Amendment 0001 - BSNP North - 30 June 2020.pdf
PDF 950 KB Posted
- Solicitation number
- W9128F20B0022
About this file
This invitation for bid solicits proposals for Missouri River Bank Stabilization and Navigation Project structures repair work between River Mile 563 to 624. The U.S. Army Corps of Engineers, Omaha District seeks to rehabilitate damaged revetments, dikes, kickers, L-head dikes and vanes through the addition of stone to replace deteriorated areas and rebuild parts of structures where substantial material has been lost. Estimated stone quantities are provided to restore each site to its design configuration. Proposals are due by 2:00pm on July 16, 2020. The construction period is 450 calendar days with an estimated value between $5-10 million. The solicitation is restricted to small businesses and will be conducted according to Federal Acquisition Regulation Part 14 procedures. Interested parties should locate the project announcement using the Beta SAM.gov website and download solicitation documents from the attachments section.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Amendment No. 0001
Missouri River Bank Stabilization & Navigation Project, Repair North Structures From The 2020 Season (Rm 624 to 563), Missouri River, NE, IA.
See attached documentation for content of the amendment revisions
Date for receipt of electronic Bids is 16 July 2020 at 2:00 pm (local time)
Government Point of Contact: Clinton Russell (402) 995-2086
U.S ARMY CORPS OF ENGINEERS, OMAHA DISTRICT
CONTRACTING OFFICE
1616 CAPITOL AVE.
OMAHA, NE 68102-4901
See Item 6
W9128F20B0022
06/30/2020
06/11/2020
Am #0001 - 2 (Continuation of SF 30)
30 June 2020 Solicitation No. W9128F20B0022
Date of Issue: 11 June 2020 Date of Opening: 16 July 2020
SUBJECT: Amendment No. 0001 to Specifications and Drawings for Construction of Missouri River Bank Stabilization & Navigation Project, Repair North Structures From The 2020 Season (Rm 624 to 563), Missouri River, NE, IA.
TO: Prospective Bidders and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment.
Pages or Sections Deleted Pages or Sections Substituted or Added
00 10 00 Page 3 thru 7 00 10 00 Page 3 thru 7
b. Drawings (Reissued). The following drawings are revised with latest revision date of 26 June 2020, and reissued with this amendment.
(1) Sheets C2.01 and C3.01
2. This amendment is a part of the bidding papers and its receipt shall be acknowledged. All other conditions and requirements of the specifications remain unchanged. If the bids have been mailed prior to receiving this amendment, you will notify the office where bids are opened, in the specified manner, immediately of its receipt and of any changes in your bid occasioned thereby.
a. See Section 00 21 00, paragraph GENERAL BIDDING INFORMATION, on how to submit electronic bids.
3. Bids will be received until 2:00 p.m., local time at place of bid opening, 16 July 2020.
Attachments: Bid Schedule - Pages 00 10 00 Pages 3 thru 7 Dwgs. listed in 1.b. above
U.S. Army Engineer District, Omaha Corps of Engineers 1616 Capitol Avenue Omaha, Nebraska 68102-4901
30 June 2020
MFS/2184
00 10 00 Page 3 Am0001
BID SCHEDULE
Item Estimated Unit No. Description Quantity Unit Price Amount
BASIC
0001. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 624 to 620 (2 Structures) 1,517 Tons $_________ $___________
0002. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (3 Structures) 14,832 Tons $_________ $___________
0003. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 560 to 580 (9 Structures) 19,988 Tons $_________ $___________
0004. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (5 Structures) 29,827 Tons $_________ $___________
0005. All remaining work Except for Option
Items listed below 1 Job XXX $___________
TOTAL BASIC AMOUNT (Items 0001 thru 0005) $_______________
OPTION 1
0006. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (1 Structures) 20,773 Tons $_________ $___________
00 10 00 Page 4 Am0001
0007. All remaining work in the option area as shown on the drawings and in the specifications 1 Job XXX $___________
TOTAL AMOUNT – OPTION 1 (Items 0006 & 0007) $_______________
OPTION 2
0008. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 560 to 580 (3 Structures) 18,721 Tons $_________ $___________
0009. All remaining work in the option area
TOTAL AMOUNT – OPTION 2 (Items 0008 & 0009) $_______________
OPTION 3
0010. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (2 Structures) 6,066 Tons $_________ $___________
0011. All remaining work in the option area
TOTAL AMOUNT – OPTION 3 (Items 0010 & 0011) $_______________
00 10 00 Page 5 Am0001
OPTION 4
0012. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 560 to 580 (3 Structures) 7,287 Tons $_________ $___________
0013. All remaining work in the option area
TOTAL AMOUNT – OPTION 4 (Items 0012 & 0013) $_______________
OPTION 5
0014. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (5 Structures) 14,405 Tons $_________ $___________
0015. All remaining work in the option area
TOTAL AMOUNT – OPTION 5 (Items 0014 & 0015) $_______________
00 10 00 Page 6 Am0001
OPTION 6
0016. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 560 to 580 (2 Structures) 3,109 Tons $_________ $___________
0017. All remaining work in the option area
TOTAL AMOUNT – OPTION 6 (Items 0016 & 0017) $_______________
OPTION 7
0018. Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (3 Structures) 5,824 Tons $_________ $___________
0019. All remaining work in the option area
TOTAL AMOUNT – OPTION 7 (Items 0018 & 0019) $_______________
TOTAL BASIC AMOUNT (Items 0001 thru 0005) $_______________
TOTAL AMOUNT BASIC PLUS OPTIONS (Items 0001 thru 0019)$_______________
Notes:
1. See SECTION 00 21 00, INSTRUCTIONS TO OFFERORS (IFB) for evaluation of options.
The Government reserves the right to exercise the options within 180 days after issuance of Notice to Proceed.
00 10 00 Page 7 Am0001
2. The quantities for unit priced items are estimated only and the respective unit price will prevail in the event of an overrun or underrun subject to Contract Clauses "Variation in Estimated Quantity."
3. Bid prices must be entered for all items of the schedule. Total amount bids submitted without bid prices being entered on individual items will be rejected. Extensions will be subject to verification by the Government. In case of variation between the unit prices and the extensions, the unit prices will be considered the bid. In case of variation between the individual bid item prices and the total amount, the individual bid prices will be considered the bid.
4. A modification to a bid which provides for a single adjustment to the total amount bid should state the application of the adjustment to each respective unit price and lump sum price affected.
If the modification is not so apportioned, the single adjustment will be applied to Item No. 0005.
5. See Section 01 22 00 MEASUREMENT AND PAYMENT for additional information.
6. Option Items 0006 and 0007 will be awarded together or not at all. Option Items 0008 and 0009 will be awarded together or not at all. Option Items 0010 and 0011 will be awarded together or not at all. Option Items 0012 and 0013 will be awarded together or not at all. Option Items 0014 and 0015 will be awarded together or not at all. Option Items 0016 and 0017 will be awarded together or not at all. Option Items 0018 and 0019 will be awarded together or not at all.
If options items are exercised, the work must be performed within the time remaining under the contract, meaning no additional time will be added to the contract.
.0 s f in
M R
Q c
N .d g n
/2
/2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
1 2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O h tt p /w w w u s a c e .a rm y .m il
.1
X
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
R .G .P
I.
D .C
D .B .P
B A
S
IC
W F -1
X -F -0
X X
X
M R
P M
R -3
M
IS
S O
U R I
R
IV
E R
D
B P
B A
N K S
T A
B
IL
IZ
A T
IO
N N
A V
IG
A T
IO
N P
R O J E
C T
R
IV
E R M
IL
E
W F
B
J U
N E
R E
P A
IR
N
O R
T H S
T R
U C
T U
R E
S F
O R
S
E A
S O
N
S T
R U
C T
U R
E T
A B
U L
A T
IO
N S
H E
E T
C3.01
S H
E E
T O
F
OF THE WORK.
2. THE 0701 SUBMITTAL SHALL BE COMPLETED 30 DAYS WITHIN COMPLETION
DEPTH (DEFICIENCY HEIGHT) DIFFERENCES GREATER THAN 2.5 FEET.
THAN 100 FT FOR DEFICIENCY LENGTHS OF GREATER THAN 300 FT AND ANY
WITH DEFICIENCY LENGTHS OF LESS THAN 300 FT, DIFFERENCES GREATER
DEFICIENCY LENGTH DIFFERENCES GREATER THAN 50 FT FOR STRUCTURES
PLACING ROCK FOR THE STRUCTURE. EXCESSIVE DIFFERENCES INCLUDE
THE CONTRACTING OFFICERS REPRESENTATIVE FOR DIRECTION PRIOR TO
NUMBERS SHOWN ARE ENCOUNTERED, THE CONTRACTOR SHOULD CONTACT
1. IF STRUCTURE LENGTHS OR DEPTHS THAT DIFFER APPRECIABLY FROM THE
NOTES:
ALL STUCTURES INCLUDED UNDER BASE 4.
DATE NO LATER THAN 31 MAY 2021.
3. THE CONTRACTOR SHALL SUBMIT THE PROPOSED ORDER OF WORK WITHIN THE WORK PLAN FOR APPROVAL. THE STRUCTURES BELOW SHOULD BE INCLUDED IN THE WORK PLAN WITH A COMPLETION
PERFORMANCE PERIOD TO ADDRESS SPECIFIC STRUCTURES TO RELIEVE SHOALING OR OTHER PERFORMANCE ISSUES.
2. NAVIGATION CHANNEL PERFORMANCE IS CRITICAL DURING THE WORK PERIOD. ON A LIMITED BASIS, THE GOVERNMENT MAY REQUIRE THE CONTRACTOR TO SHIFT WORK ORDER DURING THE
TO ADEQUATELY PLACE (AND NOT JUST DUMP OR CAST) ROCK, AS WELL AS THE ABILITY TO INSPECT AND VERIFY QUANTITIES AT THESE HIGHER RIVER STAGES.
1. THE CONTRACTOR MUST REQUIRE SPECIFIC APPROVAL FROM THE COR PRIOR TO PLACEMENT IF THE RIVER ELEVATION IS CRP+5 OR GREATER. THE CONTRACTOR WILL NEED TO SHOW THEIR ABILITY
ORDER OF WORK NOTES:
A M G
E N
E R
A L R
E V
IS
IO
N S
-2
-2
| SF30-Nov2016 good |
| Am 0001 |
| BID MRQ8 (north) |
| mrQ8c201 |
| mrQ8c301 |
File details come from the government source that posted it. Updated .