Cherry_Creek_Stilling_Basin_Specs_6-10-19_PART_1.pdf
PDF 683 KB Posted
- Attached to
- Cherry Creek Dam Dewater and Inspect Federal contract opportunity
- Solicitation number
- W9128F19Q0090
About this file
Specifications PART 1 of 2 for W9128F19Q0090
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QA_Contractor_2_July_19_Emailed_Questions.pdf | ||
| CC.2019.SBDewater.Pre-BidSiteVisitQuestions.13&24June-2019.pdf | ||
| Questions_received_via_Email.pdf | ||
| Attachments_1_and_2_Only_CC_Stilling_Basin_Dewatering_Contract_06-13-19.pdf | ||
| Cherry_Creek_Stilling_Basin_Specs_6-10-19_PART_2.pdf | ||
| W9128F19Q0090_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
(For Construction Contract - Purchase Order)
Solicitation No. W9128F19Q0090
Cherry Creek Dam - Stilling Basin Dewatering and Cleaning
Arapahoe, CO
June 2019
US Army Corps of Engineers Omaha District
This page was intentionally left blank for duplex printing.
Stilling Basin Dewatering and Cleaning
Cherry Creek Dam
Arapahoe, CO
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 22 00 PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS
AND EVALUATION/SELECTION CRITERIA
00 73 00 SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT
REQUIREMENTS)FOR PURCHASE ORDERS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 CONSTRUCTION SPECIFICATIONS
01 33 00 SUBMITTAL PROCEDURES
01 57 20.00 10 ENVIRONMENTAL PROTECTION
-- End of Project Table of Contents --
SECTION 00 22 00 – Page 1
SECTION 00 22 00
PROPOSAL INSTRUCTIONS, SUBMISSION REQUIREMENTS
AND EVALUATION/SELECTION CRITERIA
Cherry Creek Dam Stilling Basin Dewatering and Cleaning
Cherry Creek Dam, Arapahoe County, Colorado W9128F-19-Q-0090
1. WHO MAY SUBMIT. This solicitation is restricted to the Contractors under SDVOSB. There will be no public opening. All proposals submitted will become, upon receipt, the property of the U.S. Government and will not be returned. After evaluation of proposals, the original will be retained for the official contract file. Extra copies of the awardees’ proposal will be submitted to the Field and Area Offices in support of their contract administration functions. Any extra copies of the proposals deemed unnecessary by the government will be destroyed.
2. GENERAL REQUIREMENTS. In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information sufficiently detailed to clearly indicate compliance with the proposal submission requirements.
3. SUBMISSION DEADLINE. Proposals shall be received by the USACE Contracting Activity no later than the time and date specified in Block 13 of Standard Form 1442. Proposals shall be submitted electronically to the Contract Specialist per the instructions included in the RFP letter. The Contract Specialist is Dan Monahan, Daniel.D.Monahan@usace.army.mil, 402-995-2886.
4. PROPOSAL REQUIREMENTS. Offerors shall submit a proposal on 8-1/2" x 11" paper, with Times New Roman or Arial font, no smaller than 10 size. The requirements specified in the solicitation are considered minimum requirements. A proposal that fails to comply with the minimum technical requirements will not be eligible for award.
The technical proposal and pricing shall be submitted in separate forms and/or separate files.
PROPOSAL REQUIREMENTS
Paragraph 5.1 -- Previous Experience Paragraph 5.2 -- Pricing
5. EVALUATION OF PROPOSALS. Proposals will be evaluated on the factors listed below. All factors are equally important in determining the successful proposal. Offeror is highly encouraged make a site visit to the project site prior to submitting his/her proposal. See SECTION 01 11 00, CONSTRUCTION SPECIFICATIONS, for site visit contact information.
5.1 FACTOR 1: PREVIOUS EXPERIENCE. The Offeror shall provide, as a minimum, the information listed below for two construction projects completed for the Federal Government within the past five years. The projects submitted shall be of similar work type and/or complexity. For evaluation purposes “similar” is defined as sharing aspects of comparable magnitude and/or complexity. Particularly relevant are maintenance or rehabilitation projects that have been completed at dam or levee projects for the US Army Corps of Engineers, Bureau of Reclamation or other Federal Government entities. The information be will be used at the option of the source selection team to aid in the determination of acceptable previous experience. The submitted projects should include:
--- Name of Client/Customer --- Project/Program Manager or similar Point of Contact for the project with address and telephone number --- Project Location --- Project Description --- Contract Amount --- Project Start and Finish Dates --- Other relevant documentation that demonstrates successful past performance for a Federal construction contract.
Submitted projects shall have a minimum construction dollar value of $25,000 per project and shall have been completed within the last five (5) years from date proposals are due. The previous experience submittal shall be limited to no more than 1 page total per project.
mailto:Daniel.D.Monahan@usace.army.mil
SECTION 00 22 00 – Page 2
5.1.1 Factor 1 (Technical) Evaluation. Pricing data will not be part of the technical evaluation. Criteria for the technical evaluation as set forth in the solicitation will be the sole basis for determining the technical merit of proposals. Factor(s) listed above will be assigned a technical evaluation of “Acceptable” or “Unacceptable”.
Adjectival Rating Description Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
5.2 FACTOR 2: PRICING. The Contractor shall propose a price for each identified Task as shown on the
Pricing Schedule below and as described in Paragraph 5.1 of SECTION 01 11 00. The pricing submittal shall be limited to no more than 1 total page.
PRICING SCHEDULE
TASK DESCRIPTION QTY UNIT AMOUNT
1 Entire work complete, Dewatering Operations 1 Job $
2 (a, b & c)
Entire work complete, Removal & Relocation/Disposal of Riprap, Coarse Aggregate, Silt, Debris & Foreign Material and Cleaning/Pressure-Washing
Job
Entire work complete, Clean and Perform Video Camera Inspection of Walls & Slab Underdrain System
Job
4 All Remaining Work 1 Job $
TOTAL AMOUNT (Items 1 thru 4) $
5.2.1 Factor 2 Pricing Evaluation. Factor 2 will be evaluated based on a price analysis that verifies the total proposal price offered is fair, reasonable and realistic.
6. EVALUATION FOR AWARD. For those Offerors who receive an “Acceptable” rating for Factor 1, Previous Experience, the Lowest Price Technically Acceptable (LPTA) will be the source selection method used for award.
Uniformity of all proposals is essential to assure accurate evaluation. All proposals must comply with the instructions in the solicitation. Those proposals, which are properly submitted, will be evaluated to determine technically acceptable contractor(s). A proposal that fails to comply with any minimum technical requirements will not be eligible for award regardless that it may offer the lowest price.
Any Factor evaluated as “Unacceptable” in any TAB will render the complete technical portion of the offer as “Unacceptable”. No further evaluation will be made on the Offeror’s proposal, including price.
7. SELECTION AND AWARD WITHOUT EXCHANGES. It is the intent of the Government to make award based upon initial offers, without further exchanges or additional information. Therefore, proposals should be submitted initially on the most favorable terms of price and technical requirements. Do not assume an opportunity will be afforded to clarify, discuss, or revise proposals. If award is not made on initial offers, exchanges will be conducted as needed.
Dewatering & Inspection of Stilling Basin, Cherry Creek Dam, CO CD38
DOCUMENT 00 73 00 Page 1
SECTION 00 73 01
SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT REQUIREMENTS)FOR PURCHASE ORDERS
2/19
PART 1 GENERAL
1.1 SCOPE
See Section SECTION 01 11 00 CONSTRUCTION SPECIFICATIONS
1.2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
The Contractor shall commence work under this contract within ten (10) calendar days after the date of receipt by him of Notice to Proceed, prosecute said work diligently, and complete the entire work except seeding ready for use not later than 60 calendar days after receipt of Notice to Proceed. The Contractor will not be allowed onsite until 30 October 2019. The time stated for completion shall include final cleanup of the premises. (FAR 52.211-10)
1.3 CONTRACT DRAWING AND SPECIFICATIONS
The Contractor shall be responsible for making his own copies of specifications, drawings and any amendments, as needed for the duration of the project, from the electronic files provided.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
AT Level I Training Sign In Sheets;
Sign In Sheets for all employee training required for AT Level I Training, see paragraphs 1.4, subparagraph 1
Security Personnel List; G-PO
Security Personnel list as described in Access and General Protection/Security Policy and Procedures paragraph 1.4, subparagraph 3.1.
iWATCH and/or CorpsWatch Training Sign In Sheets;
Sign In Sheets for all employee training required for iWATCH and/or CorpsWatch Training, see paragraphs 1.4, subparagraph 4
OPSEC Training Sign In Sheets;
Sign In Sheets for all employee training required for OPSEC Training, see
DOCUMENT 00 73 00 Page 2 paragraphs 1.4, subparagraph 7
See Section: 01 33 00 SUBMITTAL PROCEDURES
1.5 CONTRACTOR QUALITY CONTROL (CQC).
1.5.1 Responsibility of the Contractor
Except for isolated tests or other items of work specified to be performed by the Government, the quality of all work shall be the responsibility of the Contractor. Sufficient inspections and tests of all items of work, including that of subcontractors, to ensure conformance to applicable specifications and drawings with respect to the quality of materials, workmanship, construction, finish, functional performance, and identification shall be performed on a continuing basis.
1.6 GUARANTEE
The equipment and supplies to be furnished under this contract shall be guaranteed for a period of one (1) year from the date of acceptance thereof, either for beneficial use or final acceptance, whichever is earlier, against defective materials, design, and workmanship. Upon receipt of notice from the Government of failure of any of the guaranteed equipment during the guarantee period, new replacement parts shall be furnished and installed promptly by the Contractor at no additional cost to the Government. The Contractor shall also obtain and deliver to the Contracting Officer any warranties of equipment or supplies which the subcontractors, manufacturers, or suppliers would give normal commercial practice.
1.7 ACCIDENT PREVENTION
In accordance with EM 385-1-1, Safety and Health Requirements Manual, the Contractor shall provide for protecting of the lives and health of employees and other persons; preventing of damage to property; and avoiding work interruptions.
1.8 PROTECTION OF EXISTING FACILITIES AND WORKS
The Contractor shall be responsible for the protection of work area from damage and upon completion of the work shall leave existing works in a condition equal to that which existed when the work started.
1.9 CONTRACT DRAWINGS AND SPECIFICATIONS
1.9.1 NOTIFICATION OF DISCREPANCIES
The Contractor shall check all drawings furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Dimensions marked on drawings shall be followed in lieu of scale measurements. Enlarged plans and details shall govern where the same work is shown at smaller scales. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
1.9.2 OMISSIONS
Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of
DOCUMENT 00 73 00 Page 3 the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.
1.10 PAYMENT
1.10.1 PROMPT PAYMENT ACT
Pay requests authorized in CONTRACT CLAUSES clause: "Payments Under Fixed Price Construction Contracts", will be paid pursuant to the clause, "Prompt Payment for Construction Contracts". Pay requests will be submitted on ENG Form 93 and 93a, "Payment Estimate Contract Performance" and "Continuation". All information and substantiation required by the identified contract clauses will be submitted with the ENG Form 93, and the required certification will be included on the last page of the ENG Form 93a, signed by an authorized contractor official and dated when signed. The designated billing office is the Office of the Area Engineer.
1.10.2 PAYMENTS FOR MODIFICATIONS
Payments may be made for cost bearing change orders within the scope of the contract only to the extent funds are authorized in the order on a two part modification. Contractor pricing proposed must be submitted at the earliest possible time after the change order is issued, or at a specific time as directed by the Contracting Officer. At the discretion of the Contracting Officer, any and all payments may be withheld on the modification until the Contractor has submitted a qualifying price proposal, in as much detail as required by the Contracting Officer, and the final price has been agreed.
1.11 AVAILABILITY OF UTILITY SERVICES
All reasonably required amounts of electricity (120v) will be made available to the Contractor by the Government from existing system outlets and supplies.
1.12 PROFIT
a. Weighted guidelines method of determining profit shall be used on any equitable adjustment change order or modification issued under this contract. The profit factors shall be as follows:
Factor Rate Weight Value Degree of Risk 20 See Item
Relative difficulty of work 15 b. below
Size of Job 15
Period of performance 15
Contractor's investment 5
Assistance by Government 5
Subcontracting 25
b. Based on the circumstances of each procurement action, each of the above factors shall be weighted from .03 to .12 as indicated below. The value shall be obtained by multiplying the rate by the weight. The value column when totaled indicates the fair and reasonable profit percentage
DOCUMENT 00 73 00 Page 4 under the circumstances of the particular procurement.
(1) Degree of Risk. Where the work involves no risk or the degree of risk is very small, the weighting should be .03; as the degree of risk increases, the weighting should be increased up to a maximum of .12.
Lump sum items will have, generally, a higher weighted value than the unit price items for which quantities are provided. Other things to consider:
the portion of the work to be done by subcontractors, nature of work, where work is to be performed, reasonableness of negotiated costs, amount of labor included in costs, and whether the negotiation is before or after performance of work.
(2) Relative Difficulty of Work. If the work is most difficult and complex, the weighting should be .12 and should be proportionately reduced to .03 on the simplest of jobs. This factor is tied in to some extent with the degree of risk. Some things to consider: the nature of the work, by whom it is to be done, where, and what is the time schedule.
(3) Size of Job. All work not in excess of $100,000 shall be weighted at .12. Work estimated between $100,000 and $5,000,000 shall be proportionately weighted from .12 to .05.
(4) Periods of Performance. Jobs in excess of 24 months are to be weighted at .12. Jobs of lesser duration are to be proportionately weighted to a minimum of .03 for jobs not to exceed 30 days. No weight where additional time not required.
(5) Contractor's Investment. To be weighted from .03 to .12 on the basis of below average, average, and above average. Things to consider: amount of subcontracting, mobilization payment item, Government furnished property, equipment and facilities, and expediting assistance.
(6) Assistance by Government. To be weighted from .12 to .03 on the basis of average to above average. Things to consider: use of Government-owned property, equipment and facilities, and expediting assistance.
(7) Subcontracting. To be weighted inversely proportional to the amount of subcontracting. Where 80 percent or more of the work is to be subcontracted, the weighting is to be .03 and such weighting proportionately increased to .12 where all the work is performed by the Contractor's own forces.
1.13 AS-BUILT DRAWINGS
As-Builts are not required for this project.
1.14 PORTABLE TOILETS
Toilet facilities will not be available for Contractor's use. The Contractor shall provide and maintain portable toilets for use by the Contractor's staff . Toilet(s) shall be placed at the location directed by the Contracting Officer. To prevent overturning by high winds, all portable toilets shall be anchored down.
1.15 FEDERAL HOLIDAYS AND WORKING HOURS
Work hours: The Contractor can work Monday through Friday 0700 to 1700.
Working outside these work hours will need written permission from the
DOCUMENT 00 73 00 Page 5
COR. The Contractor will not be allowed to work on Federal holidays.
The following Federal legal holidays are observed by this installation:
New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
If a wage determination applies the number of holidays specified on it, it has priority over this requirement.
1.16 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
1. AT Level I Training
All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days prior to mobilization. The Contractor shall submit certificates of completion and memo listing names of each affected Contractor employee and subcontractor employee who took the training on the date listed on the submitted certificate, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel (submittal: AT Level I Training Sign In Sheets). Any following trainings documented via memo shall require at least one formal certificate matching the dates listed on the memo. AT Level I awareness training is available at the following website:
https://jko.jten.mil/courses/atl1/launch.html.
2. Not Used
3. Access and General Protection/Security Policy and Procedures All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.
3.1 Submit a complete, updated and signed, list of all Contractor and subcontractor personnel, including their titles and intended working hours, who will be working on site prior to start of work. This listing shall be revised and resubmitted when personnel changes occur.
(submittal: Security Personnel List)
DOCUMENT 00 73 00 Page 6
3.2 Company Registration
All USACE Prime Contractors shall register their company, with USACE's HSPD-12 compliance system, information at https://www.nwd.usace.army.mil/Business-With-Us/Contractor-Vetting/ within ten (10) working days after award of any contract, task order, or notice to proceed. Cost to register company is $399 if more than 20 individuals will be accessing USACE sites, or $299 if less than 20 employees will be accessing USACE sites. Registration is good for 365 days. If the contract period is longer than 365, company must renew their registration.
3.3 Personnel Registration
All contractor and subcontractor personnel that will be onsite for more than 10 days must be registered via USACE's HSPC-12 Compliance system, information at https://www.nwd.usace.army.mil/Business-With-Us/Contractor-Vetting/.
Thirty days prior to mobilization, registration of employees must occur.
Cost to register an employee is $159. Registration is good for one year.
Employee may work on multiple contracts or for multiple companies and the registration will remain valid for 365 days. If the contract extends beyond that period a renewal fee of $159 is required.
a. Identity Verification - Once a contractor is cleared to work and access a USACE facility, the individual contractor employees shall be required to show an identification compliant with the REAL ID Act of 2005 (https://www.dhs.gov/real-id) to access the Jobsite. Acceptable forms of identity verification are documents issued by a federal Government agency that include: the individual's photograph, name, and date of birth, such as a passport or military identification (ID) card.
b. Waiver - If a denial occurs there is a waiver process on the contractor's page. If there are any difficulties with the waiver process please contact your COR.
c. Escort Requirements - Contractor personnel not cleared for authorized access to the Jobsite may be escorted by Government or Contractor personnel that have authorized unescorted access to the Jobsite. All costs related to the escorting of non-cleared personnel shall be at the expense of the Contractor. Additional burden shall not be placed upon the Government to provide these escorts. Prior to access, coordination with the Project Security Officer is required, including but not limited to:
(1) Verification of identity with photo identification
(2) Name of escorting individual and verification of unescorted status
(3) Time of entry into the Jobsite
(4) Time exiting the Jobsite.
4. iWATCH and/or CorpsWatch Training
The Contractor and all associated subcontractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 days prior to mobilization and within 30 calendar days of new employees commencing performance with the results reported to the COR. (submittal: iWATCH and/or CorpsWatch Training Sign In Sheets).
http://www.myarmyonesource.com/cmsresources/Army%20OneSource/Media/Videos/ Family%20Programs%20and%20Services/iWatch_Program/iWATCH%2060_4streaming.wmv http://www.nwd.usace.army.mil/Business-With-Us/Contractor-Vetting/ http://www.nwd.usace.army.mil/Business-With-Us/Contractor-Vetting/ http://www.dhs.gov/real-id) http://www.myarmyonesource.com/cmsresources/Army%20OneSource/Media/Videos/
DOCUMENT 00 73 00 Page 7
5. and 6 NOT USED.
7. OPSEC Training
All new Contractor employees will complete Level I OPSEC training within 30 calendar days prior to mobilization. Additionally, all Contractor employees must complete annual OPSEC awareness training. (submittal: OPSEC Training Sign In Sheets) https://securityawareness.usalearning.gov/opsec/
8. thru 12 NOT USED
13. Will be Escorted in Areas Where They May be Exposed to Classified and/or Sensitive Materials and/or Sensitive or Restricted Areas If applicable, all contract employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. There is NO classified material at this project location.
14. Contractor Company to Obtain a Facility Clearance and Individual Clearances at the Appropriate Level
The Prime Contractor Company must have (or will have) a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance.
Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL. This location does NOT require a Facility Clearance/FCL.
15. Pre-Screen Candidates using E-Verify Program
The Contractor must pre-screen Candidates using the E-verify Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
16. & 17 Not Used
PART 2 NOT USED
PART 3 NOT USED
-- End of Section --http://www.dhs.gov/E-Verify)
SECTION 01 11 00 – Page 1
SECTION TABLE OF CONTENTS
SECTION 01 11 00
CONSTRUCTION SPECIFICATIONS
Cherry Creek Dam Stilling Basin Dewatering and Cleaning
1.0 SCOPE OF WORK
1.1 GENERAL
1.2 SCHEDULE
1.3 SITE VISIT
1.4 USACE CONTRACTING OFFICIALS
2.0 GENERAL
2.1 STANDARDS AND REGULATIONS
2.1.1 Activity Hazard Analysis (AHA)
2.1.2 Accident Prevention Plan (APP)
2.1.3. Crane Critical Lift Plan
2.2 MEASUREMENT AND PAYMENT
2.3 PROJECT LOCATION AND CONTRACTOR ACCESS
2.4 WORK AREA, STAGING AREA AND ACCESS
2.4.1 Contractor Staging Area
2.4.2 Contractor Work Area
2.4.3 Access and Haul Roads and Road Restrictions
2.4.4 Access by Government Personnel
2.5 STORAGE OF EQUIPMENT AND MATERIALS
2.6 PERMITS AND RESPONSIBILITIES
2.7 WORK HOURS AND WORK LIMITS
2.7.1 Federal Holidays
2.7.2 Working Hours
2.8 VEHICLES
2.8.1 Use of Private Vehicles
2.8.2 Identification of Vehicles
2.9 FACILITIES
2.9.1 Utilities
2.9.1.1 Government Furnished Utilities
2.9.1.2 Temporary Utility Connections
2.9.2 Portable Toilets
2.10 SCAFFOLDING
2.11 CONTRACTOR’S AREA LIGHTING
2.12 GOVERNMENT FURNISHED TOOLS AND EQUIPMENT
2.13 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS
2.14 PROTECTION AND RESTORATION OF EXISTING FACILITIES
2.15 DAILY CLEANUP AND DISPOSAL
2.16 DISPOSAL OF MATERIALS
2.17 CARE OF DRAINS
2.18 NOISE CONTROL
2.19 CONTRACTOR’S AGENT, WORK SUPERVISOR, AND PERSONNEL
2.19.1 Contractor's Agent(s)
2.19.2 Site Supervisor(s)
2.19.3 Contractor's General Personnel
2.20 PROJECT REPORTING
2.21 DAILY MEETINGS
SECTION 01 11 00 – Page 2
2.22 ANTITERRORISM / OPERATION SECURITY REQUIREMENTS
2.22.1 Access and General Protection/Security Policy and Procedures
2.22.1.1 For Contractors who do not require Common Access Card (CAC), but require access to a DoD facility or installation
2.22.2 Pre-screen candidates using E-Verify Program
2.22.3 Escort Requirements
3.0 SUBMITTALS AND SUBMITTAL PROCEDURES
3.1 GENERAL
3.2 SUBMITTAL FORM
3.3 ACTION REQUIRED.
3.4 MEANING OF APPROVALS
3.5 WHEN NOT APPROVED
3.6 WITHHOLDING OF PAYMENT
3.7 SENDING OF SUBMITTALS
3.7.1 Electronic Submittal Format
3.8 ACTIVITY HAZARD ANALYSIS (AHA)
3.9 ACCIDENT PREVENTION PLAN (APP)
3.10 CRANE CRITICAL LIFT PLAN
3.11 PLAN OF OPERATION
3.12 SCHEDULE
4.0 MATERIALS
5.0 WORK REQUIREMENTS
5.1. GENERAL
5.1.1. Task 1
5.1.2. Task 2 (a)
5.1.3. Task 2 (b)
5.1.4. Task 2 (c)
5.1.5. Task 3
5.1.6. Task 4 – All Remaining Work
5.2 GENERAL PLANS, TECHNICAL DRAWINGS, AND PHOTOGRAPHS
5.3 WATER FLOW REGULATION
5.4 GENERAL ACTIVITY LIST & ORDER OF WORK - CONTRACTOR, USACE, US FISH & WILDLIFE, AND COLORADO STATE PARKS
5.5 ADDITIONAL SITE INFORMATION AND CONTRACT WORK REQUIREMENTS
5.5.1 Safety
5.5.2 Dewatering/Pumping
5.5.3 Fish – Preventative Measures & Removal/Relocation
5.5.4 Sediment, Debris, Foreign Material and Riprap/Aggregate -- Removal and Disposal/Relocation
5.5.5 Pressure Washing
5.5.6 Wall and Slab Cleaning/Inspection Requirements
5.5.7 Damage to USACE Facilities/Property
6.0 INSPECTION AND TESTS
7.0 WARRANTY
8.0 POINTS OF CONTACT
9.0 REFERENCE DRAWINGS
SECTION 01 11 00 – Page 3
SECTION 01 11 00
CONSTRUCTION SPECIFICATIONS
Cherry Creek Dam Stilling Basin Dewatering and Cleaning
1.0 SCOPE OF WORK
1.1 GENERAL.
It is the intent of this contract to pump surface water and remove sediment and debris from within the walls of the Cherry Creek Stilling Basin Structure (Structure), and thoroughly clean the Structure, so that a thorough inspection of the Structure can be performed by the U.S. Army Corps of Engineers. The work included in this Contract, and covered by this scope of work, consists of furnishing all labor, equipment, and materials and performing all operations necessary for the following tasks:
• removing all surface water from the Outlet Works Stilling Basin at Cherry Creek Dam (Stilling Basin), and from the Cherry Creek Channel (Channel) between the Stilling Basin and the Interstate 225 Bridge (I-225);
• maintaining the Stilling Basin and Channel in a dewatered condition so that a thorough structural evaluation and inspection of these features can be conducted by the U.S. Army Corps of Engineers (USACE) until inspection activities are complete;
• removing and disposing of all riprap, coarse aggregate, silt, debris, and other foreign material deposited within the Stilling Basin prior to USACE inspection activities;
• cleaning the concrete surfaces of the Stilling Basin by pressure-washing prior to USACE inspection activities; and
• cleaning and performing video camera inspections of the wall and slab drainage system with downhole camera and cleaning equipment and documenting the condition of the pipes prior to USACE inspection activities.
This work shall be completed as specified herein, as shown on the drawings, or as otherwise directed by the Contracting Officer. General plans, technical drawings, and photographs referenced in these construction specifications are included in the Attachments.
Summary of the Most Recent Dewatering of the Cherry Creek Stilling Basin (2009)
The Cherry Creek Stilling Basin was last dewatered, cleaned and inspected 02 through 20 November 2009. A large trailer mounted pump (6 to 8-inch diameter) was used to dewater the basin into the downstream Cherry Creek channel. The pump was operated for approximately 24 to 48 hours to remove the initial volume of water from the Cherry Creek Stilling Basin. Discharge water was released over a sandbag cofferdam and into the Cherry Creek channel to limit the back flow to the stilling basin. Approximately 200 pounds of fish were transferred from the Cherry Creek Stilling Basin to the Cherry Creek Lake. Attachment 6 to these specifications has typical photos from the 2009 Cherry Creek Stilling Basin Dewatering and Cleaning Project. Additional photos of the November 2009 dewatering project may be viewed at the Tri-Lakes Project Office.
1.2 SCHEDULE. The dewatering, removal of material, cleaning, inspection activities, and all incidental construction must take place over a 15-day period between Wednesday, October 30, 2019 and Wednesday, November 13, 2019 to minimize the impact on downstream water users and allowing for the coordination of travel plans with USACE inspectors. Flows will be shut off through the outlet works conduits during this 15-day window.
USACE inspection activities will take place between Monday, November 11, 2019 and Wednesday, November 13, 2019 (3 days). If adverse weather or Cherry Creek Lake reservoir conditions do not allow for work during this 15-day time period, alternate work dates are planned for November 13, 2019 to November 27, 2019. Any proposed
SECTION 01 11 00 – Page 4 change to the dates for this 15-day window shall be submitted to, and approved by, the Contracting Officer Representative prior to the start of the field work.
1.3 SITE VISIT. For Contractors submitting a proposal/bid for this Contract, a site visit is highly encouraged prior to submitting a proposal/bid. A site visit shall be coordinated with the Point of Contact shown in paragraph 8.0 of this section.
1.4 USACE CONTRACTING OFFICIALS. All USACE fiscal and logistical responsibility and authority related to this contract resides with the USACE Contracting Officer (CO), and no one besides the CO can make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract. The Contracting Officer’s Representative (COR) is an individual designated and authorized by the contracting officer to perform specific technical or administrative functions. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the
2.0 GENERAL
2.1 STANDARDS AND REGULATIONS. The Contractor shall perform to the standards in the Contract and comply with all Local, State, and Federal Regulations during the services performed. The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this Contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:
a. Engineering Manual (EM) 385-1-1 (USACE – Safety and Health Requirements Manual), dated November
2014; EM 385-1-1 can be found on line at:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf or at the USACE Tri-Lakes Project Office.
b. Occupational Safety and Health Standards (29 CFR 1910);
2.1.1 Activity Hazard Analysis (AHA). The Contractor shall prepare the AHA in accordance with paragraphs
01.A.13 to 01.A.14 and Figure 1-2 of the EM 385-1-1.
2.1.2 Accident Prevention Plan (APP). The Contractor shall prepare an APP in accordance with Appendix A, “Minimum Basic Outline for Accident Prevention Plan”, of EM 385-1-1.
2.1.3. Crane Critical Lift Plan: If a crane is used to lift material into, or out of, the Stilling Basin area, the
Contractor will prepare a critical lift plan. The Crane Critical Lift Plan format shall be in accordance with EM 385-1- 1, Paragraph 16.H.
2.2 MEASUREMENT AND PAYMENT. The will be no measurement of quantities for this Contract. Payment shall be for the total lump sum amount for furnishing all materials, equipment, and labor and performing all operations necessary for the work as indicated on the Pricing Schedule and specified in this section. Due to the short duration of this Contract, no interim or progress payments will be made. Final payment will be made in accordance with the estimated value of work completed as determined by the COR or as specified in this section, and in accordance with contract clause for payments.
2.3 PROJECT LOCATION AND CONTRACTOR ACCESS. The project location for this Contract is the Stilling Basin and the Cherry Creek Channel downstream of Cherry Creek Dam and Lake in Arapahoe County, Colorado. The Contractor Site Plan and Access Plan is shown on Attachment 1.
2.4 WORK AREA, STAGING AREA AND ACCESS. The Contractor’s Work Area, Staging Area and Access is shown on Attachment 2.
2.4.1 Contractor Staging Area. The Contractor shall use the construction staging area indicated on the contract drawings or as directed by the Contracting Officer. The Contractor may use this area to stage equipment and stockpile materials and supplies during the life of the contract. Upon completion of the work under this contract, the Contractor shall return the staging area and other work areas to their original condition. Contractor's staging area shall be restricted to the area designated by the Government. The contractor's job-site office may be in http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
SECTION 01 11 00 – Page 5 the staging area, as approved. The project areas off-limits to Contractor shall be all areas other than direct work areas. Signs may be erected outside the stilling basin structure containing instructions for personnel seeking the Contractor. The content and location of the signs must be approved. All buildings and facilities constructed or brought on site by the Contractor shall be maintained in a satisfactory condition with strict observance of the rules of sanitation, safety and order as may be established by the Contracting Officer. Prior to final payment under the contract, all buildings and facilities constructed by the Contractor for his own use shall be removed from the site by the Contractor.
2.4.2 Contractor Work Area. The limits of work are indicated on the drawings. The Contractor shall not disturb, stockpile, traverse on or perform work outside of an area 30 feet beyond the limits of the stilling basin or disposal area as shown on the Contract drawings. The Contractor shall take steps reasonably necessary to ascertain the nature and location of the work, and investigate the general and local conditions that can affect the work or its cost. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the Government. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government.
Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions that can affect the work by any of its officers or agents before the execution of this contract, unless the understanding or representation is expressly stated in this contract. Site conditions that should be investigated include, but are not limited to:
(1) Conditions bearing upon transportation, disposal, handling, and storage of materials.
(2) The availability of labor, water, electrical power, and roads
(3) Uncertainties of weather, river stages, tides, or similar physical conditions at the site
(4) The conformation and conditions of the ground and equipment and facilities to be replaced and/or rehabilitated
(5) The character of equipment and facilities needed preliminary to and during work performance
(6) Amount of work space, accessibility, lighting, etc.
2.4.3 Access and Haul Roads and Road Restrictions. All roads, either for access to the construction site or for hauling equipment and materials, shall be approved by the Contracting Officer. The Contractor shall be responsible for coordinating his mobilization routes with the Colorado Department of Transportation, as well as Arapahoe County in Colorado, and the U.S. Army Corps of Engineers Tri Lakes Project Office. The Contractor shall be responsible for obtaining legal load limit requirements and preferred haul routes.
2.4.3.1 Access Roads. Access roads are defined, for the purpose of this contract, as any existing road that is maintained by the Tri-Lakes Project Office. No new access roads are required for this work. Any damage to existing roadways that are used for access purposes shall be repaired and the surface shall be restored to its "as found" condition. The Contractor shall comply with any special requirements of the State, County, Local authorities and Corps of Engineers for use of existing roadways. These special requirements include, but are not limited to, traffic regulations and load limits. The Contractor is responsible for investigating and understanding these restrictions. No time extensions or cost claims will be allowed due to road restrictions.
2.4.3.2 Haul Roads. Haul roads are defined, for the purpose of this contract, as any existing privately owned road, or any road that must be constructed by the Contractor for the execution of the work required under this contract. The Contractor shall be responsible for coordinating the construction of any haul roads with the Tri Lakes Project Office. The Contractor shall maintain all haul roads necessary to perform the work. Haul roads shall be sprayed with water whenever, in the opinion of the Contracting Officer, control of dust is necessary to ensure safe movements of construction traffic. Upon completion of the work under this contract, haul roads constructed by the Contractor shall be removed and the area returned to its original condition
2.4.4 Access by Government Personnel. Clear access shall be maintained for Government personnel and equipment through all work areas.
2.5 STORAGE OF EQUIPMENT AND MATERIALS. Indoor and outdoor storage of equipment and materials will be permitted only at designated storage areas in the vicinity of the stilling basin which will be coordinated with
SECTION 01 11 00 – Page 6 the COR during the pre-work conference. A minimum access space of three feet shall be maintained between stored items and the existing stilling basin structure. Due to potential high winds at the site, everything in the outside storage area(s) shall be securely tied down so it will not be blown into the stilling basin area.
2.6 PERMITS AND RESPONSIBILITIES. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, County, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence, and shall take proper safety and health precautions to protect the work, workers, public, and property of others. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the Contract.
2.7 WORK HOURS AND WORK LIMITS.
2.7.1 Federal Holidays. The following Federal legal holidays are observed by this installation:
New Year's Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day (observed) 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
2.7.2 Working Hours. The Contractor is responsible for conducting business, and will have access to the
Stilling Basin and Channel areas for work, during normal business hours from 0630 to 1630 hrs Monday through Friday, excluding any federally recognized holiday that it is observed on and when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
Access on weekends and holidays will be allowed for pumping operations for maintaining the Stilling Basin, and Channel in a dewatered condition, unless otherwise approved by the COR. All weekend and Holiday work and access shall be coordinated with, and approved by, the COR prior to the start of work on these days. The Contractor shall plan all work accordingly to this work schedule. These hours will be strictly adhered to unless government determines work outside this time is beneficial to the government.
2.8 VEHICLES.
2.8.1 Use of Private Vehicles. Private vehicles of the Contractor and Contractor's employees shall use the employee parking lot on the east side of Cherry Creek Dam and north of Dam Road (See Attachment 1). The Contractor shall follow all Contracting officer requirements regarding vehicle access to the project. Parking of private vehicles shall be restricted to the areas designated by the Contracting Officer. Additional parking will be designated upon request, but may be located up to several miles from the Stilling Basin structure. The Contractor shall maintain the designated parking areas.
2.8.2 Identification of Vehicles. All Contractor's vehicles shall display approved permanent identification of such size and color to allow Government personnel to identify the vehicle.
2.9 FACILITIES.
2.9.1 Utilities.
2.9.1.1 Government Furnished Utilities. All utilities that are required for use in performance of the work under this contract shall be Contractor-furnished.
2.9.1.2 Temporary Utility Connections. All utilities provided by the Government shall be at no cost.
Care shall be exercised in conserving all utilities. The contractor shall at his own expense and in a workman like
SECTION 01 11 00 – Page 7 manner satisfactory to the COR provide all necessary hoses, cords, couplings, plugs, GFI's and other appurtenances as required to connect to the system(s). All temporary connections shall be subject to approval. The location of all power lines and all temporary connections for electricity shall be coordinated with the COR. All temporary circuits and devices shall be provided, connected, and maintained and removed prior to final acceptance. Ground fault protection shall be provided for all circuits used, inside and outside, and shall be Contractor-furnished. The temporary panel shall conform to current NEC standards in EM 385-1-1.
2.9.2 Portable Toilets. Toilet facilities will not be available for Contractor's use. The Contractor shall provide and maintain portable toilets for use by the Contractor and Government staff. Toilet(s) shall be placed at the location directed by the Contracting Officer. To prevent overturning by high winds, all portable toilets shall be anchored down.
2.10 SCAFFOLDING. Any scaffolding, platform, ladder, stairway, or other access schemes proposed to be used shall be submitted for approval, including type, layout, and connections. Approved anti-slip surface material shall be installed on scaffolding platforms. Scaffolding shall comply in every respect with EM 385- 1-1.
2.11 CONTRACTOR’S AREA LIGHTING. There are 2 existing security lights with photo cell sensors at the Stilling Basin that operate automatically at night. The Contractor shall provide any and all additional lighting necessary to perform his work and to provide a safe work environment.
2.12 GOVERNMENT FURNISHED TOOLS AND EQUIPMENT. Government tools and equipment at the project, i.e., lathes, drill presses, hand tools, etc., are not available for use.
2.13 DAMAGED EQUIPMENT OR ABNORMAL CONDITIONS. The Government shall be informed immediately upon finding any damaged equipment or other abnormal conditions involving additional work.The failure or abnormality shall not be disturbed until witnessed by the COR. Prior to proceeding further with work, the Contractor and the Government shall agree in writing as to the responsibility for the damage or abnormality.
2.14 PROTECTION AND RESTORATION OF EXISTING FACILITIES. The Contractor shall be responsible for the protection of the work area from damage. All existing grounds, property and facilities shall be protected whether or not shown on the drawings. Upon completion of the work, all the existing grounds, property and facilities, not included as a portion of the work, shall be left in a condition equal to the original condition prior to the
Costs for repair and restoration of any facilities damaged shall be considered to be incidental to and included in the contract price. All work, storage of materials, and construction plant shall be kept within the limits of the areas assigned.
Prior to construction operations, the Contractor shall confer with the Contracting Officer's representative to determine the proximity of any possible obstructions, pipe or equipment which could be damaged as a result of construction operations. The Contractor will be responsible for the protection of structures from any structural damage during the construction operations. Existing utility lines shall be protected from damage, and if damaged, shall be repaired by the Contractor at no additional expense to the Government. In the event that the Contractor damages any existing utility lines, report thereof shall be made immediately to the Contracting Officer. The Contractor shall protect from damage all manholes, piezometer pipes, movement markers and other dam safety instrumentation in the area of work. The location of these features will be identified by the Contracting Officer and shall be marked by the Contractor prior to starting work. Any damage to these features shall be repaired at the Contractor’s expense.
The Contractor shall perform his own independent investigation and verification of all utilities and dam safety instrumentation within the area of excavation prior to the start of any excavation activities.
At all times the plant and work areas shall be kept in a condition conducive to safety of workmen and the public and neat in appearance. Waste or surplus materials shall not be allowed to accumulate in the construction areas.
2.15 DAILY CLEANUP AND DISPOSAL. All debris resulting from the work, such as waste metalwork, packing cases, scrap lumber, oil and grease, and other debris shall be collected, removed, and disposed of off-site at least once per shift. Disposal shall be in accordance with Federal, State and Local regulations. The location of the
SECTION 01 11 00 – Page 8
Contractor's off-site disposal area and a plan for safe disposal of material shall be approved. The Government's trash cans, dumpsters, etc. shall not be used. Liquid waste shall not be disposed of in Stilling Basin structure drains.