westerly through the middle of the Barnegat Inlet, continuing west through Barnegat Bay into the town of Waretown; then, continuing along County Road Route 532 until County Road Route 532 becomes State Highway Route 72; then, Burlington County line)

Pipe Installation)...............$ 41.97 26.79 PLUMBER (Excluding HVAC Pipe Installation)....................$ 41.97 26.79

ROOF0030-027 05/01/2009

Rates Fringes

Roofer

SHINGLES....................$ 23.25 13.77

SLATE AND TILE..............$ 26.25 13.77

ALL OTHER WORK..............$ 30.00 22.70

Mopper, and operator of felt-laying machine: $.50 per hour additional.

Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour additional.

PAID HOLIDAY:

The last working day before Christmas, to be paid at the

W912BU-10-R-0012 0815-22

rate of four hours pay.

SFNJ0669-006 01/01/2010

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 45.25 18.85

SHEE0027-009 06/01/2009

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 41.61 29.49

TEAM0469-004 05/01/2009

Rates Fringes

Truck drivers:

Dump Truck..................$ 34.00 20.585 Off the Road Truck..........$ 33.90 20.585

Hazardous waste removal work:

Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional.

Work on a state or federally designated hazardous waste site receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours).

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

W912BU-10-R-0012 0815-23

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

W912BU-10-R-0012 0815-24

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

W912BU-10-R-0012 0815-25

General Decision Number: NJ100053 03/12/2010 NJ53

Superseded General Decision Number: NJ20080053

State: New Jersey

Construction Type: Heavy

County: Burlington County in New Jersey.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 03/12/2010

ASBE0014-003 05/01/2009

BURLINGTON COUNTY (City of Beverly; Townships of Cinnaminson, Delanco, Delron, Edgewater Park, Evesham, Hainesport and Lumberton; Borough of Maple Shade; Township of Medford; Borough of Medford Lakes; Townships of Moorestown and Mt. Laurel;

Borough of Palmyra; Township of Riverside; Borough of Riverton;

Townships of Shamong, Southampton, Tabernacle, Westhampton and Willingboro)

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 39.14 25.30

ASBE0089-003 07/01/2009

BURLINGTON COUNTY (Townships of Bordentown, Burlington, Chesterfield, Easthampton, Florence, Mansfield, Mt. Holly, New Hanover, North Hanover, Pemberton, Springfield and Woodland)

INSULATOR ((includes the application of all insulating materials, protective coverings, coatings and finishings to all types of

W912BU-10-R-0012 0815-26

mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement))......................$ 37.92 26.83

PAID HOLIDAYS:

The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay.

CARP0006-009 05/01/2009

Rates Fringes

CARPENTER (Scaffold Builder).....$ 39.45 49.75%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0006-013 05/01/2009

Rates Fringes

CARPENTER (Including Form Work)............................$ 39.45 49.75%

The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

CARP0454-009 07/01/2009

Rates Fringes

PILEDRIVERMAN....................$ 37.55 26.63

PAID HOLIDAYS:

New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.

CARP0715-007 05/01/2009

Rates Fringes

Millwright.....................$ 40.27 49.75%

Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.

W912BU-10-R-0012 0815-27

* ELEC0269-020 01/01/2010

BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road;

then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the

Electrician and cable splicer....$ 48.28 51.3% + .25

ELEC0351-012 10/05/2009

BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .