Q and A Solicitation W9128F23Q0104 YKM.pdf
PDF 487 KB Posted
- Attached to
- SP-POL-CMP-INSPECT-FY24-YKM
- Solicitation number
- W9128F23Q0104
About this file
This document contains questions and answers regarding solicitation W9128F23Q0104 from the Department of the Army Corps of Engineers Engineering District Omaha for SP-POL-CMP-INSPECT-FY24-YKM. The solicitation involves inspecting a 2,000 gallon fuel tank, which may require transferring up to 2,000 gallons of fuel to another onsite tank for the duration of the inspection. Contractors must coordinate fuel storage with the base and are responsible for transferring product as needed to float the internal floating roof, though transfer time can vary per tank. Inspection standards include SSPC PCS for coatings and NACE Level II for other aspects. Paint samples from three tank locations are required for lab analysis of lead and hex chrome. Recoat specifications after sampling are UFGS 09 97 13.27 for exterior and UFGS 09 97 13.17 for interior. Mobilization will also be needed to reset the internal floating roof legs to operational position if no mandatory repairs are found.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A Solicitation W9128F23Q0104 YKM.pdf | ||
| SP-POL-CMP-INSPECT-FY24-YKM PO 5 Attachment B.xlsx | XLSX spreadsheet | |
| Amd 0001 W9128F23Q0104 YKM Tank inspection.pdf | ||
| Att J YKM-FY19-FAC FOS 2.3.33-Tank 3-FINAL.pdf | ||
| W9128F23Q0104 YKM Tank inspection.pdf | ||
| SP-POL-CMP-INSPECT-FY24-YKM (PO 5)_Attachment B.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Solicitation W9128F23Q0104 YKM
1. A achment B has both transfer and remove for the 2,000 gallons. Please clarify if the 2,000 gallons is being removed and disposed of or transferred back into the tank.
- The fuel, up to 2,000 gal, is to be transferred and returned a er inspec on if there are no mandatory repair items.
2. For the transfer of fuel men oned in A achment B, is the transfer considered to be tank-to-tank or will the contractor need to transport fuel to another loca on on post?
- The contractor will need to coordinate with the base to u lize another onsite tank or acquire external storage tank for the dura on of the inspec on.
3. Will the USACE accept a NACE Level II or III in lieu of SSPC PCS?
- NACE Level II is acceptable.
4. Does the USACE want paint samples and lab analysis for the detec on of lead and hex chrome in the coa ng? Yes
a. If yes, how many samples and what loca ons should samples be taken from?
- Three samples. One from the exterior, one on the interior shell within 3 feet of the bo om, and one from above the IFR.
b. If yes, what are the specifica ons for recoa ng the areas where samples were taken?
- For exterior use UFGS 09 97 13.27. For the interior use UFGS 09 97 13.17.
5. For bidding purposes, a er the inspec on is complete, will another mobiliza on be needed for se ng the IFR legs (if no mandatory items are found) back to the opera onal posi on?
- Yes
6. What is the es mated amount of me needed to transfer product to float the IFR?
- This is unknown and can vary from tank to tank.