Cherry_Creek_Stilling_Basin_Specs_6-10-19_PART_2.pdf
PDF 6 MB Posted
- Attached to
- Cherry Creek Dam Dewater and Inspect Federal contract opportunity
- Solicitation number
- W9128F19Q0090
About this file
Specifications PART 2 of 2 for W9128F19Q0090
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_Contractor_2_July_19_Emailed_Questions.pdf | ||
| CC.2019.SBDewater.Pre-BidSiteVisitQuestions.13&24June-2019.pdf | ||
| Questions_received_via_Email.pdf | ||
| Attachments_1_and_2_Only_CC_Stilling_Basin_Dewatering_Contract_06-13-19.pdf | ||
| Cherry_Creek_Stilling_Basin_Specs_6-10-19_PART_1.pdf | ||
| W9128F19Q0090_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Access Road & Pedestrian / Bike Path Crossing
Work Area - Cherry Creek Dam Stilling Basin
Approximate Onsite Disposal Area
Contractor Access Road (Aggregate Surface Road)
Contractor Private Vehicle Parking Area
Notes: 1. Directions to the construction site from Interstate 225:
Take southbound Parker Road Exit Take Vaughn Way / Dam Road Exit Travel straight through the intersection with the stop light onto the Cherry Creek Dam Road Turn right onto the Contractor Access Road (2-Wheeled Path) Follow Contractor Access Road to the Cherry Creek Dam Stilling Basin
2. Always Yield to Bicyclists and Pedestrians on the Bike Path.
CONTRACTOR SITE PLAN AND ACCESS PLAN
ATTACHMENT 1
CONTRACTOR WORK AREA, STAGING AREA AND ACCESS
ATTACHMENT 2
Contractor Access Road
Approximate On- Site Disposal Area
Cherry Creek Stilling Basin;
Dewater and Sediment/Debris Removal
Pedestrian / Bike Path Crossing
Access Road
Cherry Creek Channel
Staging Area
Cherry Creek Dam Stilling Basin Structure
Orange Construction Fence
ATTACHMENT 3
CHERRY CREEK STILLING BASIN PLAN (FROM 1953 AS-BUILT DRAWING CC 1-25-1)
CHERRY CREEK STILLING BASIN CENTERLINE PROFILE (FROM 1953 AS-BUILT DRAWING CC1-25-1)
PLAN OF THE CHERRY CREEK STILLING BASIN STRUCTURE (FROM 1953 AS-BUILT DRAWING CC1-50-1)
PROFILE OF THE CHERRY CREEK STILLING BASIN STRUCTURE (FROM 1953 AS-BUILT DRAWING CC1-50-1)
SECTION A-A FROM 1953 AS-BUILT DRAWING CC 1-50-2 SHOWING DRAINAGE DETAILS
(LOCATION OF SECTION SHOWN ON PLAN, AS-BUILT DRAWING CC1-50-1)
SECTIONS B-B, C-C FROM 1953 AS-BUILT DRAWING CC 1-50-2 SHOWING DRAINAGE DETAILS
(LOCATION OF SECTIONS SHOWN ON PLAN, AS-BUILT DRAWING CC1-50-1)
ATTACHMENT 4
ESTIMATED ORIGINAL TOPOGRAPHY OF THE CHERRY CREEK STILLING BASIN (1950)
ATTACHMENT 5
Oct 1948 photo of the Cherry Creek Stilling Basin and the Cherry Creek Channel, looking downstream, before water was released.
Oct 1948 photo of the Cherry Creek Channel immediately downstream of the Cherry Creek Stilling Basin Structure before water was released.
ATTACHMENT 6
Cherry Creek Dam Stilling Basin
Dewatering/Sediment Removal/Cleaning Photographs
November 2009
Stilling basin at beginning of November 2009 dewatering effort Sandbag dam placed just upstream of the Interstate 225 bridges
Close-up of sandbag dam in previous photo Large pump set-up used for initial dewatering effort
Large pump used for initial dewater Intake and discharge hoses for large pump
One of pump locations larger pump was moved to after initial dewater Pump locations used for smaller pumps after initial dewatering.
Fish removal operation Fish removal operation
Significant sediment removal operation D/S of end sill after initial dewatering. Disposal area for sediment removed from stilling basin Significant sediment removal is not anticipated for 2019 contract.
Track skid loader that was allowed in stilling basin, betw. baffles & end sill Skid loader removing sediment on floor of basin between baffles & end sill
Skid loader removing sediment on floor of basin between baffles & end sill Manual removal of sediment between, & upstream of, baffle blocks
Pressure washing of stilling basin Pressure washing of stilling basin
Wall drain outlets on inside of east wall of stilling basin Close-up of wall drain outlets on east wall of stilling basin
D/S end sill of basin at end of walls, looking east to west. Basin has no sump West basin wall & D/S end sill of basin, looking west. Basin has no sump
View of basin end sill looking downstream toward I-225 bridge
Close-up of west side of basin, looking D/S, after dewater & cleaning Close-up of middle of basin, looking D/S, after dewater & cleaning & prior to & prior to inspection Inspection
Close-up of east side of basin, looking D/S, after dewater & cleaning & prior to inspection
Close-up of west side of basin, looking U/S, after dewater & cleaning & Close-up of east side of basin, looking U/S, after dewater & cleaning & prior to prior to inspection inspection
One of several existing damaged baffles in stilling basin Another damaged baffle in stilling basin
Baffle that was in good condition