This document is an abstract of bids for the Missouri River Bank Stabilization and Navigation (BSNP) North Structures Repair project. The U.S. Army Corps of Engineers, Engineering District Omaha is soliciting bids to rehabilitate damaged BSNP structures including revetments, dikes, kickers, L-head dikes and vanes along the Missouri River from River Mile 563 to 624 in Nebraska and Iowa. The work will include adding stone to replace deteriorated areas and rebuilding parts of structures to bring them back to design profiles. The project has a construction duration of 450 calendar days and is estimated to be valued between $5 million to $10 million. Two bids were received by the July 16, 2020 deadline from Western Contracting Corporation and Newt Marine Service. The bids include line items for stone placement and remaining work at various river mile sections, with optional additional work. Pricing ranges from $7.7 million to $11.1 million total across the line items. This opportunity is restricted to small businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED
16-Jul-20
I CERTIFY THAT I HAVE OPENED, READ AND
AND RECORDED ON THIS ABSTRACT
ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED
North Structures RepairMissouri River Bank Stabilization (BSNP)
C. REASONABLE CONTRACT
7A 7B 7C D. E. F.
ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 624 to 620 (2 Structures) 1,517 Tons $74.85 $113,547.45 $60.00 $91,020.00 $70.00 $106,190.00
Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (3 Structures) 14,832 Tons $75.20 $1,115,366.40 $55.00 $815,760.00 $70.00 $1,038,240.00
Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 560 to 580 (9 Structures) 19,988 Tons $76.75 $1,534,079.00 $55.00 $1,099,340.00 $70.00 $1,399,160.00
Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River Mile 580 to 600 (5 Structures) 29,827 Tons $75.20 $2,242,990.40 $65.00 $1,938,755.00 $90.00 $2,684,430.00
0005 All remaining work Except for Option Items listed below 1 Job $165,300.00 $175,000.00 $500,000.00
Option 1- Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River
Mile 580 to 600 (1 Structures)
20,773 Tons $75.20 $1,562,129.60 $48.00 $997,104.00 $70.00 $1,454,110.00
All remaining work in the option area as shown on the drawings and in the specifications 1 Job $14,100.00 $2,500.00 $10,000.00
Option 2 - Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River
Mile 560 to 580 (3 Structures)
18,721 Tons $76.75 $1,436,836.75 $48.00 $898,608.00 $70.00 $1,310,470.00
All remaining work in the option area as shown on the drawings and in the specifications 1 Job $14,100.00 $2,500.00 $10,000.00
Option 3 - Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River
Mile 580 to 600 (2 Structures)
6,066 Tons $75.20 $456,163.20 $48.00 $291,168.00 $70.00 $424,620.00
All remaining work in the option area as shown on the drawings and in the specifications 1 Job $14,100.00 $2,500.00 $10,000.00
Option 4 - Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River
Mile 560 to 580 (3 Structures)
7,287 Tons $76.75 $559,277.25 $48.00 $349,776.00 $70.00 $510,090.00
All remaining work in the option area as shown on the drawings and in the specifications 1 Job $14,100.00 $2,500.00 $10,000.00
Option 5 - Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River
Mile 580 to 600 (5 Structures)
14,405 Tons $75.20 $1,083,256.00 $48.00 $691,440.00 $70.00 $1,008,350.00
OMAHA, NE 68102-1618
1616 CAPITOL AVENUE
CONTRACTING DIVISION (CENWO-CT)
US ARMY CORPS OF ENGINEERS
l PAGES
9. OFFERS
TO THIS SOLICITATION
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
NO. 1 NO. 2
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
W9128F20B0022
4. ISSUING OFFICE
8. GOVERNMENT ESTIMATE
(Check A, B or C AND COMPLETE D, E AND F)
5. PROJECT TITLE
A. OFFEROR A. OFFEROR
705 Douglas St, Ste 400 5 Jones St, Ste 2
A. HIRED LABOR
IGE Western Contracting Corporation Newt Marine Service
Sioux City, IA 51101-1087 Dubuque, IA 52001-7674
B. REASONABLE CONTRACT
6. NUMBER OF AMENDMENTS ISSUED Bid Security 20%
C. AMENDMENTS ACKNOWLEDGED : Yes
Bid Security 20%
C. AMENDMENTS ACKNOWLEDGED : Yes
(Without Profit)
(Including Profit)
David W. Neal, Contracting Officer
17 July 2020
All remaining work in the option area as shown on the drawings and in the specifications 75 Job $17,600.00 $2,500.00 $10,000.00
Option 6 - Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River
Mile 560 to 580 (2 Structures)
3,109 Tons $79.40 $246,854.60 $48.00 $149,232.00 $70.00 $217,630.00
All remaining work in the option area as shown on the drawings and in the specifications 1 Job $14,100.00 $2,500.00 $10,000.00
Option 7 - Entire work, complete, for quarried stone as shown on the drawings and in the specifications from River
Mile 580 to 600 (3 Structures)
5,824 Tons $76.75 $446,992.00 $48.00 $279,552.00 $70.00 $407,680.00
All remaining work in the option area as shown on the drawings and in the specifications 1 Job $14,100.00 $2,500.00 $10,000.00
TOTAL $11,064,992.65 $7,794,255.00 $11,130,970.00