Bid_Abstract_Pg2.pdf

PDF 129 KB Posted

Attached to
Fort George Bank Stabilization Federal contract opportunity
Solicitation number
W9128F19B0001
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Bid Abstract Pg 2

View the file

Other files for this federal contract opportunity

Other files attached to Fort George Bank Stabilization, newest first.
File Type Posted
Bid_Abstract.pdf PDF
Am0002.pdf PDF
Fort_George_Advertisement_Drawings_Current_(2).pdf PDF
Am0001.pdf PDF
Final_Site_Visit_Q&A_Sheet-.pdf PDF
Fort_George_Advertisement_Drawings_Current.pdf PDF
Ft_George_Specs.pdf PDF
Fort_George_Advertisement_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B. BID SECURITY (Type & Amount)

A B C D. E. F. E. F. E. F. E. F.

ITEM # DESCRIPTION EST. QTY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

CLIN 0001 Entire Work, Complete for placement of the Breakwater Structure

1,230

Linear Foot

160.00$ $196,800.00 167.00$ $205,410.00 324.00$ $398,520.00

CLIN 0002 Mobilization/Demobilization

Job

$80,000.00 $114,796.00 $20,000.00

CLIN 0003

Entire work, complete, for the hauling and stockpiling of 6,100 Riprap Material 1

Job

$91,500.00 $122,705.00 $115,900.00

CLIN 0004 Spalls Layer Stone

2,460

Metric Ton

55.00$ $135,300.00 70.75$ $174,045.00 61.00$ $150,060.00

CLIN 0005 All Remaining Work

Job

$42,000.00 $175,000.00 $49,800.00

CLIN 0006 Breakwater Structure Opt 1

Linear Foot 170.00$ $68,000.00 125.50$ $50,200.00 324.00$ $129,600.00

CLIN 0007 Spalls Layer Stone Opt 1

Metric Ton 57.00$ $45,600.00 52.75$ $42,200.00 61.00$ $48,800.00

CLIN 0008 Entire work, complete, for the hauling and stockpiling of 2,125 tons Riprap Material 1

Job $31,875.00 $31,906.00 $40,375.00

CLIN 0009 All Remaining Work Opt 1

Job

$19,000.00 $500.00 $10,000.00

CLIN 0010 Entire Work, Complete for placement of the Breakwater Structure opt 2

Linear Foot

180.00$ $54,000.00 125.00$ $37,500.00 324.00$ $97,200.00

CLIN 0011 Spalls Layer Stone Opt 2

Metric Ton 58.00$ $34,800.00 52.75$ $31,650.00 61.00$ $36,600.00

CLIN 0012 Entire work, complete, for the hauling and stockpiling of 1,575 tons Riprap Material 1

Job $23,625.00 $23,648.00 $29,925.00

CLIN 0013 All Remaining Work Opt 2

Job $16,000.00 $500.00 $10,000.00

CLIN 0014 Entire Work, Complete for placement of the Breakwater Structure opt 3 570 Linear Foot 190.00$ $108,300.00 114.00$ $64,980.00 324.00$ $145,800.00

CLIN 0015 Spalls Layer Stone Opt 3

Metric Ton

56.00$ $50,400.00 52.75$ $47,475.00 $61.00 $54,900.00

CLIN 0016 Entire work, complete, for the hauling and stockpiling of 2,4000 tons Riprap Material 1

Job

$36,000.00 $36,035.00 $45,600.00

CLIN 0017 All Remaining Work Opt 3

Job

$28,000.00 $500.00 $10,000.00

TOTAL: $1,061,200.00 $1,159,050.00 $1,393,080.00

Sharpe Enterprises, Inc

B. BID SECURITY (Type & Amount)

20.00%

C. AMENDMENTS ACKNOWLEDGED

20%

NO. 5

A. OFFEROR

NO. 6

A. OFFEROR

NO. 4

RP&H Inc.Moltron Meyer LLC

A. OFFEROR

INSTRUCTIONS: Attach this form to Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation l PAGES

1. SOLICITATION NUMBER

W9128F19B0001 sheet will accommodate 24 contract items to conform the number of items which can be entered . Use additional forms and continuation sheets as needed.

4. OFFERS (Continued)

NO. 3

A. OFFEROR

ABSTRACT OF OFFERS -

CONTINUATION SHEET

CONSTRUCTION

2. PROJECT TITLE: Fort George Bank Stabilization, Big Bend

3. CONTRACT ITEMS

Ft. Pierre, SD

C. AMENDMENTS ACKNOWLEDGED

Minneapolis, MN

C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

B. BID SECURITY (Type & Amount)

20% B. BID SECURITY (Type & Amount)