Bid Abstract Pg 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Am0002.pdf | ||
| Fort_George_Advertisement_Drawings_Current_(2).pdf | ||
| Am0001.pdf | ||
| Final_Site_Visit_Q&A_Sheet-.pdf | ||
| Fort_George_Advertisement_Drawings_Current.pdf | ||
| Ft_George_Specs.pdf | ||
| Fort_George_Advertisement_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B. BID SECURITY (Type & Amount)
A B C D. E. F. E. F. E. F. E. F.
ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT
CLIN 0001 Entire Work, Complete for placement of the Breakwater Structure
1,230
Linear Foot
160.00$ $196,800.00 167.00$ $205,410.00 324.00$ $398,520.00
CLIN 0002 Mobilization/Demobilization
Job
$80,000.00 $114,796.00 $20,000.00
CLIN 0003
Entire work, complete, for the hauling and stockpiling of 6,100 Riprap Material 1
Job
$91,500.00 $122,705.00 $115,900.00
CLIN 0004 Spalls Layer Stone
2,460
Metric Ton
55.00$ $135,300.00 70.75$ $174,045.00 61.00$ $150,060.00
CLIN 0005 All Remaining Work
Job
$42,000.00 $175,000.00 $49,800.00
CLIN 0006 Breakwater Structure Opt 1
Linear Foot 170.00$ $68,000.00 125.50$ $50,200.00 324.00$ $129,600.00
CLIN 0007 Spalls Layer Stone Opt 1
Metric Ton 57.00$ $45,600.00 52.75$ $42,200.00 61.00$ $48,800.00
CLIN 0008 Entire work, complete, for the hauling and stockpiling of 2,125 tons Riprap Material 1
Job $31,875.00 $31,906.00 $40,375.00
CLIN 0009 All Remaining Work Opt 1
Job
$19,000.00 $500.00 $10,000.00
CLIN 0010 Entire Work, Complete for placement of the Breakwater Structure opt 2
Linear Foot
180.00$ $54,000.00 125.00$ $37,500.00 324.00$ $97,200.00
CLIN 0011 Spalls Layer Stone Opt 2
Metric Ton 58.00$ $34,800.00 52.75$ $31,650.00 61.00$ $36,600.00
CLIN 0012 Entire work, complete, for the hauling and stockpiling of 1,575 tons Riprap Material 1
Job $23,625.00 $23,648.00 $29,925.00
CLIN 0013 All Remaining Work Opt 2
Job $16,000.00 $500.00 $10,000.00
CLIN 0014 Entire Work, Complete for placement of the Breakwater Structure opt 3 570 Linear Foot 190.00$ $108,300.00 114.00$ $64,980.00 324.00$ $145,800.00
CLIN 0015 Spalls Layer Stone Opt 3
Metric Ton
56.00$ $50,400.00 52.75$ $47,475.00 $61.00 $54,900.00
CLIN 0016 Entire work, complete, for the hauling and stockpiling of 2,4000 tons Riprap Material 1
Job
$36,000.00 $36,035.00 $45,600.00
CLIN 0017 All Remaining Work Opt 3
Job
$28,000.00 $500.00 $10,000.00
TOTAL: $1,061,200.00 $1,159,050.00 $1,393,080.00
Sharpe Enterprises, Inc
B. BID SECURITY (Type & Amount)
20.00%
C. AMENDMENTS ACKNOWLEDGED
20%
NO. 5
A. OFFEROR
NO. 6
A. OFFEROR
NO. 4
RP&H Inc.Moltron Meyer LLC
A. OFFEROR
INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation l PAGES
1. SOLICITATION NUMBER
W9128F19B0001 sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.
4. OFFERS (Continued)
NO. 3
A. OFFEROR
ABSTRACT OF OFFERS -
CONTINUATION SHEET
CONSTRUCTION
2. PROJECT TITLE: Fort George Bank Stabilization, Big Bend
3. CONTRACT ITEMS
Ft. Pierre, SD
C. AMENDMENTS ACKNOWLEDGED
Minneapolis, MN
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
B. BID SECURITY (Type & Amount)
20% B. BID SECURITY (Type & Amount)
20%
Rellance, SD