Q and A Solicitation W9128F23Q0104 YKM.pdf

PDF 613 KB Posted

Attached to
SP-POL-CMP-INSPECT-FY24-YKM
Solicitation number
W9128F23Q0104
Issued by

About this file

This document contains questions and answers regarding solicitation number W9128F23Q0104 from the Department of the Army Corps of Engineers Engineering District Omaha. The solicitation is for inspection of an aboveground storage tank at an unspecified military base. The questions and answers clarify that up to 2,000 gallons of fuel currently in the tank will be transferred to another on-base tank for temporary storage during inspection. The contractor will inspect the tank interior and shell, take three paint samples for laboratory analysis to detect lead and hex chrome, and return the tank's internal floating roof to operational position upon completion if no mandatory repair items are found. Additional mobilization will be required for that task. Estimated time for fuel transfer varies by tank. Costs for the inspection do not need to include temporary fuel storage as the base can accommodate transfer to another nearby tank of the same product.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Solicitation W9128F23Q0104 YKM

1. A achment B has both transfer and remove for the 2,000 gallons. Please clarify if the 2,000 gallons is being removed and disposed of or transferred back into the tank.

- The fuel, up to 2,000 gal, is to be transferred and returned a er inspec on if there are no mandatory repair items.

2. For the transfer of fuel men oned in A achment B, is the transfer considered to be tank-to-tank or will the contractor need to transport fuel to another loca on on post?

- The contractor will need to coordinate with the base to u lize another onsite tank or acquire external storage tank for the dura on of the inspec on.

3. Will the USACE accept a NACE Level II or III in lieu of SSPC PCS?

- NACE Level II is acceptable.

4. Does the USACE want paint samples and lab analysis for the detec on of lead and hex chrome in the coa ng? Yes

a. If yes, how many samples and what loca ons should samples be taken from?

- Three samples. One from the exterior, one on the interior shell within 3 feet of the bo om, and one from above the IFR.

b. If yes, what are the specifica ons for recoa ng the areas where samples were taken?

- For exterior use UFGS 09 97 13.27. For the interior use UFGS 09 97 13.17.

5. For bidding purposes, a er the inspec on is complete, will another mobiliza on be needed for se ng the IFR legs (if no mandatory items are found) back to the opera onal posi on?

- Yes

6. What is the es mated amount of me needed to transfer product to float the IFR?

- This is unknown and can vary from tank to tank.

7. The government’s previous answer regarding transfer of fuel stated: “The contractor will need to coordinate with the base to u lize another onsite tank or acquire external storage tank for the dura on of the inspec on.” Could the government please clarify if – for bidding purposes – costs should include temporary storge for fuel or will the base make another tank available for fuel transfer?

a. The base has another tank with the same product nearby that the fuel can be transferred into. Costs do not need to include temporary storage.

8. If temporary storage is needed/requested for bidding, will fuel filtering also be required?

a. Not Applicable.