Bid Abstract Pg1

View the file

Other files for this federal contract opportunity

Other files attached to Fort George Bank Stabilization, newest first.
File Type Posted
Bid_Abstract_Pg2.pdf PDF
Fort_George_Advertisement_Drawings_Current_(2).pdf PDF
Am0002.pdf PDF
Am0001.pdf PDF
Final_Site_Visit_Q&A_Sheet-.pdf PDF
Fort_George_Advertisement_Drawings_Current.pdf PDF
Ft_George_Specs.pdf PDF
Fort_George_Advertisement_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED

I CERTIFY THAT I HAVE OPENED, READ AND

AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE DATE SIGNED

19-Dec-18

X C. REASONABLE CONTRACT

7A 7B 7C D. E. F.

ITEM # DESCRIPTION OF OFFER ITEM EST. QUANTITY UNIT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT UNIT PRICE ESTIMATED AMOUNT

Basic Items

CLIN 0001 Entire Work, Complete for placement of the Breakwater Structure

1,230

Linear Foot

$82.73 $101,761.00 14.00$ $17,220.00 110.00$ $135,300.00

CLIN 0002 Mobilization/Demobilization

Job

$28,334.00 $130,000.00 $57,500

CLIN 0003 Entire work, complete, for the hauling and stockpiling of 6,100 Riprap Material 1

Job

$121,144.00 $95,600.00 $112,850.00

CLIN 0004 Spalls Layer Stone 2,460

Metric Ton 87.55$ $215,377.00 21.00$ $51,660.00 55.00$ $135,300.00

CLIN 0005 All Remaining Work

Job $32,896.00 $125,000.00 $30,000.00

CLIN 0006 Breakwater Structure Opt 1

Linear Foot 82.73$ $33,092.00 14.00$ $5,600.00 110.00$ $44,000.00

CLIN 0007 Spalls Layer Stone Opt 1

Metric Ton 87.55$ $70,042.00 211.00$ $16,800.00 55.00$ $44,000.00

CLIN 0008 Entire work, complete, for the hauling and stockpiling of 2,125 tons Riprap Material 1

Job $76,484.00 $23,750.00 $39,312.50

CLIN 0009 All Remaining Work Opt 1

Job $32,896.00 $10,000.00 $5,000.00

CLIN 0010 Entire Work, Complete for placement of the Breakwater Structure opt 2

Linear Foot 82.73$ $24,819.00 14.00$ $4,200.00 110.00$ $33,000.00

CLIN 0011 Spalls Layer Stone Opt 2

Metric Ton 87.55$ $52,531.00 21.00$ $12,600.00 55.00$ $33,000.00

CLIN 0012 Entire work, complete, for the hauling and stockpiling of 1,575 tons Riprap Material 1

Job $70,305.00 $10,870.00 $29,137.50

CLIN 0013 All Remaining Work Opt 2

Job $32,896.00 $12,200.00 $5,000.00

CLIN 0014 Entire Work, Complete for placement of the Breakwater Structure opt 3

Linear Foot $47,156.00 14.00$ $7,980.00 110.00$ $62,700.00

CLIN 0015 Spalls Layer Stone Opt 3

Metric Ton 87.55$ $99,809.00 21.00$ $18,900.00 55.00$ $49,500.00

CLIN 0016 Entire work, complete, for the hauling and stockpiling of 2,4000 tons Riprap Material 1

Job $79,574.00 $31,000.00 $44,400.00

CLIN 0017 All Remaining Work Opt 3

Job $32,896.00 $10,000.00 $5,000.00

TOTAL 1,152,012.00$ 583,380.00$ 865,000.00$

OMAHA, NE 68102-1618

1616 CAPITOL AVENUE

CONTRACTING DIVISION (CENWO-CT)

US ARMY CORPS OF ENGINEERS

l PAGES

9. OFFERS

TO THIS SOLICITATION

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type) Lee McCormick - Contracting Officer/ Timothy Boyte - Contracting Specialist

NO. 1 NO. 2

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

W9128F19B0001

4. ISSUING OFFICE

8. GOVERNMENT ESTIMATE

(Check A, B or C AND COMPLETE D, E AND F)

5. PROJECT TITLE

(Without Profit)

(Including Profit)

A. OFFEROR A. OFFEROR

Purvis, MS Pierre, SD

A. HIRED LABOR

IGE Trans 4 Fed Morris, Inc

B. REASONABLE CONTRACT

Bid Security 20%

C. AMENDMENTS ACKNOWLEDGED 2

Bid Security 20%

C. AMENDMENTS ACKNOWLEDGED 2

6. NUMBER OF AMENDMENTS ISSUED 2

Fort George Bank Stabilization, Big Bend